Laserfiche WebLink
:OLTAIC <br />Location: 20 Civic Center Plaza <br />Santa Ana, CA 92701 <br />N1PA It: 051017 -CPI <br />CHARGING UNIT MOUNTING TYPE($): WALL <br />TOTAL# OF PARKING Pop EV: Two (2) <br />Price Breakdown: <br />City Halt — Civic Center <br />Electrical/Construction, Labor and Material <br />EVCS Unit(s) and Service(s) <br />Total Price: <br />Electrical/Construction, Labor and Material Includes: <br />$18,201.00 <br />$6,794,00 <br />$24,995.00 (tax included) <br />Project 11:73-727A <br />Proposal consists of project management and site planning, engineering and designing for any necessary <br />permit acquisitions. <br />o Permit acquisitions also include the plan checking, and inspection processes (not including <br />_— <br />actual plan check fee, permitting arrd arinspettion fed�} as required icy the authorities <br />Perform Site Validation survey (SVS) as required by ChargePoint, Inc, priorto activation of units. SVS fee <br />to ChargePoint, Inc, discounted when using ChargePoint, Inc. Certified Installers. <br />o Standard electrical power consistency evaluation: circuit breaker and electrical panel evaluation. <br />o Cellular network communications test: test for consistency of cellular signal strength. <br />o Charging station evaluation: consistent voltage, amperage, ground, network communication. <br />ELECTRICAL EQUIPMENT UPGRADE <br />• Supply and installation of new 75KVA transformer to provide adequate power and proper voltage rating <br />for a new electrical panel. <br />o New 125A circuit breaker to provide overcurrent protection to transformer. New conductors in <br />new EMT sized per NEC requirements. <br />o Installation of grounding system for transformer per NEC requirements. <br />Supply and installation of new 200A electrical panel for EV charging units. Materials and installation to <br />meet NEC, building department requirements, and If enforced, by building department. <br />CHARGING UNIT INSTALLATION <br />Installation and commissioning of one (1) charging unit to meet NEC requirements <br />• Supply and installation of two (2) 40A circuit breakers for EVCS overcurrent protection. <br />-r2- <br />'''deo hove (lira Conwr'Jnlcat i:as I V ,i>a r Droswn 11'6x1 P80 Drnvc Ganlen Gmwe I:A 97841 rn,a a u.vy t7 10J, <br />