HomeMy WebLinkAbout19D - PWA MOS CIP REPORTREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: FEBRUARY 5, 2019 TITLE: RECEIVE AND FILE: PUBLIC WORKS AGENCY MONTHLY PROJECT STATUS AND CAPITAL IMPROVEMENT PROGRAM REPORT FOR JANUARY 2019 (STRATEGIC PLAN NO. 5, 1} CITY MANAGER RECOMMENDED ACTION CLERK OF COUNCIL USE ONLY: APPROVED ❑ As Recommended ❑ As Amended ❑ Ordinance on 1� Reading ❑ Ordinance on 2nd Reading ❑ Implementing Resolution ❑ Set Public Hearing For CONTINUED TO FILE NUMBER Receive and file the Public Works Agency Project Status and Monthly Capital Improvement Program Executive Report for January 2019. DISCUSSION The January 2019 Project Status and Capital Improvement Program (CIP) Executive Summary (Exhibit 1) provides Public Works Agency activity in alignment with the City's Strategic Plan. The report includes tasks, next steps, outcomes, and percentage completed for each project. The CIP Executive Summary Schedule for all projects is available on the City's website at: https://www.santa-ana ore/sites/default/files/pw/documents/Executive-Monthly-CIP-Update-January-2019 pdf The following remarks are provided to note significant matters related to the Public Works Agency: South Main Street Corridor Improvements Plans are underway to implement the "South Main Vision Plan". The Plan calls for greater walkability by implementing traffic calming mechanisms, enhanced crosswalks, pedestrian level street lighting, street trees, landscaping, parklets, site furnishings and metered parking. Survey, geotechnical studies, utility coordination, and traffic studies have been completed. The Contract Documents are currently 60% complete and an internal review is being conducted. Contract Documents are slated to be completed and released for Bid Advertisement in Fiscal Year 2019/20. Raitt Street Rehabilitation (McFadden to Civic Center) This project is in the early design phase, with a tentative completion date scheduled for late Summer or early Fall of 2019. The project includes repair, replacement, and construction of curb and gutter, sidewalk and curb ramp, and reconstruction and replacement of existing pavement. This project intersects with the OC Streetcar project enhancements, as segments of the storm drain system from 1St Street to 5th Street will be improved in a coordinated effort. Construction of 19D-1 Monthly CIP Executive Report for January 2019 February 5, 2019 Page 2 the Raitt Street project will take place after the OC Streetcar project is constructed at the Raitt crossing, which may take up to 3 years. Raitt Street Slurry and Resurfacing (Edinger to McFadden) This project is currently in the design phase with a completion timeframe tentatively scheduled for Summer 2019. The project includes the repair, replacement, and construction of curb & gutter, sidewalk and curb ramp, and application of crack seal, slurry seal and resurfacing of asphalt concrete on Raitt Street from Edinger Avenue to McFadden Avenue. Construction will follow the design -engineering phase and is anticipated to begin in Summer 2019. C -5-F Channel Assessment between Newhope and Harbor The winter storm in January 2017 damaged a drainage channel, identified as C -5-F, located south of First Street between Newhope Street and Harbor Boulevard. The channel runs parallel to and south of First Street. Staff has been working with the Federal Emergency Management Agency (FEMA) and the California Governor's Office of Emergency Services (Cal OES) to secure Federal/State funding for repair work to the drainage channel related to that storm. The channel repair scope of work includes