HomeMy WebLinkAboutGARDEN GROVE, CITY OF (5)lrUnFfVf;[ ft'f R# t?UlR3f'()
W RK iiINY RROrEFF)
(A.Eii4( 0[-- C()Utq';11.
ffr' 0 4 2019
COOPERATIVE COST REIMBURSEMENT AGREEMENT
EUCLID STREET REHABILITATION PROJECT
FROM HAZARD AVENUE TO WESTMINSTER AVENUE
A-2019-046
PCtA
COOPERATIVE COSTEIMR U SEMENT AGREEMENT ("Agreement"), is made and entered
into this ( q day of iLW , 2019, by and between the CITY OF SANTA ANA, a
California charter city ("Santa Ana"), and the CITY OF GARDEN GROVE, a California municipal
corporation ("Garden Grove"). In this Agreement, Santa Ana and Garden Grove may each be
individually referred to as a "Party" and collectively referred to as the "Parties."
RECITALS:
WHEREAS, Santa Ana has initiated a street rehabilitation project (the "Project") to
improve the pavement condition of Euclid Street from Hazard Avenue to Westminster Avenue
and
WHEREAS, Euclid Street within the Project limits contain a portion of property within
Santa Ana and a portion of the street within the boundary of Garden Grove; and
WHEREAS, In an effort to efficiently utilize Garden Grove resources, Garden Grove
wishes to improve the portion of Euclid Street within its boundary at the same time the Santa
Ana Euclid Street Project is conducted; and
WHEREAS, the Parties desire to repave Euclid Street, within their respective
boundaries, as part of the "Project".
NOW, THEREFORE, based upon the foregoing Recitals, and for good and valuable
consideration, the receipt and sufficiency of which is acknowledged by all Parties, the Parties
agree as follows:
1. The City of Santa Ana will advertise for bids, hire a contractor, approve the work and
administer the contract for street rehabilitation.
2. Garden Grove is responsible for:
(a) Garden Grove shall pay Santa Ana for the actual cost of the work within the
Garden Grove portion based upon unit prices bid of the Successful Contractor
and quantities actually used on the Garden Grove portion as set forth in the
Project Location Map (Exhibit A) and the City Cost Sharing (Exhibit B), attached
hereto and incorporated by this reference. Garden Grove will remit payment to
Santa Ana within thirty (30) days of receipt of invoice evidencing Project work
performed within Garden Grove city boundary.
(b) Garden Grove shall pay Santa Ana for the actual cost of design engineering and
construction engineering services provided for the work within the Garden Grove
portion based upon the time spent by Santa Ana staff. Garden Grove will remit
payment to Santa Ana within thirty (30) days of receipt of invoice evidencing
Project work performed within Garden Grove city boundary.
3. Garden Grove will coordinate the relocation of all affected utility company facilities within the
City limits of Garden Grove in a timely manner.
4. Santa Ana and Garden Grove shall extend cooperation to each other and proceed under this
Agreement in good faith to facilitate timely completion of the Project. The Parties agree that
when any component of this Project is subject to the approval of Garden Grove, such approval
shall not be unreasonably withheld.
5. Garden Grove will be notified as to the official advertising dates, bid opening date,
construction start date, and overall construction schedule. Also, a representative from Garden
Grove will be invited to attend pre -construction, Project status, and final walk through meetings.
6. Change orders for work within Garden Grove must receive the written approval of the Public
Works Department Engineering Manager of Garden Grove or his/her designee prior to
implementation. Garden Grove is responsible for change order cost within Garden Grove
respective boundaries.
7. The following staff members, or as otherwise designated in writing by the Executive Director
of Public Works of Santa Ana or the Public Works Department Engineering Manager of Garden
Grove, shall be the selected representatives of each City to act on each respective City's behalf
with respect to this agreement. Any notices, requests, approvals, plan submittals or
communications shall be provided to each representative noted below:
City of Santa Ana:
ATTN: Edwin "William" Galvez, PE
City Engineer
Public Works Agency
Santa Ana, CA 92701
20 Civic Center Plaza, M-21
Phone: (714) 647-5653
E -Mail: wegalvez@santa-ana.org
City of Garden Grove:
ATTN: Dan Candelaria, PETE
City Engineer
Public Works Department
11222 Acacia Parkway
Garden Grove, CA 92840
Phone: (714) 741-5185
E -Mail: danc@ci.garden-grove.ca.us
8. Santa Ana shall cause its contractor for the Project to guarantee the Garden Grove
improvements against defects in workmanship and materials for a period of one (1) year from
the date of acceptance by Santa Ana. It is further agreed that Santa Ana shall assume the
responsibility for causing the Garden Grove improvements to be brought or restored to full
compliance with the requirements of the Plans and Specifications for any portion of the Project
which during said one (1) year period are found not to be in conformance with the provisions of
the Plans and Specifications.
