Laserfiche WebLink
ENTERPRISE <br />AUTOMATION <br />10 Schedule <br />Enterprise Automation <br />210 Goddard Irvine CA 92618 USA <br />T61949-769-6000 Fax 949-769-600$ <br />www.eainteorator=E! <br />The Gantt chart on the following pages represents an estimated schedule for <br />executing only the deliverables included in this scope of work and associated Fee <br />Proposal. <br />Note: <br />• An estimated NTP date of 1/2/2018 has been assumed <br />• Source Control and Change Control design and implementation will begin <br />immediately. Following completion of implementation, a maintenance task <br />for each system (check-in/out requests and change control requests) carries <br />on through the end of the three year contract. <br />• The schedule considers the four Pressure Reducing Valve Stations as one <br />"Site" and tasks for all four sites will be executed simultaneously <br />• The schedule for each site assumes a six month construction phase. <br />a) Gaps have been added between Functional Specification Development <br />and Testing Documentation Development, and Testing Documentation <br />Development and Testing & On-site Support to allow for City <br />Contractor and Programmer activities: <br />• These gap's are estimates only. We assume they will be <br />extended or contracted depending on contractor/programmer <br />management effort, ability to correctly use EA supplied design <br />documentation, overall organization, and other conditions <br />outside of EA's control. <br />Client: City of Sante Ana Revision: 1..0.0 <br />Document Response to RFP 17-112 Date: 11/21/2017 <br />Section: Scone ofSemices & Schedule Pae Number 29 of 31 <br />25E-41 <br />