Laserfiche WebLink
Bristol Street Rehabilitation: MacArthur <br />Boulevard to Railroad I O Alton) <br />30JECT CATEGORY: <br />Street Improvements <br />Arterial Sheet Rehabilitation <br />LOCATION MAP <br />CT DESCRIPTION: <br />ructlonhesudacing of existing pavement and <br />r eriMnstallahon of missing or damaged, curbs. <br />sidewalks, driveway epimiaches. and <br />Pair ramps within this segment of madway. <br />)JECT NEED: <br />City's Pavement Management Program has been <br />doped to identify total deferred mamlenimm <br />hements for the City's arterial network and to move <br />vd preventative maintenance. As one of the City's <br />ial streets. MacArthur Boulevard pavement <br />bilitation is idenhhed as a high priority in the <br />PROJECT COSTS FY 1819 FY 1920 FY 2021 FY 2122 FY 2223 FY M4 FV 2425 <br />ConsOunion 5640,000 <br />Engimenn9 $52.000 <br />TOTAL 9100,000 <br />PROJECT FUNDS FY 18/19 FY 1920 FY 20,121 FY 21,22 FY2223 FY 2324 FY 2425 <br />RMRA S100p0) <br />TOTAL 9100,000 <br />Public Works Agency Design Engineering <br />Jason Gabriel, Principal Civil Engineer 12 -Mar -2018 <br />55A-12 <br />