My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CITY OF COSTA MESA
Clerk
>
Contracts / Agreements
>
C
>
CITY OF COSTA MESA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2018 9:36:01 AM
Creation date
3/22/2018 1:57:33 PM
Metadata
Fields
Template:
Contracts
Company Name
CITY OF COSTA MESA
Contract #
A-2018-032
Council Approval Date
2/20/2018
Expiration Date
12/31/2022
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Scope of Work <br />Bear Street Signal Synchronization <br />INTRODUCTION <br />The City of Costa Mesa ("CITY') will lead the Bear Street PROJECT to optimize signal <br />synchronization timing along the Bear Street Corridor between Segerstrom Avenue and Bristol <br />Street. Below is the list of intersections: <br />1. Bear Street @ Segerstrom Avenue (SA)l <br />2. Bear Street @ Alton Avenue (SA) <br />3. Bear Street @ MacArthur Boulevard (SA) <br />4, Bear Street @ Sunflower Avenue (CM)2 <br />5. Bear Street @ South Coast Plaza North (CM) <br />6, Bear Street @ South Coast Drive (CM) <br />7. Bear Street @ Metro Point East (CM) <br />6. Bear Street @ Metro Point West (CM) <br />9. Bear Street @ South Coast Plaza/Metro Point (CM) <br />10. Bear Street @ Yukon/Paularino Avenue (CM) <br />11. Bear Street @ SR -73 NB Ramp (Caltrans) <br />12. Bear Street @ SR -73 SB Ramp (Caltrans) <br />13. Bear Street @ Baker Street (CM) <br />14. Bear Street @ Bristol Street (CM) <br />PRIMARY IMPLEMENTATION <br />The following is an outline of the scope of services for Bear Street PROJECT Primary <br />Implementation. <br />1) Project Administration <br />CITY shall provide general project administration, environmental processing, and quality control. <br />The City of Santa Ana ('PARTICIPATING AGENCY') shall provide support project management <br />services for the project intersections located within their jurisdiction and assist in maintaining the <br />Bear Street PROJECT schedule. <br />a) Data Collection <br />The CITY will assemble with the assistance of PARTICIPATING AGENCY the necessary <br />data to understand the existing traffic conditions for the Bear Street PROJECT and Its <br />respective traffic signal operations, This shall include, at minimum, the following: <br />• All data, documents, plans, photos, etc. related to each Bear Street <br />PROJECT intersection within the past two years; <br />• Local agency timing preferences or policies for all modes of travel and special <br />Intersection treatments; and <br />• Manual and Machine Traffic counts for highway links and intersections for <br />weekday and weekend time periods for all modes of travel. Special 72 -hour <br />video counts will be conducted along the corridor with established special <br />modal use. <br />SA - City of Santa Ana <br />' CM - City of Costa Mesa <br />Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.