Laserfiche WebLink
KimlepMorn <br />Warner Avenue Street Improvements <br />1/10/2018 <br />Liquefaction Evaluation and Foundation Design: Our team will conduct a geotechnical field <br />review as follows: <br />• One hollow stem auger boring to the depth of approximately 50 feet bgs and two CPT to <br />a maximum depth of 50 feet bgs or refusal <br />• Obtain bulk, Standard Penetration Test (SPT) and Modified California soil samples at <br />selected depths <br />We will compile data and geotechnical analysis of the field and laboratory tests consisting of <br />analyses to evaluate and provide recommendations pertaining to the following: <br />• Grain size distribution and Atterberg Limits/Plasticity Index <br />• Moisture content and dry density <br />• Direct shear and Unconfined compression tests <br />• Consolidation and Swell/Collapse Potential <br />• Liquefaction and settlement analysis based SPT and CPT data <br />• Foundation design criteria for new soundwalls (this is to confirm Caltrans standard plans <br />can be used for the sound wall design) <br />We will prepare a report presenting the results of field exploration, geotechnical laboratory <br />testing, engineering analyses including liquefaction analysis and foundation design, as well as <br />conclusions and recommendations relative to the project. <br />Deliverables: Draft Soil Report, Final Soil Report, 60%, 95%, and 100% Plans, electronic files in <br />Microstation V81 and PDF (final plans will be sealed and signed), and responses to previous <br />review comments from the City <br />Task 21: Construction Support <br />Kimley-Horn will assist the City during the construction phase by responding to the Contractor's <br />RFIs regarding design, and providing clarifications. Changes in the overall design concept are <br />not part of this scope. A 12-month construction duration is assumed. We have included up to 5 <br />RFIs and attending one preconstruction meeting. We will prepare record drawings by updating <br />the approved design drawings based on one set of redline markups provided by the Contractor <br />or City staff. Independent verification is not included in this scope. Significant deviations from <br />the original design documents are not accounted for in this scope. The purpose of the record <br />drawings is to create a deliverable that will represent the built condition for the City's records, as <br />recorded by the Contractor. This scope of work is based on hours provided on our fee schedule. <br />Additional construction support can be provided as needed on hourly rate basis. <br />Deliverables: Record Drawings: One hardcopy and one electronic (PDF format and Microstation <br />V8l) <br />Optional Items <br />Task 1: Community Outreach <br />Kimley-Horn will prepare and attend a total of two community outreach meetings and <br />workshops, one at the 60% and one at 95% design levels to demonstrate and discuss project <br />features. This encompasses a board presentation showing the 60% and 90% level design plans <br />and other related information. <br />8 1 P a g e <br />