HomeMy WebLinkAboutAGENDA PACKET_03-12-2018City of Santa Ana
Planning Commission Meeting Agenda
MARCH 12, 2018
CITY COUNCIL CHAMBER
22 Civic Center Plaza
Santa Ana, California
5:30 P.M.
MARK McLOUGHLIN
Chair, Citywide Representative
CYNTHIA CONTRERAS-LEO
Vice Chair, Ward 5 Representative
ERIC ALDERETE
Ward 1 Representative
LYNNETTE VERINO
Ward 2 Representative
KENNETH NGUYEN
Ward 3 Representative
PHIL BACERRA
Ward 4 Representative
BEATRIZ MENDOZA
Ward 6 Representative
The Planning Commission Agenda can be found online at
http://www.ci.santa- ana.ca.us/pba/documents/agenda_pc.pdf\
Si tiene preguntas en español, favor de llamar a Narcee Perez al (714) 667-2260.
Nếu cần liên lạc bằng tiếng Việt, xin điện thoại cho Tony Lai số (714) 565-2627.
If you wish to submit a comment on any item on the Agenda, please submit to eComments@santa-ana.org by 3 p.m. the day of
the meeting; emails received after said time will be on file for public viewing the day after the meeting.
If you need special assistance to participate in this Planning Commission meeting, please contact Michael Ortiz, City ADA
Program Coordinator, at (714) 647-5624. Please call prior to the meeting date, to allow the City time to make reasonable
arrangements for accessibility to this meeting. [Americans with Disabilities Act, Title II, 28 CFR 35.102]
Lisa E. Storck
Legal Counsel
Vince Fregoso, AICP
Acting Planning Manager
Sarah Bernal
Recording Secretary
Candida Neal, AICP
Acting Executive Director
PLANNING COMMISSION AGENDA 1 MARCH 12, 2018
Basic Planning Commission Meeting Information
Five-Year Strategic Plan (2014-2019) Detailed information at: http://www.santa-ana.org/strategic-planning/
Vision, Mission and Guiding Principles - The City of Santa Ana is committed to achieving a shared vision for the organization and its
community. The vision, mission and guiding principles (values) are the result of a thoughtful and inclusive process designed to set the
City and organization on a course that meets the challenges of today and tomorrow.
Vision - The dynamic center of Orange County which is acclaimed for our: •Investment in youth •Safe and healthy community
•Neighborhood pride •Thriving economic climate •Enriched and diverse culture •Quality government services
Mission – “To deliver efficient public services in partnership with our community which ensures public safety, a prosperous economic
environment, opportunities for our youth, and a high quality of life for residents.”
Guiding Principles
•Collaboration •Efficiency •Equity •Excellence •Fiscal Responsibility •Innovation •Transparency
Strategic Plan Goals/Objectives/Strategies:
Goal 1 - Community Safety
Goal 2 - Youth, Education, Recreation
Goal 3 - Economic Development
Goal 4 - City Financial Stability
Goal 5 - Community Health, Livability, Engagement & Sustainability
Goal 6 - Community Facilities & Infrastructure
Goal 7 - Team Santa Ana
*********
Code of Ethics and Conduct - The people of the City of Santa Ana, at an election held on February 5, 2008, approved an amendment
to the City Charter which established the Code of Ethics and Conduct for elected officials and members of appointed boards,
commissions, and committees to assure public confidence. A copy of the City’s Code can be found on the Clerk of the Council’s
webpage. The following are the core values expressed: Integrity · Honesty · Responsibility · Fairness · Accountability · Respect ·
Efficiency
Agenda Information - The agenda descriptions provide the public with a general summary of the items of business to be considered by
the Planning Commission. The Planning Commission is not limited in any way by the “Recommended Action” and may take any
action which the Commission deems to be appropriate on an agenda item. Except as otherwise provided by law, no action shall be
taken on any item not listed on the agenda.
Public Comments/Public Input - Pursuant to Government Code Sec. 54954.3, the public may address the Planning Commission on
any and all matters within the Commission’s jurisdiction.
At the discretion of the Chair, at the first Public Comment portion of the meeting, all comments may be considered jointly. The
public will be given the opportunity to speak on any and all matters contained on any of the Consent Calendar and Business
Calendar items and/or on issues of public interest within the jurisdiction of the Commission. Members of the public shall be given
three (3) minutes for each duly noticed hearing (unless the matter is continued prior to taking public testimony). All reques ts to
speak shall be submitted in writing to the Commission Secretary at the beginning of the meeting and before Public Comments
begin. Speaker forms will be available at the meeting.
REQUESTS TO SPEAK SHALL NOT BE ACCEPTED AFTER THE PUBLIC COMMENT SESSION BEGINS WITHOUT
PERMISSION OF THE CHAIR. When speaking, all persons addressing the Planning Commission shall follow the rules of decorum
as detailed on the back of the speaker form. The presiding officer shall have the power and responsibility to enforce decoru m and
order of the meeting as set forth in Section 2-104(c) of the Santa Ana Municipal Code.
Consent Calendar - All matters listed under the Consent Calendar are considered to be routine by the Planning Commission and will be
enacted by one motion without discussion unless a member of the Commission “pulls” an item(s) from the consent calendar for a
separate vote.
Senate Bill 343 - As required by Senate Bill 343, any non-confidential writings or documents provided to a majority of the Planning
Commission members regarding any item on this agenda will be made available for public inspection in the Planning & Building
Agency during normal business hours.
Agenda & Minutes - Staff reports and documents relating to each agenda item are on file in the office of the Planning & Building Agency
and are available for public inspection during regular business hours, 8:00 a.m. – 5:00 p.m., Monday through Thursday and
alternate Fridays. The Planning & Building Agency is located in City Hall Ross Annex, 20 Civic Center Plaza, 2nd Floor, Santa Ana,
California, (714)667-2700. Council meeting agendas, staff reports, and minutes are available the Friday before a Planning
Commission meeting at the following website address: www.santa-ana.org
PLANNING COMMISSION AGENDA 2 MARCH 12, 2018
CITY OF SANTA ANA
PLANNING COMMISSION MEETING
AGENDA
MARCH 12, 2018
5:30 P.M.
CALL TO ORDER CHAIR MCLOUGHLIN
COMMISSION MEMBERS ALDERETE,
BACERRA, CONTRERAS-LEO, MENDOZA,
NGUYEN, VERINO
ROLL CALL
PLEDGE OF ALLEGIANCE
PUBLIC COMMENTS - At this time the members of the public may address the Planning
Commission regarding any non-agenda items within the subject matter jurisdiction of the
Commission. No action may be taken on non-agenda items unless authorized by law.
ADMINISTRATIVE MATTERS
RECOMMENDED ACTION: Approve staff recommendation on the following
Consent Calendar Item: A – B.
A. MINUTES FROM THE REGULAR MEETING OF FEBRUARY 26, 2018
{STRATEGIC PLAN NO. 5, 1}
RECOMMENDED ACTION: Approve Minutes.
B. EXCUSED ABSENCES
RECOMMENDED ACTION: Excuse absent commission members.
* * * END OF CONSENT CALENDAR * *
CONSENT CALENDAR
All matters listed under the Consent Calendar are considered routine by the Planning Commission. These
items will be enacted by one motion without discussion unless otherwise directed by the Chairperson.
Persons wishing to speak regarding Consent Calendar matters should file a "Request to Speak" form with
the Recording Secretary.
PLANNING COMMISSION AGENDA 3 MARCH 12, 2018
PUBLIC HEARING
1. CONDITIONAL USE PERMIT NO. 2017-34 AND 2017-35 TO ALLOW AFTER-
HOURS OPERATION UNTIL 2:00 A.M. AND THE SALE OF ALCOHOLIC
BEVERAGES FOR ON-PREMISE CONSUMPTION AT MAIN SPORTS GRILL
RESTAURANT LOCATED AT 2531 SOUTH MAIN STREET– JOSEPH M.
RODRIGUEZ, APPLICANT {STRATEGIC PLAN NO. 3, 2} –Escarlet Mar, Case
Planner
Legal notice published in the Orange County Reporter on March 2, 2018 and notices
mailed on March 2, 2018.
RECOMMENDED ACTIONS:
1. Adopt a resolution approving Conditional Use Permit No. 2017 -34 as
conditioned to allow after-hours operation until 2:00 a.m.
2. Adopt a resolution approved Conditional Use Permit No. 2017 -35 to
allow the sale of alcoholic beverages.
2. CONDITIONAL USE PERMIT NO. 2018-01 TO ALLOW THE OPERATION OF A K-
12 CHARTER SCHOOL (CITRUS SPRINGS) LOCATED AT 2121 NORTH GRAND
AVENUE – DAVE BLACK, APPLICANT {STRATEGIC PLAN NO. 3, 2} –Ivan
Orozco, Case Planner
Legal notice published in the Orange County Reporter on March 2, 2018 and notices
mailed on March 2, 2018.
RECOMMENDED ACTION: Adopt a resolution approving Conditional Use
Permit No. 2018-01 as conditioned.
3. CONDITIONAL USE PERMIT NO. 2018-02 TO ALLOW THE CONSTRUCTION OF
AN APPROXIMATELY 46,000 SQUARE FOOT CAMPUS FOR CHRIST OUR
SAVIOR PARISH LOCATED AT 2000 WEST ALTON AVENUE – DAVID PFEIFER,
APPLICANT {STRATEGIC PLAN NO. 3, 2} –Jerry Guevara, Case Planner
Legal notice published in the Orange County Reporter on March 2, 2018 and notices
mailed on March 2, 2018.
BUSINESS CALENDAR
All matters listed under the Business Calendar are generally items requiring discussion and action.
Persons wishing to speak regarding Business Calendar matters should file a "Request to Speak" form
with the Recording Secretary.
PLANNING COMMISSION AGENDA 4 MARCH 12, 2018
RECOMMENDED ACTION: Adopt a resolution approving Conditional Use
Permit No. 2018-02 as conditioned.
4. VARIANCE NO. 2018-03 TO ALLOW THE CONSTRUCTION OF A SINGLE-
FAMILY RESIDENCE AND DETACHED GARAGE WITH REDUCTIONS IN
REQUIRED LOT SIZE, LOT FRONTAGE, PARKING, SETBACKS, AND MODIFIED
LOT COVERAGE LOCATED AT 123 NORTH JACKSON STREET– FERNANDO
NIEBLA, APPLICANT {STRATEGIC PLAN NO. 3, 2} –Jerry Guevara, Case Planner
Legal notice published in the Orange County Reporter on March 2, 2018 and notices
mailed on March 2, 2018.
RECOMMENDED ACTIONS:
Adopt a resolution to allow:
a) a reduction in lot size;
b) a reduction in lot frontage;
c) a reduction in off-street parking;
d) an increase in allowable lot coverage; and
e) a reduction in the required rear yard setback as conditioned.
* * * END OF BUSINESS CALENDAR * * *
COMMENTS
5. STAFF COMMENTS
6. PLANNING COMMISSION MEMBER COMMENTS
ADJOURNMENT - The next meeting of the Planning Commission is scheduled for
Monday, March 26, 2018 at 5:30 p.m. in the Council Chamber, 22 Civic
Center Plaza, Santa Ana, California.
FUTURE AGENDA ITEMS
ZOA 2015-01; GPA 2015-01; AA 2015-01 (Bristol Street Corridor)
CUP2018-03 & 2018-04 (Father's Burrell BBQ Pit_1810 N Tustin Avenue )
CUP2018-05 (7Eleven_2112 S Main Street)
Housing 101 Information Session
This page left blank intentionally.
1
PLANNING COMMISSION MINUTES FEBRUARY 26, 2018
ACTION MINUTES OF THE REGULAR MEETING
OF THE PLANNING COMMISSION OF THE
CITY OF SANTA ANA, CALIFORNIA
FEBRUARY 26, 2018
CALLED TO ORDER COUNCIL CHAMBER
22 CIVIC CENTER PLAZA
SANTA ANA, CALIFORNIA
5:33 P.M.
ATTENDANCE COMMISSIONERS Present:
ERIC ALDERETE
PHIL BACERRA
MARK MCLOUGHLIN, Chair
CYNTHIA CONTRERAS-LEO, Vice-Chair
BEATRIZ MENDOZA
KENNETH NGUYEN
LYNNETTE VERINO
COMMISSIONERS Absent: None.
STAFF Present:
VINCE FREGOSO, Acting Planning Manager
LISA STORCK, Assistant City Attorney
JERRY GUEVARA, Assistant Planner
SARAH BERNAL, Recording Secretary
PLEDGE OF ALLEGIANCE Commissioner Mendoza
PUBLIC COMMENTS (on non-agenda items)
The following public comments were received:
Dale Helvig provided an update on the 2525 N. Main Street project; opined that project is
inappropriate for the location.
CONSENT CALENDAR
MOTION: Approve staff recommendation on Consent Calendar Items A-B.
MOTION: Nguyen SECOND: Mendoza
VOTE: AYES: Alderete, Bacerra, Contreras-Leo, McLoughlin, Mendoza,
Nguyen, Verino (7)
NOES: None (0)
A-1
2
PLANNING COMMISSION MINUTES FEBRUARY 26, 2018
ABSTAIN: None (0)
ABSENT: None (0)
A. MINUTES FROM THE REGULAR MEETING OF FEBRUARY 12, 2018
MOTION: Approve Minutes.
B. EXCUSED ABSENCES
MOTION: Excuse the absence of commission members: None.
* * * END OF CONSENT CALENDAR * **
BUSINESS CALENDAR ITEMS
PUBLIC HEARINGS
1. CONDITIONAL USE PERMIT NO. 2017-31 TO ALLOW THE SALE OF ALCOHOLIC
BEVERAGES FOR OFF-PREMISE CONSUMPTION AT S RANCHO MARKET LOCATED
AT 2429 WEST MCFADDEN AVENUE UNITS 101 AND 102
Legal notice published in the Orange County Reporter on February 16, 2018 and notices
mailed on February 16, 2018.
Case Planner Guevara provided a presentation which included a description of the project,
project background and project analysis. The applicant spoke in support of the matter.
Chairman McLoughlin opened the Public Hearing. There were no speakers and the
hearing was closed.
MOTION: Adopt a resolution approving Conditional Use Permit No. 2017-31.
MOTION: Nguyen SECOND: Verino
VOTE: AYES: Alderete, Bacerra, Contreras-Leo, McLoughlin, Mendoza,
Nguyen, Verino (7)
NOES: None (0)
ABSTAINED: None (0)
ABSENT: None (0)
***END OF BUSINESS CALENDAR***
WORK STUDY CALENDAR ITEMS
A-2
3
PLANNING COMMISSION MINUTES FEBRUARY 26, 2018
2. DISCUSSION ON PROPOSED CAMPUS FOR CHRIST OUR SAVIOR PARISH
LOCATED AT 2000 WEST ALTON AVENUE
Case Planner Guevara provided an overview of the project which included information on
the following:
Location Information
Background
Project Description
Proposed Site Plan
Floor Plans
Proposed Renderings
Discussion ensued regarding setbacks, project timeline, architectural design, hours of
operation, security, traffic flow, campus accessibility, and signage. It was generally agreed
that the design should include contrasting colors and other natural elements to
complement the all-white building color; would like Church to feel inviting. Overall,
Commission expressed support for the project. The applicant was present to address
Commission concerns and provided additional information on the project.
