My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA WATER MAIN IMPROV
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
03/06/2018
>
20A - AA WATER MAIN IMPROV
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2018 7:02:40 PM
Creation date
3/1/2018 6:50:34 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
3/6/2018
Destruction Year
2023
Document Relationships
MICHELS PIPELINE CONSTRUCTION
(Message)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.; 15-6447 <br />WEST GROVE VALLEY NEIGHBORHOOD WATER MAIN IMPROVEMENTS <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14* <br />Repair Sidewalk per City Standard <br />2,000 <br />SF <br />$ <br />$ <br />Drawing 1104 <br />i 6 0 <br />�a d 0 <br />15* <br />Imported Backfill Material <br />500 <br />CY <br />$ <br />$ I t �Gb <br />r <br />16* <br />1" Combination Air Valve Assembly per <br />City Standard Drawing 1415 <br />6 <br />EA <br />$u <br />a <br />$ <br />a �, a <br />I t i1 �7 <br />tl7* <br />Slurry Seal Entire Street Width along <br />Pipeline Alignment with REAS Type 11 <br />220 <br />TN <br />$�G <br />$ <br />I i g0D <br />Ca <br />/ <br />18 <br />Bollards & Appurtenances <br />2 <br />EA <br />$1,000 <br />$2,000 <br />TOTAL BASE BID (Items 1-17) <br />$ <br />The quantity for this bid item is shown for bid comparison only. Thus bid item shall riot be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />t This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount <br />shown above, within one -hundred and thirty five (135) working days after the commencement <br />date stated in the Notice to Proceed. <br />• 15 —Working days for exploratory potholing and data gathering <br />• 120 —Working days for project construction <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the <br />Standard Specifications, shall be $2,000 per calendar day. <br />Name of Firm Michels Pipeline Construction, a division of Michels Corporation <br />Signature of BIDDER Kyle Melcher <br />Title General Manager <br />(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of <br />all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />P-2 of P-16 <br />20A-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.