My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA WATER MAIN IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
03/06/2018
>
20A - AA WATER MAIN IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2018 7:02:40 PM
Creation date
3/1/2018 6:50:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
3/6/2018
Destruction Year
2023
Document Relationships
MICHELS PIPELINE CONSTRUCTION
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA EXHIBIT 3 <br />CONSTRUCTION CONTRACT <br />PROJECT 15-6447 <br />WEST GROVE VALLEY NEIGHBORHOOD WATER MAIN IMPROVEMENTS <br />This CONSTRUCTION CONTRACT is made and entered into this 6h day of March, 2018 by and <br />between the City of Santa Ana, California, a charter city and municipal corporation organized and <br />existing under the Constitution and laws of the State of California (hereinafter "CITY"), and Michels <br />Pipline Construcion, a divison of Michels Corporation (hereinafter "CONTRACTOR'). <br />WITNESSETH: <br />The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows: <br />CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and <br />expense necessary to construct and complete in a good and workmanlike manner and to the <br />satisfaction of the City Engineer of the CITY, the West Grove Valley Neighborhood Water Main <br />Improvements Project (hereinafter referred to as the "WORK OF IMPROVEMENT') identified in <br />and in accordance with the Contract Documents prepared by the City's Public Works Agency and <br />approved by the City Council. <br />2. The complete Construction Contract consists of the "Contract Documents" as defined by the <br />Standard Specifications for Public Works Construction and which include the following: <br />• Notice Inviting Bids <br />• Information to Bidders <br />• Bid Proposal <br />• Bid Bond <br />• Contract Form <br />• Contract Bonds <br />• General Provisions <br />• Special Provisions <br />• Technical Provisions and Project Plans <br />• Community Workforce Agreement <br />• Appendices <br />In case of conflict between the Contract Documents, the precedence of documents shall be as <br />established in the Standard Specifications for Public Works Construction. <br />3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK,. <br />OF IMPROVEMENT the sum total amount not to exceed Two- Ilion Tliree:.Hundred=BightLy=eig'ht- <br />Thousand, Seventy-six Dollars and No Cents, as set forth and identified in the BID PROPOSAL, <br />which is attached hereto and incorporated herein as Exhibit "A." <br />The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate <br />quantities only, and the City does not expressly or by implication agree that the actual amount of <br />work will correspond therewith, but reserves the right to increase or decrease the amount of any <br />class or portion of the work or to omit portions of the work as may be deemed necessary or <br />advisable. <br />rev. 09/01/2017 20A-35 Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.