HomeMy WebLinkAbout55A - RESO CLEAN WATER CIPREQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
SEPTEMBER 18, 2018
CLERK OF COUNCIL USE ONLY:
TITLE: APPROVED
ADOPT REIMBURSEMENT AND PLEDGED ❑ As Recommended
REVENUE AND FUNDS RESOLUTIONS E]Amended
E]OOrrdinance on 1 Reading
FOR CLEAN WATER AND SAFE DRINKING ❑ Ordinance on 2ntl Reading
WATER STATE REVOLVING FUND ❑ Implementing Resolution
CAPITAL IMPROVEMENT PROJECTS - [I Set Public Hearing For
[NONGENERAL FUND]
(STRATEGIC PLAN NO. 6, 1G)
CIV
MAN GER
RECOMMENDED ACTION
CONTINUED TO
FILE NUMBER
Adopt Reimbursement and Pledged Revenue and Funds Resolutions required for participation in
the California State Water Resources Control Board, Clean Water State Revolving Fund and
Safe Drinking Water State Revolving Fund programs, pledging funds from any financing received
through these programs for the four capital improvement projects below and authorizing the
reimbursement of expenditures for these projects made prior to the receipt of such financing:
1. Segerstrom (San Lorenzo) Sewer Lift Station
2. Sewer Collection System Improvements
3. Automated Metering Infrastructure
4. Water Distribution System Improvements
DISCUSSION
The California State Water Resources Control Board (SWRCB) oversees two capital
improvement financing programs, known as the Safe Drinking Water State Revolving Fund
(SDWSRF) and Clean Water State Revolving Fund (CWSRF), which provide grants and low-cost
flexible financing for capital improvements to water and wastewater utilities. On August 2, 2016,
Council adopted resolutions and authorized staff to submit various applications for grants and/or
low interest loans to the SWRCB for both water and sewer infrastructure projects. With the
assistance of a contract consultant, staff has submitted applications for the subject capital
projects that are good candidates for SWRCB approval. These projects would benefit from a
near-term infusion of cash to shorten their respective project delivery schedules, and accelerate
realization of service -level and financial benefits to the City and its enterprise ratepayers.
55A-1
Adopt Reimbursement and Pledged Revenue and Funds Resolutions for
State Revolving Fund Capital Improvement Projects
September 18, 2018
Page 2
The following projects were selected by staff in accordance with the water and sewer
infrastructure master plans:
Application Project Name
Proiect # and Description
1. San Lorenzo Sewer Lift Station
06-3510; Replace Segerstrom sewer lift station
2. Sewer Collection System Improvements
Replace existing mains and associated assets
3. Automated Meter Infrastructure
16-6460; Replace 48,000 meters with smart
meters and associated assets
4. Water Distribution System Improvements
Replace end -of -useful -life cast iron water mains
Stage of Delivery Estimated Cost
Finalizing Plans & $4.0 Million
Specifications
Various, ongoing $9.5 Million
Feasibility Study $13.7 Million
Complete
Various, ongoing $14.6 Million
Staff utilized the services of the City's Municipal Consultant, Urban Futures, to evaluate the water
and sewer enterprise's ability to accommodate new debt. It was concluded that both enterprises
have the financial capacity of incurring the type of financing award offered through the SDWSRF
and CWSRF. If the SWRCB elects to award the City low interest loans, staff will return to Council
at a future date with a detailed analysis and recommendation on whether to accept or decline any
award.
The project applications have advanced to the fourth and final step in the SWRCB review
process, which is the submission of a financial application and accompanying Reimbursement
and Pledged Revenues resolutions. These resolutions are required to meet the State's
requirements, regardless of whether or not the City receives this funding as a grant or a low-
interest loan.
STRATEGIC PLAN ALIGNMENT
Approval of this item supports the City's efforts to meet Goal #6 - Community Facilities &
Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City
assets), Strategy G (develop and implement the City's Capital Improvement Program in
coordination with the Community Investment and Deferred Maintenance Plans
ENVIRONMENTAL IMPACT
There is no environmental impact associated with this action.
55A-2
Adopt Reimbursement and Pledged Revenue and Funds Resolutions for
State Revolving Fund Capital Improvement Projects
September 18, 2018
Page 3
FISCAL IMPACT
There is no fiscal impact associated with this action at this time. Upon notification of financing
award, staff will return to Council for approval of further actions and will indicate the fiscal impact
of any such awards and associated expenditures at that time.
