HomeMy WebLinkAbout23A - SEWER MAIN IMPROV PROJREQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
AUGUST 20, 2019
TITLE:
AWARD A CONSTRUCTION CONTRACT
TO G.J. GENTRY GENERAL
ENGINEERING, INC., IN THE AMOUNT OF
$1,269,090 FOR THE CITYWIDE SEWER
MAIN IMPROVEMENTS PROJECT
ESTIMATED DELIVERY COST: $1,629,500
(PROJECT NO. 17-6437)
(NON -GENERAL FUND)
(STRATEGIC PLAN NOS. 6, 1B & 1C)
CITY MANAGER
RECOMMENDED ACTION
CLERK OF COUNCIL USE ONLY:
APPROVED
❑ As Recommended
❑ As Amended
❑ Ordinance on is' Reading
❑ Ordinance on 2n' Reading
❑ Implementing Resolution
❑ Set Public Hearing For
CONTINUED TO
FILE NUMBER
Award a construction contract to G.J. Gentry General Engineering, Inc., the lowest
responsible bidder, in accordance with the base bid in the amount of $1,269,090, for
construction of the Citywide Sewer Main Improvements Project, for the term beginning upon
execution of the contract and ending upon project completion, and authorize the City
Manager and the Clerk of the Council to execute the contract subject to non -substantive
changes approved by the City Manager and the City Attorney.
2. Approve the Project Cost Analysis for a total estimated construction delivery cost of
$1,629,500, which includes $1,269,090 for the construction contract, $190,364 for contract
administration, inspection and testing, and a $170,046 project contingency (approximately
13.40% of the construction contract amount), paid with Capital Recovery Charges funding.
DISCUSSION
Public Works staff monitors the condition of sewer main pipelines by assessing critical factors
such as history of breaks, pipe size, alignment, location, and system redundancy to determine
replacement priorities. The existing 6-inch and 8-inch diameters of vitrified clay and cast iron
sewer main pipes located in Hazard Street, Garnsey Street, Oak Street, and Pomona Street,
which were installed in the 1920s and 1960s, are deteriorating, lack capacity, and have been
identified for priority replacement (Exhibit 1).
The Citywide Sewer System Improvement Project will include approximately 4,000 linear feet of
new 8-inch polyvinyl chloride sewer main pipes, sewer laterals, sewer manholes, asphalt
concrete pavement, and striping. Once this project is completed, the improved sewer system will
23A-1
Award Construction Contract to G.J. Gentry General Engineering, Inc.
Citywide Sewer Main Improvements Project
August 20, 2019
Page 2
eliminate sewer main obstructions, prevent sewer overflows, and reduce sewer maintenance
requirements. In addition, the improvements will enhance ride quality and surface drainage.
Public Outreach and Contractor Participation
To provide an opportunity for local vendors to submit bids, a Notice Inviting Bids was advertised
in the Orange County Register newspaper on May 10 and 15, 2019, and bids were received
electronically via the City's web -based electronic bidding system, PlanetBids, on June 19, 2019.
Through the PlanetBids online portal, vendors may register to receive notifications on all current
and future City projects, as well as download contract documents, receive project updates and
submit bids electronically.
A total of 112 vendors, including 5 located in the City of Santa Ana, were notified of the project
via PlanetBids. 52 vendors requested bidding documents and 11 bids were received. No bids
were received from Santa Ana contractors.
Bid Results Summary
RANK
BIDDER'S NAME
LOCATION
BASE BID
1
G.J. Gentry General Engineering, Inc.
Upland
$1,269,090
2
Vasilj Inc.
Irwindale
$1,570,115
3
CHI Construction
Anaheim
$1,672,809
4
Kordich Construction, Inc.
Cypress
$1,779,399
5
Mike Prlich and Sons, Inc.
Baldwin Park
$1,795,125
6
MNR Construction Inc.
La Verne
$1,814,450
7
Christensen Brothers General
Engineering, Inc.
Apple Valley
$1,852,304
8
All Cities Engineering, Inc.
Jurupa Valley
$1,865,710
9
Excel Paving Cc
Long Beach
$1,871,154
10
O'Duffy Bros Inc.
