Laserfiche WebLink
Project #:73-727.4 <br />o From the electrical panel(s) to new charging station, the new electrical conductors: #8 and #10 <br />ground wires. <br />• Forming and pouring of concrete pad of dimensions per manufacturers specifications for charging unit <br />structural support. <br />PROVISIONS FOR FUTURE GROWTH <br />+ None. <br />PARKING MODIFICATIONS <br />• Supply and mounting of two (2) concrete -incased sign posts with EV parking signage. <br />• Stenciling/marking "EV CHARGING ONLY" for two (2) EV parking spaces. <br />RELATED CONSTRUCTION WORK <br />• Trenching and/or pneumatic boring, approximately+45' <br />• Concrete (demolition and repair) <br />• Concrete X-ray imaging services <br />INITIALS DATE <br />•19- ; <br />Video Voice Data Communications I Voltaic Division 112681, Pala Drive, Garden Grove, CA 92541 a Prim Date; lanuaq 17,2078 <br />75A-36 <br />