Z,4��►'� �• s .
Fuad S. Sweiss, PE, PLS
Executive Director
Public Works Agency
FS/NS/RR
Exhibit: 1. Pledge Revenues and Funds Resolution: Segerstrom (San Lorenzo) Sewer
Lift Station
2. Reimbursement Resolution: Segerstrom (San Lorenzo) Sewer Lift Station
3. Pledge Revenues and Funds Resolution: Sewer Collection System
Improvements
4. Reimbursement Resolution: Sewer Collection System Improvements
5. Pledge Revenues and Funds Resolution: Automated Metering Infrastructure
6. Reimbursement Resolution: Automated Metering Infrastructure
7. Pledge Revenues and Funds Resolution: Water Distribution System
Improvements
8. Reimbursement Resolution: Water Distribution System Improvements
55A-3
55A-4
Jmf 8/14/18
RESOLUTION NO. 2018 -XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SANTA ANA PLEDGING REVENUES AND FUNDS FOR THE
REPAYMENT OF FINANCING FROM THE STATE WATER
RESOURCES CONTROL BOARD FOR THE SEGERSTROM
(SAN LORENZO) SEWER LIFT STATION PROJECT
WHEREAS, the City of Santa Ana ("Agency') desires to finance the costs of
constructing and/or reconstructing certain public facilities and improvements relating
to its water and wastewater system, including specifically the Segerstrom (San
Lorenzo) Sewer Lift Station Project ("Project"); and
WHEREAS, the City Council of the City of Santa Ana has previously authorized
City staff to apply for financing of the construction and/or reconstruction of the Project
or portions of the Project with low interest moneys from the State Revolving Fund,
provided by the State of California, acting by and through the State Water Resources
Control Board ("State Water Board"); and
WHEREAS, the State Water Board requires, as a condition of approval of any
financing agreement, the establishment of pledged sources of revenue to repay this
financing.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Santa Ana as follows:
Section 1. The City of Santa Ana hereby dedicates and pledges the net
revenues of the sewer enterprise fund and the sewer enterprise fund to payment of
any and all Clean Water State Revolving Fund and/or Water Recycling Funding
Program financing for the Segerstrom (San Lorenzo) Sewer Lift Station Project.
Section 2. The City commits to collecting such revenues and maintaining
such fund(s) throughout the term of such financing and until the City has satisfied its
repayment obligation thereunder unless modification or change is approved in writing
by the State Water Board.
Section 3. So long as the financing agreement(s) are outstanding, the City's
pledge hereunder shall constitute a lien in favor of the State Water Board on the
foregoing fund(s) and revenue(s) without any further action necessary.
Section 4. So long as the financing agreement(s) are outstanding, the City
commits to maintaining the fund(s) and revenue(s) at levels sufficient to meet its
obligations under the financing agreement(s).
EXHIBIT 1--' Resolution No. 20184M
Page 1 of 2
55A-5
jmf 8/14/18
Section 5. This Resolution shall take effect immediately upon its adoption by
the City Council, and the Clerk of the Council shall attest to and certify the vote
adopting this Resolution.
ADOPTED this _ day of September, 2018.
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By: �.Lv* jL
ohn M. Funk
Assistant City Attorney
AYES:
NOES:
ABSTAIN:
NOT PRESENT:
Councilmembers
Councilmembers
Councilmembers
Councilmembers
Miguel A. Pulido
Mayor
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, MARIA D. HUIZAR, Clerk of the Council, do hereby attest to and certify the attached
Resolution No. 2018 -XXX to be the original resolution adopted by the City Council of
the City of Santa Ana on 2018.