Romoland
$2,040,995
11
Colich & Sons L.P.
Gardena
$3,020,775
All 11 bids received were deemed responsive. G.J. Gentry General Engineering, Inc., submitted
the lowest responsive bid in the amount of $1,269,090 (Exhibit 2). Based on the bid analysis and
a contractor's reference check, staff recommends awarding the construction contract to G.J.
Gentry General Engineering, Inc. in the amount bid (Exhibit 3).
23A-2
Award Construction Contract to G.J. Gentry General Engineering, Inc.
Citywide Sewer Main Improvements Project
August 20, 2019
Page 3
Protect Delivery
To deliver a complete project, in addition to the construction contract awarded to the lowest
responsible bidder, the estimated total construction delivery cost of the project includes
construction administration, inspection, and testing, along with an allowance for contingencies to
account for unexpected or unforeseen conditions. Construction administration and inspection
includes construction management; implementation of the City's Community Workforce
Agreement requirements; inspection of the Contractor's work to ensure contract compliance,
workmanship, and quality; and material testing. As indicated in the Cost Analysis (Exhibit 4) and
as summarized in the table below, the estimated total construction delivery cost of the project is
$1,629,500.
Construction Contract
$1,269,090
Construction Administration, Inspection, and Testing
$190,364
Contingencies
$170,046
ESTIMATED CONSTRUCTION DELIVERY COST
$1,629,500
All staffing costs are included in this estimate and no additional funding will be required.
STRATEGIC PLAN ALIGNMENT
Approval of this item supports the City's efforts to meet Goal #6 — Community Facilities &
Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City
assets), Strategy B (equitably maintain existing streets and associated assets in a state of good
repair so they are clean, safe, and aesthetically pleasing for all users); Strategy C (invest
resources and technology to extend the service life of existing infrastructure to protect the City's
investment and support a high quality of life standard).
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the recommended actions are
exempt from further review. Categorical Exemption Environmental Review No. ER-2018-30 was
filed for the project.
FISCAL IMPACT
As indicated in the Cost Analysis (Exhibit 4), the estimated total construction delivery cost of the
project is $1,629,500, which includes the construction contract, contract administration,
inspection, testing, and project contingency. The following table summarizes the funds budgeted
to deliver construction of this project:
23A-3
Award Construction Contract to G.J. Gentry General Engineering, Inc.
Citywide Sewer Main Improvements Project
August 20, 2019
Page 4
Fiscal
Year
Accounting Unit
- Account No.
Project No.
Fund
Description
Accounting Unit,
Account
Description
Amount
FY 2019-
Capital Recovery
20
05417647-66220
Sanitary Sewer
Charges,
$1,629,500
July -June
(17-6437)
Capital
Improvement Other
Than Building
Total
$1,629,500
All funds are scheduled for expenditure in Fiscal Year 2019-20.
APPROVED AS TO FUNDS AND ACCOUNTS:
Fuad . Sweiss, PE, PLS Kat�wns, CPA
Execu ve Director Executive Director Gr]
Public orks Agency Finance and Management Services Agency
Exhibits: 1. Location Map
2. Bid
3. Construction Contract
4. Cost Analysis
23A-4
Exhibit 1
HAZARD STREET
HAZARD STREET
ED/NGER
O
U
W
® PROJECT LOCATION
SA AMA
Pu
PUBUMOUSAGOCT
AVENU
GARNSEY
STREET
o
z
y
m
C
ti
VICINITY MAP
NOT TO SCALE
Project No. 17-6437:
CITYWIDE SEWER MAIN
IMPROVEMENTS
STREET
POMONA
STREET
23A-6
City of Santa Ana
Chyvdde Sewer Mein Improvements (17-6437), bidding on June 19, 2019 2:00 PM (Pacific)
Bid Results
Bidder Detalls
Vendor Name
G,J. Gentry General Engineering, Inc.