COMMENTS
3. STAFF COMMENTS: None.
4. PLANNING COMMISSION MEMBER COMMENTS: None.
ADJOURNED 6:23 P.M. - The next meeting of the Planning Commission is scheduled for
Monday, March 12, 2018 at 5:30 p.m. in the Council Chamber, 22 Civic
Center Plaza, Santa Ana, California.
Sarah Bernal
Recording Secretary
A-3
This page left blank intentionally.
1-1
1-2
1-3
1-4
1-5
This page left blank intentionally.
EXHIBIT 1
1-6
1-7
1-8
1-9
1-10
1-11
1-12
This page left blank intentionally.
1-13
1-14
1-15
1-16
1-17
This page left blank intentionally.
2-1
2-2
2-3
2-4
EXHIBIT 1
2-5
2-6
2-7
2-8
2-9
This page left blank intentionally.
2-10
2-11
2-12
2-13
3-1
3-2
3-3
This page left blank intentionally.
EXHIBIT 1
3-4
3-5
3-6
3-7
3-8
3-9
3-10
This page left blank intentionally.
CUP No. 2018-02 for Christ Our Savior Catholic Parish
2000 W. Alton Avenue
Exhibit 2 – Vicinity Zoning & Aerial Map
3-11
CUP No. 2018-02 for Christ Our Savior Catholic Parish
2000 W. Alton Avenue
Exhibit 3 – Site Photos
3-12
CUP No. 2018-02 for Christ Our Savior Catholic Parish
2000 W. Alton Avenue
Exhibit 4 – Site Plan Phase I
Page 1 of 2
N
3-13
Exhibit 4 – Site Plan Phase II
Page 2 of 2
N
3-14
CUP No. 2018-02 for Christ Our Savior Catholic Parish
2000 W. Alton Avenue
Exhibit 5 – Church Floor Plan
Page 1 of 4
3-15
Exhibit 5 – Parish Center Floor Plan
Page 2 of 4
3-16
Exhibit 5 – Parish Meeting Room Building Floor Plan
Page 3 of 4
3-17
Exhibit 5 – Parish Hall Floor Plan
Page 4 of 4
3-18
CUP No. 2018-02 for Christ Our Savior Catholic Parish
2000 W. Alton Avenue
Exhibit 6 – Elevations
Page 1 of 2
3-19
Exhibit 6 – Elevations
Page 2 of 2
3-20
CUP No. 2018-02 for Christ Our Savior Catholic Parish
2000 W. Alton Avenue
Exhibit 7 – Renderings
3-21
CUP No. 2018-02 for Christ Our Savior Catholic Parish
2000 W. Alton Avenue
Exhibit 8 – Landscape Plan
3-22
3-23
3-24
3-25
3-26
3-27
3-28
3-29
3-30
3-31
3-32
3-33
3-34
3-35
3-36
3-37
3-38
3-39
3-40
3-41
3-42
3-43
3-44
3-45
3-46
September 2017
TRAFFIC IM PAC T ANALYSIS
CHRIST OUR SAVIOR CATHOLIC PARISH
SANTA ANA, ORANGE COUNTY, CALIFORNIA
Submitted to:
Domus Studio Architecture
2150 West Washington, Suite 303
San Diego, CA 92110
Prepared by:
LSA
20 Executive Park, Suite 200
Irvine, CA 92614
(949) 553-0666
Project No. DOM1701
3-47
T RAFFIC I MPACT A NALYSIS
S EPTEMBER 2017
C HRIST O UR S AVIOR C ATHOLIC P ARISH
S ANTA A NA , O RANGE C OUNTY , C ALIFORNIA
P:\DOM1701\doc\Traffic Impact Analysis.docx «09/20/17» i
EXECUTIVE SUMMARY
This report analyzes trip generation and traffic impacts associated with the proposed Christ Our
Savior Catholic Parish project. The project proposes to construct a 19,427-square-foot (sf) sanctuary
with 1,250 seats, a 6,004 sf parish center, 4,850 sf of meeting rooms, a 16,024 sf parish hall, a
23,956 sf courtyard, and a 19,346 sf garden. These uses will replace the existing 4,770 sf sanctuary
with 396 seats, 2,420 sf of office space, and 3,700 sf of courtyard space, which will be demolished as
part of the project. The project will retain the two existing access driveways and add a third
driveway connecting to Jaguar Way, which would be gated and only used on weekends.
The combined trip generation for this project and the residential project located on the southern
portion of the lot is anticipated to be lower than the trip generation for the Master Plan analyzed as
part of the Armstrong Ranch Development Project Environmental Impact Report in June 2002. The
trip generation for the Church project is lower than the City’s threshold for requiring a traffic impact
analysis. However, the traffic impacts of the project were analyzed at the adjacent intersections
during the a.m. and p.m. peak hours of the street as well as during the Sunday peak hour of traffic
generation.
All study area intersections are anticipated to operate at a satisfactory LOS in the weekday a.m. and
p.m. peak hours and the Sunday morning peak hour with the addition of project traffic. LSA
considered special events and determined the effect of these events would be no greater than the
analyzed Sunday services. LSA examined the project access driveways and found that the driveway
and gated access would function adequately without interference to the arterial street system.
Special consideration was given to the interaction with traffic at the nearby school. The gate on the
southern driveway will remain closed on weekdays, so no Church traffic would interact with school
traffic on Jaguar Way. The southern leg of Raitt Street from Alton Avenue is used as an unofficial
drop-off area. Church traffic does not create an impact. In fact, the proposed project will create a
wider and more defined turn-around area on Raitt Street should drop-offs continue. But Raitt Street
is not wide enough for a parking lane and a driving lane and drop-off activity may create friction on
Raitt Street.
Based on the results of this TIA, the proposed development of the Christ Our Savior Catholic Parish
could be implemented without significantly impacting the nearby circulation system.
3-48
T RAFFIC I MPACT A NALYSIS
S EPTEMBER 2017
C HRIST O UR S AVIOR C ATHOLIC P ARISH
S ANTA A NA , O RANGE C OUNTY , C ALIFORNIA
P:\DOM1701\doc\Traffic Impact Analysis.docx «09/20/17» ii
TABLE OF CONTENTS
EXECUTIVE SUMMARY ............................................................................................................................. i
TABLE OF CONTENTS .............................................................................................................................. ii
LIST OF ABBREVIATIONS AND ACRONYMS ............................................................................................ iv
TRAFFIC IMPACT ANALYSIS CHRIST OUR SAVIOR CATHOLIC PARISH ........................... 1
INTRODUCTION ............................................................................................................................. 1
Project Description ............................................................................................................................. 1
METHODOLOGY............................................................................................................................. 3
Study Area Intersections .................................................................................................................... 3
Intersection Level of Service Methodology ........................................................................................ 3
EXISTING CONDITIONS .................................................................................................................. 8
Existing Circulation System ................................................................................................................. 8
Adjacent School Circulation ................................................................................................................ 8
Existing Intersection Level of Service Analysis ................................................................................... 9
PROJECT IMPACTS ....................................................................................................................... 12
Church Operations............................................................................................................................ 12
Trip Generation ................................................................................................................................ 13
Trip Distribution and Assignment ..................................................................................................... 13
EXISTING PLUS PROJECT CONDITIONS ........................................................................................ 15
Existing Plus Project Intersection Level of Service Analysis .............................................................. 15
SPECIAL ISSUES ............................................................................................................................ 20
Special Event Traffic ......................................................................................................................... 20
Project Access ................................................................................................................................... 20
CONCLUSION ............................................................................................................................... 21
APPENDICES
A: Existing Traffic Data
B: LOS Worksheets
3-49
T RAFFIC I MPACT A NALYSIS
S EPTEMBER 2017
C HRIST O UR S AVIOR C ATHOLIC P ARISH
S ANTA A NA , O RANGE C OUNTY , C ALIFORNIA
P:\DOM1701\doc\Traffic Impact Analysis.docx «09/20/17» iii
FIGURES AND TABLES
FIGURES
Figure 1: Project Location ....................................................................................................................... 2
Figure 2: Site Plan ................................................................................................................................... 4
Figure 3: Study Area Intersections ......................................................................................................... 5
Figure 4: Existing Geometrics and Traffic Control .................................................................................. 6
Figure 5: Existing Traffic Volumes ........................................................................................................ 10
Figure 6: Sunday Morning Traffic Volumes .......................................................................................... 11
Figure 7: Weekday Project Trip Assignment ........................................................................................ 16
Figure 8: Sunday Project Trip Assignment ............................................................................................ 17
Figure 9: Existing Plus Project Traffic Volumes .................................................................................... 18
Figure 10: Sunday Morning Plus Project Traffic Volumes .................................................................... 19
TABLES
Table A: Existing Intersection Level of Service Summary ....................................................................... 9
Table B: Project Trip Generation Summary .......................................................................................... 14
Table C: Trip Generation Comparison to Master Plan ......................................................................... 14
Table D: Existing Plus Project Intersection Level of Service Summary ................................................. 15
3-50
T RAFFIC I MPACT A NALYSIS
S EPTEMBER 2017
C HRIST O UR S AVIOR C ATHOLIC P ARISH
S ANTA A NA , O RANGE C OUNTY , C ALIFORNIA
P:\DOM1701\doc\Traffic Impact Analysis.docx «09/20/17» iv
LIST OF ABBREVIATIONS AND ACRONYMS
Armstrong Ranch EIR Armstrong Ranch Development Project Environmental Impact Report
CEQA California Environmental Quality Act
Church Christ Our Savior Catholic Parish
City City of Santa Ana
HCM Highway Capacity Manual
ICU Intersection Capacity Utilization
LOS level of service
sf square feet
TIA traffic impact analysis
v/c volume-to-capacity
3-51
T RAFFIC I MPACT A NALYSIS
S EPTEMBER 2017
C HRIST O UR S AVIOR C ATHOLIC P ARISH
S ANTA A NA , O RANGE C OUNTY , C ALIFORNIA
P:\DOM1701\doc\Traffic Impact Analysis.docx «09/20/17» 1
TRAFFIC IMPACT ANALYSIS
CHRIST OUR SAVIOR CATHOLIC PARISH
LSA has prepared the following analysis to identify the potential traffic impacts resulting from the
development of the Christ Our Savior Catholic Parish property (project) in Santa Ana, Orange
County, California. LSA has prepared this analysis consistent with the City of Santa Ana (City)
Capacity Calculations and Level of Service Standards and applicable provisions of the California
Environmental Quality Act (CEQA).
INTRODUCTION
The purpose of this traffic impact analysis (TIA) is to identify potential traffic and circulation impacts
associated with the development of the Christ Our Savior Catholic Parish (Church). Figure 1 shows
the project location. In accordance with the approved Scope of Work (August 4, 2017), this limited
scope TIA has been prepared because the proposed project is less intense than the project analyzed
in the previously certified Armstrong Ranch Development Project Environmental Impact Report
(Armstrong Ranch EIR) in June 2002. As such, an analysis of significant traffic impacts to City streets
and intersections has already been conducted, and an access analysis will suffice to address the
remaining traffic concerns. The issues addressed in this analysis include the performance of the
project access intersections and interface with the arterial street system. The traffic analysis for the
project examines two scenarios:
1. Existing conditions
2. Existing plus project conditions
A residential project with 42 single-family homes is proposed on the property adjacent to and south
of the project site. This project is in the approval process with the City as a separate application.
However, the sale of the property for the residential project by the Church facilitates development
of the Church project. Both projects are likely to proceed through construction on a similar timeline.
Therefore, traffic volume associated with the residential project is included in the existing plus
project conditions in this analysis.
Project Description
The existing site consists of a 4,770-square-foot (sf) sanctuary with 396 seats, 2,420 sf of office
space, and 3,700 sf of courtyard space. The project proposes to demolish the existing sanctuary,
office, and courtyard spaces and construct a 19,427 sf sanctuary with 1,250 seats, a 6,004 sf parish
center, 4,850 sf of meeting rooms, a 16,024 sf parish hall, a 23,956 sf courtyard, and a 19,346 sf
garden. The new sanctuary, parish center, and meeting rooms will be constructed first, followed by
demolition of the existing structures and construction of the parish hall.
3-52
PR
O
J
E
C
T
SI
T
E
AL
T
O
N
A
V
E
AL
T
O
N
A
V
E
BEAR ST BEAR ST
G
R
E
E
N
V
I
L
L
E
S
T
G
R
E
E
N
V
I
L
L
E
S
T
R
A
I
T
T
S
T
R
A
I
T
T
S
T
MA
C
A
R
T
H
U
R
B
L
V
D
MA
C
A
R
T
H
U
R
B
L
V
D
FE
E
T
25
0
0
FIGURE
1
Project Location
I:
\
D
O
M
1
7
0
1
\
G
\
L
o
c
a
t
i
o
n
.
c
d
r
(
9
/
1
4
/
2
0
1
7
)
50
0
N SO
U
R
C
E
G
o
o
g
l
e
E
a
r
t
h
:
Christ Our Savior Church
3-
5
3
T RAFFIC I MPACT A NALYSIS
S EPTEMBER 2017
C HRIST O UR S AVIOR C ATHOLIC P ARISH
S ANTA A NA , O RANGE C OUNTY , C ALIFORNIA
P:\DOM1701\doc\Traffic Impact Analysis.docx «09/20/17» 3
Access to the project site is currently provided via a driveway off the south leg of Raitt Street/Alton
Avenue and a gated right-in/right-out driveway on Alton Avenue. The project will reconstruct the
intersection of the main entry driveway with Raitt Street to provide more turn-around space. The
project proposes to add a gate to the Church side of the access. The project will maintain the
existing right-in/right-out driveway and gate from Alton Avenue. An additional driveway and gate
with a Knox-Box is proposed at the northern terminus of Jaguar Way. The project will also construct
a fire lane off this southern driveway, which will be accessible from Jaguar Way without interference
from the gate. Figure 2 shows the project site plan.
METHODOLOGY
This TIA is prepared consistent with the objectives and requirements of the City’s Capacity
Calculations and Level of Service Standards and applicable CEQA provisions.
City staff reviewed the scope of work for this traffic analysis. Figure 3 illustrates the locations of the
intersections included in the study area. Figure 4 provides the existing geometrics and traffic control
at each study area intersection. The study area analyzed in this report includes the following
intersections:
Study Area Intersections
1. Raitt Street/Alton Avenue
2. Jaguar Way/Project Driveway (unsignalized)
3. Jaguar Way/Proposed Residential Driveway (unsignalized)
4. Raitt Street-Jaguar Way/MacArthur Boulevard
5. Project Driveway/Alton Avenue (unsignalized)
Intersection Level of Service Methodology
Traffix Version 8.0 computer software was used to determine the level of service (LOS) at signalized
intersections based on the intersection capacity utilization (ICU) methodology, while Synchro
Version 9.1 computer software was used at the unsignalized project driveway using the Highway
Capacity Manual (HCM) methodology. The ICU methodology was used to determine the LOS for the
signalized study area intersections consistent with City requirements, including 5 percent loss time,
1,700 vehicle per lane per hour capacity for through lanes, and 1,600 vehicle per lane per hour
capacity for turn lanes. The ICU methodology compares the volume-to-capacity (v/c) ratios of
conflicting turn movements at an intersection, sums up these critical conflicting v/c ratios for each
intersection approach, and determines the overall ICU. The HCM methodology calculates the delay
experienced by vehicles passing through the intersection.