Date:
y
Clerk of the Council
City of Santa Ana
Resolution No. 2018-)00(
Page 2 of 2
Jmf 8/14/18
RESOLUTION NO. 2018 -XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SANTA ANA AUTHORIZING THE REIMBURSEMENT OF
FUNDING FOR THE SEGERSTROM (SAN LORENZO) SEWER
LIFT STATION PROJECT FROM THE STATE WATER
RESOURCES CONTROL BOARD
WHEREAS, the City of Santa Ana ("Agency") desires to finance the costs of
constructing and/or reconstructing certain public facilities and improvements relating
to its water and wastewater system, including specifically the Segerstrom (San
Lorenzo) Sewer Lift Station Project ('Project"); and
WHEREAS, the Agency intends to finance the construction and/or
reconstruction of the Project or portions of the Project with moneys ('Project Funds")
provided by the State of California, acting by and through the State Water Resources
Control Board ("State Water Board"); and
WHEREAS, the State.Water Board may fund the Project Funds with proceeds
from the sale of obligations the interest upon which is excluded from gross income for
federal income tax purposes ("Obligations"); and
WHEREAS, prior to the issuance of the Obligations or the approval by the State
Water Board of the Project Funds, the Agency desires to incur certain - capital
expenditures ("Expenditures") with respect to the Project from available moneys of the
Agency; and
WHEREAS, the Agency has determined that those moneys to be advanced on
and after the date hereof to pay the Expenditures are available only for a temporary
period, and it is necessary to reimburse the Agency for the Expenditures from the
proceeds of the Obligations.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Santa Ana as follows:
Section 1. The Agency hereby states its intention and reasonably expects
to reimburse Expenditures paid pnorto the issuance of the Obligations orthe approval
by the State Water Board of the Project Funds.
Section 2. The reasonably expected maximum principal amount of the
Project Funds is $4,000,000.
Section 3. This Resolution is being adopted no later than 60 days after the
date on which the Agency will expend moneys for the construction portion of the
Project costs to be reimbursed with Project Funds.
Resolutlon No. 2018 -XXX
EXHIBIT 2 Pagel of
55A-7
jmf 8/14/18
Section 4. Each Agency expenditure will be of a type properly chargeable to
a capital account under general federal income tax principles.
Section 5. To the best of our knowledge, this Agency is not aware of the
previous adoption of official intents by the Agency that have been made as a matter
of course for the purpose of reimbursing expenditures and for which tax-exempt
obligations have not been issued.
Section 6. This Resolution is adopted as official intent of the Agency in order
to comply with Treasury Regulation Section 1.150-2 and any other regulations of the
Internal Revenue Service relating to the qualification for reimbursement of Project
costs.
Section 7. All the recitals in this Resolution are true and correct, and this
Agency so finds, determines, and represents.
Section 8. This Resolution shall take effect immediately upon its adoption by
the City Council, and the Clerk of the Council shall attest to and certify the vote
adopting this Resolution.
ADOPTED this _ day of September, 2018.
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By: Yl/, f/1-yA
ohn M. Funk
Assistant City Attorney
AYES: Councilmembers
NOES: Councilmembers
ABSTAIN: Councilmembers
NOT PRESENT: Councilmembers
Miguel A. Pulido
Mayor
'• •
ResoluUon No. 2018 -XXX
Page 2 of 3
jmf 8114118
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, MARIA D. HUIZAR, Clerk of the Council, do hereby attest to and certify the attached
Resolution No. 2018 -XXX to be the original resolution adopted by the City Council of
the City of Santa Ana on 2018.
Date:
Clerk of the Council
City of Santa Ana
55A-9
Resolutbn No. 2018-)00(
Page 3 of 3
55A-10
Jmf 8/14/18
RESOLUTION NO. 2018 -XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SANTA ANA PLEDGING REVENUES AND FUNDS FOR THE
REPAYMENT OF FINANCING FROM THE STATE WATER
RESOURCES CONTROL BOARD FOR THE SEWER
COLLECTION SYSTEM IMPROVEMENTS PROJECT
WHEREAS, the City of Santa Ana ("Agency") desires to finance the costs of
constructing and/or reconstructing certain public facilities and improvements relating
to its water and wastewater system, including specifically the Sewer Collection System
Improvements Project ("Project"); and
WHEREAS, the City Council of the City of Santa Ana has previously authorized
City staff to apply for financing of the construction and/or reconstruction of the Project
or portions of the Project with low interest moneys from the State Revolving Fund,
provided by the State of California, acting by and through the State Water Resources
Control Board ("State Water Board"); and
WHEREAS, the State Water Board requires, as a condition of approval of any
financing agreement, the establishment of pledged sources of revenue to repay this
financing.
NOW;.THEREFORE, BE IT RESOLVED by the City Council of the City of
Santa Ana as follows:
Section 1. The City of Santa Ana hereby dedicates and pledges the net
revenues of the sewer enterprise fund and the sewer enterprise fund to payment of
any and all Clean Water State Revolving Fund and/or Water Recycling Funding
Program financing for the Sewer Collection System Improvements Project.
