My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENTERPRISE AUTOMATION (2)-2018
Clerk
>
Contracts / Agreements
>
E
>
ENTERPRISE AUTOMATION (2)-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2019 6:18:25 PM
Creation date
3/12/2018 11:07:46 AM
Metadata
Fields
Template:
Contracts
Company Name
ENTERPRISE AUTOMATION
Contract #
A-2018-024
Agency
PUBLIC WORKS
Council Approval Date
2/6/2018
Expiration Date
5/5/2021
Insurance Exp Date
11/13/2019
Destruction Year
2026
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ENTERPRISE <br />Au -6 N AT10N <br />Enterprise Automation <br />210 Goddard Irvine CA 92618 USA <br />Te1949.769-6000 Fax949-769.6005 <br />WWW,ealnW_CJ tors m <br />The City of Santa Ana released RFP 17.11.2 soliciting bids from qualified systems <br />integrators to provide several consultative and design services aimed at promoting <br />standardization and best practices, This project is a continuation of the City's <br />initiative to mitigate risk and improve the serviceability of their SCADA system, <br />The RFP specifically solicited proposals for the sole source development of control <br />panel designs and functional specifications for two pump stations and four <br />pressure reducing valve stations, which will be upgraded in the future. <br />Additional scope includes the development of programming and testing <br />specifications for those sites, the development of source control and change control <br />systems, and support services for those systems throughout the life of the three <br />year contract.. <br />Enterprise Automation has a thorough understanding of the City's needs, <br />expectations, and quality standards as we have been providing similar services to <br />the City since 2014, with great success. Projects include: <br />I. East Pump station (June 2014 —May 2015) <br />a. Functional Specification <br />b. Test documentation (FAT and SAT) <br />c. On -site testing and support <br />2. SA-5 Lift Station (July 2014 —present) <br />a. Functional Specification <br />It. Design and specifications review <br />c. On -site testing and support <br />3. San Lorenzo Lift Station (February 2015 —present) <br />a. Control panel design and factory acceptance testing <br />b. Design and specifications review <br />c. Functional Specification <br />d. Test document development (FAT and SAT) <br />4. Walnut Pump Station (May 201.6 —present) <br />a. Existing condition technical memorandum <br />i. Site surveys and operations workshops <br />b. Functional Specification <br />c. PLC standard code modules and documentation <br />d. OIT programming standards documentation <br />e. Design and specifications review <br />f. Testing documentation development (FAT and SAT) <br />g. On -site testing and support <br />Do cu City or Santa Flna Revision: I o.0 <br />Documenk. Response to RFP 17-112 Date: 11/21/2017 <br />Section_ __ Scope_of Services & Schedule Pa e Plumber_ 6 of 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.