HomeMy WebLinkAbout23A - CONTRACT AWARD LANDSCAPE PROJREQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
FEBRUARY 5, 2019
TITLE:
AWARD CONTRACT TO ARAMEXX GROUP INC.
FOR THE JEROME CENTER LANDSCAPE
DRAINAGE PROJECT (PROJECT NO 19-2703)
(STRATEGIC PLAN NO. 6, 1C)
CITY MANAGER
RECOMMENDED ACTION
CLERK OF COUNCIL USE ONLY:
APPROVED
❑ As Recommended
❑ As Amended
❑ Ordinance on 1� Reading
❑ Ordinance on 2nd Reading
❑ Implementing Resolution
❑ Set Public Hearing For
CONTINUED TO
FILE NUMBER
Award a contract to Aramexx Group Inc., the lowest responsible bidder, in accordance with the
base bid in the amount of $83,155, for the term beginning upon execution of the contract and
ending upon project completion, for construction of the Jerome Center Landscape Drainage
Project, and authorize the City Manager and the Clerk of the Council to execute the contract
subject to nonsubstantive changes approved by the City Manager and the City Attorney.
2. Approve the Project Cost Analysis for a total estimated construction delivery cost of $100,000
which includes the contract bid amount, administration, inspection and testing, and an
authorized contingency of $8,313.
The Jerome Center provides several programs forthe community, including recreational basketball
activities (Exhibit 1 -Map). In August of 2018, the indoor basketball courts were compromised by
water damage, began uplifting and were not usable. Staff quickly assessed the problem and
determined that water was infiltrating into the building foundation from the exterior landscaping
irrigation system and room drains. Consequently, a project was developed to address these
concerns.
The scope of work for the project includes drainage improvements to the exterior of the building,
modifications to the existing irrigation system, along with regrading and the removal of unnecessary
trees and shrubs located adjacent to the building. These improvements should prevent water from
intruding into the building foundation and damaging the new basketball court.
A Notice Inviting Bids was advertised on January 18 and 23, 2019, and bids were opened on
January 29, 2019. The following is a summary of the bid invitations made and the bids received:
23A-1
Award Contract to Aramexx Group Inc. for Jerome Center Landscape Drainage Project
February 5, 2019
Page 2
Contractor Participation Data
Santa Ana contractors receiving notices
20
Contractors requesting bidding documents
27
Bids received
5
Bids received from Santa Ana contractors
0
Outreach
To provide an opportunity for local vendors to submit bids, the City is now utilizing the PlanetBids
web -based system. Through this system, 20 qualified local vendors were notified of the opportunity
to bid on this project.
Bid Results Summary
RANK
BIDDER'S NAME
LOCATION
BASE BID
1
Aramexx Group Inc.
Claremont
$83,155
2
HYM Engineering, Inc.
Buena Park
$92,630
3
Green Giant Landscape, Inc.
La Habra
$98,000
4
Ya
[CEEMConstruction
Covina
$109,750
5
Corp.
Downey
$118,750
A total of five bids were received and all bids were deemed responsive. Aramexx Group Inc.
submitted the lowest responsive bid in the amount of $83,155 (Exhibit 2). Based on the bid analysis
and a contractor's reference check, staff recommends awarding the construction contract to
Aramexx Group Inc. in the amount of $83,155 (Exhibit 3).
STRATEGIC PLAN ALIGNMENT
Approval of this item supports the City's efforts to meet Goal #6 Community Facilities &
Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City
assets), Strategy C (invest resources to extend the service life of existing infrastructure to protect
the City's investment and support a high quality of life standard).
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the recommended actions are
exempt from further review. Categorical Exemption Environmental Review No. ER -2019-10 was
filed for the project.
23A-2
Award Contract to Aramexx Group Inc. for Jerome Center Landscape Drainage Project
February 5, 2019
Page 3
FISCAL IMPACT
Pursuant to the Cost Analysis (Exhibit 4), the estimated total construction delivery cost of the
project is $100,000 which includes construction contract, administration, inspection, testing,
surveying, and an authorized contingency of $8,313. Funding is available in the PRCSA-Capital
Outlay Fund (Cell Tower) for $100,000 (Account No. 05113263-66220) for expenditure in Fiscal
Year 2018/19.
APPROVED AS TO FUNDS AND ACCOUNT:
FuadWeiss, PE, PLS Kath n Downs,CPA3
Executive Director Executive Director
Public Wo ks Agency Finance and Management Services Agency
WHOWNLIQ/'N
1T..
