My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75B - PH RELOCATION PLAN
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
04/17/2018
>
75B - PH RELOCATION PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/12/2018 6:50:56 PM
Creation date
4/12/2018 6:43:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
75B
Date
4/17/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Project Site Location and Description <br />The Project site is on Warner Avenue between Main Street and Oak Street. (See Figure z: Project <br />Site Location) The Project Site is located approximately 4.5 miles south of State Route za (SR -22), <br />z miles southwest of Interstate 5 (1-5), 2.5 miles east of the Santa Ana River, and z miles north of <br />Interstate 405 (1-405). Santa Ana is the County Seat and is the second largest city in Orange <br />County.' The Warner Avenue Improvements (Main to Oak) Project (Phase t) was planned and <br />designed to incorporate complete street concepts with storm drain quality features. Warner <br />Avenue is classified as an East-West Major Arterial in the City's General Plan Circulation Element <br />(GPCE) and the County of Orange Master Plan of Arterial Highway (MPAH). Improving the t -mile <br />Warner Avenue segment from Warner Avenue to Wright Street has been a long-term priority <br />project that is being constructed in several phases. Improvements include widening from a four - <br />lane roadway to a six -lane arterial to address safety issues and provide adequate vehicular <br />capacity; and installing parkway, raised median landscape, storm drain, protected bike lanes, <br />street lights, and traffic signals. <br />® <br />1 <br />Transmission Maslen; - ° <br />SouthCoaatAuclian <br />i <br />Palm <br />9UbenyTax Service <br />a <br />3 <br />®Raul Shoe Repair n <br />7 <br />Ll j <br />ARCO <br />O <br />Ave .. <br />_ - vB <br />19 <br />- <br />EWamer Ave <br />W WameeAve <br />EWamer Ave — Ave <br />EWa_mer Ave <br />_ <br />la Q <br />e, Inc <br />GII L hVEly <br />McDonald's <br />Wells Fargo Bank Tanasy Bionicos'Nlce' <br />Santa Ana A, <br />'g <br />Army National Guard <br />� <br />RecnrDng Olrrce� <br />3 <br />— <br />u <br />Mann Anne Wholesale <br />N <br />CVSv n <br />A <br />v aaSa <br />Pacifica Auto Sales <br />Figure z: Project Site Location <br />' City of Santa Ana website: http:/Lwww.ci.santa-ana.ca.us/facts, accessed February 19, 2018. <br />3 <br />75B-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.