9. The City of Santa Ana shall have its contractor provide insurance as follows:
9.1 INSURANCE AMOUNTS. Contractor shall maintain the following insurance for the
duration of this Agreement:
(a) Commercial general liability in the amount of $1,000,000 per occurrence; (claims
made and modified occurrence policies are not acceptable); Insurance
companies must be acceptable to City and have an AM Best's Guide Rating of A -
Class VII or better, as approved by the City. If Contractor maintains broader
coverage and/or higher limits than the minimums shown above, the City shall be
entitled to the broader coverage and/or higher limits maintained by the
Contractor. Any available insurance proceeds in excess of the specified minimum
limits of insurance and coverage shall be available to the City.
An Additional Insured Endorsement, ongoing and completed operations, for
the policy shall designate the City of Santa Ana, the City of Garden Grove, their officers,
officials, employees, agents, and volunteers as additional insureds for liability arising out
of work or operations performed by or on behalf of the Contractor. Contractor shall
provide to City proof of insurance and endorsement forms that conform to City's
requirements, as approved by the City.
(b) Automobile liability in the amount of $1,000,000 combined single limit, including
mobile equipment if applicable; (claims made and modified occurrence
policies are not acceptable); Insurance companies must be acceptable to City
and have an AM Best's Guide Rating of A-, Class VII or better, as approved by
the City.
An Additional Insured Endorsement for the policy shall designate the City of
Garden Grove, the City of Santa Ana, their officers, officials, employees, agents, and
volunteers as additional insureds for automobiles owned, leased, hired, or borrowed by
the Contractor. Contractor shall provide to City proof of insurance and endorsement
forms that conform to City's requirements, as approved by the City.
(c) For any claims related to this Agreement, Contractor's insurance coverage shall
be primary insurance as respects City, its officers, officials, employees, agents,
and volunteers. Any insurance or self-insurance maintained by the City, its
officers, officials, employees, agents, or volunteers shall be in excess of the
Contractor's insurance and shall not contribute with it.
9.2 WORKERS COMPENSATION INSURANCE. For the duration of this Agreement,
Contractor and all subcontractors shall maintain Workers Compensation Insurance in the
amount and type required by law, if applicable. The insurer shall waive its rights of
subrogation against the City of Garden Grove, the City of Santa Ana, their officers,
officials, agents, employees, and volunteers.
9.3. CONTRACTOR shall not commence work until all certificates and endorsements
have been received and approved by Santa Ana. All insurance required shall contain a
Statement of Obligation on the part of the carrier to notify City of any material change,
cancellation, or termination at least thirty (30) days in advance.
10. This Agreement contains all of the agreements of the Parties regarding the Project and all
previous understandings, negotiations and agreements regarding the Project are integrated into
and superseded by this Agreement.
11. This Agreement may be amended at any time by the mutual consent of the Parties by an
instrument in writing signed by both Parties.
12. In the event that any one or more of the phrases, sentences, clauses, paragraphs, or
sections contained in this Agreement shall be declared invalid or unenforceable by a valid
judgment or decree of a court of competent jurisdiction, such invalidity or unenforceability shall
not affect any of the remaining phrases, sentences, clauses, paragraphs, or sections of this
Agreement which are hereby declared as severable and shall be interpreted to carry out the
intent of the Parties hereunder.
13. The persons executing this Agreement on behalf of the Parties hereto warrant that they are
duly authorized to execute this Agreement on behalf of said Parties and that by so executing
this Agreement the Parties hereto are formally bound to the provisions of this Agreement.
14. This Agreement shall be binding upon and shall endure to the benefit of the Parties hereto
and their respective heirs, personal representatives, successors, and assigns.
15. This Agreement may be executed by the Parties and counterparts, which counterparts shall
be construed together and have the same effect as if all of the Parties had executed the same
instrument.
16. This Agreement is to be governed by the laws of the State of California, in Orange County
California.