Executive Director
Parks, Recreation, and Community
Services Agency
EWGlFC/MO
Exhibits: 1. Location Map
2. Bid proposal
3. Construction Contract
4. Cost Analysis
23A-3
23A-4
LOCATION MAPA
(NOT TO SCALE)
SANTA ANA
Project No. 19-2703:P`W� Jerome Center Landscape Drainage
NBUCWOMSAGBU Project
4U"I, �
23A-6
CITY OF SANTA ANA ADDENDUM NO. l
PROPOSAL EXHIBIT 2
PROJECT NO.: 0-2703
JEROME CENTER LANDSCAPE DRAINAGE
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM:
f; o i1ii510klel.rw
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with
said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the
following schedule:
Item
P-1
Description
Qty
Unit
Unit Price
Amount
I
Clearing and Grubbing
1
LS
$
$
2
Remove Existing Planter Landscaping
Trees
1
LS
$ Q
�� �•
$p oo O
and
/
I/
3
Furnish and Install Waterproofing
380
SF
$
$ S-
1 IVO
4
Mulch (3'I
2,300
SF
$
$
5
Remove Existing and Construct PCC
Walkway
310
SF
$
S
$ J
(T=4")
11+9
6
Remove Existing and Construct PCC
24
LF
$ f
Q J
$
2,Z B D
Curb & Gutter (A-2-6)
7
Furnish and Install Precast Concrete
8
LF
$
�{��
$
Ir600'
Splash Block
8
Furnish and Install 4" Perforated PVC
Pipe
160
IF
$
Z��
$
-�1
u000
9
Furnish and Install 4" PVC Pipe
170
LF
$ n !
LSA
$
-Iill SD�
10
Furnish and Install 6" PVC Pipe
100
LF
$ 3D
$ 3000-
000"11
11
Furnish and Install 8" PVC Pipe
170
LF
$ 3
r
$ q i
I
12
Furnish and Install 12"x12" Drain Inlet
2
EA
$ Z u
$ PO i
13
PCC Parkway Culvert
1
EA
$
2$00'
$
?,$DO
14
Project Advertising Sign
I
EA
$ \0()b'
006--
$ 1006--
P-1 of P-16
23A-7
CITY OF SANTA ANA ADDENDUM NO. 1
PROPOSAL
PROJECT NO.: 19-2703
JEROME CENTER LANDSCAPE DRAINAGE
Item
Description
Qty
Unit
Unit Price
Amount
15
Labor Agreement Oversight
1
LS
$5,000
$5,000
TOTAL BASE BID
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount
shown above, within twenty (20) working days after the commencement date stated in the Notice
to Proceed.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the
Standard Specifications, shall be $500 per calendar day.
Name of Firm
Signature of BI
Title
(If an individual, so state. If a fain or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. if a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
P-2 of P-16
23A-8
CITY OF SANTA ANA
PROPOSAL
PROTECT NO.: 19-2703
JEROME CENTER LANDSCAPE DRAINAGE
BIDDER'S STATEMENT
BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent
Construction Contract Agreement shall constitute the entire agreement between BIDDER and the
AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the
Council with her signature and official seal noting hereon the action of approval of the Council,
signed by the Public Works Agency Executive Director or his/her duly authorized agent, and
signed by the City Attorney, denoting his approval of the form of this document, and its
execution, and when it or an exact copy of it has been either delivered to BIDDER or deposited
with the United States Postal Service properly addressed to the BIDDER with the correct postage
affixed thereto.
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she
will furnish AGENCY all required bonds and certificate of liability insurance within ten (10)
business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof
accompanying this proposal shall become the property of the AGENCY and shall be considered
as payment of damages due to the delay and other causes suffered by AGENCY because of the
failure to furnish the necessary bonds and because it is distinctly agreed that the proof of
damages actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or
BIDDER'S bond substituted in lieu thereof shall be returned to the undersigned.
BIDDER understands that a bid is required for the entire work, the estimated quantities set forth
in the bid schedule are solely for the purpose of comparing bids, and that final compensation
under the contract will be based upon the actual quantities of work satisfactorily completed. The
BIDDER also certifies that the bid is a balanced bid.
In accordance with Section 7028.15 of the California Business and Professions Code, the
undersigned certifies under penalty of raper ury that the foregoing is true and correct.