Address
1297 W. 9th Street
Upland, CA 91786
United States
Respondee
Bryan MezaSave
Respondee Title
VP of Public Works
Phone
909435.4601 Ext.
Email
bryanm@g)gentry.com
Vendor Type
CADIR
License #
991354
CA DIR
Bid Detail
Bid Format
Electronic
Submitted
June 19, 2019 8:49:13 AM (Pacific)
Delivery Method
Bid Responsive
Bid Status
Submitted
Confirmation #
182217
Ranking
0
Respondee Comment
Buyer Comment
Attachments
File Title
General Forms
Ownership Affidavit
Bid Bond Guaranty
Non -Collusion Affidavit
Line Items
File Name
General Fonns.pdf
Ownership AffidavlLpdf
Bid Bond Guamnty.pdf
Non -Collusion Affidavit.pdf
Type Item Code UOM city
Ewe Bid Proposal
1 Mobilization/Demobilization (No More than 6% total bid)
LB 1
2 Remove F)dsting Sewer Main and Construct 8° PVC SDR-26 Sewer Main
LF 4000
Page 1
Primed 071OZ2019
Exhibit 2
File Type
General Forms
Ownership Affidavit (Notary
Public) - REQ Original
Hard Copy Submittal In
Addition
Bid Bond Guaranty (Notary
Public) - REO Original
Hard Copy Submittal In
Addition
Non -Collusion Affidavit
(Notary Public) - REQ
Original Hard Copy
Submittal In Addition
Unit Price Line Total Comment
$60,000.00 $60,00o.00
$97.19 $388,760.00
PlanetBids, Inc.
23A-7
City of Santa Ana
Page 2
Cltywlde Sewer Main Improvements (17-6437), bidding on June 19, 2019 200
PM (Pacific)
Printed 07102/2019
Bid Results
Type
Item Code u0M
0ty
Unit Pit"
Line Total Comment
3
Remove Existing Sewer Main and Construct 10" PVC SDR-26 Sewer Main
LF
400
$129.40
$61,760.00
4
Asphalt Concrete (AC) Paving
TN
...__........
715
-............
$167.65
,....._.._..,..........
$120,012.76
.... ._..._......_..._......_
5
Asphalt Rubber Hot Mix (ARHM) (T=2")
TN
62
$199.34
$16,346.88
6
Cold Milling (T=2°)
SF
6600
$1.81
$11,765.00
7
PCC Goss -Gutter (Arterial Streets)
SF
350
$24.64
$8,694.00
8
Construct New P.C.C. Sewer Manhole
EA
15
$4,149.08
$62,236.20
9
Remove F-xisting Manhole Structure
EA
15
$1,211.60
$18,174.00
10
Construct 4" or 6" PVC Sewer Lateral and Cleanout (Open Trench)
EA
104
$2,355.66
$244.988.64
11
Construct 4" or 6" HOPE Sewer Lateral and Cleanout (Pipe Bursting)
EA
............
15
$3,741.82
$56,127.30
12
Connect Sewer Laterals prevloulsy pipe bursted by City Forces
._.. _..
... ...,.. ..__,._... _..._ _........
FA
.,.....,.
7
.. ...
$1,772.61
........ _..
$12,408.27
13
CCTV Inspection of New Sewer Main
_ ._
.. . _...,... ...... _. ... ............
LF
4400
$2.96
$13,024.00
14
CCTV Inspection of New Sewer Laterals (Open Trench/Pipe Burst)
EA
_..... ....... ..........,......_......... _,........,.._ _.-._... __
126
,.................................
$68.77
$8,685.02
_..., .... ,..............
15
Traffic Control
_....._._.. , ..
LS
1
$49.136.78
$49,136.78
16
Signing and Striping
LS
1
$31.097.00
$31.097.00
17
Imported Baxkfill Material (As Needed)'
CY
900
$50.00
$45,000.00
18
Additional Potholing (As Needed)'
FA
10
$1,263.60
$12,636.00
PlanetBlds, Inc.
23A-8
City of Santa Ana Page s
Gtywide Sewer Main Improvements (17-6437), bidding on June 19, 2019 2:00 PM (Padfic) Printed 07/02/2019
Bid Results
Type Item Code UOM Qty Unit Price Llno Total Comment
19 Sewer Flow Level Monitoring & Alarming Device
EA 2 $5,879.60 $11,759.00
20 Labor Agreemnet Oversight
LS 1 $20,000.00 $20,000.00
21 As -Built
LS 1 $25,000.00 $25,000.00
22 Backflow, Prevention Device*
EA 2 $760.00 $1,600.00
Subtotal $1.269,089.64
Asterisk Notes (per P-3 of P-16 of Specificatlons) - NOT part of Total Bid Calculation
23 •= The quantity for this bid Item Is shown for bid comparison only. This bid hem shall not be subject to the 25% limit as stated In Section 3-2 of
the Sped6cations...
ea 0 0 0
Subtotal 0
Total $1,269,089.84
PlanetBids, Inc.
