My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO SCE STREET LIGHTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
04/03/2018
>
55A - RESO SCE STREET LIGHTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 7:42:40 PM
Creation date
3/29/2018 7:21:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
4/3/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EDISON <br />SouthernnCaI''if ornia Edison Revised Cal. PUC Sheet No. 41547-E <br />Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 35135-E <br />Schedule LS -2 Sheet 5 (T) <br />LIGHTING - STREET AND HIGHWAY <br />CUSTOMER -OWNED INSTALLATION - UNMETERED SERVICE <br />(Continued) <br />SPECIAL CONDITIONS <br />1. Ownership of Facilities: <br />a. For multiple systems SCE will deliver service at 120, 120/240 volts, or, at the option <br />of SCE, at 240/480 or 277/480 volts, three wire, single phase. For existing series <br />systems (installed prior to October 25, 1981) SCE will furnish and maintain constant <br />current regulating transformers and deliver service at the secondary side of such <br />transformers. <br />b. The customer will furnish and maintain all utilization equipment beyond the point of <br />delivery except for switching equipment and where the customer has elected the <br />Optional Relamp Service provided by SCE in accordance with Special Condition 5. <br />C. New or modified installations normally shall be multiple service installations. New or <br />modified series installations shall be made only where, in the opinion of SCE, it is <br />practical to supply series service. <br />d. For new or modified series installations requiring a new constant current regulating <br />transformer, the customer shall furnish and maintain the transformer; and service will <br />be delivered at the primary side of the transformer. <br />(To be inserted by utility) Issued by <br />Advice 2041-E AkbarJazaveri <br />Decision 06-06-067 Vice President <br />501 55A-71 <br />(To be inserted by Cal. PUC) <br />Date Filed Sep 8, 2006 <br />Effective Oct 1, 2006 <br />Resolution <br />
The URL can be used to link to this page
Your browser does not support the video tag.