Name of Firm Amex r4p Inc`
Signature of BIDDER
Title Salim Samour - President
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. if a corporation, stale legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
P-3 ofP-16
23A-9
CI'T'Y OF SANTA ANA
PROPOSAL
PROJECT NO.: 19-2703
JEROME CENTER LANDSCAPE DRAINAGE
CONTRACTOR'S LICENSING AND REGISTRATION STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she
and all his/her subcontractors are registered with the State of California Department of industrial
Relations (DIR), and that the following is true and correct.
Contractor's Name: Aramexx GrouD Inc
Business Address: 541 wast First et Unit 109 Claremont CA 91711
Business E -Mail Address: infoparamexxgroupinc.com
Telephone: 909-746-8066
State Contractor's License No. and Class: Class A # 960305
License Expiration Date:
4/30/19
State Dept. of Industrial Relations (DIR)
Registration No.:
100001010179
State Dept. of I us 'al elat is IR)
Registration Exratio 6/30/19
Signed: —
Title: Salim Samour - President
P-4 of P-16
23A-10
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 19-2703
JEROME CENTER LANDSCAPE DRAINAGE
PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT
Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well
as California Code of Regulations, Title 8, Section 16,000, et seq., ("Prevailing Wage Laws"),
which require the payment of prevailing wage rates and the performance of other requirements
on "public works" and "maintenance" projects. Since the services are being performed as part of
an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws,
and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such
Prevailing Wage Laws.
City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at
the commencement of this Agreement. Contractor shall make copies of the prevailing rates of
per diem wages for each craft, classification or type of worker needed to execute the services
available to interested parties upon request, and shall post copies at the Contractor's principal
place of business and at the project site.
Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees
and agents free and harmless from any claim or liability arising out of any failure or alleged
failure to comply with the Prevailing Wage Laws.
The undersigned certifies that the foregoing is true and correct.
Name of Firm
Signature of BE
Title Salim Samour - President
(if an individual, so state)
P-5 of P-16
23A-11
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 19-2703
JEROME CENTER LANDSCAPE DRAINAGE
LIST OF SUB -CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all
subcontract work exceeding the following amount:
o Streets, highways including bridge projects: ''/2% of the bid or $10,000, whichever is greater
o Buildings, parks, or other projects: Y2% ofthe bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State
Department of industrial Relations (DIR).
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
Name iAAIA 6
License #/Exp.
DIR Reg. #/Exp.
Location
Phone
Type Of Work
A mount $
Name
License #/Exp.
DIR Reg.#/Exp.
License #
Location
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg.#/Exp.
License #
Location
Phone
Type Of Work
Amount$..
Signature of Bidder
Name
License #/Exp.
DIR Reg. #/Exp.
Location
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License # _
Location _
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. 4/Exp.
License #
Location
Phone
Type Of Work
Amount $
P-8 ofP-l6
23A-12
CITY OF SANTA ANA
PROPOSAL
PROTECT NO.: 19-2703
JEROME CENTER LANDSCAPE DRAINAGE
REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER has performed similar work within the past three years.
Ulrich
Address of Owner.
610-9410
Name and Telephone Number of person familiar with project.
$1.377.816 Landscape & Irrigation
Contract Amount Type of Work
2. Cahuilla Band of Indians Anza, CA
Name and Address of owner.
Jan 2019
Date Completed
Name and Telephone Number of person familiar with project.
$729,940 Softball Field- Irrigation & Landscape Nov 2017
Contract Amount Type of Work Date Completed
of Claremont 207 Harvard Ave., Claremont CA 91711
Name and Address of owner.
CariDillman 909-399-5431
Name and Telephone Number of person familiar with project.
$296,323 Dog Park Renovations Dec 2017
Contract Amount Type of Work . Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
Pinnacle Surety 151 Lamus Dr Ste A201 Costa Mesa CA 92626
Shawn Blume 951-217-8637
2P39Af PAT
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 19-2703
JEROME CENTER LANDSCAPE DRAINAGE
ADDITIONAL REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER or Subcontractor has performed similar work in the past five years.
City of Anaheim 200 S. Anaheim Blvd, Anaheim CA 90805
Name and Address of Owner.
Blair Fickett 562-301-4644
Name and Telephone Number of person familiar with project.
$584,710 Landscape, Irrigation, Hardscape 1-26-16
Contract Amount Type of Work Date Completed
2•
Monument Sign City of Buena Park 6650 Reach Blvd Buena_ Park
Name and Address of owner.
Ken Kim 714-562-3688
Name and Telephone Number of person familiar with project.
