My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH CANNABIS TESTING LABS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
03/20/2018
>
75B - PH CANNABIS TESTING LABS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2018 5:26:57 PM
Creation date
3/15/2018 5:17:36 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75B
Date
3/20/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
application and issue the RSP, without consideration of the merit based point system, <br />so long as they satisfy all other requirements of this article and Chapter 18. <br />b. The Regulatory Safety Permit ("RSP") selection process will be conducted in <br />two phases, Phase 1 (Registration Application) and Phase 2 (Regulatory Safety Permit <br />Application). Registration Applications will be reviewed by the Director of Planning and <br />Building or designees(s) for completeness and compliance, and if eligible, will be placed <br />on the "Regulatory Safety Permit ("RSP") Eligibility List" and entered into the Phase 2 <br />Regulatory Safety Permit Application process. In Phase 2, the City of Santa Ana has <br />established a merit based point system to objectively award permits as described in the <br />Regulatory Safety Permit Application. <br />2. Phase 1 — Registration Application <br />a. Following the adoption of this article, the Director of Planning and Building <br />shall prepare Adult Use commercial cannabis retail business registration application <br />forms and a related administrative policy. Each Adult Use commercial cannabis retail <br />business interested in operating pursuant to this article may submit an application <br />together with a non-refundable processing fee in an amount established by the City <br />Council. <br />b. The Registration Application period shall be thirty (30) calendar days from <br />the date the applications are released. Following the application period, the Director of <br />Planning and Building or designee(s) shall stop accepting applications and review all <br />applications received in Phase 1. Each application that is complete and in compliance <br />with the application requirements in Phase 1 shall be placed on the "RSP Eligibility List" <br />and shall be notified in writing whether they are a "RSP Eligible Applicant" or not. Each <br />applicant on the RSP Eligibility List may then choose to file an application for a RSP in <br />Phase 2. <br />C. The requirements for Phase 1 include but are not limited to: <br />All application documents required in the City's Phase 1 <br />Registration Application package. <br />ii. Application was submitted during the application period. <br />iii. Application forms are filled out completely. <br />iv. Business Owner(s)/Applicant(s) referenced on the application <br />provides a Live Scan that was conducted within 14 days prior to <br />submitting the application. <br />Phase 1 application fee is paid. <br />Ordinance No. NS -XXX <br />Page 21 of 35 <br />75B-31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.