My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LOS ANGELES ENGINEERING, INC.,
Clerk
>
Contracts / Agreements
>
PROJECTS
>
LOS ANGELES ENGINEERING, INC.,
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/5/2018 11:48:48 AM
Creation date
3/5/2018 11:34:49 AM
Metadata
Fields
Template:
Contracts
Company Name
LOS ANGELES ENGINEERING, INC.,
Contract #
Various
Agency
Public Works
Council Approval Date
6/20/2017
Document Relationships
23A - CONTRACT CONSTRUCTION OF BRISTOL ST IMPROV, WATER MAIN AND SEWER MAIN IMPROV
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2017\06/20/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />CITY 01F SANTA. ANA A00ENDUM ONE <br />PROPOSAL <br />PROJECT NO. 116740: BRISTOL STREET IMPROVEMENTS AND WIDENING FROM. <br />WASHINGTON AVENUE TO 17r1'f STP FET <br />PROJECT NO. 17-6472: BRISTOL STREET WATER MAIN IMPROVEMENTS FROM <br />WASHINGTONAVENUE TO 1.7"'i'[STREET <br />PROJECT NO. 17-6473: BRISTOL STREET SEWER MAIN IMPROVEMENTS FROM <br />WASHINGTON AVENUE TO 11"" STREET <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Las Angeles Englrieering, Inc, <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with <br />said plans (if any) and the specifications for the unlit price(s) or lump sum(s) set forth in the <br />following schedule: <br />Itern <br />Description <br />Qty <br />ITnit <br />UnitPr'ioe <br />Amount <br />PROJECT '11.6740 STRE'.ET T ti[PROVENWNTS A.ND WIDLNING <br />1. <br />Unelassi Tied Excavation <br />6,540 <br />Cly <br />$ - <br />$ «� <br />04)ob ., <br />2, <br />Clearing nod Grubbing <br />! <br />_ <br />LS <br />$ <br />d,� <br />A.0 Pavement <br />9,310 <br />TN <br />$ -- <br />$ <br />4. <br />Co[dMi11(1"} <br />16,200 <br />SF <br />$--,........-..�.. <br />$ <br />S. <br />Cold Mill (3") <br />51,700 <br />$F <br />$ <br />$ ._..-.... <br />t7,`7C�XS� <br />6. <br />Asphalt Rubber Flot Mix (ARHM) <br />2,100 <br />TN <br />$ <br />$ <br />7. <br />PCCSidewall<(4") <br />24,404 <br />SF <br />$ <br />$� <br />('P <br />1 i'EQa <br />e, <br />PCC Driveway Approach (Commercial =8") <br />1,500 <br />Si' <br />$ <br />$ <br />11' <br />9. <br />PCC Curb Ramp <br />1,400 <br />SF <br />$ <br />10? <br />PCC Curb and Gutter (Type A-2-8) <br />1,900 <br />LF <br />$ <br />1 <br />3 fa0u' <br />11. <br />PCC Curb and Gutter (Type B-1) <br />3,600 <br />LF <br />$ <br />$ <br />P-1 of P-22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.