Laserfiche WebLink
PROJECT TITLE: <br />Main Street Rehabilitation. Dyer Road to <br />Avenue <br />PROJECT CATEGORY: <br />Stmet improvements <br />Arteria/ Street Rehabilitation <br />Ll AI IUN MAY <br />FY 18119 FY 1920 FY 20121 FY 21fn FY 2223 FY 23x24 FY 2425 <br />Concvu,twn <br />$556,000 <br />,` <br />N <br />$ao 000 <br />TOTAL <br />77o,00o <br />PROJECT FUNDS <br />FY 19/19 FY 1920 FY 2021 FY 2122 FY 2223 FY 2324 FY 2425 <br />RMRn <br />s500.000 <br />TOTAL <br />$600,000 <br />MF <br />wxw.r.w. <br />Wm a.. <br />k,v <br />CITY OF SANTA ANA FY 18t19 <br />CAPITAL IMPROVEMENT PROJECT WORKSHEET <br />Reconstruchonlresurfacing of existing pavement and <br />mplacemenNnstallalon of missing or damaged, curbs, <br />gutters. sidewalks driveway appmachesand <br />wheelchair ramps within this segment of madway <br />PROJECT NEED. <br />The City"s Pavement Management Program has been <br />devebpad to ldentity total defend maintenance <br />requirements for the City's animal network and to move <br />toward Irmentahve maintenance. As one of the City's <br />artenal sheets. Main Street pavement rehahi6tation a <br />identified as a high priority in the Pavement <br />PROJECT COSTS <br />FY 18119 FY 1920 FY 20121 FY 21fn FY 2223 FY 23x24 FY 2425 <br />Concvu,twn <br />$556,000 <br />En9mee ng <br />$ao 000 <br />TOTAL <br />77o,00o <br />PROJECT FUNDS <br />FY 19/19 FY 1920 FY 2021 FY 2122 FY 2223 FY 2324 FY 2425 <br />RMRn <br />s500.000 <br />TOTAL <br />$600,000 <br />Public Works Agency Design Engineering Jason Gabriel Principal Civil Engineer 12 -Mar -2018 <br />-1- <br />55A-14 <br />