Laserfiche WebLink
.:O LTA u.� I C <br />mmn. <br />v�o�n vn�cn omA co.�M�.,��;;:;.,,; <br />Third & Bush Parking Lot <br />Location: 201 East 31d Street <br />Santa Ana, CA 92701 <br />NJPA #: 051017 -CPI <br />CHARGING UNIT MOUNTING TYPE(s): BOLLARD <br />TOTAL OF PARKING FOR EV: Two J2) <br />Price Breakdown: <br />Electrical/Construction, Labor and Material <br />EVCS Unit(s) and Service(s) <br />Total Price: <br />Electrical/Construction. Labor and Material Includes: <br />$19,879.00 <br />$7,355.00 <br />$27,234.00 (tax included) <br />Project #:73-727.4 <br />Proposal consists of project management and site planning, engineering and designing for any necessary <br />permit acquisitions. <br />o Permit acquisitions also include the plan checking, and inspection processes (not including <br />actual plan check fee, permitting and/or inspection fees) as required by the authorities having <br />jurisdiction. <br />o Application for upgrading existing service to be completed by customer. <br />Perform Site Validation survey (SVS) as required by ChargePoint, Inc. prior to activation of units. SVS fee <br />to ChargePoint, Inc. discounted when using ChargePoint, Inc. Certified Installers. <br />o Standard electrical power consistency evaluation: circuit breaker and electrical panel evaluation. <br />o Cellular network communications test: test for consistency of cellular signal strength. <br />o Charging station evaluation: consistent voltage, amperage, ground, network communication. <br />ELECTRICAL EQUIPMENT UPGRADE <br />Removing existing electrical meter and electrical panel to be replaced with higher rated amperage. <br />o Replacement of existing 100A panel with 200A panel and associated circuit breakers. <br />o Existing panel has spaces, but is not able to carry the two additional 30A circuits for EV charging. <br />o Coordination with SCE for service upgrade. <br />Supply and install new meter socket panel combo rated at 200A. Materials and installation to meet NEC, <br />building department requirements, and if enforced, by building department. <br />CHARGING UNIT INSTALLATION <br />Installation and commissioning of one (1) charging unit to meet NEC requirements. <br />Supply and installation of two (2) 40A circuit breakers for EVCS overcurrent protection. <br />o Utilization of upgrade electrical panel to supply two (2) 30A circuits to new charging unit. <br />-is- <br />V�dza Voice Da{a romi'll,nitabons Voltaic DiwISIon t2f31jf dh Juvc liard�n Grprp�CA 92MI t'nr t att Ino fary n oto <br />