Section 2. The City commits to collecting such revenues and maintaining
such fund(s) throughout the term of such financing and until the City has satisfied its
repayment obligation thereunder unless modification or change is approved in writing
by the State Water Board.
Section 3. So long as the financing agreement(s) are outstanding, the City's
pledge hereunder shall constitute a lien in favor of the State Water Board on the
foregoing fund(s) and revenue(s) without any further action necessary.
Section 4. So long as the financing agreement(s) are outstanding, the City
commits to maintaining the fund(s) and revenue(s) at levels sufficient to meet its
obligations under the financing agreement(s).
Resolution No. 2018-M
Page 1 of 2
55A-11
jmf 8/14/18
Section 5. This Resolution shall take effect immediately upon its adoption by
the City Council, and the Clerk of the Council shall attest to and certify the vote
adopting this Resolution.
ADOPTED this _ day of September, 2018.
Miguel A. Pulido
Mayor
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By: �ir
ohn M. Funk
.Assistant City Attorney
AYES: Councilmembers
NOES: Councilmembers
ABSTAIN: Councilmembers
NOT PRESENT: Councilmembers
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, MARIA D. HUIZAR, Clerk of the Council, do hereby attest to and certify the attached
Resolution No. 2018 -XXX to be the original resolution adopted by the City Council of
the City of Santa Ana on 2018.
Date:
Clerk of the Council
City of Santa Ana
55A-12
Resoldon No. 2010 -XXX
Page 2 of 2
jmf 8/14/18
RESOLUTION NO. 2018 -XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SANTA ANA AUTHORIZING THE REIMBURSEMENT OF
FUNDING FOR THE SEWER COLLECTION SYSTEM
IMPROVEMENTS PROJECT FROM THE STATE WATER
RESOURCES CONTROL BOARD
WHEREAS, the City of Santa Ana ("Agency") desires to finance the costs of
constructing and/or reconstructing certain public facilities and improvements relating
to its water and wastewater system, including specifically the Sewer Collection System
Improvements Project ("Project"); and
WHEREAS, the Agency Intends to finance the construction and/or
reconstruction of the Project or portions of the Project with moneys ("Project Funds")
provided by the State of California, acting by and through the State Water Resources
Control Board ("State Water Board"); and
WHEREAS, the State Water Board may fund the Project Funds with proceeds
from the sale of obligations the interest upon which is excluded from gross income for
federal income tax purposes ("Obligations"); and
WHEREAS, prior to the issuance of the Obligations orthe approval by the State
Water Board of the Project Funds, the Agency desires to incur certain capital
expenditures ("Expenditures") with respect to the Project from available moneys of the
Agency; and
WHEREAS, the Agency has determined that those moneys to be advanced on
and after the date hereof to pay the Expenditures are available only for a temporary
period, and it is necessary to reimburse the Agency for the Expenditures from the
proceeds of the Obligations.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Santa Ana as follows:
Section 1. The Agency hereby states its intention and reasonably expects
to reimburse Expenditures paid priorto the issuance of the Obligations orthe approval
by the State Water Board of the Project Funds.
Section 2. The reasonably expected maximum principal amount of the
Project Funds is $9,500,000.
Section 3. This Resolution Is being adopted no later than 60 days after the
date on which the Agency will expend moneys for the construction portion of the
Project costs to be reimbursed with Project Funds.
EXHIBIT4 ResduUon �Page 1 o 3
55A-13
jmf 8/14/18
Section 4. Each Agency expenditure will be of a type properly chargeable to
a capital account under general federal income tax principles.
Section 5. To the best of our knowledge, this Agency is not aware of the
previous adoption of official intents by the Agency that have been made as a matter
of course for the purpose of reimbursing expenditures and for which tax-exempt
obligations have not been issued.
Section 6. This Resolution is adopted as official intent of the Agency in order
to comply with Treasury Regulation Section 1.150-2 and any other regulations of the
Internal Revenue Service relating to the qualification for reimbursement of Project
costs.
Section 7. All the recitals in this Resolution are true and correct, and this
Agency so finds, determines, and represents.
Section 8. This Resolution shall take effect immediately upon its adoption by
the City Council, and the Clerk of the Council shall attest to and certify the vote
adopting this Resolution.
ADOPTED this day of September, 2018.
