Laserfiche WebLink
V-0 LTA IC <br />Project M:73 -727A <br />Corporate Yard — General Parking <br />Location: 215 South Daisy. Avenue <br />Santa Ana, CA 92703 <br />NJPA #: 051017 -CPI <br />CHARGING UNIT MOUNTINGTYPE(5): WALL <br />TOTAL ii OF PARKING FOR EV: Two (2) <br />Price Breakdown: <br />Electrical/Construction, Labor and Material $16,393.00 <br />EVCS Unit(s) and Service(s) $6,848.00 <br />Total Price: $17,241.00 (tax included) <br />Electrical/Construction. Labor and Material Includes: <br />Proposal consists of project management and site planning, engineering and designing for any necessary <br />permit acquisitions. <br />o Permit acquisitions also include the plan checking, and Inspection processes (not Including <br />actual plan check fee, permitting and/or inspection fees) as required by the,authorities having <br />jurisdiction. <br />Perform Site Validation survey (SVS) as required by ChargePoint, Inc. prior to activation of units. SVS_ fee <br />to ChargePoint, Inc. discounted when using ChargePoint, Inc. Certified Installers. <br />o Standard electrical power consistency evaluation: circuit breaker and electrical panel evaluation. <br />o Cellular network communications test: test for consistency of cellular signal strength. <br />o Charging station evaluation: consistent voltage, amperage, ground, network communication. <br />ELECTRICAL EQUIPMENT UPGRADE <br />• None. <br />o Use two (2) available spares in existing electrical panel "PA" <br />CHARGING UNIT INSTALLATION <br />Installation and commissioning of one (1) charging unit to meet'NEC requirements. <br />Supply and installation of one (1) 40A circuit breakers for EVCS overcurrent protection. <br />o Utilization of existing electrical panels to supply one (1) 30A circuit to new charging unit. <br />o From the electrical panel(s) to new charging stations, the new electrical conductors: #6 and #10 <br />ground wires. <br />-3- <br />Video Voice Data Communications I Voltaic Division ) 12681 Pala Drive, Garden Grove, CA 92841 Print Date: Januar- 17,201 -8- <br />75A -20 <br />7,2018 <br />75A-20 <br />