Laserfiche WebLink
�OLTAIC <br />Project #:73-727.4 <br />• Forming and pouring of concrete pad of dimensions per manufacturer's specifications for charging unit <br />structural support. <br />PROVISIONS FOR FUTURE GROWTH <br />• None <br />PARKING MODIFICATIONS <br />• Stenciling/marking "EV CHARGING ONLY" for two (2) EV parking spaces. <br />• Supply and mounting of two (2) EV parking signs on existing post. (Repositioning of sign post if required) <br />RELATED CONSTRUCTION WORK <br />• Core drilling. <br />• Placement of EMT, approximately+180'. <br />• Trenching and/or pneumatic boring, approximately+20'. <br />• Concrete work (demolition and repair) for pneumatic boring window cut. <br />• Concrete work for EV structural pad. <br />INITIAL$ DATE <br />-]- <br />Video Voice Data Communications I Voltaic Division i 12681 Pala Drive, Garden Grove, CA 92841 'Print Dare: Januar• 17, 2018 <br />75A-24 <br />