Laserfiche WebLink
:VOLTAIC <br />Santa Ana Regional Transportation Center <br />Location: 1000 Santa Ana Blvd <br />Santa Ana, CA 92701 <br />NJPA #: 051017 -CPI <br />CHARGING UNIT MOUNTING TYPE(S): BOLLARD <br />TOTAL# OF PARKING FOR EV: Two (2) <br />Price Breakdown: <br />Electrical/Construction, Labor and Material $7,443.00 <br />EVCS Unit(s) and Service(s) $7,355.00 <br />Total Price: $14,798.00 (tax included) <br />Electrical/Construction. Labor and Material Includes: <br />Project #:73-727.4 <br />Perform Site Validation survey (SVS) as required by ChargePoint, Inc. prior to activation of units. SVS fee <br />to ChargePoint, Inc. discounted when using ChargePoint, Inc. Certified Installers. <br />o Standard electrical power consistency evaluation: circuit breaker and electrical panel evaluation. <br />o Cellular network communications test: test for consistency of cellular signal strength. <br />o Charging station evaluation: consistent voltage, amperage, ground, network communication. <br />ELECTRICAL EQUIPMENT UPGRADE <br />• None <br />o Using existing house meter panel located outdoor. <br />CHARGING UNIT INSTALLATION <br />Installation and commissioning of one (1) charging unit to meet NEC requirements <br />Use existing 40A circuit breaker for EVCS overcurrent protection. <br />o Utilization of existing electrical panel to supply 30A circuits to new charging unit. <br />o From the electrical panels) to new charging stations, the new electrical conductors: #6 and #10 <br />ground wires. <br />PROVISIONS FOR FUTURE GROWTH <br />• None. <br />-21 <br />Vld-n Voce Bata r_ornrnumcanons I voltalc'DIVlnon 12681 Pala Dnve, Gaz den grove CA 9?341 Pn, I nal L, U,xy Li tole, <br />