23A-9
CITY OF SANTA ANA
PROPOSAL ADDENDUM FOUR
PROJECT NO.: 17-6437
CITYWIDE SEWER MAIN IMPROVEMENTS
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: G.J. Gentry General Engineering, Inc.
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with said
plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following
schedule:
BASE BID:
Item
Description
Qty
Unit
Unit Price
Amount
I
Mobilization/Demobilization (No more
1
LS
S
S
than 5%total bid)
60,000.00
60,000.00
2
Remove Existing Sewer Main and
4,000
LF
S
$
Construct 8" PVC SDR-26 Sewer Main
97.19
388,760.00
3
Remove Existing Sewer Main and
400
LF
$
$
Construct 10" PVC SDR-26 Sewer Main
129AO
51,760.00
4
Asphalt Concrete (AC) Paving
715
TN
$
S
167.85
120,012.75
5
Asphalt Rubber Hot Mix (ARHM) (T=213
82
TN
$
$
199.34
16,345.88
6
Cold Milling (T=2")
6,500
SF
$
S
1.81
11,765.00
7
PCC Cross -Gutter (Arterial Streets)
350
SF
S
S
24.84
8,694.00
8
Construct New P.C.C. Sewer Manhole
15
EA
$
S
4,149.08
62,736.20
9
Remove Existing Manhole Structure
15
EA
$
S
1,211.60
18,174.00
10
Construct 4" or 6" PVC Sewer Lateral and
104
EA
S
5
Cleanout (Open Trench)
2,355.66
244,988.64
11
Construct 4" or 6" HOPE Sewer Lateral
15
EA
S
S
and Cleanout (Pipe Bursting)
3,741.82
56,127.30
12
Connect Sewer Laterals previously pipe
7
EA
$
S
bursted by City Forces
1,772.61
12,408.27
13
CCTV Inspection of New Sewer Main
4400
LF
S
S
2.96
13,024.00
14
CCTV Inspection of New Sewer Laterals
126
EA
S
S
(Open Trench/Pipe Burst)
68.77
8,665.02
rx I
CITY OF SANTA ANA
PROPOSAL ADDENDUM FOUR
PROJECT NO.: 17-6437
CITYWIDE SEWER MAIN IMPROVEMENTS
Item
Description
Qty
Unit
Unit Price
Amount
15
Traffic Control
I
LS
S
49,136.78
S
49,136.78
16
Signing and Striping
I
LS
S
31,097.00
S
31,097.00
*17
Imported Backfill Material (As Needed)
900
Cy
S50
$45,000
• 18
Additional Potholing (As Needed)
10
EA
S
1,263.60
S
12,636.OD
19
Sewer Flow Level Monitoring & Alarming
Device
2
EA
S
5,879.50
S
11,759.00
20
Labor Agreement Oversight
1
LS
S20,000
$20,000
21
As -Built
I
LS
525,000
$25,000
022
Backflow Prevention Device
2
EA
$750
51,500
2 ;2 of P111
CITY OF SANTA ANA
PROPOSAL ADDENDUM FOUR
PROJECT NO.: 17-6437
CITYWIDE SEWER MAIN IMPROVEMENTS
TOTAL BASE BID 5 1,269,089.84
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add-altemate bid items (if any). If add
alternate one bid is awarded it will replace bid item 7 and up to 37 units of bid item 6.
' The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown
above, within One Hundred fifteen (115) working days after the commencement date stated in the
Notice to Proceed.
• 15 — Working Days for exploratory potholing and data gathering
• 100 —Working Days for project construction
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $1,000 per calendar day.
Name of Firm G.J. Gentry General Engineering, Inc.
