My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH ELECTRIC VEHICLE FEE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
02/06/2018
>
75A - PH ELECTRIC VEHICLE FEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 7:04:35 PM
Creation date
2/1/2018 7:10:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
75A
Date
2/6/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�OLTAIC <br />Project #:73-727.4 <br />• Forming and pouring of concrete pad of dimensions per manufacturer's specifications for charging unit <br />structural support. <br />PROVISIONS FOR FUTURE GROWTH <br />• None <br />PARKING MODIFICATIONS <br />• Stenciling/marking "EV CHARGING ONLY" for two (2) EV parking spaces. <br />• Supply and mounting of two (2) EV parking signs on existing post. (Repositioning of sign post if required) <br />RELATED CONSTRUCTION WORK <br />• Core drilling. <br />• Placement of EMT, approximately+180'. <br />• Trenching and/or pneumatic boring, approximately+20'. <br />• Concrete work (demolition and repair) for pneumatic boring window cut. <br />• Concrete work for EV structural pad. <br />INITIAL$ DATE <br />-]- <br />Video Voice Data Communications I Voltaic Division i 12681 Pala Drive, Garden Grove, CA 92841 'Print Dare: Januar• 17, 2018 <br />75A-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.