removal and replacement of damaged sections caused by the January 2017 storm event. A Notice of Obligation authorizing Federal/State funding has been issued and the project is currently in the design phase. We don't anticipate further damage by the current winter season, and staff is looking forward to the start of construction Summer of 2019. General Water Main and Sewer Main Progress Report This project is in the design phase and shall be completed in February 2019. The project includes the replacement of 6,300 linear feet of the existing 6" and 8" vitrified clay pipe (VCP) with an 8" and 10" polyvinyl chloride (PVC). These construction improvements include sewer related appurtenances such as: sewer manholes and sewer laterals. STRATEGIC PLAN ALIGNMENT This item supports the City's efforts to meet Goal #5 — Community Health, Livability, Engagement & Sustainability, Objective #1 (establish a comprehensive community engagement initiative to expand access to information and create opportunities for stakeholders to play an active role in discussing public policy and setting priorities). FISCAL IMPACT The". no fiscal impact associated with this item O Fuad S`8iss, PE, PLS Executive(rector Public Wor Agency Exhibit: 1. CIP — Executive Summary Schedule may be reviewed at: https://www.santa-ana.org/sites/default/files/pw/documents/Executive-Monthly-CIPhttps://www.santa- sites/default/files/pw/documents/Executive-Monthly-CIP-Update-January-2019�dfJanuary-2019 pdf 19D-2 P_ O a= to 8 a< x 9 -- gi a e I'a 8< W � 1 I J ♦A C_ ' ce J O V p $z H 01� 8< 104 z 008 8 8 88 88888885$888808 8 88 3 i gg 8 J LL a ��HB do 8 mm p N S N u: � v"i rcNe o mo"uocn 8 S 8 p� 8 S p N N N N N Q N N N N 91 o z I"' c C rgi S4 t5 7 e 2 O O i O 2 tA WW 5S g ct i i? u i I? T '^ `4 �mii .�i " " I � a o > s cc '., ry E u y W««« c« m Y 3 n° w Er J G o a" p �«, co i > .fj. X = c n n` 3 voi N E o a n Y° o a a o E o = n. y M n 2 ° E E so za 'c m u u > 09 c n n u'^ m d u« c i r E E m o>> C V 6 c c a Y a m` i' f i i W z" rc m m ��° m 3 3 °i C c � P X P X X X X X X X � � � � � � i = N h = � � � _ = M �0 N •� � 1 WI11 1 r z i M n N N n m E `u E s• i � a f m m � c � E i F n o° E o ` . E $« E Eo 3 ffl p A s ` E ., u C m qn` ¢ Y A A a a n o i cin c s L '•� '�' q � Z g`g a� c� N m u m c 'c yy a p y 3 g m` '�'' c u t er S iS n S3u°irmo.�'3..O Yi i7' Mu9i m` im`�i� f Ni�{"3-t� �3LL3�ti 3 C m L m cE w ��PowwaNwww3www 000T� � w�w$� 8 N 19D-4 N a s I a ll�Ill��hllllllllltlll�l■1■ ?I EI II II II II II II II II II II II II II II II II II II I■■■■MERRO■■I X1 m"R N v j O y C E L c 3 Y J E � m o �c m« �c E4« 8 c ¢ u « 3 i E is E:2 E `pR� ° m L E a E 'O^ K y Q �i V O r b C Y C O C O� N pLp h q N N � la o x c B 3 N g d E m u Y d S N G c o c .n c tttitu wE�S5nc��Su=u[°!8� .c M '� „ �8QP..88g8g88y8888q88Q8g8Q8s8 t4 ou° J3a3 LC a§ mo z 8g 8g og8gg8 ggQg$g g U � Q . . o8$$ oEg.25 . g 'i gg'om .6ggi 0 a oe b 10 ry b b b b b N b P m P b P [O P 2. 2So08S n m o 88 O eM 2$$W N m��aaa N N N N F Z I O e "ova' 11 i <:: J? y 7j T dF L V j O y « D E L c 3 Y E � m o �c m« �c E4« 8 c ¢ u « 3 3 y E:2 E `pR� ° m L E a E 'O^ K y Q V O r b C Y C O C O� N pLp h q N o x c B 3 v Syy r t E d E m u Y d S N G c o c .n c s wE�S5nc��Su=u[°!8� .c M '� „ o c.oi t4 ou° J3a3 LC mo ttl U � T T N y e n pp p imp N m T N N M py a 1O P P R P �D S N W O 9 b 10 ry b b b b b N b P m P b P [O P titi'1 wwNtiw M_�-1M M_-iutbbO 19D-5 7 { , � \a\■¥#■■#■ r##■*■■■%.� 4 \\\\ \ � ®#■###!##R §!m\!!!!!!#-"/#;#§ k � 99���( T\/) wle /{)�02_ - )\\}!`}) lC-4�- fƒ l;�!/ ., \k|®Er77�-�]•\;l;= _ z;: --k{)// Z!)|! _ §,;�l=§ ;.,;a!%;|�!|•2|} � +[||/!! !!!!l�zo ) §§(/) wle