My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT WATER SYSTEM
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
02/06/2018
>
25E - AGMT WATER SYSTEM
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 7:02:51 PM
Creation date
2/1/2018 7:10:53 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
2/6/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
,dkENTERPRISE <br />AUTOMATION <br />Enterprise Automation <br />210 Goddard Irvine CA 92618 USA <br />Tel 949-769-6000 Fax 949-7696005 <br />w .eainteamtoccom <br />EA's oversight of the entire development, testing and commissioning process is <br />essential to ensure that commissioning of the plant controls is as short as possible <br />and that the City is provided with the functionality they have requested. <br />In ENS opinion, the allowance of 20 hours is insufficient to protect the City. <br />Depending on the capability and diligence of the PLC.programmer 40 to 120 hours <br />is more realistic. [Me aMdonale86rtie&o—tincluded inFee P"pamg <br />Key Deliverables <br />Client requested: <br />a) Panel FAT documentation and signroff <br />b) Control system FAT documentation and sign -off <br />c) Commissioning/SAT documentation and sign -off <br />AdMilnualeoope (value add? <br />a) Programming specifications (included in the fee proposal) <br />7.7 Source control <br />The RFP requires the selected integrator to implement, manage, and,maintain a <br />source control system for the City. EA has already implemented a VisualSVN <br />source control system for existing City projects. <br />As part of the scope of this project, EA will collect:programs from the City's PLCs, <br />develop procedures for the system's use and maintenance, and will provide copies <br />of relevant configurations when a check-in/out request is made <br />7.7.1 PLC program collection <br />As requested in the RFP, a.budget has been included to collect configurations from <br />the City's 45 PLCs. <br />This budget has been allocated under the assumption that programs are accessible <br />(not password locked or passwords are on hand), and that we have support from <br />the City whilst collecting to programs. EA has also assumed that the 45 PLCs are <br />located at approximately 30 sites, and has provided an allowance of 80 hours to <br />collect all programs. <br />EA will organize and check-in the collected configurations to the existing source <br />control system. <br />Other configurations such as: <br />1. Dynac <br />2. Switches <br />3. Firewalls <br />Client City of Santa Ana Revision: 1.0.0 <br />Document Response to RFP 17-112 Date: 1 112 112 01 7 <br />Section: Scope of Services & Schedule Page Number 21 of 01 <br />25E-33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.