Loading...
HomeMy WebLinkAboutPOWERPOINT- 75BCITRUS SPRINGS CHARTER SCHOOL Appeal of the Planning Commission’s Denial of CUP No. 2018-01 2121 North Grand Avenue 75B 1 PROJECT DESCRIPTION Request to expand on-site educational  instruction from K-6 to include 7-12 on-site instruction for an existing K-6 charter school No new construction or school expansion is  proposed as part of the application Application requires approval of a Conditional  Use Permit (CUP) 2 SITE LOCATION Zoning: R1  General Plan: LR  Total Property  Size: 4.2 acres Surrounded by  single family residential, post office, middle school, and church uses 3 SITE PHOTO 4 SITE PLAN Existing SFD (not part of project) 5 PROJECT HISTORY Planning Commission denied Citrus Springs  Charter School CUP application on 3/12/2018 Planning Commission found that approval of  the application will increase the level of traffic on Grand Avenue Appeal Filed by Citrus Springs scheduled for  City Council Public Hearing on 6/5/2018 6 PROJECT ANALYSIS The expansion of grade levels and overall site improvements  will provide a long-term social benefit to the community as the facility will offer additional educational opportunities to children in the area and provide a supportive and safe learning environment. No adverse impacts are anticipated as a result of the project’s  approval as no building expansion is proposed. Existing spaces will be reallocated for use by the expanded  grade levels. Traffic study was not required as the proposed expansion was  not to increase the physical size of the school The site will continue to operate in compliance will all  applicable regulations and conditions imposed on a school pursuant to Chapter 41 of the SAMC. 7 CITY COUNCIL OPTIONS Approve Appeal No. 2018-02 and adopt a resolution  approving Conditional Use Permit No. 2018-01 as conditioned, or Approve Appeal No. 2018-02 and adopt a resolution  approving Conditional Use Permit No. 2018-01 with additional conditions, or Deny Appeal No. 2018-02 and adopt a resolution  denying Conditional Use Permit No. 2018-01. 8 RECOMMENDATION Approve Appeal No. 2018-02 and adopt a resolution approving Conditional Use Permit No. 2018-01 As Conditioned 9 10 CONDITIONS OF APPROVAL Conditional Use Permit No. 2018-01 is approved subject to compliance, to the reasonable satisfaction of the Planning Manager, with all applicable sections of the Santa Ana Municipal Code, the California Administrative Code, the California Building Standards Code and all other applicable regulations. The Applicant must comply in full with each and every condition listed below prior to exercising the rights conferred by this conditional use permit. The Applicant must remain in compliance with all conditions listed below throughout the life of the conditional use permit. Failure to comply with each and every condition may result in the revocation of the conditional use permit. 1.All proposed site improvements must conform to the Site Plan Review approval of DP No. 2015-69 and the staff report exhibits. 2.The site shall be maintained free from litter and graffiti, including the landscaping areas and playground areas. 3.The premises shall be maintained as per approved plans. Any damage to the existing structures, walls, parking areas, or landscaping must be repaired. 11