Signature of BIDDER
Title
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
23AL' 12
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6437
CITYWIDE SEWER MAIN IMPROVEMENTS
BIDDER'S STATEMENT
BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent
Construction Contract Agreement shall constitute the entire agreement between BIDDER and the
AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the
Council with her signature and official seal noting hereon the action of approval of the Council,
signed by the Public Works Agency Executive Director or his/her duly authorized agent, and
signed by the City Attorney, denoting his approval of the form of this document, and its
execution, and when it or an exact copy of it has been either delivered to BIDDER or deposited
with the United States Postal Service properly addressed to the BIDDER with the correct postage
affixed thereto.
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she
will furnish AGENCY all required bonds and certificate of liability insurance within ten (10)
business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof
accompanying this proposal shall become the property of the AGENCY and shall be considered
as payment of damages due to the delay and other causes suffered by AGENCY because of the
failure to furnish the necessary bonds and because it is distinctly agreed that the proof of
damages actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or
BIDDER'S bond substituted in lieu thereof shall be returned to the undersigned.
BIDDER understands that a bid is required for the entire work, the estimated quantities set forth
in the bid schedule are solely for the purpose of comparing bids, and that final compensation
under the contract will be based upon the actual quantities of work satisfactorily completed. The
BIDDER also certifies that the bid is a balanced bid.
In accordance with Section 7028.15 of the California Business and Professions Code, the
undersigned certifies under penalty of perjury that the foregoing is true and correct.
Name of Firm G.J. Gentry General Engineering, Inc.
Signature of BIDDER
Title
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
23Aul13
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6437
CITYWIDE SEWER MAIN IMPROVEMENTS
CONTRACTOR'S LICENSING AND REGISTRATION STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she
and all his/her subcontractors are registered with the State of California Department of Industrial
Relations (DIR), and that the following is true and correct.
Contractor's Name: G.J. Gentry General Engineering, Inc.
Business Address: 1297 W. 9th Street. Upland, CA. 91786
Business E-Mail Address: bryanm@gjgentry.com
Telephone: (909) 693-3391
State Contractor's License No. and Class: 991354 A
License Expiration Date: 03/31/2020
State Dept. of Industrial Relations (DIR)
Registration No.: 1000009875
State Dept. of Industrial Relations (DIR)
Registration Expiration Date: 06/30/2019
Signed:
NAR14
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6437
CITYWIDE SEWER MAIN IMPROVEMENTS
PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT
Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well
as California Code of Regulations, Title 8, Section 16,000, et seq., ("Prevailing Wage Laws"),
which require the payment of prevailing wage rates and the performance of other requirements
on "public works" and "maintenance" projects. Since the services are being performed as part of
an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws,
and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such
Prevailing Wage Laws.
City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at
the commencement of this Agreement. Contractor shall make copies of the prevailing rates of
per diem wages for each craft, classification or type of worker needed to execute the services
available to interested parties upon request, and shall post copies at the Contractor's principal
place of business and at the project site.
Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees
and agents free and harmless from any claim or liability arising out of any failure or alleged
failure to comply with the Prevailing Wage Laws.
The undersigned certifies that the foregoing is true and correct.
Name of Firm G.J. Gentry General Engineering, Inc.
Signature of BIDDER
Title CQV&T,
(if an individual, so state)
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6437
CITYWIDE SEWER MAIN IMPROVEMENTS
OWNERSHIP AFFIDAVIT
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS:
�CIITTY,,,O,F�S,A'N1TAAA,N�A�,�,��� � )
`- wa# 1,_� /r t7L—t 4 , being duly sworn, deposes and says:
❑ INDIVIDUAL That he/she is the puny making the foregoing proposal:
❑ PARTNERSIIIP That he/she is a member of the co -partnership firm designated as:
and who has been and is duly vested with the authority to make and execute instruments
for the co -partnership by:
who constitute the other members of the co -partnership.
CORPORATION Th�t he is
J•
a corporation which is making the foregoing proposal:
❑ JOINT VENTURE That he is oL'
one of the parties making the foregoing proposal as a joint venture, and the he/she has
been and is duly vested with the authority to execute instruments for an on behalf of the
parties making said bid who are:
that such a bid is genuine and not collusive or sham, and has not in any manner sought by
collusion to secure any advantage against the City of Santa Ana or any person interested in the
proposed con et, for himself or any other person.
gnature of Bidder
Subscribed and swom to before me this day of 20
.7l-C.TYfl3
Signature of officer Administering Oath (Notary Public)
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate
is attached, and not the truthfulness, accuracy, or
validity of that document.
