My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT RECYCLED WATER SYSTEM PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
02/20/2018
>
25A - AGMT RECYCLED WATER SYSTEM PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2018 6:25:16 PM
Creation date
2/15/2018 6:22:32 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25A
Date
2/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t City of Santa Ana Recycled Water Master Plan <br />management requirements and costs will be requirements of these users, a summary <br />determined during development of the of water use data, and the potential <br />Master Plan, recycled water users, <br />We will utilize the OPCC in conjunction with <br />anticipated recycled water demands to <br />provide an estimated unit cost per acre-foot <br />of recycled water. <br />3. Preliminary Costs related to <br />Administration, Maintenance and <br />Ownership <br />The TRHA Team will prepare a preliminary <br />cost estimate for administration, <br />maintenance, and ownership costs of the <br />proposed recycled water system. These <br />estimates will be planning level estimates <br />with a 30 percent contingency. <br />4, identification of Funding Sources <br />and opportunities <br />The TRHA Team will evaluate potential <br />funding sources. The funding sources to be <br />considered shall consist of: <br />• Clean Water State Revolving Fund <br />Loans, <br />• Metropolitan Water District of <br />Southern California Grants, <br />• US Bureau of Reclamation Title XVI <br />and WaterSMART grans, and <br />• Local Bond Issues. <br />B. Deliverables <br />The master plan will generally follow the <br />outline show below. <br />• Section 1 —Introduction <br />The Introduction will consist of project <br />background, a description of the project <br />area, and other information suitable for <br />a person unfamiliar with the City or <br />context of the project to understand the <br />project goals. <br />• Section 2—Anticipated Recycled <br />Water Demands and Users <br />• Section 3— Site Evaluations <br />This will consist of a written narrative <br />and figures. <br />Section 4— Preliminary Recycled <br />Water Piping System, Pump <br />Stations; and Storage Evaluation <br />This will consist of a written narrative <br />and figures depicting the proposed <br />recycled water system. <br />• Section 5 -• Proposed Recycled <br />Water Capital Improvement <br />Projects <br />This will consist of a narrative and <br />figures depicting the phasing of the <br />proposed projects. <br />• Section 6 — Opinion of Probable <br />Construction Costs <br />This will consist of a narrative and tables <br />describing the anticipated engineering <br />and construction costs for the proposed <br />projects. <br />• Section 7 — Coordination and <br />Regulatory Requirements <br />This will consist of a written narrative <br />and tables listing agencies with a stake <br />in the proposed recycled water projects <br />and a list of anticipated permits, <br />• Section 8 — Funding Sources <br />Evaluation <br />This will consist of a written narrative, <br />tables, and figures depicting the results <br />of the financial analysis of the proposed <br />recycled water system. <br />• Appendix A —Water Use Data <br />This appendix will consist of tables <br />detailing the water use data obtained <br />from the City. <br />This will consist of a written narrative Appendix B -- Proposed Recycled <br />and figures describing the different Water System <br />types of recycled water users, the <br />Firm Team, Understanding of Meed and Approach, and Scope of Work Page 92 <br />25A-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.