My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25A - AGMT WATER ALTERNATIVE STUDY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
03/06/2018
>
25A - AGMT WATER ALTERNATIVE STUDY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2018 7:04:18 PM
Creation date
3/1/2018 6:50:50 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25A
Date
3/6/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B , <br />Newcomb � Anderson j McCormick <br />cneoar mxr„acv xnxe -.nu co„o."u,r�n <br />1191201$ <br />Newcomb Anderson McCormickproposesthe following tasks to support the City of Santa Ana, We propose to act as the "solar owner's representative", <br />coordinating our work with City staff. The tasks described below will ensure the City has access to the expertise required to determine the feasibility of the <br />solar and other energy saving projects, <br />"1 a lead role; 2 = Support role <br />"Direct Costs to be billed at cost without markup <br />"Includes NAM sub consultants <br />Copyright 2018 Newcomb Anderson McCormick <br />25A-50 <br />Page 1 of 1 <br />MRN,' � �� VAN <br />� <br />Usk <br />Gather site and utility data from:.. <br />=20 Water Wells <br />-7 Water Booster Stations. <br />- 2 Sanitary Sewer Lift Stations <br />2 <br />1 <br />72 <br />$12,600 <br />-29 Main Electric Loads <br />Evaluate historical energy consumption <br />Understand Enterprise Operations <br />Evaluate renewable energy resource <br />Discuss technologies, advantages/disadvantages; & constraints <br />1 <br />2 <br />32 <br />$5,600 <br />Provided detailed recommendations on most suitable technologies <br />Investigate improvement to buildings to Increase energy efficiency <br />1 <br />2 <br />AO <br />$7,000 <br />Business Case Development, Including: <br />Solar Feasibility <br />• Utility Costs <br />• Capital Costs <br />• Operation and Maintenance Costs <br />1 <br />2 <br />72 <br />$12,600 <br />-Available grants, incentives credits, etc, <br />• Excess power generation potential <br />• Environmental Considerations <br />Identify Renewable Energy Implementation Opportunities, Including: <br />• Best suites suited for alternativeenergy development <br />-Estimate cost of installation <br />1 <br />2 <br />AO <br />$7,000 <br />- Potential funding sources <br />-. Estimate. ROI <br />-Carbon Dioxide savings <br />Next Step Recommendations <br />1 <br />2 <br />20 <br />:$3,500 <br />Deliverable Creation <br />1 <br />2 <br />36 <br />.$6,300 <br />Support. City deeision-making <br />116 <br />:$2;600 <br />Direct Costs" <br />Travel expenses, conference calls <br />nla-$2,000 <br />TOTAL”" <br />326 <br />$5g,A00 <br />"1 a lead role; 2 = Support role <br />"Direct Costs to be billed at cost without markup <br />"Includes NAM sub consultants <br />Copyright 2018 Newcomb Anderson McCormick <br />25A-50 <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.