My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55A - RESO SCE STREET LIGHTS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
04/03/2018
>
55A - RESO SCE STREET LIGHTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2018 7:42:40 PM
Creation date
3/29/2018 7:21:43 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55A
Date
4/3/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
438
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ems{ BUILDING SOLUTIONS, <br />Recommendations <br />The below table compares the proposed Tanko project to the project ABS would recommend to be <br />considered by the City. If the City considers these recommendations, the initial Acquisition / <br />Conversation project would be reduced by about $2,800,000. These recommendations would result in <br />about a $8,600,000 reduction over the 20 -year life of system life. These results and recommendations <br />are explained in further detail below. <br />LS-1 Acquisition Costs <br />Recorn.mencled <br />$3,679,122 <br />$3,895,693 <br />LED Conversion Costs <br />$3,184,799 <br />$5,686,015 <br />5 % Contingency <br />$343,196 <br />$479,085 <br />Subtotal <br />$7,207,117 <br />$10,060,793 <br />Rebate <br />$723,965 <br />$723,965 <br />Project Total <br />$6,483,152 <br />$9,336,828 <br />20 year Internal Maint. Cost <br />1 $306,220 <br />$306,220 <br />20 year Other Maint. / Software Cost <br />I $0 <br />$5,250,708 <br />LS -1 Acquisition Costs <br />• The reduction of cost is due to Tanko's Audit resulting in finding additional poles to purchase <br />from SCE <br />• It is typically very difficult and timely to revise and negotiate the terms of SCE's Acquisition <br />Study <br />• If additional streetlights are found to qualify for City purchase from SCE, ABS would recommend <br />using the contingency already in the project <br />LED Conversation Costs <br />• The reduction of cost is due to: <br />o Simplifying the project implementation by hiring a project manager to buy the new LED <br />lights direct and manage a sub -contract to install <br />o Removing the remote monitoring system from the scope <br />• These systems do not save energy or money <br />• All streetlights on the LS -2 rate scheduled are billed based on a standard <br />calculation, so modifying control will not result in savings <br />Currently there is no standard for adding power consuming accessories (remote <br />monitoring systems) to streetlights on the LS -2 rate <br />The cost for these systems is high compared to the benefits of knowing when <br />lights go out and any complex features that may be added to them <br />These systems are still relatively new to the industry and are known to be <br />difficult to commission and cause issues that didn't previously exist <br />12526 High Bluff Drive Suite 345, San Diego, CA 92130 (858) 333-4775 <br />www.absenergy.com Contractors License # 1008135 <br />55A-88 <br />
The URL can be used to link to this page
Your browser does not support the video tag.