Laserfiche WebLink
Phase 2 Description Hours Hourly { Total <br />G ...,. _ Rate <br />1 Develop Sound Business Cas® <br />i <br />120 $210 $25,200 <br />2 Assess Regulatory Environment <br />30 $210 $6,300 <br />3 Facilitate and Develop MOU <br />80 $210 $16,800 <br />4 Construction Cost Estimates <br />80 $210 $18,800 <br />5 *Design & Engineering <br />(Optional Task) Per Ft. Per Ft TBD <br />Total for phase 2 (Not to- <br />Exceed) 310 $65,100 <br />L-111--.,-,--.--�--,—�---.,�,-",�..__...._.._- -- — -- — <br />* Magellan Advisors rate for Engineering and Design is $1.25 per ft. for Underground Design and $1,00 <br />per ft. for Aerial. <br />The total to the City of Santa Ana for Phase 1 and 2 including $5,000 in travel and incidental <br />expenses is $200,000 which includes all work to be completed for the City by Magellan. <br />Phase Description <br />hour -$--,- <br />ours <br />Hourly <br />' f TGtaI <br />Rate <br />_ _ <br />1 Total (Not to Exceed] <br />618 <br />$210 <br />$129,780 <br />-._ _ ......_ _..--- ---- -------------- <br />........ _... <br />.....-- <br />2 Total (Not to Exceed) <br />310 <br />$210 <br />$65,100 <br />Travel & Incidental <br />$5,000 <br />Total Cost to Santa Ana <br />g28 <br />$199,880 <br />-- - i <br />2017 Magellan Adviaon, <br />www mannllan-advisors rnm <br />