Laserfiche WebLink
EDISON <br />SouthernCaliforniaEdison Revised Cal. PUC Sheet No. 52415-E <br />Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 48630-E <br />Schedule LS -1 Sheet 10 (T) <br />LIGHTING - STREET AND HIGHWAY -UNMETERED SERVICE <br />COMPANY-OWNED SYSTEM <br />(Continued) <br />SPECIAL CONDITIONS (Continued) <br />6. Removal, Relocation or Modification of Facilities: (Continued) <br />C. Where street lighting facilities are ordered modified and/or relocated by a customer, the <br />customer shall pay to SCE, in advance of such modification and/or relocation, a <br />nonrefundable amount equal to the estimated cost of such modification and/or <br />relocation. This includes facilities that now serve street light load only, but that may <br />have been installed originally to serve other than street light load. <br />d. Facilities removed or installed remain the sole property of SCE. <br />Requirements and Restrictions: <br />a. The applicant for street light service shall specify the type of service, lamp size, and <br />location of street lights. <br />b. Service shall not be furnished under this Schedule where location, mounting height, <br />and/or other considerations are unacceptable to SCE. <br />C. The installation of street lighting equipment and facilities hereunder is contingent upon <br />SCE obtaining easements, rights of way, and highway permits satisfactory to SCE for <br />the required poles, lines, equipment, and facilities. <br />d. In accordance with Rule 4, a written contract for a term of not less than one year and <br />not more than five years is required in order to receive street light service under the <br />provisions of this Schedule. <br />e. Should the applicant not commence using the street lighting in a bona fide manner <br />within ninety (90) days after date of completion and installation of a street light or street <br />lighting system requested by the applicant, SCE will bill, and the applicant shall pay, the <br />applicable non -energy (other charges) portion of the lamp charge(s). <br />(To be inserted by utility) <br />Advice 2872-E <br />Decision 13-03-031 <br />IOC21 <br />Issued by <br />AkbarJazaveri <br />Vice President <br />55A-62 <br />(To be inserted by Cal. PUC) <br />Date Filed Mar 29. 2013 <br />Effective Apr 1, 2013 <br />Resolution <br />