My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75A - PH ELECTRIC VEHICLE FEE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
02/06/2018
>
75A - PH ELECTRIC VEHICLE FEE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2018 7:04:35 PM
Creation date
2/1/2018 7:10:55 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
75A
Date
2/6/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VOLTAIC <br />Project #:73-727.4 <br />Santa Ana Zoo <br />Location: 1801 East Chestnut Avenue <br />Santa Ana,,CA 92701 <br />NJPA #: 051017 -CPI <br />CHARGING UNIT MOUNTING TYPEIS): BOLLARD <br />TOTAL# OF PARKING FOR EV: TWO (2) <br />Price Breakdown: <br />Electrical/Construction, Labor and Material $17,295.00 <br />EVCS Unit(s) and Service(s) $7,355.00 <br />Total Price; $24,650.00 (tax included) <br />Electrical/Construction. Labor and Material Includes: <br />• Proposal consists of project management and site planning, engineering and designing for any necessary <br />permit acquisitions. <br />o Permit acquisitions also include the plan checking, and inspection processes (not including <br />actual plan check fee, permitting and/or inspection fees) as required by the authorities having <br />jurisdiction. <br />• Perform Site Validation survey (SVS) as required by ChargePoint, Inc. priorto activation of units. SVS fee <br />to ChargePoint, Inc. discounted when using ChargePoint, Inc. Certified Installers. <br />o Standard electrical power consistency evaluation: circuit breaker and electrical panel evaluation. <br />o Cellular network communications test: test for consistency of cellular signal strength. <br />o Charging station evaluation: consistent voltage, amperage, ground, network communication. <br />ELECTRICAL EQUIPMENT UPGRADE <br />Supply and installation of new 125A electrical panel for EV charging units. Materials and installation to <br />meet NEC, building department requirements, and if enforced, by building department. <br />o Concrete. structural work for new electrical panel to be located outdoors. <br />CHARGING UNIT INSTALLATION <br />Installation and commissioning of one (1) charging unit to meet NEC requirements <br />Supply and installation of two (2) 40A circuit breakers for EVCS overcurrent protection. <br />o Utilization of new electrical panel to supply two (2) 30A circuits to new charging unit. <br />o From the electrical panel(s) to new charging stations, the new electrical conductors: #8 and #10 <br />ground wires. <br />-15- <br />Video Voice Da[a Communications (Voltaic Division 112651 Pala Drive, Garden Grove, CA 92841 Pdnt nate: January ti, 2018 <br />75A-32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.