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By: UV
ohn M. Funk
Assistant City Attorney
AYES: Councilmembers
NOES: Councjimembers
ABSTAIN: Councilmembers
NOT PRESENT: Councilmembers
Miguel A. Pulido
Mayor
55A-14
ResoluUon No. 2018 -XXX
Page 2 of 3
jmf 8/14/18
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, MARIA D. HUIZAR, Clerk of the Council, do hereby attest to and certify the attached
Resolution No. 2018 -XXX to be the original resolution adopted by the City Council of
the City of Santa Ana on 2018.
Date:
Clerk of the Council
City of Santa Ana
55A-15
Resolutlon No. 2018 -XXX
Page 3 of 3
55A-16
jmf 8/14/18
RESOLUTION NO. 2018 -XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SANTA ANA PLEDGING REVENUES AND FUNDS FOR THE
REPAYMENT OF FINANCING FROM THE STATE WATER
RESOURCES CONTROL BOARD FOR THE AUTOMATED
METER INFRASTRUCTURE PROJECT
WHEREAS, the City of Santa Ana ("Agency") desires to finance the costs of
constructing and/or reconstructing certain public facilities and improvements relating
to its water and wastewater system, including specifically the Automated Meter
Infrastructure Project ("Project"); and
WHEREAS, the City Council of the City of Santa Ana has previously authorized
City staff to apply for financing of the construction and/or reconstruction of the Project
or portions of the Project with low interest moneys from the State Revolving Fund,
provided by the State of California, acting by and through the State Water Resources
Control Board ("State Water Board"); and
WHEREAS, the State Water Board requires, as a condition of approval of any
financing agreement, the establishment of pledged sources of revenue to repay this
financing.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Santa Ana as follows:
Section 1. The City of Santa Ana hereby dedicates and pledges the net
revenues of the water enterprise fund and the water enterprise fund to payment of any
and all Clean Water State Revolving Fund and/or Water Recycling Funding Program
financing for the Automated Meter Infrastructure Project.
Section 2. The City commits to collecting such revenues and maintaining
such fund(s) throughout the term of such financing and until the City has satisfied its
repayment obligation thereunder unless modification or change is approved in writing
by the State Water Board.
Section 3. So long as the financing agreement(s) are outstanding, the City's
pledge hereunder shall constitute a lien in favor of the State Water Board on the
foregoing fund(s) and revenue(s) without any further action necessary.
Section 4. So long as the financing agreement(s) are outstanding, the City
commits to maintaining the fund(s) and revenue(s) at levels sufficient to meet its
obligations under the financing agreement(s).
EXHIBIT 5 ResoMon No. 201&X)0(
Page 1 of 2
55A-17
jmf 8/14/18
Section 5. This Resolution shall take effect immediately upon its adoption by
the City Council, and the Clerk of the Council shall attest to and certify the vote
adopting this Resolution.
ADOPTED this _ day of September, 2018.
Miguel A. Pulido
Mayor
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By:
ohn M. Funk
Assistant City Attorney
AYES: Councilmembers
NOES
Councilmembers
ABSTAIN: Councilmembers
NOT PRESENT: Councilmembers
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, MARIA D. HUIZAR, Clerk of the Council, do hereby attest to and certify the attached
Resolution No. 2018 -XXX to be the original resolution adopted by the City Council of
the City of Santa Ana on 2018.
Date:
Clerk of the Council
City of Santa Ana
55A-18
Resolution No. 2018-)=
Page 2 of 2
Jmf 8/14/18
RESOLUTION NO. 2016 -XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SANTA ANA AUTHORIZING THE REIMBURSEMENT OF
FUNDING FOR THE AUTOMATED METER
INFRASTRUCTURE PROJECT FROM THE STATE WATER
RESOURCES CONTROL BOARD
WHEREAS, the City of Santa Ana ("Agency") desires to finance the costs of
constructing and/or reconstructing certain public facilities and improvements relating
to its water and wastewater system, including specifically the Automated Meter
Infrastructure Project ("Project"); and
WHEREAS, the Agency intends to finance the construction and/or
reconstruction of the Project or portions of the Project with moneys ("Project Funds")
provided by the State of California, acting by and through the State Water Resources
Control Board ("State Water Board"); and
WHEREAS, the State Water Board may fund the Project Funds with proceeds
from the sale of obligations the interest upon which is excluded from gross income for
federal income tax purposes ("Obligations"); and
WHEREAS, prior to the issuance of the Obligations or the approval by the State
Water Board of the Project Funds, the Agency desires to incur certain capital
expenditures ("Expenditures") with respect to the Project from available moneys of the
Agency; and
WHEREAS, the Agency has determined that those moneys to be advanced on
and after the date hereof to pay the Expenditures are available only for a temporary
period, and it is necessary to reimburse the Agency for the Expenditures from the
proceeds of the Obligations.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Santa Ana as follows:
Section 1. The Agency hereby states its intention and reasonably expects
to reimburse Expenditures paid prior to the issuance of the Obligations or the approval
by the State Water Board of the Project Funds.
