Laserfiche WebLink
OLTA IC <br />vn�o vmm� o,:� c�.�M��lo,dnxn <br />Project 4t73-727.4 <br />Forming and pouring of concrete pad of dimensions per manufacturer's specifications for charging unit <br />structural support. <br />PROVISIONS FOR FUTURE GROWTH <br />• None <br />PARKING MODIFICATIONS <br />• Stenciling/marking "EV CHARGING ONLY" for two (2) EV parking spaces. <br />• Supply and mounting of two (2) EV parking signs on existing post. (Repositioning of sign post If required) <br />RELATED CONSTRUCTION WORK <br />• Core drilling. <br />• Placement of EMT, approximately+180'. <br />• Trenching and/or pneumatic boring, approximately +20'. <br />• Concrete work (demolition and repair) for pneumatic boring window cut. <br />• Concrete work for EV structural pad. <br />L <br />INITIALS DATE <br />-]- <br />Video Vo cE Data Co,nmunlCdUortS I Voltaic Division 12681 Palo Drive ,1ar,en C, o"ern 9<91 i 4 nnl Date Ianua,y 1 / )719 <br />