Laserfiche WebLink
COST ANALYSIS <br />CONSTRUCTION OF THE PROJECT NO._17-6893: WARNER AVENUE AND <br />FLOWER STREET TRAFFIC SIGNAL MODIFICATION <br />Construction Contract <br />$ <br />77,752.00 <br />Contract Administration <br />$ <br />5,163.00 <br />Inspection and Testing <br />$ <br />6,500.00 <br />Contingencies <br />$ <br />26,835.00 <br />TOTAL ESTIMATED CONSTRUCTION COSTS <br />$ <br />116,250.00 <br />EXHIBIT 4 <br />23A-35 <br />