$159,407 Landscape, Sign 9-10-18
Contract Amount Type of Work Date Completed
of Victorville 14343 Civic Center Dr Vicorville CA 92392
Name and Address of owner.
Bruce Miller 760-955-5085
cq*Td Telephone Number of person familiar with project.
Contract Amount
Landscape, Irrigation 6-28-16
Type of Work Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
Pinnacle Surety 714-465-5100 151 Kalmus Dr. St A201 Costa Mesa CA 92626
P-10 of P-16
23A-14
CITY OF SANTA ANA
PROPOSAL
PROTECT NO.: 19-2703
JEROME CENTER LANDSCAPE DRAINAGE
NON-DISCRIMINATION CERTIFICATE
The undersigned contractor or corporate.officer, during the performance of this contract, certifies
as follows:
The Contractor shall not discriminate against any employee or applicant for employment
because of race, color, religion, sex, or national origin. The Contractor shall take affirmative
action to ensure that applicants are employed, and that employees are treated during
employment without, regard to their race, color, religion, sex, or national origin. Such action
shall include, but not be limited to, the following: employment, upgrading, demotion, or
transfer; recruinrnent or recruitment advertising; layoff or termination; rates of pay or other
forms of compensation; and selection for training, including apprenticeship. The Contractor
agrees to post in conspicuous places, available to employees and applicants for employment,
notices to be provided setting forth the provisions of this nondiscrimination clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on
behalf of die Contractor, state that all qualified applicants will receive consideration for
employment without regard to race, color, religion, sex, or national origin.
The Contractor shall send to each labor union or representative of workers with which he/she
has a collective bargaining agreement or other contract or understanding, a notice to be
provided advising the said labor union or workers' representatives of the Contractor's
commitments under this section, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24,
1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Contractor shall furnish all information and reports required by Executive Order 11246
of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or
pursuant thereto, and will permit access to his/her books, records, and accounts by the
administering agency and the Secretary of Labor for purposes of investigation, to ascertain
compliance with such rules, regulations, and orders.
6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract may be canceled,
terminated, or suspended in whole or in part and the Contractor may be declared ineligible
for further Government contracts or federally assisted construction contracts in accordance
with procedures authorized in Execution Order 11246 of September 24, 1965, and such other
sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of
September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as
otherwise provided by law.
P-12 of P-16
23A-15
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 19-2703
JEROME CENTER LANDSCAPE DRAINAGE
The Contractor shall include the portion of the sentence immediately preceding paragraph (1)
and the provisions of paragraphs (1) through (7) in every subcontract or purchase order
unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to
Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be
binding upon each subcontract or purchase order as the administering agency may direct as
means of enforcing such provisions, including sanctions for noncompliance; provided,
however, that in the event the Contractor becomes involved in, or is threatened with,
litigation with a subcontractor or vendor as a result of such direction by the administering
agency, the Contractor may request that the United States enter into such litigation to protect
the interests of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stars. 1939, and as
amended, no discrimination shall be made in the employment of persons upon public works
because of race, religious creed, color, national origin, ancestry, physical handicaps, mental
condition, marital status, or sex of such persons, except as provided in Section 1420, and any
contractor of p> ewof�s viaYating this Section is subject to all the penalties imposed for a
violation of the C ap er
Signed:
Title: Salim Samour - President
Firm: Aramexx Group Inc
Date: 1-29-19
P-13 ofP-16
23A-16
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 19-2703
JEROME CENTER LANDSCAPE DRAINAGE
STATEMENT REGARDING APPRENTICESHIP REWREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor
Code regarding employment of apprentices, and understands that contractors on contracts
exceeding $30,000 or 20 working days shall:
1. Apply to the joint apprenticeship committee administering the apprenticeship standards of
the craft or trade in the area of the site of the public work for a certificate approving the
contractor under the apprenticeship standards for the employment and training of apprentices
in the area or industry affected.
2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the
apprenticeship standards.
3. Contribute to the fund or ibnds in each craft or made in which lie/she employs journeymen or
apprentices on the public work, in the same amount or upon the same basis and in the same
manner as t tier ontra except contractors not signatory to the trust agreement shall
pay a like amou toe Cala Apprenticeship Council.
Signed: y .�_._.-
Title: Salim Samour - President
Firm: Aramexx Group Inc
Date: 1-29-19
1 P
1 //
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 19-2703
JEROME CENTER LANDSCAPE DRAINAGE
STATEMENT REGARDING "ANTI -KICKBACK" REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by
these bid documents, agrees to comply with the Copeland "Anti -Kickback' Act (18 USC 74) as
supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that
each contractor or subcontractor shall be prohibited from inducing, by any means, any person
employed in the ce�flsuct' nor" of public work, to give up any part of the compensation to
which he/she is otherva e titled.