The resulting ICU or delay is expressed in terms of LOS, where LOS A represents free-flow activity
and LOS F represents overcapacity operation. LOS is a qualitative assessment of the quantitative
effects of such factors as traffic volume, roadway geometrics, speed, delay, and maneuverability on
roadway and intersection operations. LOS criteria for intersections are described in detail below.
3-54
FE
E
T
60
0 SO
U
R
C
E
d
o
m
u
s
t
u
d
i
o
a
r
c
h
i
t
e
c
t
u
r
e
:
Site Plan
I:
\
D
O
M
1
7
0
1
\
G
\
S
i
t
e
_
P
l
a
n
.
c
d
r
(
9
/
1
4
/
2
0
1
7
)
12
0
N
FIGURE
2
Christ Our Savior Church
3-
5
5
AL
T
O
N
A
V
E
AL
T
O
N
A
V
E
BEAR ST BEAR ST
G
R
E
E
N
V
I
L
L
E
S
T
G
R
E
E
N
V
I
L
L
E
S
T
R
A
I
T
T
S
T
R
A
I
T
T
S
T
MA
C
A
R
T
H
U
R
B
L
V
D
MA
C
A
R
T
H
U
R
B
L
V
D
FE
E
T
25
0
0 SO
U
R
C
E
G
o
o
g
l
e
E
a
r
t
h
:
FIGURE
3
Study Area Intersections
I:
\
D
O
M
1
7
0
1
\
G
\
S
t
u
d
y
I
n
t
e
r
s
e
c
t
i
o
n
s
.
c
d
r
(
9
/
1
4
/
2
0
1
7
)
Christ Our Savior Church
50
0
N
#
LE
G
E
N
D
-
S
t
u
d
y
A
r
e
a
I
n
t
e
r
s
e
c
t
i
o
n
PR
O
J
E
C
T
SI
T
E
1
3 4
2
5
3-
5
6
1 Raitt St/Alton Ave 2 Jaguar Way/South Project Dwy 3 Jaguar Way/Future Residential Dwy
4 Raitt St-Jaguar Way/MacArthur Blvd 5 East Project Dwy/Alton Ave
FIGURE 4
LEGEND
Signal
Stop Sign
Free Right Turn Christ Our Savior Church
xx Proposed Geometrics Existing Geometrics and Traffic Control
a
c
c
d
a
c
d
e
xvt ac
d v u g
ad b d
ace e
c
d
wt ac
c
c
e
cc
F
P:\DOM1701\figures\Fig 4-geometrics.xls 9/18/2017
3-57
T RAFFIC I MPACT A NALYSIS
S EPTEMBER 2017
C HRIST O UR S AVIOR C ATHOLIC P ARISH
S ANTA A NA , O RANGE C OUNTY , C ALIFORNIA
P:\DOM1701\doc\Traffic Impact Analysis.docx «09/20/17» 7
LOS Description
A No approach phase is fully utilized by traffic, and no vehicle waits longer than one red indication. Typically, the
approach appears quite open, turns are made easily, and nearly all drivers find freedom of operation.
B This service level represents stable operation, where an occasional approach phase is fully utilized, and a
substantial number are nearing full use. Many drivers begin to feel restricted within platoons of vehicles.
C This level still represents stable operating conditions. Occasionally, drivers may have to wait through more
than one red signal indication, and backups may develop behind turning vehicles. Most drivers feel somewhat
restricted, but not objectionably so.
D This level encompasses a zone of increasing restriction approaching instability at the intersection. Delays to
approaching vehicles may be substantial during short peaks within the peak period; however, enough cycles
with lower demand occur to permit periodic clearance of developing queues, thus preventing excessive
backups.
E Capacity occurs at the upper end of this service level. It represents the most vehicles that any particular
intersection approach can accommodate. Full utilization of every signal cycle is attained no matter how great
the demand.
F This level describes forced flow operations at low speeds, where volumes exceed capacity. These conditions
usually result from queues of vehicles backing up from a restriction downstream. Speeds are reduced
substantially, and stoppages may occur for short or long periods of time due to the congestion. In the extreme
case, speed can drop to zero.
LOS = level of service
The relationship between LOS and the ICU value (i.e., the v/c ratio) is as follows:
Level of Service Intersection Capacity Utilization
A < 0.60
B 0.61–0.70
C 0.71–0.80
D 0.81–0.90
E 0.91–1.00
F > 1.00
The relationship between LOS and the HCM delay (at unsignalized intersections) is as follows:
Level of Service Unsignalized Intersection Delay per
Vehicle (seconds)
A < 10.0
B 10.0–15.0
C 15.0–25.0
D 25.0–35.0
E 35.0–50.0
F > 50.0
The City considers LOS D to be the upper limit of satisfactory operations. Mitigation is required for
any intersection where project traffic causes the intersection to deteriorate from LOS D to LOS E
or F.
3-58
T RAFFIC I MPACT A NALYSIS
S EPTEMBER 2017
C HRIST O UR S AVIOR C ATHOLIC P ARISH
S ANTA A NA , O RANGE C OUNTY , C ALIFORNIA
P:\DOM1701\doc\Traffic Impact Analysis.docx «09/20/17» 8
EXISTING CONDITIONS
Existing Circulation System
Key roadways in the vicinity of the project include the following:
• Raitt Street is adjacent to and north of the project site. Raitt Street is a two-lane roadway
facilitating travel between major arterials and ultimate destinations.
• Bear Street is east of the project site. Bear Street is a four-lane arterial north of MacArthur
Boulevard and a five-lane arterial south of MacArthur Boulevard. This north-south arterial
provides access to State Route 73 to the south.
• MacArthur Boulevard is south of the project site. MacArthur Boulevard is a six-lane east-west
arterial that provides primary access to Jaguar Way and ultimately to the project site. This
arterial provides regional east-west travel to the adjacent cities of Fountain Valley and Irvine.
Adjacent School Circulation
The primary entrance to the Church parking lot is accessed from the Raitt Street/Alton Avenue
traffic signal. Traffic accesses the Church, the YMCA, and Segerstrom High School (one of the
school’s access points is in this location) from the southern leg of Raitt Street. The Church holds
services at 8:00 a.m. Monday, Wednesday, and Friday. Inbound trips for these services occur at the
same time as inbound and drop-off trips for the high school. In order to understand how high
school-generated traffic affects access, LSA staff conducted a field visit of the site on Wednesday,
September 13, 2017.
Raitt Street is used by some Segerstrom High School vehicular traffic as a drop-off area, although the
street is not designated by the school for that purpose. During the morning drop-off, school traffic
enters from Alton Avenue and many drivers seek to drop off students as close as possible to Alton
Avenue. The curb in this area of the southerly projection of Raitt Street is painted red. California
Vehicle Code Section 22500(c) states that a person shall not stop, park, or leave standing any vehicle
whether attended or unattended in an area indicated by a sign or red paint on the curb so long as
the sign or paint was erected or placed by local authorities pursuant to an ordinance. No signage is
placed along Raitt Street indicating whether this is a “No Stopping” or a “No Parking” zone. Signage
consistent with California Manual on Uniform Traffic Control Devices R26(S), R26A(S), or R28(S)
would further support the red curb prohibition of stopping a vehicle in this area, but would not be
necessary. As long as the red curb was placed by the City pursuant to an ordinance, drop-off activity
would not be permitted in this area and vehicles could be cited.
When vehicles stop on Raitt Street to drop off in this undesignated area, traffic flow on Raitt Street
for the Church’s morning service is restricted. The southbound lane is 15.5 feet in width, which does
not provide a comfortable parking and travel lane. As a result, vehicles traveling southbound slow
considerably when passing stopped vehicles. Vehicles that dropped off rejoin the southbound traffic
and make a U-turn at the southern end of Raitt Street. Occasionally drivers will choose to U-turn
midblock rather than proceed to the end of Raitt Street. Northbound queues were not observed to
3-59
T RAFFIC I MPACT A NALYSIS
S EPTEMBER 2017
C HRIST O UR S AVIOR C ATHOLIC P ARISH
S ANTA A NA , O RANGE C OUNTY , C ALIFORNIA
P:\DOM1701\doc\Traffic Impact Analysis.docx «09/20/17» 9
interfere with the performance of the Church’s driveway on Raitt Street, but the drop-off and turn-
around activity does increase friction on Raitt Street.
Drop-off activity begins to occur more frequently starting at approximately 7:35 a.m. This activity
continues for 15 minutes until approximately 7:50 a.m. Currently, this period of peak drop-off
activity coincides with inbound traffic to the 8:00 a.m. Church service on Monday, Wednesday, and
Friday.
If the drop-off activity and the traffic volume associated with school traffic continues, the project’s
proposed modification of the driveway with Raitt Street will provide a benefit to traffic flow. The
provision of more turn-around space will provide a defined area for turn-around movements to be
conducted. The wider space for turning around will also permit all vehicles to complete the turn in
one motion, eliminating the three-point turns larger vehicles now perform. The uniformity of turn-
around location and continuous forward movement will decrease confusion and reduce delay for all
vehicles using Raitt Street.
Existing Intersection Level of Service Analysis
Peak-hour intersection turn volumes were collected by National Data and Surveying Services and are
provided in Appendix A. Traffic volumes at Raitt Street-Jaguar Way/MacArthur Boulevard were
collected during the a.m. peak hour, the p.m. peak hour, and the hour after school (i.e., 2:15 p.m. to
3:15 p.m.) during the 2016–2017 school year on Tuesday, May 16, 2017. Traffic volumes for Raitt
Street/Alton Avenue were collected during the a.m. and p.m. peak hours during the 2017–2018
school year on Wednesday, August 16, 2017. Traffic volumes were also collected from 8:00 a.m. to
10:30 a.m. (the typical Church service time) for Raitt Street/Alton Avenue and Jaguar Way/
MacArthur Boulevard on Sunday, August 20, 2017. Figure 5 presents the existing a.m. and p.m.
peak-hour turn movement volumes for the study area intersections. Figure 6 presents the existing
Sunday morning traffic volumes.
Table A summarizes the existing a.m. and p.m. peak-hour LOS analysis (Appendix B contains all LOS
calculation worksheets). As Table A indicates, all study area intersections currently operate at an
acceptable LOS (LOS D or better) during both a.m. and p.m. peak hours.
Table A: Existing Intersection Level of Service Summary
Intersection
Existing
AM Peak Hour PM Peak Hour Sunday Morning
ICU/Delay LOS ICU/Delay LOS ICU/Delay LOS
1. Raitt Street/Alton Avenue 0.60 B 0.51 A 0.22 A
2. Jaguar Way/Project Driveway1 N/A – N/A – N/A –
3. Jaguar Way/Proposed Residential Driveway1 N/A – N/A – N/A –
4. Jaguar Way/MacArthur Boulevard 0.72 C 0.54 A 0.17 A
5. Project Driveway/Alton Avenue1 0.0 sec A 0.0 sec A 9.1 sec A
Source: LSA (September 2017).
1 Unsignalized intersection
ICU = intersection capacity utilization
LOS = level of service
sec = seconds
N/A = not applicable; intersection does not exist
3-60
45/325
229/293
63/6
373/218 365/79
569/215
31/5
1 Raitt St/Alton Ave 2 Jaguar Way/South Project Dwy 3 Jaguar Way/Future Residential Dwy
353/39
861/1773
277/104 337/624
99/34 888/399
1497/987
145/59
4 Raitt St-Jaguar Way/MacArthur Blvd 5 East Project Dwy/Alton Ave
FIGURE 5
LEGEND
123/456 AM/PM Peak-Hour Volumes
Christ Our Savior Church
Existing Traffic Volumes
36
5
/
7
9
72
/
5
90
/
3
51
0
/
9
9
31
5
/
1
5
4
14
0
/
5
22
9
/
1
8
1
35
/
1
51
0
/
9
9
11
4
/
2
8
11
2
/
1
6
18
9
/
3
3
10/0
31
/
1
4
7
64
/
3
0
93
/
8
1
P:\DOM1701\figures\Fig 5-existing volume.xls (9/14/2017)
3-61
43
72
10
42 0
61
30
1 Raitt St/Alton Ave 2 Jaguar Way/South Project Dwy 3 Jaguar Way/Future Residential Dwy
432
19 125
2 203
411
19
4 Raitt St-Jaguar Way/MacArthur Blvd 5 East Project Dwy/Alton Ave
FIGURE 6
LEGEND
XXX Sunday Morning Peak Hour Volume
Christ Our Savior Church
Sunday Morning Traffic Volumes
0
17 8 0
67 35 14
6
21 0
121640 7
P:\DOM1701\figures\Fig 6-sunday volume.xls (9/14/2017)
3-62
T RAFFIC I MPACT A NALYSIS
S EPTEMBER 2017
C HRIST O UR S AVIOR C ATHOLIC P ARISH
S ANTA A NA , O RANGE C OUNTY , C ALIFORNIA
P:\DOM1701\doc\Traffic Impact Analysis.docx «09/20/17» 12
PROJECT IMPACTS
Church Operations
The Church site was originally contemplated to hold the cathedral for the Diocese of Orange. The
cathedral site would have included a larger facility capable of accommodating a larger congregation
and larger special events. The cathedral site would also have been the seat for the administrative
functions of the Diocese of Orange. The proposed project is a typical, neighborhood-serving Catholic
church. Catholic churches in Orange County may hold services daily in the morning, on Saturday
evening, and multiple times on Sunday. Classes related to the religious practice can be held during
weekday evenings. Community groups may also use the facilities during weekday evenings. Special
events (e.g., baptisms, quinceañeras, weddings, and funerals) may occur on Friday evenings or on
Saturdays. The proposed Church will likely follow this pattern.
The project is constructing a new 19,427 sf sanctuary building with seating capacity for
approximately 1,250 people, which will be the primary location for religious services. Weekday
morning services are planned to be held at 8:00 a.m. Monday, Wednesday, and Friday. Evening
services are planned for 5:30 p.m. Tuesdays and 7:00 p.m. one Friday a month. Saturday services will
be held at 5:00 p.m. and 7:00 p.m. On Sunday, services are planned for 8:30 a.m., 10:30 a.m.,
12:30 p.m., 2:30 p.m., and 5:00 p.m. This planned schedule is similar to the existing schedule at the
temporary facility. Individual days of particular importance in the Church calendar with higher-than-
normal attendance (e.g., Ash Wednesday, Easter week, and Christmas) may require deviation from
this typical schedule.
