My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL PACKET_2018-05-01
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
05/01/2018
>
FULL PACKET_2018-05-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/11/2024 8:33:46 AM
Creation date
4/30/2018 11:49:52 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
5/1/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
634
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REFERENCES <br />COST ALLOCATION / INDIRECT COST RATE AND ISF STUDY <br />REFERENCES <br />Contact Mr. Scott Wagner <br />Title: Finance Officer <br />Phone: 707.543.4670 <br />E-Mail., swaener@srcitv.ore <br />Work Performed. Preparation of Full Cost and 2 CFR Part 200 cost plans, <br />development of ISF allocation methods, full cost hourly staffing rates. <br />2014 — current. <br />Contact:. Ms. Sharun;Koike• <br />Title: Accounting Manager <br />Phone: 310.412.8724 <br />£-Mail. skoike0citvofinzlewood.ore <br />Work Performed. Annual preparation of the City's Full Cost plan, 2 CFR <br />Part 200 cost plans and ISF allocation methods (submitted to federal <br />agencies for review and approval). 2014 — current. <br />Contact:; Ms. Stefany Toll, <br />Title: Accounting Manager <br />Phone: 415.923.2207 <br />E-Mail: stollra¢olden¢ate.or¢ <br />Work Performed: Annual preparation of the District's 2 CFR Part 200 cost <br />plans and indirect cost rate for Engineering (submitted to Caltrans for <br />review and approval). Current client. <br />Contact: <br />Ms. Guadalupe Reyna=Coffin. <br />Title: Financial Services Supervisor <br />Phone: 43.5.473.6753 <br />E-Moil: Grevnacoffin@marincountv.ore <br />Work Performed. Annual preparation of 2 CFR Part 200 cost plan to the <br />State Controllers Office; assistance with desk and field audits (if <br />necessary). Current client. <br />®**+® M GT CITY OF SANTA ANA, CALIFORNIA I MARCH 8, 2018 11 PAGE 12 <br />CONSULTING GROUP RFP NO. 18-0231 I PROPOSAL FOR COST ALLOCATION PLAN / ISF ALLOCATION STUDY I <br />25A-58 <br />
The URL can be used to link to this page
Your browser does not support the video tag.