Signed: -
Title: Salim Samour - President
Firm: Aramexx Group Inc
Date: 1-29-19
P-15 of P-16
23A-18
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 19-2703
JEROME CENTER LANDSCAPE DRAINAGE
PUBLIC CONTRACT CODE SECTION 10162 OUESTIONNAIRE
In conformance with Public Contract Code Section 10162, the BIDDER shall complete,
under penalty of perjury, the following questionnaire:
Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a
proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented
from bidding on, or completing a federal, state, or local government project because of a
violation of law or a safety regulation?
Yes No x
If the answer is yes, explain the circumstances in the following space.
iAfPAI9
MAYOR
Miguel A. Pulido
MAYOR PRO TEM
Juarl Viliegas
COUNCILMEMBERS
Cecilia Iglesias
David Penaloza
Roman Rayne
Vicente Salmlento
Jose Solodo
January 22, 2019
ADDENDUM NO. ONE
CITY OF SANTA ANA
20 Chic Center Plaza • P.O. Box 1988
Santa Ana, California 92702
www.sant"na.OM
PUBLIC WORKS AGENCY
CITY MANAGER
Raul Godinez II
CITY ATTORNEY
Sonia R. Carvalho
CLERK OF THE COUNCIL
Maria D. Hulzar
SUBJECT: PROJECT NO. 19-2703: JEROME CENTER LANDSCAPE DRAINAGE
The following changes/clarifications have been made for the subject project:
Revision
1. Replace page P-1 of P-16 and P-2 of P-16, Proposal. Bid Items have been
revised.
2. Replace all sheets of Appendix A, Definition of Bid Items,
3. Replace all sheets of Appendix F, Standard Plans.
4. Replace all sheets of Appendix G, Products.
5. Replace plan sheet 2 of 2, Improvement Plan.
Clarification
6. Per page iv, Notice Inviting Bids, Bids are due on January 29, 2019. Correction
has been made on PlanetBids.
All other terms and conditions remain the same.
FOR THF CITY VSANTA ANA
Edwin "William" GaWez, P.E.
City Engineer
SANTA ANA CITY COUNCIL
\H2O\
VaW A. PWIdo Juan vmwe Vio Ml SaWemo David PvW= Jme80alo Ru RRayne Cedla Vesim
5myw Mayor Pro Tem, Word 5 Wardd Wanl2 Wad3 Ward Wade
rilamae�sardaace ora dcecelma(a�58M159ce Qn hNbrio(@salla-ana.am___.Reme�Osanlaannae ._. ddasimOmnlaane.ma
i
23A-20
Z"\
3
Aramexx aaa55511Construction
101 N. Indian Hill Blvd. Suite C1-201
Claremont, CA 91711
PH: 909.746.8066 - FX: 909,591.4569
1.
Department of Transportation
Install Vegetation Control Under Guardrail, 08.0114804.
Dec 2016—July 2017
172730th Street
Construction on state highway in San Bernardino County, In
Sacramento, CA 95816
Ontario on route 10 from 0.2 mile East of Vineyard Ave.
951-232-6478
overcrossing to 0.1 mile East of Milliken Ave. and in Chino on
David Benson
route ED from 0.2 mile West of Mountain Ave. undercrossing to
david.benson@dot.m.gov
Euclid Ave. undercrossing.
2.
Department ul Transportation
Install Rock Blanket, 08-0115404. Construction on state highway in
Sept. 2016— Jan. 2017
1727 30th Street
San Bernardino County In Hesperia and Victorville from 0.2 mile
Sacramento, CA 95816
North of Joshua Street overcrossing to 0.2 mile North of Mojave
951-232-6478
Drive overcrossing.
David Benson
davld.benson@dot.ca.gcv
3.
Brea Olinda Unified School
Track Replacement Project at Brea Olinda,16003.00. Demolition
lune 2016—Aug. 2016
District
of old tracks exovatiompaving, installation of synthetic running
1 Civic Center
track surface, installation of landscape Irrigation system, storm
Level2
drainage, and planting.
Brea, CA 92821
909.6"-8009
Noel Garcia
ngarcia@mlkl2.00m
4.
Cfry of la Habra Heights
La Habra Heights Park Irrigation System Upgrade, 2023-05.