In addition to the sanctuary building holding the Church services described above, the project is
constructing a 16,024 sf parish hall. The parish hall will have one large assembly area with at least
6,500 sf of space and many flexible meeting rooms ranging in size from 650 sf to 900 sf each. The
hours of use for the parish hall could be between 7:00 a.m. and 10:00 p.m. Weekday daytime usage
will typically be incidental but occasional special events could be scheduled nonconcurrent with
services. Weekday evening religious classes may use the flexible meeting rooms in the parish hall.
Weekend use could include occasional special events that would be scheduled nonconcurrent with
services. The parish hall will likely be used to hold services during individual days of higher-than-
normal attendance (e.g., Ash Wednesday, Easter week, and Christmas).
The site plan includes a 4,850 sf building providing meeting space separate from the parish hall.
Individual meeting rooms will range in size from 250 sf to 1,100 sf. The potential hours of operation
are between 7:00 a.m. and 10:00 p.m.; however, weekday daytime usage would typically be
incidental. These meeting rooms will be the primary location for weekday and weekend evening
religious classes and community groups. During services, these meeting rooms will be used as
Sunday school classrooms.
Access to the Church parking lot will be controlled by three gates at the three access driveways.
Primary access will be taken from a newly constructed roundabout at the southern terminus of Raitt
Street. A gate is proposed across the Church’s entrance from this roundabout. The gate will typically
be open Monday through Friday from 7:15 a.m. to 10:00 p.m. and from 7:30 a.m. to 6:30 p.m. on
3-63
T RAFFIC I MPACT A NALYSIS
S EPTEMBER 2017
C HRIST O UR S AVIOR C ATHOLIC P ARISH
S ANTA A NA , O RANGE C OUNTY , C ALIFORNIA
P:\DOM1701\doc\Traffic Impact Analysis.docx «09/20/17» 13
Saturday and Sunday, but the gate will remain open for any evening religious classes or community
group meetings extending past these times.
The northern driveway provides right-in/right-out access on Alton Avenue. This driveway has an
existing gate. The northern gate will typically be open from 7:00 a.m. to 9:00 a.m. on days with a
morning service and from 4:00 p.m. to 8:30 p.m. during Saturday evening services. On Sundays, the
northern gate will be open from 7:30 a.m. to 6:30 p.m. The project is constructing a southern
driveway with access to Jaguar Way. A gate is proposed along this driveway that would restrict
access to Jaguar Way on weekdays. The southern gate would be open from 7:30 a.m. to 8:30 p.m.
on Saturday and from 7:30 a.m. to 6:30 p.m. on Sunday, although this gate may remain open for any
evening religious classes or community group meetings extending past these times. While the
southern gate is not intended to be open during a typical weekday, individual days of high
attendance may necessitate using this gate. Examples include Ash Wednesday and the week before
Easter Sunday.
Trip Generation
Weekday daily, weekday a.m. peak hour, weekday p.m. peak hour, and Sunday peak-hour trips for
the existing and proposed Church land use were generated using trip rates contained in the Institute
of Transportation Engineers Trip Generation Manual (9th Edition, 2012). However, these trip
generation rates appeared to generate fewer trips for the existing Church in the a.m. and p.m. peak
hours than observed. Similar to the approach used in the Armstrong Ranch EIR, a.m. peak-hour trip
generation was adjusted based on Church service attendance and p.m. peak-hour trip generation
was adjusted to account for evening religious classes. The estimate of maximum attendance at
evening religious classes is 50 percent higher than originally anticipated in the Armstrong Ranch EIR,
so this trip generation has also been increased by 50 percent from the Armstrong Ranch EIR trip
generation. The existing morning Church service does not use the entire facility, so a larger facility
may not necessarily cause a growth in trip generation. However, this trip generation calculation
projects a conservative 20 percent growth in morning service attendance. As Table B indicates, the
project is estimated to generate 692 daily trips, 36 a.m. peak-hour trips, and 145 p.m. peak-hour
trips. Trip generation during a Sunday Church service is projected to be 557 peak-hour trips.
As mentioned above, the Armstrong Ranch EIR analyzed a larger project. When originally analyzed
and approved, the Master Plan was anticipated to be a 91,000 sf Church on land currently proposed
to contain the 46,305 sf Church use and 42 residential dwelling units. Table C compares the total trip
generation for the two projects currently proposed in the Master Plan area to the originally analyzed
and approved Master Plan. As Table C shows, fewer trips are generate than originally planned.
Trip Distribution and Assignment
The project trip distribution is based on existing travel patterns and regional travel utility as well as
the Church trip distribution identified in the Armstrong Ranch EIR (June 2002). Gate operations also
affect the travel paths available for vehicles. As such, for Sunday services, 23 percent of traffic was
distributed west on MacArthur Boulevard, 23 percent was distributed east on MacArthur Boulevard,
5 percent was distributed south on Raitt Street, 17 percent was distributed north on Raitt Street,
20 percent was distributed west on Alton Avenue, and 12 percent was distributed east on Alton
Avenue. However, because the southern driveway will be gated and closed on weekdays, weekday
3-64
T RAFFIC I MPACT A NALYSIS
S EPTEMBER 2017
C HRIST O UR S AVIOR C ATHOLIC P ARISH
S ANTA A NA , O RANGE C OUNTY , C ALIFORNIA
P:\DOM1701\doc\Traffic Impact Analysis.docx «09/20/17» 14
Table B: Project Trip Generation Summary
Land Use
(Land Use Code) Size Units ADT AM Peak Hour PM Peak Hour Sunday Peak Hour
In Out Total In Out Total In Out Total
Trip Rates
Church (560) TSF 9.11 0.35 0.21 0.56 0.26 0.29 0.55 5.90 6.14 12.04
Existing Use
Church (560)1 7.190 TSF 66 302 0 30 2 2 4 86 86 172
Evening Religious Classes3 180 0 0 0 18 18 36 0 0 0
Total Existing 246 30 0 30 20 20 40 86 86 172
Proposed Project Trip Generation
Church (560)1 46.305 TSF 422 364 0 36 12 13 25 273 284 557
Evening Religious Classes5 270 0 0 0 60 60 120 0 0 0
Total Proposed 692 36 0 36 72 73 145 273 284 557
Net New Project Trips 446 6 0 6 52 53 105 187 198 385
Source: LSA (September 2017).
1 Building area includes the Church, Parish Center, Parish Hall, and Meeting Rooms.
2 Higher trip generation was used based on observed parking demand.
3 Proportionate to projected attendance based on seating.
4 Weekday morning service does not use the full existing facility and is projected to increase no more than 20 percent.
5 Trip generation increased from Table 3.10-8 of the Armstrong Ranch Development Project Environmental Impact Report due to increased
class participation projection.
ADT = average daily traffic
TSF = thousand square feet
Table C: Trip Generation Comparison to Master Plan
Land Use
(Land Use Code) Size Units ADT AM Peak Hour PM Peak Hour Sunday Peak Hour
In Out Total In Out Total In Out Total
Trip Rates
Single-Family Detached
Housing (210)
DU 9.52 0.19 0.56 0.75 0.63 0.37 1.00 0.46 0.40 0.86
Church (560) TSF 9.11 0.35 0.21 0.56 0.26 0.29 0.55 5.90 6.14 12.04
Projects Proposed in Master Plan Area Trip Generation
Single-Family Detached
Housing (210)
42 DU 400 8 24 32 26 16 42 19 17 36
Church (560) 46.305 TSF 422 36 0 36 12 13 25 273 284 557
Evening Religious Classes 270 0 0 0 60 60 120 0 0 0
Total Both Projects 1,092 44 24 68 98 89 187 292 301 593
Approved Master Plan Trip Generation
Church (560)1 83.000 TSF 756 40 40 80 30 25 55 490 510 1,000
Day Care Center 4.000 TSF 317 27 24 51 25 28 53 0 0 0
Evening Religious Classes 180 0 0 0 40 40 80 0 0 0
Approved Church Total 1,253 67 64 131 95 93 188 490 510 1,000
Reduction from Approved 161 23 40 63 (3) 4 1 198 209 407
Source: LSA (September 2017).
1 AM and PM trip generation referenced from Table 3.10-8 of the Armstrong Ranch Development Project Environmental Impact Report.
ADT = average daily traffic
DU = dwelling units
TSF = thousand square feet
3-65
T RAFFIC I MPACT A NALYSIS
S EPTEMBER 2017
C HRIST O UR S AVIOR C ATHOLIC P ARISH
S ANTA A NA , O RANGE C OUNTY , C ALIFORNIA
P:\DOM1701\doc\Traffic Impact Analysis.docx «09/20/17» 15
trip assignment is limited to Alton Avenue. Figure 7 illustrates the project trip assignment based on
the project trip generation and the trip distribution identified above during the weekday a.m. and
p.m. peak hours. Figure 8 illustrates the additional trips possible during Sunday morning Church
services.
EXISTING PLUS PROJECT CONDITIONS
Traffic generated by the project was added to the existing traffic volumes at the study area
intersections. Figure 9 shows the resulting existing plus project a.m. and p.m. peak-hour traffic
volumes. Figure 10 shows Sunday morning traffic volumes with the proposed Church. Both figures
also include the anticipated traffic volume from the proposed residential project.
Existing Plus Project Intersection Level of Service Analysis
Table D summarizes the results of the existing plus project a.m. and p.m. peak-hour LOS analysis for
all study area intersections. As Table D indicates, all study area intersections are anticipated to
operate at an acceptable LOS (i.e., LOS D or better) in both the existing a.m. and p.m. peak hours
with implementation of the project.
Table D: Existing Plus Project Intersection Level of Service Summary
Intersection AM Peak Hour PM Peak Hour Sunday Morning
ICU/Delay LOS ICU/Delay LOS ICU/Delay LOS
Existing
1. Raitt Street/Alton Avenue 0.60 B 0.51 A 0.22 A
2. Jaguar Way/Project Driveway1 N/A – N/A – N/A –
3. Jaguar Way/Proposed Residential Driveway1 N/A – N/A – N/A –
4. Jaguar Way/MacArthur Boulevard 0.72 C 0.54 A 0.17 A
5. Project Driveway/Alton Avenue1 0.0 sec A 0.0 sec A 9.1 sec A
Existing Plus Project
1. Raitt Street/Alton Avenue 0.60 B 0.52 A 0.24 A
2. Jaguar Way/Project Driveway1 11.8 sec B 8.6 sec A 0.0 sec A
3. Jaguar Way/Proposed Residential Driveway1 31.8 sec D 9.9 sec A 10.4 sec B
4. Jaguar Way/MacArthur Boulevard 0.73 C 0.55 A 0.25 A
5. Project Driveway/Alton Avenue1 0.0 sec A 9.6 sec A 9.2 sec A
Source: LSA (September 2017).
1 Unsignalized intersection
ICU = intersection capacity utilization
LOS = level of service
sec = seconds
N/A = not applicable; intersection does not exist
As stated previously, a residential project with an access driveway on Jaguar Way has been
approved, but is not currently built. Therefore, as seen in Tables A and D, there is no delay at Jaguar
Way/Proposed Residential Driveway in the existing condition. With the addition of residential and
Church traffic during the weekdays and on Sundays, the residential driveway on Jaguar Way is not
expected to experience significant delay, according to the City’s guidelines.
3-66
1/13
1/7
1/14
1 Raitt St/Alton Ave 2 Jaguar Way/South Project Dwy 3 Jaguar Way/Future Residential Dwy
1/13
1/8
4 Raitt St-Jaguar Way/MacArthur Blvd 5 East Project Dwy/Alton Ave
FIGURE 7
LEGEND
XXX/YYY AM/PM Peak-Hour Volumes
Christ Our Savior Church
Weekday Project Trip Assignment
0/
1
8
0/
8
3/
1
8
0/
2
1
1/7 0/
4
P:\DOM1701\figures\Fig 7-weekday project volume.xls (9/15/2017)
3-67
33
37
1 Raitt St/Alton Ave 2 Jaguar Way/South Project Dwy 3 Jaguar Way/Future Residential Dwy
62 33
63 22
4 Raitt St-Jaguar Way/MacArthur Blvd 5 East Project Dwy/Alton Ave
FIGURE 8
LEGEND
XXX Sunday Morning Peak Hour Volume
Christ Our Savior Church
Sunday Project Trip Assignment
1814 11
59
13
9
65 14 65
48 22
13
9
46 14
4
14
4
P:\DOM1701\figures\Fig 8-sunday project volume.xls (9/14/2017)
3-68
45/325
229/293
64/19 24/16
373/218 365/79
570/222
32/19
1 Raitt St/Alton Ave 2 Jaguar Way/South Project Dwy 3 Jaguar Way/Future Residential Dwy
357/53
861/1773
277/104 338/637
103/46 889/414
1497/987
145/59
4 Raitt St-Jaguar Way/MacArthur Blvd 5 East Project Dwy/Alton Ave
FIGURE 9
LEGEND
XXX/YYY AM/PM Peak-Hour Volumes
Christ Our Savior Church
Existing Plus Project Traffic Volumes
36
5
/
7
9
72
/
2
3
90
/
1
1
51
0
/
9
9
31
5
/
1
5
4
14
3
/
2
3
22
9
/
1
8
1
35
/
2
2
51
0
/
9
9
8/
2
6
12
5
/
3
5
11
2
/
1
6
20
2
/
4
1
11/7
31
/
1
4
7
64
/
3
0
93
/
8
1
0/
4
P:\DOM1701\figures\Fig 9-existing plus project volume.xls (9/15/2017)
3-69
43
72
33 17
42
61
37
1 Raitt St/Alton Ave 2 Jaguar Way/South Project Dwy 3 Jaguar Way/Future Residential Dwy
71
432
19 148
72 211
411
19
4 Raitt St-Jaguar Way/MacArthur Blvd 5 East Project Dwy/Alton Ave
FIGURE 10
LEGEND
XXX Sunday Morning Peak Hour Volume
Christ Our Savior Church
Sunday Morning Plus Project Traffic Volumes
18161540 11
59
13
9 19
73 15 73
48 22
13
9
67 46 14
6
14
4
14
4
P:\DOM1701\figures\Fig 10-sunday plus project.xls (9/14/2017)
3-70
T RAFFIC I MPACT A NALYSIS
S EPTEMBER 2017
C HRIST O UR S AVIOR C ATHOLIC P ARISH
S ANTA A NA , O RANGE C OUNTY , C ALIFORNIA
P:\DOM1701\doc\Traffic Impact Analysis.docx «09/20/17» 20
Based on the City’s criteria for determining significant traffic impacts, the project will not result in a
significant impact at any of the study area intersections.
SPECIAL ISSUES
Special Event Traffic
Based on information the Church provided, the sanctuary and parish hall in the proposed project
may occasionally host special events (e.g., baptisms, quinceañeras, weddings, and funerals).
Baptisms and quinceañeras would be held on Saturday generally between the hours of 10:00 a.m.
and 3:00 p.m. Weddings could be held on Friday (daytime or evening) or on Saturday within the
hours of 10:00 a.m. and 3:00 p.m. Because of scheduled religious services on Saturday evenings,
weddings do not take place Saturday evening. Funerals could be held on weekdays, typically
beginning at 10:00 a.m. or 11:00 a.m., or on Saturday within the hours of 10:00 a.m. and 3:00 p.m.