Section 2. The reasonably expected maximum principal amount of the
Project Funds is $13,700,000.
Section 3. This Resolution is being adopted no later than 60 days after the
date on which the Agency will expend moneys for the construction portion of the
Project costs to be reimbursed with Project Funds.
EXHIBIT 6 Resolution No. 2018-X)0(
Page 1 of 3
55A-19
jmf 8/14/18
Section 4. Each Agency expenditure will be of a type properly chargeable to
a capital account under general federal income tax principles.
Section 5. To the best of our knowledge, this Agency is not aware of the
previous adoption of official intents by the Agency that have been made as a matter
of course for the purpose of reimbursing expenditures and for which tax-exempt
obligations have not been issued.
Section 6. This Resolution is adopted as official intent of the Agency in order
to comply with Treasury Regulation Section 1.150-2 and any other regulations of the
Internal Revenue Service relating to the qualification for reimbursement of Project
costs.
Section 7. All the recitals in this Resolution are true and correct, and this
Agency so finds, determines, and represents.
Section 8. This Resolution shall take effect immediately upon its adoption by
the City Council, and the Clerk of the Council shall attest to and certify the vote
adopting this Resolution.
ADOPTED this _ day of September, 2018.
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By: . :F'�G
hn M. Funk
Assistant City Attorney
AYES: Councilmembers
NOES: Councilmembers
ABSTAIN: Councilmembers
NOT PRESENT: Councilmembers
Miguel A. Pulido
Mayor
55A-20
Resolution No. 2018 -XXX
Page 2 of 3
jmf 8/14/18
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, MARIA D. HUIZAR, Clerk of the Council, do hereby attest to and certify the attached
Resolution No. 2018 -XXX to be the original resolution adopted by the City Council of
the City of Santa Ana on 2018.
Date:
Clerk of the Council
City of Santa Ana
55A-21
Resolution No. 2018-M
Page 3 of 3
55A-22
jmf 8/14/18
RESOLUTION NO. 2018 -XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SANTA ANA PLEDGING REVENUES AND FUNDS FOR THE
REPAYMENT OF FINANCING FROM THE STATE WATER
RESOURCES CONTROL BOARD FOR THE WATER
DISTRIBUTION SYSTEM IMPROVEMENTS PROJECT
WHEREAS, the City of Santa Ana ("Agency") desires to finance the costs of
constructing and/or reconstructing certain public facilities and improvements relating
to its water and wastewater system, including specifically the Water Distribution
System Improvements Project ("Project"); and
WHEREAS, the City Council of the City of Santa Ana has previously authorized
City staff to apply for financing of the construction and/or reconstruction of the Project
or portions of the Project with low interest moneys from the State Revolving Fund,
provided by the State of California, acting by and through the State Water Resources
Control Board ("State Water Board"); and
WHEREAS, the State Water Board requires, as a condition of approval of any
financing agreement, the establishment of pledged sources of revenue to repay this
financing.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Santa Ana as follows:
Section 1. The City of Santa Ana hereby dedicates and pledges the net
revenues of the water enterprise fund and the water enterprise fund to payment of any
and all Clean Water State Revolving Fund and/or Water Recycling Funding Program
financing for the Water Distribution System Improvements Project.
Section 2. The City commits to collecting such revenues and maintaining
such fund(s) throughout the term of such financing and until the City has satisfied its
repayment obligation thereunder unless modification or change is approved in writing
by the State Water Board.
Section 3. So long as the financing agreement(s) are outstanding, the City's
pledge hereunder shall constitute a lien in favor of the State Water Board on the
foregoing fund(s) and revenue(s) without any further action necessary.
Section 4. So long as the financing agreement(s) are outstanding, the City
commits to maintaining the fund(s) and revenue(s) at levels sufficient to meet its
obligations under the financing agreement(s).
Resolution No. 2018-X)0(
Pagel of 2
55A-23
jmf 8/14/18
Section 5. This Resolution shall take effect immediately upon its adoption by
the City Council, and the Clerk of the Council shall attest to and certify the vote
adopting this Resolution.