June 2016—Aug. 2016
1245 N. Hacienda Rd.
Upgrade of existing irrigation system. Installation of new new
La Habra Heights, CA 90631
controller, new remote control valves, new sprinkler heads, main
562-6946302
line and lateral piping.
Lori Askew
Iaskew@Lhhclty.org
S.
Momngo Band of Mission
Morongo Roundabout landscape Improvements, 08 -15 -N -LF-
Oct 2015—Dec. 2016
Indians -
0337. Installation of new Califomia native landscape and
12700 Pumarra Rd.
irrigation, electrical lighting, underground boring, service
Banning,CA92220
pedestals, concrete hardscape, cobble paving, fence, point to
951-755-5124
point irrigation, and grading.
Karen Woodard
kwoodard@momngo-nsn.gov
6.
City of Anaheim
Uttle Peoples Park Remodel and Improvements, RCP 2015-11137.
Oct. 2015—Feb. 2016
200 S. Aneehim Blvd.
Demolition of existing concrete walk paths and landscape,
Anaheim, CA 92805
irrigation of new wrought Iron fence, natural stone pilasters, brick
714-7653166
pavers, drinking fountains, electrical lighting, site amenities,
Blair Flckett
basketball court resurface and equipment, wood gazebo,
Bfickett@anahelm.net
concrete walkways, landscape and irrigation.
7.
City of Claremont
College Park Landscape and Irrigation Improvements, OP 2015-6.
Oct. 2015—Jam 2016
207 Harvard Ave.
Baseball field renovations, drip irrigation, palm to point irrigation,
Claremont, CA 91711
shrub and rotor Irrigation, DG mulch, DG trails, concrete
909-3935460
walkways, concrete mow curbs, mulch, runningtrack
Kristin Mikula
kmlkula@ci.claremont.ca.us
23A-21
J
Aramexx Construction
101 N. Indian Hill Blvd. Suite C1-201
Claremont, CA 91711
PH: 909.746.8066 - FX: 909.591.4569
8.
Metro
North Hollywood Sustainable Parking Demonstration Project, IFB
Apr. 2015—Sept. 2015
1 Gateway Plaza
No. C11326. Construction of temporary parking lot and mull -use
Los Angeles, CA 90012
trail, heavy grading and export, compaction, laser grading,
213-922-6268
landscape and irrigation installation, TemPark installation, drive
Awny Malak
approaches, fencing. utility coordination and installation.
malaka@metro.com
9.
City of Fontana
Foothill Blvd. Median Landscape From Cherry Ave. to Hemlock
Mar. 2014—Aug. 2015
8353 Sierra Ave.
Ave. 56 -02 -DE -15. Median work, removal and export of soil,
Fontana, CA 92335
grading, boring, Irrigation service and electrical service pedestals,
909-350-6649
cobble paving, palm tree planting, point to point Irrigation,
Christopher Smethurst
natural cobble swales.
10.
City of Menifee
Newport Rd.Widening-Median work, removal and export of soil,
Oct. 2014—Jan. 2015
29714 Haun Road
grading, boring, irrigation service and electrical service pedestals,
Menifee, CA 92586
cobble paving, point to point irrigation, natural cobble swales.
951-639-1368
Carlos Geronimo or Nino Abad
cgemnimo@dtyofinengee.us
'
11.
Chaffey School District
Ontario High School Quad Mcdemization- Installation of 6'
Aug. 2014—Dec.2014
901 West Francis St.
mainline, point to point irrigation, tree and shrub landscaping.
Ontario, CA
Project completed in multiple phasm
909-460-5886
David Rutz
druiz@tilden-coil.com
23A-22
Or
E OF _:J.,: . i^c• i STATE MMIMMON #JTNCY :,.d hl,q U.,L b�
DEPARTMENT OF TRANSPORTATION
DISTRICT 8
CONSTRUCTION DIVISON (MSIM)
464 WEST 4TH STREET, 61a FIAOR
SAN BERNARDINO, CA 97401-1400
FHONE (909) 383-4563
FAX (909) 383-6913
TTY (909) 383-6300
October 17, 2018
To Whom It May Concern
MaWagConse'vaffon
a CadfMdaWay of Ufa
I write this letter of recommendation for Aramexx Construction. I have had the.pleasure of
working with Aramexx Construction on two (2) projects for District 8 (Riverside and San .