Attendance at these special events would be between 50 and 200 people. Trip generation for a
200-person special event would be less than the trip generation analyzed above for Sunday services.
Each of the analyzed intersections was projected to operate at a satisfactory LOS during Sunday
services and would similarly be anticipated to operate at a satisfactory LOS during a special event.
Project Access
As discussed under Project Description, access to the project site is currently provided via a
driveway off the south leg of Raitt Street/Alton Avenue and a gated right-in/right-out driveway on
Alton Avenue. The project will reconstruct the intersection of the main entry driveway with Raitt
Street to provide more turn-around space. The project proposes to add a gate to the Church side of
the access. The project will maintain the existing right-in/right-out driveway and gate from Alton
Avenue. An additional driveway is proposed, connecting to Jaguar Way, to provide options and split
traffic volume generated by weekend Church services. This southern driveway will be gated and
closed on weekdays.
The gates on all three driveways will be open during Church services on Sunday. The gate at the
primary entrance will stay open during business hours. The gate on the northern right-in/right-out
driveway will be open during weekday morning, Saturday evening, and Sunday services. The gate at
the southern driveway will be closed on weekdays but will be open Saturday and Sunday. According
to the HCM analysis, all three driveways are anticipated to operate at satisfactory LOS during the
weekday a.m. and p.m. peak hours and the Sunday morning peak hour.
On the typical weekdays and Sundays analyzed, the access driveways are anticipated to operate at
satisfactory LOS and queues are not expected to form. During individual days of higher-than-normal
attendance (i.e., Easter and Christmas) queues are known to form entering churches. The proposed
site plan has 285 feet from the primary entrance to Alton Avenue and 465 feet from the southern
entrance to the parking lot to MacArthur Boulevard, for a total of 750 feet of potential queue
storage. This limits the potential for Church queues to impact adjacent arterial intersections on
these busiest days.
3-71
T RAFFIC I MPACT A NALYSIS
S EPTEMBER 2017
C HRIST O UR S AVIOR C ATHOLIC P ARISH
S ANTA A NA , O RANGE C OUNTY , C ALIFORNIA
P:\DOM1701\doc\Traffic Impact Analysis.docx «09/20/17» 21
CONCLUSION
Based on the results of this TIA, the proposed development of the Christ Our Savior Catholic Parish
could be implemented without significantly impacting the nearby circulation system. All study area
intersections are anticipated to operate at a satisfactory LOS in the weekday a.m. and p.m. peak
hours and the Sunday morning peak hour with the addition of project traffic. LSA considered special
events and determined the effect of these events would be no greater than the analyzed Sunday
services. LSA examined the project access driveways and found that the driveway and gated access
would function adequately without interference to the arterial street system.
3-72
T RAFFIC I MPACT A NALYSIS
S EPTEMBER 2017
C HRIST O UR S AVIOR C ATHOLIC P ARISH
S ANTA A NA , O RANGE C OUNTY , C ALIFORNIA
P:\DOM1701\doc\Traffic Impact Analysis.docx «09/20/17»
APPENDIX A
EXISTING TRAFFIC DATA
3-73
ITM Peak Hour Summary
Prepared by:
N ational D ata & Surveying Services
Lanes 0 1 1 City:
AM 114 112 189 AM
NOON 0 0 0 NOON
PM 28 16 33 PM
AM NOON PM AM NOON PM Lanes
353 0 39 1
861 0 1773 3
1 99 0 34 277 0 104 1
3 1497 0 987
0 145 0 59
Lanes AM NOON PM AM NOON PM
AM 31 64 93 AM
NOON 0 0 0 NOON
PM 147 30 81 PM
1 1 1 Lanes
AM AM
NOON NOON
PM PM
AM NOON PM AM NOON PM
1006 0 1948 1491 0 1916
1741 0 1080 1779 0 1101
AM NOON PM AM NOON PM
AM AM
NOON NOON
PM PM 437258
415
179
534
0
South Leg
302827470
East Leg
North Leg
180
3270
722
0
South Leg
East Leg
188
0 0
10377
West Leg
0
West Leg
3017
End
Total Ins & Outs
North Leg
534
0
179
Northbound Approach
9:00 AM
NONE
931
0
6:00 PM
516
0
Total Volume Per Leg
Count Periods
AM
Start
2:00 PM
17-1114-003
NOON Peak Hour
NOON
PM
6:30 AM
NONE
Day:
E
a
s
t
b
o
u
n
d
A
p
p
r
o
a
c
h
Raitt St - Jaguar Way and MacArthur Blvd , Santa Ana
PM Peak Hour
1101
516
0
103
Signalized
CONTROL
445 PM
1006 0 1948
Ra
i
t
t
S
t
-
J
a
g
u
a
r
W
a
y
AM Peak Hour
Tuesday
We
s
t
b
o
u
n
d
A
p
p
r
o
a
c
h
Santa Ana
Date:
1779 0
715 AM
Peak Hour Summary
Southbound Approach Project #:5/16/2017
MacArthur Blvd
3-74
Prepared by National Data & Surveying Services
ID:17-01164-002 Day:
City:Santa Ana Date:
AM 0 0 0 0
AM
NOON 0 0 0 0
NOON
PM 0 0 0 0
PM
AM NOON PM PM NOON AM
0 1 1 0 1 0 0 0
3 0 0 432
2 0 0 0 1 0 0 19
0 0 0 1 TEV 939 0 0 0 0 0 0
411 0 0 3 PHF 0.96
19 0 0 0 0 1 1 1
AM NOON PM PM NOON AM
PM 0 0 0 0
PM
NOON 0 0 0 0
NOON
AM 0 16 0 40
AM
Peak Hour Turning Movement Count
0
Total (PM)Total (PM)
Jaguar Way & MacArthur Blvd
Sunday
08/20/2017
CONTROL
W
E
S
T
B
O
U
N
D
09:30 AM - 10:30 AM
Total (NOON)
Pedestrians (Crosswalks)
Total (NOON)
451
C
O
U
N
T
P
E
R
I
O
D
S
Total (AM)
PE
A
K
H
O
U
R
S
Total (AM)
NONE
NONE
0
0
0
Signalized
Ma
c
A
r
t
h
u
r
B
l
v
d
EA
S
T
B
O
U
N
D
Jaguar Way
38
0
Jaguar Way
SOUTHBOUND
NONE
NORTHBOUND
0
0
M
a
c
A
r
t
h
u
r
B
l
v
d
08:00 AM - 10:30 AM
NONE
450 0 0
NOONAM PM
0
0
0
0 0 0 0 0 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM
NOON
19
432
0
19
411
0
0 0 0
1
6
0
4
0
N/A
N/A
N/A
N/A
N/A
N/A
N/
A
N/
A
N/
A
N
/
A
N
/
A
N
/
A
19
432
0
19
411
0
0 0 0
1
6
0
4
0
N/A
N/A
N/A
N/A
N/A
N/A
N/
A
N/
A
N/
A
N
/
A
N
/
A
N
/
A
N/A
N/A
N/A
N/A
N/A
N/A
N/
A
N/
A
N/
A
N
/
A
N
/
A
N
/
A
N/A
N/A
N/A
N/A
N/A
N/A
N/
A
N/
A
N/
A
N
/
A
N
/
A
N
/
A
NO
O
N
PM AM NO
O
N
AM
PM
NO
O
N
AM
PMNO
O
N
PM AM
3-75
Prepared by National Data & Surveying Services
ID:17-01164-001 Day:
City:Santa Ana Date:
AM 315 140 229 0
AM
NOON 0 0 0 0
NOON
PM 154 5 181 0
PM
AM NOON PM PM NOON AM
1 1 1 0 0 325 0 45
2 293 0 229
0 0 0 0 1 6 0 63
373 0 218 1 TEV 2191 0 1411 0 0 0 0
569 0 215 2 PHF 0.78 0.94
31 0 5 0 0 1 0.5 0.5
AM NOON PM PM NOON AM
PM 0 1 5 3
PM
NOON 0 0 0 0
NOON
AM 0 35 72 90
AM
Peak Hour Turning Movement Count
16
Total (PM)Total (PM)
Raitt St & Alton Ave
Wednesday
08/16/2017
CONTROL
W
E
S
T
B
O
U
N
D
07:15 AM - 08:15 AM
Total (NOON)
Pedestrians (Crosswalks)
Total (NOON)
888
C
O
U
N
T
P
E
R
I
O
D
S
Total (AM)
PE
A
K
H
O
U
R
S
Total (AM)
NONE
05:00 PM - 06:00 PM
490
548
0
Signalized
Al
t
o
n
A
v
e
EA
S
T
B
O
U
N
D
Raitt St
234
0
Raitt St
SOUTHBOUND
04:00 PM - 06:00 PM
NORTHBOUND
399
0
A
l
t
o
n
A
v
e
07:00 AM - 09:00 AM
NONE
579 0 448
NOONAM PM
0
0
0
0 0 0 0 0 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM
NOON
63
229
45
31
569
373
31
5
14
0
22
9
3
5
7
2
9
0
N/A
N/A
N/A
N/A
N/A
N/A
N/
A
N/
A
N/
A
N
/
A
N
/
A
N
/
A
63
229
45
31
569
373
31
5
14
0
22
9
3
5
7
2
9
0
N/A
N/A
N/A
N/A
N/A
N/A
N/
A
N/
A
N/
A
N
/
A
N
/
A
N
/
A
6
293
325
5
215
218
15
4
5 18
1
1
5
3
6
293
325
5
215
218
15
4
5 18
1
1
5
3
NO
O
N
PM AM NO
O
N
AM
PM
NO
O
N
AM
PMNO
O
N
PM AM
3-76
Prepared by National Data & Surveying Services
ID:17-01164-001 Day:
City:Santa Ana Date:
AM 67 35 146 0
AM
NOON 0 0 0 0
NOON
PM 0 0 0 0
PM
AM NOON PM PM NOON AM
1 1 1 0 0 0 0 43
2 0 0 72
0 0 0 0 1 0 0 10
42 0 0 1 TEV 552 0 0 0 0 0 0
61 0 0 2 PHF 0.75
30 0 0 0 0 1 0.5 0.5
AM NOON PM PM NOON AM
PM 0 0 0 0
PM
NOON 0 0 0 0
NOON
AM 0 21 17 8
AM
Peak Hour Turning Movement Count
0
Total (PM)Total (PM)
Raitt St & Alton Ave
Sunday
08/20/2017
CONTROL
W
E
S
T
B
O
U
N
D
09:30 AM - 10:30 AM
Total (NOON)
Pedestrians (Crosswalks)
Total (NOON)
215
C
O
U
N
T
P
E
R
I
O
D
S
Total (AM)
PE
A
K
H
O
U
R
S
Total (AM)
NONE
NONE
102
0
0
Signalized
Al
t
o
n
A
v
e
EA
S
T
B
O
U
N
D
Raitt St
75
0
Raitt St
SOUTHBOUND
NONE
NORTHBOUND
0
0
A
l
t
o
n
A
v
e
08:00 AM - 10:30 AM
NONE
160 0 0
NOONAM PM
0
0
0
0 0 0 0 0 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
PM
AM
AM
NOON
PM
PM
NOON
AM
AM
NOON
PM
NOON
10
72
43
30
61
42
67 35 14
6
2
1
1
7
8
N/A
N/A
N/A
N/A
N/A
N/A
N/
A
N/
A
N/
A
N
/
A
N
/
A
N
/
A
10
72
43
30
61
42
67 35 14
6
2
1
1
7
8
N/A
N/A
N/A
N/A
N/A
N/A
N/
A
N/
A
N/
A
N
/
A
N
/
A
N
/
A
N/A
N/A
N/A
N/A
N/A
N/A
N/
A
N/
A
N/
A
N
/
A
N
/
A
N
/
A
N/A
N/A
N/A
N/A
N/A
N/A
N/
A
N/
A
N/
A
N
/
A
N
/
A
N
/
A
NO
O
N
PM AM NO
O
N
AM
PM
NO
O
N
AM
PMNO
O
N
PM AM
3-77
ITM Peak Hour Summary
Prepared by:
N ational D ata & Surveying Services
Lanes 0 0 0 City:
AM 0 0 0 AM
NOON 0 0 0 NOON
PM 0 0 0 PM
AM NOON PM AM NOON PM Lanes
0 0 0 0
0 0 0 0
0 0 0 0 0 0 0 0
1 0 0 0
0 365 0 79
Lanes AM NOON PM AM NOON PM
AM 510 0 0 AM
NOON 0 0 0 NOON
PM 99 0 0 PM
0 1 0 Lanes
AM AM
NOON NOON
PM PM
AM NOON PM AM NOON PM
510 0 99 0 0 0
365 0 79 0 0 0
AM NOON PM AM NOON PM
AM AM
NOON NOON
PM PM 17899
0
79
365
0
South Leg
1788750
East Leg
North Leg
0
0
875
0
South Leg
East Leg
510
0 0
00
West Leg
0
West Leg
0
End
Total Ins & Outs
North Leg
365
0
79
Northbound Approach
9:00 AM
NONE
0
0
6:00 PM
0
0
Total Volume Per Leg
Count Periods
AM
Start
4:00 PM
17-1114-002
NOON Peak Hour
NOON
PM
7:00 AM
NONE
Day:
E
a
s
t
b
o
u
n
d
A
p
p
r
o
a
c
h
Raitt St - Jaguar Way and Segerstrom HS Dwy , Santa Ana
PM Peak Hour
0
0
0
0
No Control
CONTROL
430 PM
510 0 99
Ra
i
t
t
S
t
-
J
a
g
u
a
r
W
a
y
AM Peak Hour
Tuesday
We
s
t
b
o
u
n
d
A
p
p
r
o
a
c
h
Santa Ana
Date:
0 0
700 AM
Peak Hour Summary
Southbound Approach Project #:5/16/2017
Segerstrom HS Dwy
3-78
T RAFFIC I MPACT A NALYSIS
S EPTEMBER 2017
C HRIST O UR S AVIOR C ATHOLIC P ARISH
S ANTA A NA , O RANGE C OUNTY , C ALIFORNIA
P:\DOM1701\doc\Traffic Impact Analysis.docx «09/20/17»
APPENDIX B
LOS WORKSHEETS
3-79
01 Existing AM Thu Sep 14, 2017 14:55:24 Page 2-1
--------------------------------------------------------------------------------
Christ Our Savior Church
DOM1701
Existing AM
--------------------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative)
********************************************************************************
Intersection #1 Raitt Street/Alton Avenue
********************************************************************************
Cycle (sec): 100 Critical Vol./Cap.(X): 0.602
Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx
Optimal Cycle: 29 Level Of Service: B
********************************************************************************
Street Name: Raitt Street Alton Avenue
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------|---------------||---------------||---------------||---------------|
Control: Protected Protected Prot+Permit Prot+Permit
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lanes: 1 0 0 1 0 1 0 1 0 1 1 0 1 1 0 1 0 1 1 0
------------|---------------||---------------||---------------||---------------|
Volume Module:
Base Vol: 35 72 90 229 140 315 373 569 31 63 229 45
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 35 72 90 229 140 315 373 569 31 63 229 45
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 35 72 90 229 140 315 373 569 31 63 229 45
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 35 72 90 229 140 315 373 569 31 63 229 45
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
FinalVolume: 35 72 90 229 140 315 373 569 31 63 229 45
------------|---------------||---------------||---------------||---------------|
Saturation Flow Module:
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 0.94 1.00 1.00 0.94 1.00 0.94 0.94 1.00 1.00 0.94 1.00 1.00
Lanes: 1.00 0.44 0.56 1.00 1.00 1.00 1.00 1.90 0.10 1.00 1.67 0.33
Final Sat.: 1600 756 944 1600 1700 1600 1600 3224 176 1600 2842 558
------------|---------------||---------------||---------------||---------------|
Capacity Analysis Module:
Vol/Sat: 0.02 0.10 0.10 0.14 0.08 0.20 0.23 0.18 0.18 0.04 0.08 0.08
Crit Moves: **** **** **** ****
********************************************************************************
Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA
3-80
HCM 2010 TWSC
3: Jaguar Way & Future Residential Dwy 09/15/2017
Christ Our Savior Church (DOM1701) 5:00 pm 09/14/2017 01 Existing AM Synchro 9 Report
LSA Analyst AY Page 1
Intersection
Int Delay, s/veh 0
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 0 510 0 0 365
Future Vol, veh/h 0 0 510 0 0 365
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 66 66 66 66 66 66
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 773 0 0 553
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1326 773 0 0 773 0
Stage 1 773 - - - - -
Stage 2 553 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 172 399 - - 842 -
Stage 1 455 - - - - -
Stage 2 576 - - - - -
Platoon blocked, % - --
Mov Cap-1 Maneuver 172 399 - - 842 -
Mov Cap-2 Maneuver 172 - - - - -
Stage 1 455 - - - - -
Stage 2 576 - - - - -
Approach WB NB SB
HCM Control Delay, s 0 0 0
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h)- - - 842 -
HCM Lane V/C Ratio - - - - -
HCM Control Delay (s) - - 0 0 -
HCM Lane LOS - - A A -
HCM 95th %tile Q(veh) - - - 0 -
3-81
01 Existing AM Thu Sep 14, 2017 14:55:24 Page 3-1
--------------------------------------------------------------------------------
Christ Our Savior Church
DOM1701
Existing AM
--------------------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative)
********************************************************************************
Intersection #4 Raitt Street-Jaguar Way/MacArthur Boulevard
********************************************************************************
Cycle (sec): 100 Critical Vol./Cap.(X): 0.721
Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx
Optimal Cycle: 40 Level Of Service: C
********************************************************************************
Street Name: Raitt Street-Jaguar Way MacArthur Boulevard
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------|---------------||---------------||---------------||---------------|
Control: Permitted Permitted Protected Protected
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lanes: 1 0 1 0 1 1 0 0 1 0 1 0 2 1 0 1 0 3 0 1
------------|---------------||---------------||---------------||---------------|
Volume Module:
Base Vol: 31 64 93 189 112 114 99 1497 145 277 861 353
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 31 64 93 189 112 114 99 1497 145 277 861 353
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 31 64 93 189 112 114 99 1497 145 277 861 353
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 31 64 93 189 112 114 99 1497 145 277 861 353
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
FinalVolume: 31 64 93 189 112 114 99 1497 145 277 861 353
------------|---------------||---------------||---------------||---------------|
Saturation Flow Module:
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 0.94 1.00 0.94 0.94 1.00 1.00 0.94 1.00 1.00 0.94 1.00 0.94
Lanes: 1.00 1.00 1.00 1.00 0.50 0.50 1.00 2.74 0.26 1.00 3.00 1.00
Final Sat.: 1600 1700 1600 1600 842 858 1600 4650 450 1600 5100 1600
------------|---------------||---------------||---------------||---------------|
