My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT TRAFFIC SIGNAL SYNC FAIRVIEW
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
02/20/2018
>
25C - AGMT TRAFFIC SIGNAL SYNC FAIRVIEW
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2018 5:57:28 PM
Creation date
2/15/2018 5:52:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25C
Date
2/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(1) additional one (1) year period upon the mutual consent of both parties. <br />2. SCOPE OF PROJECT <br />a. The PROJECT will include improvement at thirty-four (34) traffic signals along <br />Fairview Road as listed in the Scope of Work, attached hereto as Exhibit A <br />and incorporated herein by this reference. <br />b. The PROJECT will include hardware and software upgrades to traffic <br />controllers, traffic telecommunications, master controllers and associated <br />systems (hereinafter collectively referred to as "Traffic Control Elements"), <br />and these Traffic Control Elements will be constructed and/or installed and <br />implemented as part of the PROJECT as identified in the Scope of Work and <br />the Cost Estimate, attached hereto as Exhibit B and incorporated herein by <br />this reference. <br />3. SHARED RESPONSIBILITIES <br />a. CITIES agree to coordinate the inclusion of other Traffic Control Elements <br />and in-kind services to be integrated during the construction of the PROJECT <br />that are not included in the project application and that the owning city will <br />have the responsibility for verifying and coordinating during the course of the <br />PROJECT. <br />b. CITIES agree to implement the PROJECT based on Exhibits A and B, <br />including a combined cash and in-kind match of Four Hundred Twenty -Three <br />Thousand Seven Hundred Eighty -Eight Dollars ($423;788.00), equivalent to <br />twenty percent (20%) of the PROJECT cost split with the following cost <br />contribution of cash and in-kind services: SANTA ANA, Two Hundred <br />Seventeen Thousand Six Hundred Twelve Dollars ($2TT,612,00) and COSTA <br />MESA, Two Hundred Six Thousand One Hundred Seventy -Six Dollars <br />($206,176.00). The final amount may vary and will be based on the 20% of <br />actual cost of Implementing all timing, improvements, and maintenance, as <br />identified in the project application, <br />c. Upon issuance of a Notice to Proceed to the consultant that is mutually <br />selected through a Request for Proposal, COSTA MESA may issue invoices <br />to SANTA ANA for up to eight percent (80%) of the cash match amount <br />identified in Exhibit A. The remaining cash match amount will be invoiced <br />after the completion of the Primary Implementation Phase of the PROJECT. <br />d. CITIES agree that unused PROJECT funds from one city can be used by the <br />other city (with matching fund responsibility) upon mutual written agreement <br />of CITIES. <br />e. Each city agrees to: <br />2 <br />25C-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.