Laserfiche WebLink
V. A detailed description of the cannabis goods requested for delivery <br />including the weight or volume, or any accurate measure of the <br />amount of cannabis goods requested. <br />vi. The total amount paid for the delivery including any fees or taxes. <br />k. At the time of the delivery, the date and time delivery was made, and the <br />signature of the person who received the delivery. <br />I. No cannabis delivery vehicle shall display signs, decals or any other form <br />of advertisement with the exception of a maximum four -inch by four -inch decal. <br />M. Inspections by an authorized City of Santa Ana representative may be <br />conducted anytime during regular business hours. <br />6 Additional Operational Standards for Commercial Cannabis Testing <br />Facilities or Laboratories <br />b Inspections by an authorized City of Santa Ana representative may be <br />conducted anytime during the business's regular business hours. <br />C. Educational tours of cannabis testing facility/laboratoryfacility/laboratory businesses shall <br />be allowed. <br />Section 40-9. Adu#-Mise Commercial Cannabis Retail Selection Process <br />1. Adult Use Commercial Cannabis Retail — Registration Application <br />and Regulatory Safety Permit Required <br />a. Existing medicinal cannabis business operators, or those with pending <br />applications for a medicinal RSP, who desire to operate an adult cannabis retail <br />business shall apply for the cannabis Regulatory Safety Permit ("RSP") on or before <br />December 14, 2017. The Director of Planning and Building shall review such <br />application and issue the RSP, without consideration of the merit based point system, <br />so long as they satisfy all other requirements of this article and Chapter 18. <br />b. The Regulatory Safety Permit ("RSP") selection process will be conducted in <br />two phases, Phase 1 (Registration Application) and Phase 2 (Regulatory Safety Permit <br />Application). Registration Applications will be reviewed by the Director of Planning and <br />Building or designees(s) for completeness and compliance, and if eligible, will be placed <br />on the "Regulatory Safety Permit ("RSP") Eligibility List" and entered into the Phase 2 <br />Regulatory Safety Permit Application process. In Phase 2, the City of Santa Ana has <br />Ordinance No. NS -XXX <br />Page 19 of 33 <br />75B-65 <br />