Laserfiche WebLink
�V7V I C <br />Santa Ana Regional Transportation Center <br />Location: 1000 Santa Ana Blvd <br />Santa Ana, CA 92701 <br />N1PA #: 051017-cPl <br />CHARGING UNIT MOUNNNGTYPE(S)! BOLLARD <br />TOTAL# OF PARKING FOR EV: Two (2) <br />Price Breakdown: <br />Electrical/Construction, Labor and Material $7,443.00 <br />EVCS Uhit(s) and Service(s) $7,355.00 <br />Total Price: $14,798.00 (tax included) <br />Electrical/Construction. Labor and Material Includes: <br />Project #:73-727.4 <br />Perform Site Validation survey (SVS) as required by ChargePoint, Inc. prior to activation of units. SVS fee <br />to ChargePoint, Inc. on <br />when using ChargePoint, Inc. Certified Installers. <br />o Standard electrical power consistency evaluation: circuit breaker and electrical panel evaluation. <br />o Cellular network communications test: test for consistency of cellular signal strength. <br />o Charging station evaluation: consistent voltage, amperage, ground, network communication. <br />ELECTRICAL EQUIPMENT UPGRADE <br />• None <br />o Using existing house meter panel located outdoor. <br />CHARGING UNIT INSTALLATION <br />Installation and commissioning of one (1) charging unit to meet NEC requirements <br />Use existing 40A circuit breaker for EVCS'overcurrent protection. <br />o Utilization of existing electrical panel to supply 30A circuits to new charging unit. <br />o From the electrical panel(s) to new charging stations, the new electrical conductors: #6 and #10 <br />ground wires. <br />PROVISIONS FOR FUTURE GROWTH <br />• None. <br />-21- <br />Video Voice Data Communications I Voltaic Division 112681 Pala Drive, Garden Grove, CA 92841 Print bate: January 17, 2018 <br />75A-38 <br />