Capacity Analysis Module:
Vol/Sat: 0.02 0.04 0.06 0.12 0.13 0.13 0.06 0.32 0.32 0.17 0.17 0.22
Crit Moves: **** **** **** ****
********************************************************************************
Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA
3-82
HCM 2010 TWSC
5: East Project Dwy & Alton Ave 09/15/2017
Christ Our Savior Church (DOM1701) 5:00 pm 09/14/2017 01 Existing AM Synchro 9 Report
LSA Analyst AY Page 2
Intersection
Int Delay, s/veh 0
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 888 10 0 337 0 0
Future Vol, veh/h 888 10 0 337 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 79 79 79 79 79 79
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1124 13 0 427 0 0
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 568
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 6.94
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.32
Pot Cap-1 Maneuver - - 0 - 0 466
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - --
Mov Cap-1 Maneuver - - - - - 466
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Control Delay, s 0 0 0
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h)- - - -
HCM Lane V/C Ratio - - - -
HCM Control Delay (s) 0 - - -
HCM Lane LOS A - - -
HCM 95th %tile Q(veh) - - - -
3-83
01 Existing PM Thu Sep 14, 2017 15:00:08 Page 2-1
--------------------------------------------------------------------------------
Christ Our Savior Church
DOM1701
Existing PM
--------------------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative)
********************************************************************************
Intersection #1 Raitt Street/Alton Avenue
********************************************************************************
Cycle (sec): 100 Critical Vol./Cap.(X): 0.507
Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx
Optimal Cycle: 24 Level Of Service: A
********************************************************************************
Street Name: Raitt Street Alton Avenue
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------|---------------||---------------||---------------||---------------|
Control: Protected Protected Prot+Permit Prot+Permit
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lanes: 1 0 0 1 0 1 0 1 0 1 1 0 1 1 0 1 0 1 1 0
------------|---------------||---------------||---------------||---------------|
Volume Module:
Base Vol: 1 5 3 181 5 154 218 215 5 6 293 325
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 1 5 3 181 5 154 218 215 5 6 293 325
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 1 5 3 181 5 154 218 215 5 6 293 325
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 1 5 3 181 5 154 218 215 5 6 293 325
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
FinalVolume: 1 5 3 181 5 154 218 215 5 6 293 325
------------|---------------||---------------||---------------||---------------|
Saturation Flow Module:
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 0.94 1.00 1.00 0.94 1.00 0.94 0.94 1.00 1.00 0.94 1.00 0.94
Lanes: 1.00 0.62 0.38 1.00 1.00 1.00 1.00 1.95 0.05 1.00 1.00 1.00
Final Sat.: 1600 1063 638 1600 1700 1600 1600 3323 77 1600 1700 1600
------------|---------------||---------------||---------------||---------------|
Capacity Analysis Module:
Vol/Sat: 0.00 0.00 0.00 0.11 0.00 0.10 0.14 0.06 0.06 0.00 0.17 0.20
Crit Moves: **** **** **** ****
********************************************************************************
Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA
3-84
HCM 2010 TWSC
3: Jaguar Way & Future Residential Dwy 09/15/2017
Christ Our Savior Church (DOM1701) 5:00 pm 09/14/2017 01 Existing PM Synchro 9 Report
LSA Analyst AY Page 1
Intersection
Int Delay, s/veh 0
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 0 99 0 0 79
Future Vol, veh/h 0 0 99 0 0 79
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 84 84 84 84 84 84
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 118 0 0 94
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 212 118 0 0 118 0
Stage 1 118 - - - - -
Stage 2 94 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 776 934 - - 1470 -
Stage 1 907 - - - - -
Stage 2 930 - - - - -
Platoon blocked, % - --
Mov Cap-1 Maneuver 776 934 - - 1470 -
Mov Cap-2 Maneuver 776 - - - - -
Stage 1 907 - - - - -
Stage 2 930 - - - - -
Approach WB NB SB
HCM Control Delay, s 0 0 0
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h)- - - 1470 -
HCM Lane V/C Ratio - - - - -
HCM Control Delay (s) - - 0 0 -
HCM Lane LOS - - A A -
HCM 95th %tile Q(veh) - - - 0 -
3-85
01 Existing PM Thu Sep 14, 2017 15:00:08 Page 3-1
--------------------------------------------------------------------------------
Christ Our Savior Church
DOM1701
Existing PM
--------------------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative)
********************************************************************************
Intersection #4 Raitt Street-Jaguar Way/MacArthur Boulevard
********************************************************************************
Cycle (sec): 100 Critical Vol./Cap.(X): 0.537
Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx
Optimal Cycle: 25 Level Of Service: A
********************************************************************************
Street Name: Raitt Street-Jaguar Way MacArthur Boulevard
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------|---------------||---------------||---------------||---------------|
Control: Permitted Permitted Protected Protected
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lanes: 1 0 1 0 1 1 0 0 1 0 1 0 2 1 0 1 0 3 0 1
------------|---------------||---------------||---------------||---------------|
Volume Module:
Base Vol: 147 30 81 33 16 28 34 987 59 104 1773 39
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 147 30 81 33 16 28 34 987 59 104 1773 39
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 147 30 81 33 16 28 34 987 59 104 1773 39
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 147 30 81 33 16 28 34 987 59 104 1773 39
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
FinalVolume: 147 30 81 33 16 28 34 987 59 104 1773 39
------------|---------------||---------------||---------------||---------------|
Saturation Flow Module:
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 0.94 1.00 0.94 0.94 1.00 1.00 0.94 1.00 1.00 0.94 1.00 0.94
Lanes: 1.00 1.00 1.00 1.00 0.36 0.64 1.00 2.83 0.17 1.00 3.00 1.00
Final Sat.: 1600 1700 1600 1600 618 1082 1600 4812 288 1600 5100 1600
------------|---------------||---------------||---------------||---------------|
Capacity Analysis Module:
Vol/Sat: 0.09 0.02 0.05 0.02 0.03 0.03 0.02 0.21 0.21 0.07 0.35 0.02
Crit Moves: **** **** **** ****
********************************************************************************
Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA
3-86
HCM 2010 TWSC
5: East Project Dwy & Alton Ave 09/15/2017
Christ Our Savior Church (DOM1701) 5:00 pm 09/14/2017 01 Existing PM Synchro 9 Report
LSA Analyst AY Page 2
Intersection
Int Delay, s/veh 0
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 399 0 0 624 0 0
Future Vol, veh/h 399 0 0 624 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 94 94 94 94 94 94
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 424 0 0 664 0 0
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 212
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 6.94
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.32
Pot Cap-1 Maneuver - - 0 - 0 793
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - --
Mov Cap-1 Maneuver - - - - - 793
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Control Delay, s 0 0 0
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h)- - - -
HCM Lane V/C Ratio - - - -
HCM Control Delay (s) 0 - - -
HCM Lane LOS A - - -
HCM 95th %tile Q(veh) - - - -
3-87
01 Existing Sunday Thu Sep 14, 2017 15:07:00 Page 2-1
--------------------------------------------------------------------------------
Christ Our Savior Church
DOM1701
Existing Sunday
--------------------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative)
********************************************************************************
Intersection #1 Raitt Street/Alton Avenue
********************************************************************************
Cycle (sec): 100 Critical Vol./Cap.(X): 0.216
Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx
Optimal Cycle: 16 Level Of Service: A
********************************************************************************
Street Name: Raitt Street Alton Avenue
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------|---------------||---------------||---------------||---------------|
Control: Protected Protected Prot+Permit Prot+Permit
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lanes: 1 0 0 1 0 1 0 1 0 1 1 0 1 1 0 1 0 1 1 0
------------|---------------||---------------||---------------||---------------|
Volume Module:
Base Vol: 21 17 8 146 35 67 42 61 30 10 72 43
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 21 17 8 146 35 67 42 61 30 10 72 43
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 21 17 8 146 35 67 42 61 30 10 72 43
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 21 17 8 146 35 67 42 61 30 10 72 43
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
FinalVolume: 21 17 8 146 35 67 42 61 30 10 72 43
------------|---------------||---------------||---------------||---------------|
Saturation Flow Module:
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 0.94 1.00 1.00 0.94 1.00 0.94 0.94 1.00 1.00 0.94 1.00 1.00
Lanes: 1.00 0.68 0.32 1.00 1.00 1.00 1.00 1.34 0.66 1.00 1.25 0.75
Final Sat.: 1600 1156 544 1600 1700 1600 1600 2279 1121 1600 2129 1271
------------|---------------||---------------||---------------||---------------|
Capacity Analysis Module:
Vol/Sat: 0.01 0.01 0.01 0.09 0.02 0.04 0.03 0.03 0.03 0.01 0.03 0.03
Crit Moves: **** **** **** ****
********************************************************************************
Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA
3-88
HCM 2010 TWSC
3: Jaguar Way & Future Residential Dwy 09/15/2017
Christ Our Savior Church (DOM1701) 5:00 pm 09/14/2017 01 Existing Sunday Synchro 9 Report
LSA Analyst AY Page 1
Intersection
Int Delay, s/veh 0
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 0 0 0 0 0 0
Future Vol, veh/h 0 0 0 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 96 96 96 96 96 96
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 0 0 0 0
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1 0 0 0 0 0
Stage 1 0 - - - - -
Stage 2 1 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 1022 - - - - -
Stage 1 - - - - - -
Stage 2 1022 - - - - -
Platoon blocked, % - --
Mov Cap-1 Maneuver 1022 - - - - -
Mov Cap-2 Maneuver 1022 - - - - -
Stage 1 - - - - - -
Stage 2 1022 - - - - -
Approach WB NB SB
HCM Control Delay, s 0 0 0
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h)- - - - -
HCM Lane V/C Ratio - - - - -
HCM Control Delay (s) - - 0 0 -
HCM Lane LOS - - A A -
HCM 95th %tile Q(veh) - - - - -
3-89
01 Existing Sunday Thu Sep 14, 2017 15:07:00 Page 3-1
--------------------------------------------------------------------------------
Christ Our Savior Church
DOM1701
Existing Sunday
--------------------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative)
********************************************************************************
Intersection #4 Raitt Street-Jaguar Way/MacArthur Boulevard
********************************************************************************
Cycle (sec): 100 Critical Vol./Cap.(X): 0.171
Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx
Optimal Cycle: 15 Level Of Service: A
********************************************************************************
Street Name: Raitt Street-Jaguar Way MacArthur Boulevard
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------|---------------||---------------||---------------||---------------|
Control: Permitted Permitted Protected Protected
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lanes: 1 0 1 0 1 1 0 0 1 0 1 0 2 1 0 1 0 3 0 1
------------|---------------||---------------||---------------||---------------|
Volume Module:
Base Vol: 16 0 40 0 0 0 2 411 19 19 432 0
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 16 0 40 0 0 0 2 411 19 19 432 0
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 16 0 40 0 0 0 2 411 19 19 432 0
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 16 0 40 0 0 0 2 411 19 19 432 0
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
FinalVolume: 16 0 40 0 0 0 2 411 19 19 432 0
------------|---------------||---------------||---------------||---------------|
Saturation Flow Module:
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 0.94 1.00 0.94 0.94 1.00 1.00 0.94 1.00 1.00 0.94 1.00 0.94
Lanes: 1.00 1.00 1.00 1.00 1.00 0.00 1.00 2.87 0.13 1.00 3.00 1.00
Final Sat.: 1600 1700 1600 1600 1700 0 1600 4875 225 1600 5100 1600
------------|---------------||---------------||---------------||---------------|
Capacity Analysis Module:
Vol/Sat: 0.01 0.00 0.03 0.00 0.00 0.00 0.00 0.08 0.08 0.01 0.08 0.00
Crit Moves: **** **** ****
********************************************************************************
Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA
3-90
HCM 2010 TWSC
5: East Project Dwy & Alton Ave 09/15/2017
Christ Our Savior Church (DOM1701) 5:00 pm 09/14/2017 01 Existing Sunday Synchro 9 Report
LSA Analyst AY Page 2
Intersection
Int Delay, s/veh 0.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 203 12 0 125 0 7
Future Vol, veh/h 203 12 0 125 0 7
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 75 75 75 75 75 75
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 271 16 0 167 0 9
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 143
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 6.94
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.32
Pot Cap-1 Maneuver - - 0 - 0 879
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - --
Mov Cap-1 Maneuver - - - - - 879
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Control Delay, s 0 0 9.1
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h)879 - - -
HCM Lane V/C Ratio 0.011 - - -
HCM Control Delay (s) 9.1 - - -
HCM Lane LOS A - - -
HCM 95th %tile Q(veh) 0 - - -
3-91
02 Existing Plus Project AMMon Sep 18, 2017 16:18:15 Page 2-1
--------------------------------------------------------------------------------
Christ Our Savior Church
DOM1701
Existing Plus Project AM
--------------------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative)
********************************************************************************
Intersection #1 Raitt Street/Alton Avenue
********************************************************************************
Cycle (sec): 100 Critical Vol./Cap.(X): 0.602
Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx
