Laserfiche WebLink
changing needs of your stakeholders, including but not limited to online engagement services, website development and <br />web publishing services. As a firm focused on planning and design, PlaceWorks understands the needs of planners and is <br />organized to meet them. <br />Finally, as leaders In the field, we review the work of others, attend and present at conferences, and keep current In the <br />best practices of the profession. As part of our training, PlaceWorks staff will teach best methods for analysis, approaches to <br />conditions of approval, and national changes that may be of Interest locally. All of this Information will be shared with the <br />City and integrated Into our everyday tasks, <br />Relevant Experience <br />PROJECT EXPERIENCE <br />NEWPORT BEACH LAND USE ELEMENT AMENDMENT AND EIR I City of Newport Beach 12014 <br />Client Contact: Brenda Chase Wisneski, AICP I Deputy Community Development Director 1949.644.3297 <br />Described as an "oil change" rather than an engine overhaul, the amendments to the Land Use <br />Element adopted In 2006 reflect changes In the economy and market demands, Incorporate <br />subsequently approved neighborhood revitalization plans, and develop new policies addressing <br />emerging issues such as sustainabllity, climate change, and healthy communities. After the city <br />was approached by various property owners regarding the limitations of the Land Use Element, <br />staff recognized certain areas in the city would benefit from a reallocation of building Intensity <br />and residential units from other areas within the community. The amendments built on the <br />visions and principles defined by the 2006 Plan and modified the location and types of land <br />uses permitted in strategic subareas, Including Newport Center/Fashion Island, Newport Coast, 'f <br />and land adjoining John Wayne Airport. The Newport Beach Coastal Land Use Plan, Local <br />Coastal Program, and Zoning Code and Map were amended concurrently to ensure <br />consistency. A supplement to the 2006 General Plan Environmental Impact Report (SEIR) was f# <br />prepared to address potential environmental Impacts associated with the "net' land use <br />changes, updated policies, and revised Coastal Land Use Plan. It was supported by technical x <br />studies for traffic, air quality, greenhouse gases, noise, and cultural resources. <br />ORANGE COUNTY CIVIC CENTER FACILITIES STRATEGIC PLAN EIR I County of Orange 12017 <br />Client Contact: James Campbell I Manager, Land Development 714.227.1011 <br />Over the past 10 years the County of Orange has been working on a plan to guide the <br />redevelopment of the Civic Center. In 2006, the County completed the Civic Center Facilities <br />Strategic Plan (FSP). Pursuant to the Plan, the first step was to address Building 16 due to Its <br />prominent central location In the Civic Center. In June of 2016 the County approved a plan and <br />adopted a Mitigated Negative Declaration (MND) to demolish Building 16, which Is scheduled <br />for demolition in the Winter 2016/2017. In 2012, Griffin Holdings was selected as developer of <br />new Building 16 and was tasked with refining the FSP for the County's long-term occupancy in <br />the Civic Center. In 2016, the preferred plan was presented to the Board of Supervisors and an <br />environmental consultant, PlaceWorks, was selected to conduct the environmental review of -..: -. <br />the FSP in accordance with CEOA. PlaceWorks prepared the EIR and associated technical analyses, including air quality, <br />greenhouse gas emissions, and noise. IN Group was our subconsultant and prepared the traffic impact analysis for the <br />project. The EIR was presented to the City Council and certified in April 2017, <br />UPTOWN NEWPORT EIR I City of Newport Beach 12013 <br />Client Contact: Rosalinh Ung I Associate Planner 1949.6443208 <br />Consistent with the City of Newport Beach's 2006 adopted General Plan, the Uptown Newport <br />project would Introduce a high -density residential, mixed use project —up to 1,244 residential <br />units,11,500 square feet of neighborhood -serving retail space, and two acres of park space —in <br />the Airport Business Area of the city. Although surrounded by office uses, the actual project <br />site currently accommodates a semiconductor manufacturing facility (TowerJazz). The project <br />would be developed in two phases, and Phase 1 may be occupied before Phase 2 starts. <br />PlaceWorks conducted comprehensive analysis of environmental conditions as well as the <br />technical studies for air quality, greenhouses gases, health risk, offsite consequence analysis <br />(hazardous chemical release), and noise. The EIR also incorporated subconsultant/team <br />14 CITY OF SANTA ANA PLANNING DIVISION I PROPOSAL TO PROVIDE ENVIRONMENTAL AND PLANNING SERVICES <br />