My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-03-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
03/06/2018
>
FULL PACKET_2018-03-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 9:34:31 AM
Creation date
3/5/2018 9:12:08 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
3/6/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
454
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAYOR <br />Miguel A. Pulldo <br />MAYOR PRO TEM <br />Michele Martinez <br />COUNCILMEMBERS <br />P. David Benavides <br />Vicente Sarmlento <br />Jose Solorio <br />'Sal Tinaiero <br />Juan Villegas <br />December 6, 2017 <br />ADDENDUM T) TREE <br />CITY OF SANTA ANA <br />20 Civic Center Plaza • P:O. Box 1988 <br />Santa Ana, California 92702 <br />714-647-6900 <br />WW W.santa-ana org <br />CITY MANAGER <br />Raul Godinez II <br />CITY ATTORNEY <br />Sonia R. Carvalho <br />CLERK OF THE COUNCIL <br />Maria D. Huizar <br />SUBJECT:- PROJECT NO. 154447: WEST CROVE VALLEY NEIGHBORHOOD WATER <br />MAIN IMPROVEMENTS <br />WATER MAIN POLYVINYLCHLORIDE (PVC) PRESSURE CLASS - CLARIFICATION: <br />:Contract Specifications; <br />Section 7.10 Polyvinyl Chloride (PVC) Water Main and Appurtenances <br />Page 51; Third paragraph, first sentence <br />READS: <br />Tlus work shall include constructing AW WA C900-97, Class 235 DR14, PVC Water Main, and <br />appurtenances complete and in place, of,the size and class, and to the alignment and grade as indicated on <br />the plans. <br />MODIFY: <br />This work shall include.constructing AW WA C900-16 "Polyvinyl Chloride (PVC) Pressure Pipe and <br />Fabricated Fittings", Class 305 DR14, PVC Water Main, and appurtenances complete and in place, of the <br />size and class, and to the alignment and grade as indicated on the plans. <br />Contract Specifications and Construction Engineering Plans and City of Santa Ana Standard Plans <br />There is a pressure pipe class clarification throughout the documents. See items below <br />• Bid Proposal <br />Page P-1 of P-16; Bid Item Nos. 2 and 3 <br />• Definition of Bid Items <br />Page I of 4; Bid Item No. 2 and No. 3 <br />• Engineering Construction Plans <br />Construction Notes I and 2 (All sheets) <br />• City of Santa Ana Std. Plans (Water); 1400-1442 <br />READS: <br />(Class 235) and or Class 200 <br />REPLACE WITH: <br />(Class 305, DR 14) <br />I oft <br />SANTA ANA CITY COUNCIL <br />Uguel A. NO& <br />Kichela Martinez <br />vicenle sa ndenlo Jose Sdado <br />P. David eena does <br />Juan Villegas <br />Sal Tinajero <br />Wpr <br />Mayor Pro Tan, Ward 2 <br />Ward a WaN 3 <br />Ward 4 <br />Ward 5 <br />Ward 6 <br />mDWldoTsanla-ma ora <br />mlmartineziilsantaana era <br />ysarmlenloG2sanla�ana ora rio sa a=a dhenavldeiussnnta-ana.aro <br />ivilleaasissnta-ana ara <br />5fna[erNolsantamna 0ro <br />O <br />
The URL can be used to link to this page
Your browser does not support the video tag.