Optimal Cycle: 29 Level Of Service: B
********************************************************************************
Street Name: Raitt Street Alton Avenue
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------|---------------||---------------||---------------||---------------|
Control: Protected Protected Prot+Permit Prot+Permit
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lanes: 1 0 0 1 0 1 0 1 0 1 1 0 1 1 0 1 0 1 1 0
------------|---------------||---------------||---------------||---------------|
Volume Module:
Base Vol: 35 72 90 229 143 315 373 570 32 64 229 45
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 35 72 90 229 143 315 373 570 32 64 229 45
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 35 72 90 229 143 315 373 570 32 64 229 45
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 35 72 90 229 143 315 373 570 32 64 229 45
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
FinalVolume: 35 72 90 229 143 315 373 570 32 64 229 45
------------|---------------||---------------||---------------||---------------|
Saturation Flow Module:
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 0.94 1.00 1.00 0.94 1.00 0.94 0.94 1.00 1.00 0.94 1.00 1.00
Lanes: 1.00 0.44 0.56 1.00 1.00 1.00 1.00 1.89 0.11 1.00 1.67 0.33
Final Sat.: 1600 756 944 1600 1700 1600 1600 3219 181 1600 2842 558
------------|---------------||---------------||---------------||---------------|
Capacity Analysis Module:
Vol/Sat: 0.02 0.10 0.10 0.14 0.08 0.20 0.23 0.18 0.18 0.04 0.08 0.08
Crit Moves: **** **** **** ****
********************************************************************************
Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA
3-92
HCM 2010 TWSC
2: Jaguar Way/Project Dwy & School Dwy 09/15/2017
Christ Our Savior Church (DOM1701) 5:00 pm 09/14/2017 02 Existing Plus Project AM Synchro 9 Report
LSA Analyst AY Page 1
Intersection
Int Delay, s/veh 10.3
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 365 510 0 0 0
Future Vol, veh/h 0 365 510 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 66 66 66 66 66 66
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 553 773 0 0 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 1547 2 2 0 - 0
Stage 1 2 - - - - -
Stage 2 1545 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 126 1082 1620 - - -
Stage 1 1021 - - - - -
Stage 2 194 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 66 1082 1620 - - -
Mov Cap-2 Maneuver 66 - - - - -
Stage 1 1021 - - - - -
Stage 2 101 - - - - -
Approach EB NB SB
HCM Control Delay, s 11.8 9.2 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h)1620 - 1082 - -
HCM Lane V/C Ratio 0.477 - 0.511 - -
HCM Control Delay (s) 9.2 0 11.8 - -
HCM Lane LOS A A B - -
HCM 95th %tile Q(veh) 2.7 - 3 - -
3-93
HCM 2010 TWSC
3: Jaguar Way & Future Residential Dwy 09/15/2017
Christ Our Savior Church (DOM1701) 5:00 pm 09/14/2017 02 Existing Plus Project AM Synchro 9 Report
LSA Analyst AY Page 2
Intersection
Int Delay, s/veh 0.8
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 24 0 510 8 0 365
Future Vol, veh/h 24 0 510 8 0 365
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 66 66 66 66 66 66
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 36 0 773 12 0 553
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 1332 779 0 0 785 0
Stage 1 779 - - - - -
Stage 2 553 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 170 396 - - 834 -
Stage 1 452 - - - - -
Stage 2 576 - - - - -
Platoon blocked, % - --
Mov Cap-1 Maneuver 170 396 - - 834 -
Mov Cap-2 Maneuver 170 - - - - -
Stage 1 452 - - - - -
Stage 2 576 - - - - -
Approach WB NB SB
HCM Control Delay, s 31.8 0 0
HCM LOS D
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h)- - 170 834 -
HCM Lane V/C Ratio - - 0.214 - -
HCM Control Delay (s) - - 31.8 0 -
HCM Lane LOS - - D A -
HCM 95th %tile Q(veh) - - 0.8 0 -
3-94
02 Existing Plus Project AMMon Sep 18, 2017 16:18:15 Page 3-1
--------------------------------------------------------------------------------
Christ Our Savior Church
DOM1701
Existing Plus Project AM
--------------------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative)
********************************************************************************
Intersection #4 Raitt Street-Jaguar Way/MacArthur Boulevard
********************************************************************************
Cycle (sec): 100 Critical Vol./Cap.(X): 0.729
Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx
Optimal Cycle: 41 Level Of Service: C
********************************************************************************
Street Name: Raitt Street-Jaguar Way MacArthur Boulevard
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------|---------------||---------------||---------------||---------------|
Control: Permitted Permitted Protected Protected
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lanes: 1 0 1 0 1 1 0 0 1 0 1 0 2 1 0 1 0 3 0 1
------------|---------------||---------------||---------------||---------------|
Volume Module:
Base Vol: 31 64 93 202 112 125 103 1497 145 277 861 357
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 31 64 93 202 112 125 103 1497 145 277 861 357
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 31 64 93 202 112 125 103 1497 145 277 861 357
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 31 64 93 202 112 125 103 1497 145 277 861 357
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
FinalVolume: 31 64 93 202 112 125 103 1497 145 277 861 357
------------|---------------||---------------||---------------||---------------|
Saturation Flow Module:
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 0.94 1.00 0.94 0.94 1.00 1.00 0.94 1.00 1.00 0.94 1.00 0.94
Lanes: 1.00 1.00 1.00 1.00 0.47 0.53 1.00 2.74 0.26 1.00 3.00 1.00
Final Sat.: 1600 1700 1600 1600 803 897 1600 4650 450 1600 5100 1600
------------|---------------||---------------||---------------||---------------|
Capacity Analysis Module:
Vol/Sat: 0.02 0.04 0.06 0.13 0.14 0.14 0.06 0.32 0.32 0.17 0.17 0.22
Crit Moves: **** **** **** ****
********************************************************************************
Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA
3-95
HCM 2010 TWSC
5: East Project Dwy & Alton Ave 09/15/2017
Christ Our Savior Church (DOM1701) 5:00 pm 09/14/2017 02 Existing Plus Project AM Synchro 9 Report
LSA Analyst AY Page 3
Intersection
Int Delay, s/veh 0
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 889 11 0 338 0 0
Future Vol, veh/h 889 11 0 338 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 79 79 79 79 79 79
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 1125 14 0 428 0 0
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 570
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 6.94
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.32
Pot Cap-1 Maneuver - - 0 - 0 465
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - --
Mov Cap-1 Maneuver - - - - - 465
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Control Delay, s 0 0 0
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h)- - - -
HCM Lane V/C Ratio - - - -
HCM Control Delay (s) 0 - - -
HCM Lane LOS A - - -
HCM 95th %tile Q(veh) - - - -
3-96
02 Existing Plus Project PMMon Sep 18, 2017 16:17:21 Page 2-1
--------------------------------------------------------------------------------
Christ Our Savior Church
DOM1701
Existing Plus Project PM
--------------------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative)
********************************************************************************
Intersection #1 Raitt Street/Alton Avenue
********************************************************************************
Cycle (sec): 100 Critical Vol./Cap.(X): 0.523
Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx
Optimal Cycle: 25 Level Of Service: A
********************************************************************************
Street Name: Raitt Street Alton Avenue
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------|---------------||---------------||---------------||---------------|
Control: Protected Protected Prot+Permit Prot+Permit
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lanes: 1 0 0 1 0 1 0 1 0 1 1 0 1 1 0 1 0 1 1 0
------------|---------------||---------------||---------------||---------------|
Volume Module:
Base Vol: 22 23 11 181 23 154 218 222 19 19 293 325
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 22 23 11 181 23 154 218 222 19 19 293 325
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 22 23 11 181 23 154 218 222 19 19 293 325
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 22 23 11 181 23 154 218 222 19 19 293 325
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
FinalVolume: 22 23 11 181 23 154 218 222 19 19 293 325
------------|---------------||---------------||---------------||---------------|
Saturation Flow Module:
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 0.94 1.00 1.00 0.94 1.00 0.94 0.94 1.00 1.00 0.94 1.00 0.94
Lanes: 1.00 0.68 0.32 1.00 1.00 1.00 1.00 1.84 0.16 1.00 1.00 1.00
Final Sat.: 1600 1150 550 1600 1700 1600 1600 3132 268 1600 1700 1600
------------|---------------||---------------||---------------||---------------|
Capacity Analysis Module:
Vol/Sat: 0.01 0.02 0.02 0.11 0.01 0.10 0.14 0.07 0.07 0.01 0.17 0.20
Crit Moves: **** **** **** ****
********************************************************************************
Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA
3-97
HCM 2010 TWSC
2: Jaguar Way/Project Dwy & School Dwy 09/18/2017
Christ Our Savior Church (DOM1701) 5:00 pm 09/14/2017 02 Existing Plus Project PM Synchro 9 Report
LSA Analyst AY Page 1
Intersection
Int Delay, s/veh 7.9
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 79 99 0 0 0
Future Vol, veh/h 0 79 99 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 84 84 84 84 84 84
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 94 118 0 0 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 237 1 1 0 - 0
Stage 1 1 - - - - -
Stage 2 236 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 751 1084 1622 - - -
Stage 1 1022 - - - - -
Stage 2 803 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 696 1084 1622 - - -
Mov Cap-2 Maneuver 696 - - - - -
Stage 1 1022 - - - - -
Stage 2 744 - - - - -
Approach EB NB SB
HCM Control Delay, s 8.6 7.4 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h)1622 - 1084 - -
HCM Lane V/C Ratio 0.073 - 0.087 - -
HCM Control Delay (s) 7.4 0 8.6 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0.2 - 0.3 - -
3-98
HCM 2010 TWSC
3: Jaguar Way & Future Residential Dwy 09/18/2017
Christ Our Savior Church (DOM1701) 5:00 pm 09/14/2017 02 Existing Plus Project PM Synchro 9 Report
LSA Analyst AY Page 2
Intersection
Int Delay, s/veh 0.7
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 16 0 99 26 0 79
Future Vol, veh/h 16 0 99 26 0 79
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 84 84 84 84 84 84
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 19 0 118 31 0 94
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 227 133 0 0 149 0
Stage 1 133 - - - - -
Stage 2 94 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 761 916 - - 1432 -
Stage 1 893 - - - - -
Stage 2 930 - - - - -
Platoon blocked, % - --
Mov Cap-1 Maneuver 761 916 - - 1432 -
Mov Cap-2 Maneuver 761 - - - - -
Stage 1 893 - - - - -
Stage 2 930 - - - - -
Approach WB NB SB
HCM Control Delay, s 9.9 0 0
HCM LOS A
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h)- - 761 1432 -
HCM Lane V/C Ratio - - 0.025 - -
HCM Control Delay (s) - - 9.9 0 -
HCM Lane LOS - - A A -
HCM 95th %tile Q(veh) - - 0.1 0 -
3-99
02 Existing Plus Project PMMon Sep 18, 2017 16:17:21 Page 3-1
--------------------------------------------------------------------------------
Christ Our Savior Church
DOM1701
Existing Plus Project PM
--------------------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative)
********************************************************************************
Intersection #4 Raitt Street-Jaguar Way/MacArthur Boulevard
********************************************************************************
Cycle (sec): 100 Critical Vol./Cap.(X): 0.548
Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx
Optimal Cycle: 26 Level Of Service: A
********************************************************************************
Street Name: Raitt Street-Jaguar Way MacArthur Boulevard
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------|---------------||---------------||---------------||---------------|
Control: Permitted Permitted Protected Protected
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lanes: 1 0 1 0 1 1 0 0 1 0 1 0 2 1 0 1 0 3 0 1
------------|---------------||---------------||---------------||---------------|
Volume Module:
Base Vol: 147 30 81 41 16 35 46 987 59 104 1773 53
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 147 30 81 41 16 35 46 987 59 104 1773 53
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 147 30 81 41 16 35 46 987 59 104 1773 53
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 147 30 81 41 16 35 46 987 59 104 1773 53
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
FinalVolume: 147 30 81 41 16 35 46 987 59 104 1773 53
------------|---------------||---------------||---------------||---------------|
Saturation Flow Module:
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 0.94 1.00 0.94 0.94 1.00 1.00 0.94 1.00 1.00 0.94 1.00 0.94
Lanes: 1.00 1.00 1.00 1.00 0.31 0.69 1.00 2.83 0.17 1.00 3.00 1.00
Final Sat.: 1600 1700 1600 1600 533 1167 1600 4812 288 1600 5100 1600
------------|---------------||---------------||---------------||---------------|
Capacity Analysis Module:
Vol/Sat: 0.09 0.02 0.05 0.03 0.03 0.03 0.03 0.21 0.21 0.07 0.35 0.03
Crit Moves: **** **** **** ****
********************************************************************************
Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA
3-100
HCM 2010 TWSC
5: East Project Dwy & Alton Ave 09/18/2017
Christ Our Savior Church (DOM1701) 5:00 pm 09/14/2017 02 Existing Plus Project PM Synchro 9 Report
LSA Analyst AY Page 3
Intersection
Int Delay, s/veh 0
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 414 7 0 637 0 4
Future Vol, veh/h 414 7 0 637 0 4
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 94 94 94 94 94 94
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 440 7 0 678 0 4
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 224
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 6.94
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.32
Pot Cap-1 Maneuver - - 0 - 0 779
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - --
Mov Cap-1 Maneuver - - - - - 779
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Control Delay, s 0 0 9.6
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h)779 - - -
HCM Lane V/C Ratio 0.005 - - -
