PROJECT DESCRIPTION
Request to expand on-site educational
instruction from K-6 to include 7-12 on-site
instruction for an existing K-6 charter school
No new construction or school expansion is
proposed as part of the application
Application requires approval of a Conditional
Use Permit (CUP)
2
SITE LOCATION
Zoning: R1
General Plan: LR
Total Property
Size: 4.2 acres
Surrounded by
single family
residential, post
office, middle
school, and
church uses
3
SITE PHOTO
4
SITE PLAN
Existing SFD
(not part of project)
5
PROJECT HISTORY
Planning Commission denied Citrus Springs
Charter School CUP application on 3/12/2018
Planning Commission found that approval of
the application will increase the level of traffic
on Grand Avenue
Appeal Filed by Citrus Springs scheduled for
City Council Public Hearing on 6/5/2018
6
PROJECT ANALYSIS
The expansion of grade levels and overall site improvements
will provide a long-term social benefit to the community as the
facility will offer additional educational opportunities to
children in the area and provide a supportive and safe learning
environment.
No adverse impacts are anticipated as a result of the project’s
approval as no building expansion is proposed.
Existing spaces will be reallocated for use by the expanded
grade levels.
Traffic study was not required as the proposed expansion was
not to increase the physical size of the school
The site will continue to operate in compliance will all
applicable regulations and conditions imposed on a school
pursuant to Chapter 41 of the SAMC.
7
CITY COUNCIL OPTIONS
Approve Appeal No. 2018-02 and adopt a resolution
approving Conditional Use Permit No. 2018-01 as
conditioned, or
Approve Appeal No. 2018-02 and adopt a resolution
approving Conditional Use Permit No. 2018-01 with
additional conditions, or
Deny Appeal No. 2018-02 and adopt a resolution
denying Conditional Use Permit No. 2018-01.
8
RECOMMENDATION
Approve Appeal No. 2018-02 and adopt a
resolution approving
Conditional Use Permit No. 2018-01
As Conditioned
9
10
CONDITIONS OF APPROVAL
Conditional Use Permit No. 2018-01 is approved subject to compliance,
to the reasonable satisfaction of the Planning Manager, with all
applicable sections of the Santa Ana Municipal Code, the California
Administrative Code, the California Building Standards Code and all
other applicable regulations.
The Applicant must comply in full with each and every condition listed
below prior to exercising the rights conferred by this conditional use
permit.
The Applicant must remain in compliance with all conditions listed
below throughout the life of the conditional use permit. Failure to
comply with each and every condition may result in the revocation of
the conditional use permit.
1.All proposed site improvements must conform to the Site Plan Review approval of
DP No. 2015-69 and the staff report exhibits.
2.The site shall be maintained free from litter and graffiti, including the landscaping
areas and playground areas.
3.The premises shall be maintained as per approved plans. Any damage to the
existing structures, walls, parking areas, or landscaping must be repaired.