Laserfiche WebLink
„V\/ IC <br />Noru Nuae D.�w Co An ova Zr <br />Project 4:73-727.4 <br />CELLULAR SIGNAL COMMUNICATION <br />• Cellular signal readings are not adequate for Charge Point EV charging station per ChargePoint <br />manufacture specifications. <br />• Supply and installation of 3G cellular booster with two-way splitter for EV charging stations. <br />PROVISIONS FOR FUTURE GROWTH <br />• None <br />PARKING MODIFICATIONS <br />• Stenciling/marking "EV CHARGING ONLY” for eight (8) EV parking spaces. <br />• Supply and mounting of eight (8) bolt -down steel sign posts with EV parking signage. <br />RELATED CONSTRUCTION WORK <br />• Using existing conduit infrastructure from electrical room to the junction box located near parking space <br />55. (Includes approximate wire runs of +300') Shall the length of the pull exceed, pricing will be charged <br />accordingly), <br />• Placement of EMT, approximately+180'. <br />• Bolt -down of units on existing basement concrete. <br />• GPR scanning for bolt down of units. <br />INITIALS DATE <br />-10- <br />lridei Vul.e Date Calx ,' unlcdhons Volt is Division 117631 P it i 1)Ive 0a d n Prove, CA 92841 Nen U a 1a ,ary av+ <br />