Laserfiche WebLink
2. Within a reasonable lime prior to the start crony on-site work, delivery of materials, equipment, or personnel, Contractor will submit to <br />Owner the following: <br />A- A complete set of drawings approved by Owner and subsequently by the City iu which the Building is located. <br />B- A fully executed Indemnity Agreement (To Be Provided by Owner Upon Request), <br />C- Certificate or Insurance in a form approved by Owner executed by Insurance companies acceptable to Owner. <br />D- A tally executed Notification -Rules for Contractors (To Be Provided by Owner Upon Request), <br />E- A job schedule of the work to be accomplished, detailed by trade, <br />F- A complete list or all proposed Subcontractors and suppliers. Owner must approve all contractors and subcontractors before <br />commencement of their work. <br />G- The Marne and phone number (Including emergency phone numbers) orpersonnel who are authorized to represent the Contractor. <br />3. No revisions or changes of any kind may be made to the construction plans previously approved by Owner without prior written consent of <br />the Owner. Any proposed revisions or changes must be submitted to Owner in the form of a change order, for Owner's review and <br />approval prior to commencement of such changes. Revisions or changes altering the floor plan, base building systems, or building <br />operations must be submitted, in writing, tattle Owner Far review and approval prior to commencement of work. <br />C All of Contractor's work must be scheduled so that it in no way conflicts with, interferes with, or impedes the quiet and peaceful enjoyment <br />of other tenants at- occupants of the Project, or with the progress of Owner's work or operations. Any work that is in con Met will be <br />rescheduled by the Contractor to such time as approved by Owner. Additionally, Owner shall have no liability for any costs or expenses <br />incurred by Contractor (or Tenant) in connection with such rescheduling. <br />5. Contractor and subcontractors shall employ persons and means for the orderly progress of the work without interruption on account of <br />strikes, work stoppages or similar causes of delay, Additionally, Owner shall have no liability for any costs or expenses incurred by <br />Contractor (or Tenant) in connection with such delays. <br />6. Materials and tool storage will be limited to the areas iron which access has been granted. <br />7. Clenn-up and rubbish removal shall be provided by the Contractor at Contractor's expense, Contractor must, oil a daily basis, remove all <br />rubbish, surplus kind waste material resulting from the performance of his work. At the request of Owner, Contractor shall relocate any <br />materials causing au obstruction as directed by Owner. Contractor will not be allowed to place a dumpster on site on a continuous basis <br />during construction, <br />Important note: The placement and location orrubbish dmmpsters and bins must be approved in advance by Owner. <br />8. In general, Owner will interface with Contractor to the extent necessary for work to be completed within the guidelines of project <br />specifications and for the enforcement ofbuilding rules and regulations. <br />9. Connector will make arrangements far unloading, trash removal and hoisting utter nonan working hours due to the local city noise <br />ordinance. (No such activity will be allowed between the hours of 10:00 p.m, to 7:00 a.m.) At no time will the Contractor be given <br />exclusive reserved use of the freight elevator unless applied For by Contractor and approved by Owner. Connector may be afforded access <br />to loading clock space and hoisting facilities For limited use at stitch time during normal working hours as is prearranged with Owner, or at <br />other times, with the consent of Deaner and upon payment orOwner's prevailing free for after-hours use and access, <br />10. Contractor will be afforded unIend ing areas as prearranged with Owner, All materlit[ s onIand oil at these areas will be moved to an area ul' <br />use immediately and shall not be stored or used in a way which adversely impacts use ofill e Building. <br />11. Contactor (and Temnll) will be responsible for the security of its own materials, equipment and work, and that of his subcontractors. <br />Contractor will also be responsible for damage caused by Contractor or its subcontractors to the Project, Building and/or tenant areas, <br />including, but not limited to the loading dock and indoor anti outdoor public areas, freight elevnios, etc. Any such damages will be <br />promptly repaired to the Owner's satisfaction at sole cost of Contractor. <br />12, Contractor will comply with all applicable codes, Imus and regulations pertaining to the work of Contraclo', including all saltily, and health <br />regulations. 'fie Contractor shall supply the Owno with a Master List of all Hazardous Materials and their Material Safety Data Sheers <br />(MSM) upon delivery to lhe,job site. A discussion will than ensue pertaining to the sure storage, handling and use ol'[hese mnleritds, as <br />well as the Contractor's emergency preparedness plan liar handling the conainnrent and clean-up of potential 1-1114arelous Material spills, <br />13. Contractor will not engage in any Inbor practice that may delay or otherwise hornet the workof Owncr or any other contractor. <br />14. No base building systems will be turned off or disengaged by C'untractoor any s ibconuaclur without prior written approval and <br />supervision by a repr�senlativc ofOwnm a' its ngenl. Said systems include but are not limited to sprinklers. electrical circuits, air -handling <br />units, seance head., and water supply. Building electrical power Shut -downs tine allowed, with the prior written consent ol'Owner. on <br />Saturdays between 10:00 p.m. and 5;00 a.m. only, A request ror approval shall be made to the Property Manager at least ten ( 10) days in <br />advance. <br />80/ WCirie Cenhrr Ur—Citi- of.SarwaAna Geese -4- Eixhilan U <br />