Bernardino Counties). One in Victorville on I-15 and another on I-10 In Ontario. The contract
work included Rock Blanket, Minor Concrete installations and Irrigation Repairs.
On both projects Aramexx Construction performed high quality work and were timely required
paperwork.
They were eager to partner with the department and sincerely endeavor to provide the best .
quality work. I have no doubt that Aramexx Construction will perform admirably on all projects
on which they are involved.
I welcome the opportunity to work with Aramexx Construction on future projects.
Sincerely,
David Benson
Resident Engineer
ProWde asV'4'sosw"70 kregmWand4kfeaf hmppa#adon sysfem
to mhmme Cartes u amyand 1hWUftry"
23A-23
LANDSCAPE
ARCHITECTS
February 6, 2017
Subject Aramexx Construction
To Whom It May Concern:
In my capacity as Consult Project Manager & Landscape Architect for The
Morongo Band of Mission Indians, I worked closely with Aramexx
Construction on the Morongo Trail / Interstate 10 Roundabout Landscape
Improvement Project in early 2016.
Aramexx Construction was the successful low bidder and performed
construction of the project. Aramexx Construction's work and dedication to
the project were a major part of its success and timely completion.
Aramexx provided great knowledge of value engineering and
constructability methods for this improvement project.
With the help and dedication of Aramexx Construction Project Manager
Lupe Lainez and Construction Superintendent, Bruce Gallardo, the tribe
and Caltrans received a high quality project in a safe and timely manner.
Aramexx is a great candidate to perform landscape construction projects for
any local agency: Feel free to contact me at (619) 300-2782 if you have
any questions.
Sincerely,
Brett J. Allen
Construction Manager/ Project Manager/ Landscape Architect
VDLA—Van Dyke Landscape Architects
Landscape Architecture 462 Stevens Avenue. Suite 107, Solana Beach, CA 92075-2042
Planning Tel: 619.294.8484 • Fax 619.574.0626 • E-mail: admin@vdla.us • Web: www.vdla.us
Water Management Principals: Mitch Phillippe: ASLA, CA LLA #3781 - Yale Hooper, CID, CLIA
Graphic Communications Associates: Ling Chan, ASIA, CA LLA #5435, LEED AP
23A-24
ca
23A-25
A
s"s
s
o
BaFao
E6 ES
R
R
R
o
eot
� bn
sg
U g
b u e
s
8
e
O
p
23A-25
A
23A-26
a
E
o
cO
Im
y
j;
�O
c
z
3wmv�tEm
cme
cEMam
d
anda�cca
a dG
VI.
FE
'E
gy
ye
z
��
m
�E"�sg�e
m8
m
l
E
P'u
m c U m
Mc 00
d
m
4
g V m
2n90 °ELL2
an
Wa�c
�
p
� OFC�
°CSO
�'
N
4
mQ
o
U«C4 ml
YI -.0
�
�
mCY6AN
iL
... ..
a
3$aam
Eme
Euc=3i
E'acc
5
do
`�Kdmva
a
S
ix"omE
sm E m n S=$
'y�E c�
y
�i°
Y 2 0 — C C
E�S
6s8 �$b
G�8
4s�
23A-26
m m
r
-> m
o m c v c
=E'
¢tE 83Ut5 cm_ om 3`m8'`�
Hmm m B a ccm mW
N
c �6c pm .- mn �cc om
2mE`m
m mem 05 a���
o
O�� ,OM f9 p p TJ" r
V ym .`0 8E -a .2
;iple ��o$ Nm m3 U�
L°yom Ncmmrn mN ''c $ic m
}N $ C 0 H y LL O
c E o y c CQ V N m m c c
m e 9 m m Vi m, E
DR
�?
U
V Um mmo TiN nNopm
U aomi2ENtEn ma_a
E°
c
Cl
o mm`3� �amm 0-1 D0 �
uiiH�Sm
5 EmmmQ
mgo
T_eE-= oa'iY._
c c o '-^`mom p>> K�
m r _�3W aan8E`$mN$p`.m _=No in Ym
N
Y m « r
p (] u L NNN DNp 'O
C
O .C.
c s m E� c
YS o
cc
n
at
H-
C
9 .0
LL.
iL DA
O NN m O
. O _j 3 d ? E
L m x. v c G a$ .7
C 6 'Ley
-
°1
LL
N � .
23A-27
I
o
Mi
Ea
98
23A-28
0
v
Y -
Q
T
4-
u
m
23A-29
2$ i
Zm $
E
!!
!
) �
} }
\
}
&
}
{
!
