My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT WATER ALTERNATIVE STUDY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
03/06/2018
>
25A - AGMT WATER ALTERNATIVE STUDY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2018 7:04:18 PM
Creation date
3/1/2018 6:50:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25A
Date
3/6/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Proposal No. 2669.01 Water Enterprise Alternative Energy Feasibility Study 1-21. <br />SCHEDULE <br />A detailed schedule based on the Scope of Services contained in the RFP Is provided below In Section Two. NAM <br />Is prepared to provide the resources required to complete all of the scoped work in as timely a manner as <br />possible. NAM strives to continually meet client expectations by giving its employee's the bandwidth to address <br />project scope and timelines. NAM's current work load will not prevent any part of the scope work to be fully <br />addresses within the proposed schedule. <br />Copyright ©Newcomb Anderson McCormick 2017 <br />25A-35 <br />CITY OF SANTA ANA <br />• <br />SANBAG <br />Preliminary feasibility studies for over 30 MW <br />2012 <br />Duane Baker <br />of PV systems at various San Bernardino <br />(909) 884-8276 <br />County locations <br />Santa Clara USD <br />Feasibility study, procurement and <br />2013 <br />Larry Adams <br />Installation support for 2.8 MW PV system <br />(408) 423-2001 <br />UH Manba <br />Feasibility study, procurement and <br />2014 <br />Steve Mader <br />nstallation support for 4,8 MW PV system <br />808) 956-8018 <br />UN System PV <br />Feasibility study for 70 MW PV system <br />2012 <br />Steve Mader <br />Plant <br />(808) 956-8018 <br />Washington USD <br />Feasibility study, procurement and <br />2013 <br />Scott Lantsberger <br />installation support for 2.5 MW PV system <br />(916) 375.7604 x1010 <br />Yolo County <br />Feasibility study, procurement and <br />2013 <br />Terry Vernon <br />installation support for 2.5 MW PV system <br />(530) 666-8066 <br />SCHEDULE <br />A detailed schedule based on the Scope of Services contained in the RFP Is provided below In Section Two. NAM <br />Is prepared to provide the resources required to complete all of the scoped work in as timely a manner as <br />possible. NAM strives to continually meet client expectations by giving its employee's the bandwidth to address <br />project scope and timelines. NAM's current work load will not prevent any part of the scope work to be fully <br />addresses within the proposed schedule. <br />Copyright ©Newcomb Anderson McCormick 2017 <br />25A-35 <br />CITY OF SANTA ANA <br />
The URL can be used to link to this page
Your browser does not support the video tag.