My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALFARO COMMUNICATIONS CONSTRUCTION, INC. (CROSSWALK UPGRADES - PHASE I)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ALFARO COMMUNICATIONS CONSTRUCTION, INC. (CROSSWALK UPGRADES - PHASE I)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 5:42:24 PM
Creation date
2/16/2018 10:52:37 AM
Metadata
Fields
Template:
Contracts
Company Name
ALFARO COMMUNICATIONS CONSTRUCTION, INC. (CROSSWALK UPGRADES - PHASE I)
Contract #
15-6831
Agency
Public Works
Council Approval Date
5/16/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT' NO.: 15-6831 <br />CIkOSS%A,'AI.,K UPGRADES - PHASE I <br />F`I'DI,'RAI. PRO.IFCT NO: I ISIN, 5063(155) <br />P-2 of' P-40 <br />Remove all conflicting striping, R.P.M.'s arid/or <br />10 <br />legends and Install new striping Pei plan at the <br />I <br />LS <br />$4,000.00 <br />5 4,000,00 <br />Intersection of Main at Walnut -- Sheet 8 of 1.0 <br />--- <br />Furnish & Install Complete Functioning Carmanah <br />11 <br />RRFB System per Plan at the Intersection of Lyan <br />I <br />LS <br />$16,000.00 <br />$ 16,000.00 <br />at Mark and EUAn ExpMsswqy— Sheet 9 of 10 <br />Remove all conflicting striping, R.P.M,'s and/or <br />J <br />12 <br />legends and Install new striping per plan at the <br />I <br />LS <br />$ 3,000.00 <br />3,000 0 <br />Intersection of <br />Ex �rqssway7 Sheet 9 of 10 <br />Furnish & Install Complete Functioning Carmana--- <br />h <br />13 <br />RRFB System per Plan at the Intersection of Santa <br />I <br />LS <br />$ 12,000.00 <br />$ 12,000.00 <br />Ana at Lacy,—Sheet 10 of 10 <br />Remove all conflicting striping, R.P.M.'s and/or <br />14 <br />legends and Install new striping per plan at the <br />I <br />LS <br />$2,500.00 <br />$ 2,500.00 <br />Intersection of Santa Ana at L Sheet 10 of 10 <br />15 <br />INSTALLSIGN <br />74 <br />EA <br />$ 178.00 <br />$ 13,172.00 <br />16 <br />INSTALL SIGN& POST <br />27 <br />EA <br />$ 293.00 <br />$ 7,911.00 <br />1.7 <br />INSTALL NEW POST <br />4 <br />EA <br />$ 172.00 <br />$ 688.00 <br />18 <br />REMOVE SIGN <br />38 <br />EA <br />$ 35.00 <br />$ 1,330.0 <br />19 <br />REMOVE SIGN & POST <br />5 <br />EA <br />$ 143,00 <br />$ 715.00 <br />20 <br />RELOCATE SIGN <br />5 <br />EA <br />$ 86,00 <br />$ 4:30.00 <br />21 <br />INSTALL SIGN(S) ON MAST ARM <br />8 <br />EA <br />$ 370.00 <br />$2,960,00 <br />22 <br />REMOVE EXISTING SIGN(S) FROM MAST ARM <br />8 <br />EA <br />$ 154.00 <br />$ 1,232.00 <br />23 <br />REMOVE EXISTING VIDEO CAMERAS FROM MAST <br />4 <br />EA <br />$ 206.00 <br />$ 824�00 <br />ARM <br />24 <br />REMOVE EXISTING FLASHING BEACON(S) FROM <br />8 <br />EA <br />$ 206.110 <br />$ <br />MAST ARM <br />1,648.00 <br />25 <br />REMOVE EXISTING TENON(S) FROM MAST ARM <br />8 <br />EA <br />$ 150.00 <br />$ 1,200.00 11 <br />26 <br />REMOVE EXISTING CONTROLLER CABINET FROM <br />2 <br />EA <br />$ 400.00 <br />$ <br />MAST ARM <br />800.00 <br />27 <br />REMOVE EXISTING SOLAR PANEL FROM MAST <br />2 <br />EA <br />300.00 <br />$ <br />ARM <br />600.00 <br />P-2 of' P-40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.