2
!!
r
:
Va
\
ci
k
\)
!
t
}
!/
]i
!
`
c
�`*
{
§f
2
�!
7|ID
[
)
23A-30
�
1 CONTRACTORS LICENSE .�I
!
Contractor's License Detail for License # 960305
DISCLAIMER: A license status check provides Information taken from the CSLB license database. Before relying on this
Information, you should be aware of the following limitations.
Data current as of 9/27/2018 9:43:08 AM
Business Information
ARAMFJOC GROUP INC
dba ARAMEXX CONSTRUCTION
532W FIRST ST UNIT 202
CLAREMONT, CA 91711
Business Phone Number(909) 746-8066
Entity Corporation
Issue Date 04/25/2011
Expire Date 04/30/2019
License Status
This license Is current and active.
MI Information below should be reviewed. --
Classifications
A - GENERAL ENGINEERING CONTRACTOR
B - GENERAL BUILDING CONTRACTOR
C27 - LANDSCAPING
Banding Information
Contractor's Bond
sense Tisa a uomrara
Number: 251043C
Amount: $15,000
ive Date: 01/0112016
Bond of Qualifying Individual
ildual SALIM SALVADOR SAMOUR certified that helShe owns to percent or more o
Interest of this company; therefore, the Bond of Qualifying Ind'nriduel Is not required.
Date:
Insurance
to Daft: 12/71/2017
Date: 121=2018
23A-31
OF THE
23A-32
CITY OF SANTA ANA EXHIBIT 3
CONSTRUCTION CONTRACT
PROJECT 19-2703
JEROME CENTER LANDSCAPE DRAINAGE PROJECT
This CONSTRUCTION CONTRACT is made and entered into this 5'h day of February, 2019 by and
between the City of Santa Ana, California, a charter city and municipal corporation organized and
existing under the Constitution and laws of the State of California (hereinafter "CITY"), and Aramexx
Group Inc. dba Aramexx Construction (hereinafter "CONTRACTOR").
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the
satisfaction of the City Engineer of the CITY, the Jerome Center Landscape Drainage Project
(hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in accordance with
the Contract Documents prepared by the City's Public Works Agency and approved by the City
Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the
Standard Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK
OF 11APROVEMENT the sum total amount not to exceed Eighty -Three Thousand One Hundred
Fifty -Five Dollars and No Cents ($83,155.00), as set forth and identified in the BID PROPOSAL,
which is attached hereto and incorporated herein as Exhibit "A."
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of
work will correspond therewith, but reserves the right to increase or decrease the amount of any
class or portion of the work or to omit portions of the work as may be deemed necessary or
advisable.
mv. 09/01/2017 23A-33 Pagel of3
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including
commencing construction within the timeframe therein specified after issuance of a Notice to
Proceed.
5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the
WORK OF RVIPROVEMENT a salary or wage at least equal to the prevailing salary or wage
established for such work as set forth in the wage determinations for this work in accordance with
applicable State and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's
website at:
hUp://www.santa-ana.org/pwa/documents/CWA.pdf
CONTRACTOR shall, after award of this Contract, fumish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work (Performance Bond), and one in the amount of One Hundred Percent
(100%) of the Contract price to guarantee payment of all claims for labor and materials furnished
(Payment Bond). This Contract shall not become effective until such bonds are supplied to and
approved by the CITY.
CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred
Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand
Dollars ($10,000) or Twenty Percent (20%) of the final contract price. For projects above Five
Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of One
Hundred Thousand Dollars ($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the
CITY.
//
23A-34 Page 2 of 3
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST:
NORMA MITRE-RAMIREZ
Acting Clerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
R
�41;19901,lk
Assistant City Attorney
FOR APPROVAL:
FUAD SWEISS, PE, PLS
Executive Director
Public Works Agency
CITY OF SANTA ANA
STEVEN A. MENDOZA
Acting City Manager
CONTRACTOR:
Aramexx Group Inc. dba Aramexx Construction
NAME:
TITLE:
23A-35
Page 3 of 3
23A-36
COST ANALYSIS
CONSTRUCTION OF THE PROJECT NO. 19-2703: JEROME CENTER
LANDSCAPE DRAINAGE PROJECT
Construction Contract
$
83,155.00
Contract Administration
$
3,732.00
Inspection and Testing
$
4,800.00.
Contingencies
$
8,313.00
TOTAL ESTIMATED CONSTRUCTION COSTS
$
100,000.00
=:1:11 -iii!
23A-37
23A-38