Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 17-6881 <br />FAIRVIEW STREET PAVEMENT MAINTENANCE <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: All American <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract 'Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />1 <br />Unclassified Excavation <br />10o <br />CY <br />$ 3 <br />3.00 <br />$ <br />, <br />2 <br />Rubberized Emulsion Aggregate Slurry <br />1,100 <br />TN <br />$ e.�, <br />$ G3 7 O <br />(REAS), Type II <br />57�.oa <br />3 <br />Aspahlt Rubber Hot Mix (ARHM) * <br />3,200 <br />TN <br />$ <br />qb 00 <br />$ <br />3aZ,zoo <br />4 <br />Coldmill(2")* <br />244,900 <br />SF <br />$d a5 <br />$ 611225 <br />5 <br />Crack Sealing <br />1 <br />LS <br />$ <br />51,3°o <br />$ <br />S 7, 3 00 <br />6 <br />Remove and Replace PCC Curb Ramp <br />11,200 <br />SF <br />$ (y b $ <br />$ 166'3'2 0 <br />7 <br />Remove and Replace PCC Sidewalk <br />1,500 <br />SF <br />$ 16 'I -I <br />$ 1611 10 <br />8 <br />Adjust Manhole Frame & Cover to <br />2 <br />EA <br />$LIS. °O <br />$ <br />Finished Grade <br />9 <br />Furnish and Install New Water Valve <br />Frame & Cover <br />6 <br />EA <br />$ <br />X17' °O <br />$ <br />5,2 2 <br />to Finished Grade <br />10 <br />Furnish and Install Pull Box #6 and Adjust <br />Grade <br />2 <br />EA <br />$ baa <br />$ <br />51 z a <br />to <br />11 <br />Protection of Surface Utility Frames & <br />1 <br />LS <br />$I�(7',a <br />$ 1 3 a <br />Covers <br />i� <br />12 <br />Install Traffic Loop Type E T <br />60 <br />EA <br />$ ° <br />$ 6 o $ o <br />13 <br />Install Traffic Loop Type D T <br />22 <br />EA <br />$ a%`l, 00 <br />$ 6 l 00 <br />14 <br />Temporary Construction Sign <br />4 <br />EA <br />$$ <br />lizo� <br />`y, SS0n <br />P-1 ofP-16 <br />