HCM Control Delay (s) 9.6 - - -
HCM Lane LOS A - - -
HCM 95th %tile Q(veh) 0 - - -
3-101
02 Existing Plus Project SuThu Sep 14, 2017 15:14:29 Page 2-1
--------------------------------------------------------------------------------
Christ Our Savior Church
DOM1701
Existing Plus Project Sunday
--------------------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative)
********************************************************************************
Intersection #1 Raitt Street/Alton Avenue
********************************************************************************
Cycle (sec): 100 Critical Vol./Cap.(X): 0.243
Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx
Optimal Cycle: 16 Level Of Service: A
********************************************************************************
Street Name: Raitt Street Alton Avenue
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------|---------------||---------------||---------------||---------------|
Control: Protected Protected Prot+Permit Prot+Permit
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lanes: 1 0 0 1 0 1 0 1 0 1 1 0 1 1 0 1 0 1 1 0
------------|---------------||---------------||---------------||---------------|
Volume Module:
Base Vol: 59 48 22 146 46 67 42 61 37 33 72 43
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 59 48 22 146 46 67 42 61 37 33 72 43
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 59 48 22 146 46 67 42 61 37 33 72 43
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 59 48 22 146 46 67 42 61 37 33 72 43
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
FinalVolume: 59 48 22 146 46 67 42 61 37 33 72 43
------------|---------------||---------------||---------------||---------------|
Saturation Flow Module:
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 0.94 1.00 1.00 0.94 1.00 0.94 0.94 1.00 1.00 0.94 1.00 1.00
Lanes: 1.00 0.69 0.31 1.00 1.00 1.00 1.00 1.24 0.76 1.00 1.25 0.75
Final Sat.: 1600 1166 534 1600 1700 1600 1600 2116 1284 1600 2129 1271
------------|---------------||---------------||---------------||---------------|
Capacity Analysis Module:
Vol/Sat: 0.04 0.04 0.04 0.09 0.03 0.04 0.03 0.03 0.03 0.02 0.03 0.03
Crit Moves: **** **** **** ****
********************************************************************************
Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA
3-102
HCM 2010 TWSC
2: Jaguar Way/Project Dwy & School Dwy 09/15/2017
Christ Our Savior Church (DOM1701) 5:00 pm 09/14/2017 02 Existing Plus Project Sun Synchro 9 Report
LSA Analyst AY Page 1
Intersection
Int Delay, s/veh 0
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 139 144 0
Future Vol, veh/h 0 0 0 139 144 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 96 96 96 96 96 96
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 0 145 150 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 295 150 150 0 - 0
Stage 1 150 - - - - -
Stage 2 145 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 696 896 1431 - - -
Stage 1 878 - - - - -
Stage 2 882 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 696 896 1431 - - -
Mov Cap-2 Maneuver 696 - - - - -
Stage 1 878 - - - - -
Stage 2 882 - - - - -
Approach EB NB SB
HCM Control Delay, s 0 0 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h)1431 - - - -
HCM Lane V/C Ratio - - - - -
HCM Control Delay (s) 0 - 0 - -
HCM Lane LOS A - A - -
HCM 95th %tile Q(veh) 0 - - - -
3-103
HCM 2010 TWSC
3: Jaguar Way & Future Residential Dwy 09/15/2017
Christ Our Savior Church (DOM1701) 5:00 pm 09/14/2017 02 Existing Plus Project Sun Synchro 9 Report
LSA Analyst AY Page 2
Intersection
Int Delay, s/veh 0.6
Movement WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Vol, veh/h 17 0 139 19 0 144
Future Vol, veh/h 17 0 139 19 0 144
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - 0 - - 0
Grade, % 0 - 0 - - 0
Peak Hour Factor 96 96 96 96 96 96
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 18 0 145 20 0 150
Major/Minor Minor1 Major1 Major2
Conflicting Flow All 305 155 0 0 165 0
Stage 1 155 - - - - -
Stage 2 150 - - - - -
Critical Hdwy 6.42 6.22 - - 4.12 -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 - - 2.218 -
Pot Cap-1 Maneuver 687 891 - - 1413 -
Stage 1 873 - - - - -
Stage 2 878 - - - - -
Platoon blocked, % - --
Mov Cap-1 Maneuver 687 891 - - 1413 -
Mov Cap-2 Maneuver 687 - - - - -
Stage 1 873 - - - - -
Stage 2 878 - - - - -
Approach WB NB SB
HCM Control Delay, s 10.4 0 0
HCM LOS B
Minor Lane/Major Mvmt NBT NBRWBLn1 SBL SBT
Capacity (veh/h)- - 687 1413 -
HCM Lane V/C Ratio - - 0.026 - -
HCM Control Delay (s) - - 10.4 0 -
HCM Lane LOS - - B A -
HCM 95th %tile Q(veh) - - 0.1 0 -
3-104
02 Existing Plus Project SuThu Sep 14, 2017 15:14:29 Page 3-1
--------------------------------------------------------------------------------
Christ Our Savior Church
DOM1701
Existing Plus Project Sunday
--------------------------------------------------------------------------------
Level Of Service Computation Report
ICU 1(Loss as Cycle Length %) Method (Base Volume Alternative)
********************************************************************************
Intersection #4 Raitt Street-Jaguar Way/MacArthur Boulevard
********************************************************************************
Cycle (sec): 100 Critical Vol./Cap.(X): 0.250
Loss Time (sec): 5 Average Delay (sec/veh): xxxxxx
Optimal Cycle: 16 Level Of Service: A
********************************************************************************
Street Name: Raitt Street-Jaguar Way MacArthur Boulevard
Approach: North Bound South Bound East Bound West Bound
Movement: L - T - R L - T - R L - T - R L - T - R
------------|---------------||---------------||---------------||---------------|
Control: Permitted Permitted Protected Protected
Rights: Include Include Include Include
Min. Green: 0 0 0 0 0 0 0 0 0 0 0 0
Y+R: 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
Lanes: 1 0 1 0 1 1 0 0 1 0 1 0 2 1 0 1 0 3 0 1
------------|---------------||---------------||---------------||---------------|
Volume Module:
Base Vol: 16 15 40 73 15 73 72 411 19 19 432 71
Growth Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Initial Bse: 16 15 40 73 15 73 72 411 19 19 432 71
User Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
PHF Volume: 16 15 40 73 15 73 72 411 19 19 432 71
Reduct Vol: 0 0 0 0 0 0 0 0 0 0 0 0
Reduced Vol: 16 15 40 73 15 73 72 411 19 19 432 71
PCE Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
MLF Adj: 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
FinalVolume: 16 15 40 73 15 73 72 411 19 19 432 71
------------|---------------||---------------||---------------||---------------|
Saturation Flow Module:
Sat/Lane: 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700 1700
Adjustment: 0.94 1.00 0.94 0.94 1.00 1.00 0.94 1.00 1.00 0.94 1.00 0.94
Lanes: 1.00 1.00 1.00 1.00 0.17 0.83 1.00 2.87 0.13 1.00 3.00 1.00
Final Sat.: 1600 1700 1600 1600 290 1410 1600 4875 225 1600 5100 1600
------------|---------------||---------------||---------------||---------------|
Capacity Analysis Module:
Vol/Sat: 0.01 0.01 0.03 0.05 0.05 0.05 0.05 0.08 0.08 0.01 0.08 0.04
Crit Moves: **** **** **** ****
********************************************************************************
Traffix 8.0.0715 (c) 2008 Dowling Assoc. Licensed to LSA ASSOC. IRVINE, CA
3-105
HCM 2010 TWSC
5: East Project Dwy & Alton Ave 09/15/2017
Christ Our Savior Church (DOM1701) 5:00 pm 09/14/2017 02 Existing Plus Project Sun Synchro 9 Report
LSA Analyst AY Page 3
Intersection
Int Delay, s/veh 0.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 211 18 0 148 0 11
Future Vol, veh/h 211 18 0 148 0 11
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - - 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 75 75 75 75 75 75
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 281 24 0 197 0 15
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 - - - 153
Stage 1 - - - - - -
Stage 2 - - - - - -
Critical Hdwy - - - - - 6.94
Critical Hdwy Stg 1 - - - - - -
Critical Hdwy Stg 2 - - - - - -
Follow-up Hdwy - - - - - 3.32
Pot Cap-1 Maneuver - - 0 - 0 866
Stage 1 - - 0 - 0 -
Stage 2 - - 0 - 0 -
Platoon blocked, % - --
Mov Cap-1 Maneuver - - - - - 866
Mov Cap-2 Maneuver - - - - - -
Stage 1 - - - - - -
Stage 2 - - - - - -
Approach EB WB NB
HCM Control Delay, s 0 0 9.2
HCM LOS A
Minor Lane/Major Mvmt NBLn1 EBT EBR WBT
Capacity (veh/h)866 - - -
HCM Lane V/C Ratio 0.017 - - -
HCM Control Delay (s) 9.2 - - -
HCM Lane LOS A - - -
HCM 95th %tile Q(veh) 0.1 - - -
3-106
Christ Our Savior Catholic Parish
Community Outreach Meeting Report
Meeting Date: December 13, 2016
I. Call to order
Joe Truxaw called to order the regular meeting of Christ Our Savior Catholic Parish/
Community Outreach Meeting at 7:03p on December 13, 2016 at 2000 W Alton Ave,
Santa Ana, CA 92704.
II. Meeting Attended by:
Fr. Steve Correz, Joe Truxaw, Luis Ramirez, Christ Our Savior Catholic Parish
David Pfeifer, AIA, Principal, DomusStudio Architecture
Joe Novoa, Director of Construction Management Services, Diocese of Orange
Christ Our Savior Catholic Parish (COSCP) community members
Community neighbors
III. Welcome and Prayer
Fr. Steve Correz, Pastor, Opening Prayer
Joe Truxaw, 10 year parishioner of COSCP, Pastoral Council and Building Committee
member - Welcome, and a brief explanation of the meeting purpose and background
on the project site.
Meeting Purpose:
1. To review and explore preliminary plans for the proposed development of a new
Church Campus on the existing Christ Our Savior parish property.
2. To obtain input from the community that will be used by the City of Santa Ana to
complete the ongoing site development process.
Background:
This original 14 acre site was purchased by the Diocese of Orange in 2002 from
the Segerstrom Family. In 2004 the City of Santa Ana granted a Conditional Use
Permit for construction of a 2650 seat cathedral facility. Christ Our Savior
Cathedral Parish was formed in 2005, worshiping in temporary facilities at nearby
Thorpe Fundamental and Segerstrom High School before moving onto the land in
3-107
2008 in this modular building. With the Diocese acquisition of Chrystal
Cathedral in 2012, the congregation became Christ Our Savior Catholic Parish
and a smaller parish church facility was envisioned.
The Parcel Map to subdivide the 14 acres was approved by the Santa Ana City
Council in November 2016. 8 Acres will be retained for the future church
campus and 6 acres will be sold to Shea Homes for single family housing.
Meeting was turned over to David Pfeifer, Architect at 7:09
IV. Architectural Aspects of the Project/COSCP Building
(PowerPoint presentation attached)
a) Site plan was sent to the City of Santa Ana for review on October 2016.
Expected to be complete the process by Spring of 2017
b) Church will be built on an 8 acre site.
c) Sale of land will be 6 acres to Shea Homes
d) Buildings will be an “inward looking Campus” to avoid interruptions to the
community/neighbors
e) Phase 1. New Church Building, Parish Offices, and Meeting Rooms, a total of
417 parking spaces will be available when phase 1 is completed.
f) Phase 2. Parish Hall, date to be determined.
V. Question and Answer Section
1. What is the seating capacity?
Answer: 1200 seats with 50 seats in the Choir
2. What is the distance from Armstrong properties to COSCP building?
Answer: 131 ft. from Armstrong fence to parish building and 147 ft. from
Shea Homes to parish building
3. How tall is the Parish Building?
Answer: It is a one (1) story building, 85ft Spire, layers: 48 ft, and 38ft
roofs at the Church and 24 ft tall for Parish Hall.
4. How many parking spaces after Phase 2?
Answer: 488 parking spaces.
3-108
5. Will we have to deal with High School traffic once building is complete?
Answer: The parish is currently working to mitigate existing traffic
concerns related to Segerstrom High School parents using the private drive
entrance between COSCP and the adjacent YMCA as a student drop-off.
This area is private property owned by the YMCA and COSCP and is not a
public street. The proposed site layout provides a turn-around area to allow
a safe place for traffic to circulate in/out of the site. The existing gate at the
northeast corner of the site is intended to remain. A new gate will be added
at the southwest corner of the property into the existing Raitt St. (south)
cul-de-sac. Said gate will be locked on weekdays, and only open on
weekends for masses.
6. What is the timeline for Phase 1 and Phase 2?
Answer: Exact dates are unknown as of today due to the approval process.
We expect to start construction Early 2018 and to take approximately 14
months. Expect to complete project in spring of 2019.
7. Can we obtain master plans?
Answer: No. Master plans have not been published yet, as they are still in
the preliminary phase.
8. Where will the main entrance to our building be?
Answer: Via the existing private entrance at the signalized intersection of
Alton and Raitt Street (north).
9. Will there be handicap parking spaces?
Answer: Yes, absolutely.
10. How far will the closest parking space be from Parish Building?
Answer: About 250 feet.
11. Will construction of our church building interfere with the construction of
Shea Homes?
Answer: No
12. Is each phase, phase 1 and phase 2, funding dependent?
Answer: Yes
13. What is the cost of Phase 1?
Answer: Approximate construction/hard cost is 10 million, but still fluid.
3-109
14. Who is the construction company?
Answer: A contractor has not been selected yet.
15. Where is the main entrance to Shea Homes Development?
Answer: Along the east side of the Raitt St. cul-de-sac north of MacArthur.
The location is preliminary and dependent upon Shea Homes.
16. What will be the capacity of the Parish Hall?
Answer: Approximately 400 people, sit down.
17. Is a Gym part of the project?
Answer: No.
18. What is the growth status of the YMCA?
Answer: Unknown.
19. Will there be a playground on our property or has it been proposed?
Answer: No.
VI. Adjournment
Joe Truxaw adjourned the meeting at 7:40pm.
Refreshments and the project plans are available on the patio for further discussion.
Minutes submitted by: Maggie Avalos
3-110
4-1
4-2
4-3
4-4
EXHIBIT 1
4-5
4-6
4-7
4-8
4-9
4-10
4-11
4-12
4-13
4-14
4-15
This page left blank intentionally.
VA No. 2018-03
123 N. Jackson Street
Exhibit 2 – Vicinity Zoning & Aerial Map
4-16
VA No. 2018-03
123 N. Jackson Street
Exhibit 3 – Site Photos
4-17
VA No. 2018-03
123 N. Jackson Street
Exhibit 4 – Site Plan
N
4-18
VA No. 2018-03
123 N. Jackson Street
Exhibit 5 – Floor Plan
4-19
VA No. 2018-03
123 N. Jackson Street
Exhibit 5 – Elevations
Exhibit 6 – Elevations
4-20
VA No. 2018-03
123 N. Jackson Street
Exhibit 7 – Color Elevations
4-21
VA No. 2018-03
123 N. Jackson Street
Exhibit 8 – Landscape Plan
N
4-22
This page left blank intentionally.