17. Each party agrees to defend, hold harmless, and indemnify the other as to any and all
claims, judgments, liabilities or damages for injuries and damages directly arising out of each
party's own performance under this Agreement, except to the extent such damage or expense
is caused in whole or in part by the other party's negligence or willful misconduct.
IN WITNESS WHEREOF, the Parties hereto have caused this Agreement to be
executed on the day and year first written above.
CITY OF SANTA ANA
STEVEN A. MENDOZA
Acting City Manager
^+are nye.
!� S
4��L_ I ti INORMA MITRE
I Qdlo'yd
.*
Acting Clerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
0. FUNK
nt City Attorney
ENDED FOR APPROVAL:
O
FUAD'S.SWEISS, PE, PLS
Public W rks Agency
Executive Director
CITY OF GARDEN GROVE
SCOTT C. STILES
City Manager
ATTEST:
RESA POMEROY
City Clerk
APPROVED TO FORM:
OMAR SANDOVAL
City Attorney
Exhibit A
Location Map
Euclid Street Rehabilitation Project
From Hazard Avenue to Westminster Avenue
...........
SANTA ANA
■PWA■
CITY OF GARDEN GROVE
WESTMINSTER e AVE
EXHIBIT A
iANTA ANA
PROJECT 18-6915
EUCLID ST. REHABILITATION:
HAZARD AVE. TO WESTMINSTER AVE.
LOCATION MAP
PAGE 1 OF 1
EXHIBIT B
City Cost Sharing
Euclid Street Rehabilitation Project
From Hazard Avenue to Westminster Avenue
City of Garden Grove Cost
PROJECT NO. 18-6915
EUCLID REHABILITATION: FROM HAZARD TO WESTMINSTER
City of Garden Grove and Santa Ana Cooperative Agreement
QUANTITIES
NO.
.DESC$TYTTON -
'UNIT
G.G.
QUANTITY
`UNIT
COST
GARDEN GROVE
I
Unclassified Ex.
CY
1,000
$
38.00
$
38,000.00
2
Cold Milling (3")
SF
0
S
0.28
$
-
3
Cold Milling (6")
SF
0
S
0.65
$
-
4
Crash Miseellancous Base (CMB)
TN
610
$
29.00
$
17,690.00
5
Asphalt Conoretc(AC)
TN
950
$
75.00
$
71,250.00
6
Asphalt Rubber Hot Mix(ARHM)
TN
320
$
92.00
$
29,440.00
7
PCC Curb Ramps
SF
1,000
$
8.50
$
8,500.00
8
PCC Sidewalk (4")
SF
1,660
$
5.30
$
8,798.00
9
PCC Crass Gutter
SF
860
$
16.00
$
13,760.00
10
PCC Driveway per GG standard plan
SF
350
$
10.50
$
3,675.00
11
PCC Curb Type A4
LF
80
$
21.00
$
1,680.00
12
PCC Curb and Garter Type C -S
LF
10
$
32.00
$
320.00
13
Adjust OCSD Manhole Frame& Cover to Finish Grade
EA
0
$
1,800.00
$
-
14
Adjust Manhole Fr amc & Cover to Finish Grade
EA
1
$
1,000.00
$
1,000.00
15
lAdj.st Water Valve Frame & Cover to Finish Grade (S.A.)
EA
0
S
1,000.00
$
-
16
Adjust Water Valve Frame & Cover to Finish Grade (G.G.)
EA
17
$
1,000.00
$
17,000.00
17
18" Dowels
EA
8
$
80.00
$
640.00
18
Root Shave
EA
10
$
260.00
$
2,600.00
19
Furnish and Install New #6 Pullbox
EA
5
$
315.00
$
1,575.00
20
Temporary Construction Sign
EA
5
$
315.00
$
1,575.00
21
Project advertisement sign
EA
0
$
800.00
$
22
Furnish and Install Traffic Loops'rypc D t
EA
4
S
240.00
$
960.00
23
Furnish and Install Traffic Loeps Tyl,eE t
EA
8
$
210.00
$
1,680.00
24
Signing and Striping
LS
0.10
$
123,000,00
$
12,300.00
25
Labor Agreement Oversight
LS
0.10
$
10,000.00
$
1,000.00
S ]06 AL CONSTRUCTION C08'T' ,..
$
233,443.00
Design Engineering
Contingency
Construction Engineering
10%
10%
15%
$
$
$
23,344.30
23,344.30
35,016.40
TOTAL PROJECT COST
I
$
315,148.00
EXHIBIT B