ADOPTED this _ day of September, 2018.
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By: % f'
hn M. Funk
Assistant City Attorney
AYES: Councilmembers
NOES
ABSTAIN:
NOT PRESENT:
Councilmembers
Councilmembers
Councilmembers
Miguel A. Pulido
Mayor
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, MARIA D. HUIZAR, Clerk of the Council, do hereby attest to and certify the attached
Resolution No. 2018 -XXX to be the original resolution adopted by the City Council of
the City of Santa Ana on 2018.
Date:
Clerk of the Council
City of Santa Ana
55A-24
Resolution No. 2018-700(
Page 2 of 2
Jmf 8/14/18
RESOLUTION NO. 2018 -XXX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
SANTA ANA AUTHORIZING THE REIMBURSEMENT OF
FUNDING FOR THE WATER DISTRIBUTION SYSTEM
IMPROVEMENTS PROJECT FROM THE STATE WATER
RESOURCES CONTROL BOARD
. WHEREAS, the City of Santa Ana ("Agency") desires to finance the costs of
constructing and/or reconstructing certain public facilities and improvements relating
to its water and wastewater system, including specifically the Water Distribution
System Improvements Project ('Project"); and
WHEREAS, the Agency intends to finance the construction and/or
reconstruction of the Project or portions of the Project with moneys ("Project Funds")
provided by the State of California, acting by and through the State Water Resources
Control Board ("State Water Board"); and
WHEREAS, the State Water Board may fund the Project Funds with proceeds
from the sale of obligations the interest upon which is excluded from gross Income for
federalincome tax purposes ("Obligations"); and
WHEREAS, prior to the issuance of the Obligations or the approval by the State
Water Board of the Project Funds, the Agency desires to incur certain capital
expenditures ("Expenditures") With respect to the Project from available moneys of the
Agency; and
WHEREAS, the Agency has determined that those moneys to be advanced on
and after the date hereof to pay the Expenditures are available only for a temporary
period, and it is necessary to reimburse the Agency for the Expenditures from the
proceeds of the Obligations.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Santa Ana as follows:
Section 1. The Agency hereby states its intention and reasonably expects
to reimburse Expenditures paid prior to the Issuance of the Obligations or the approval
by the State Water Board of the Project Funds.
Section 2. The reasonably expected maximum principal amount of the
Project Funds is $14,600,000.
Section 3. This Resolution is being adopted no later than 60 days after the
date on which the Agency will expend moneys for the construction portion of the
Project costs to be reimbursed with Project Funds.
Resdutlon No. 2018 -XXX
EXHIBIT 8 Pagel of
55A-25
jmf 8/14/18
Section 4. Each Agency expenditure will be of a type properly chargeable to
a capital account under general federal income tax principles.
Section 5. To the best of our knowledge, this Agency is not aware of the
previous adoption of official intents by the Agency that have been made as a matter
of course for the purpose of reimbursing expenditures and for which tax-exempt
obligations have not been issued.
Section 6. This Resolution is adopted as official intent of the Agency in order
to comply with Treasury Regulation Section 1.150-2 and any other regulations of the
Internal Revenue Service relating to the qualification for reimbursement of Project
costs.
Section 7. All the recitals in this Resolution are true and correct, and this
Agency so finds, determines, and represents.
Section 8. This Resolution shall take effect immediately upon its adoption by
the City Council, and the Clerk of the Council shall attest to and certify the vote
adopting this Resolution.
ADOPTED this _ day of September, 2018.
APPROVED AS TO FORM:
Sonia R. Carvalho, City Attorney
By:.
hn M. Funk
Assistant City Attorney
AYES: Councilmembers
NOES: Councilmembers
ABSTAIN: Councilmembers
NOT PRESENT: Councilmembers
Miguel A. Pulido
Mayor
55A-26
Resoldon No. 2018 -XXX
Page 2 of 3
jmf 8/14/18
CERTIFICATE OF ATTESTATION AND ORIGINALITY
I, MARIA D. HUIZAR, Clerk of the Council, do hereby attest to and certify the attached
Resolution No. 2018 -XXX to be the original resolution adopted by the City Council of
the City of Santa Ana on 2018.
Date:
Clerk of the Council
City of Santa Ana
55A-27
Resolution No. 2018 -XXX
Page 3 of 3