State of California
County of San Bernardino
Subscribed and sworn to (or affirmed) before me on this 18th
day of June 2019 , by Garrett Gentry
proved to me on the basis of satisfactory evidence to be the
pe
ALLYSON FREDERICKSEN
a _ Commission #2226564 c
0 � Notary Publlc - California y
3 son BernorainoCounty
My Comm. Uphes December 24, 2021
(Seal) Signature
—0j IA4W
23A-17,ssefY�rrf(�Yi�'
Il
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6437
CITYWIDE SEWER MAIN IMPROVEMENTS
: �
KNOW ALL PRESENT that,
Bond No. CSSA-10992
[Jarrett J. Gentry General Engineering Incorporated , as BIDDER, and
U.S. Specialty Insurance Company , as SURETY,
are held and firmly bound unto the CITY OF SANTA ANA, as AGENCY, in the penal sum of
Ten Percent of Amount Bid Dollars (S 10% 1, which is ten percent (10%)
of the total amount bid by BIDDER to AGENCY for the above -stated project, for the payment of
which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to
submit a bid to AGENCY for the above -stated project, if said bid is rejected, or if said bid is
accepted and a contract is awarded and entered into by BIDDER in the manner and time
specified, then this obligation shall be null and void, otherwise it shall remain in full force and
effect in favor of AGENCY.
IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this
3rd day of June 2019.
ninnca•
SURETY*
625 The City Drive So.. Ste. 205
Subscribed and sworn to before me
, 20_
Signature:
Notary Public in and for the County of
of
State of = _
° Provide BIDDER/ SURETY name, address, and telephone number and the'hame, title,
address, and telephone number of authorized representative.
P-8 of P-17
23A-18
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.
State of California
County of Orange )
On 6/3/2019 before me, Melissa Ann Vaccaro, Notary Public
(insert name and title of the officer)
personally appeared Shaunna Rozelle Ostrom
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal. r,1Et.I5sa AN"
vacCARO
' •..,.v COMM, N2241394 w
.•teat Notary PublioCalitornia t:
`� �� ORANGE COUNTY u
My Comm. Fxnims May 12.2022
Signature (Seal)
Melissa Ann Vaccaro
23A-19
2
POWER OF ATTORNEY
AMERICAN CONTRACTORS INDEMNITY COSIPANY TEXAS BONDING COMPANY
UNITED STATES SURETY COAIPANY U.S. SPECIALTY INSURANCE COMPANY
KNOW ALL MEN BY THESE PRESENTS: That American Contractors Indemnity Company, a California corporation, Texas
Bonding Company, an assumed name of American Contractors Indemnity Company, United States Surety Company, a Maryland
corporation and U.S. Specialty Insurance Company, a Texas corporation (collectively, the "Companies"), do by these presents make,
constitute and appoint:
Daniel Huckabay, Arturo Ayala, Dwight Reilly, Shaunna Rozelle Ostrom or Frank Morones
of Orange, California
its Due and lawful Artorney(s)-in-fact, each in their separate capacity if more than one is named above, with full power and authority
hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings
or other instruments or contracts of suretyship to include riders, amendments, and consents of surety, providing the bond
penalty does not exceed ******* Twenty Million ******** Dollars (S *20,000.000.00* ).
This Power of Attorney shall expire without further action on November3,2019. This Power of Attorney is granted under and by
authority of the following resolutions adopted by the Boards of Directors of the Companies:
Be it Resolved, nut the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is hereby vested with full
power and authority to appoint any one or more suitable persons as Auomey(s)4n 1`act to represent and act for and on behalf of the Company subject to the following
provisions:
Attorney -in -Fact may be given full power and authority for and in the name of and an behalf of the Company, to execute, acknowledge and deliver, arty and all bonds,
recognizance, canoes, agreements or indemnity and other conditional or obligatory undertakings, including arty and all consents for the release of retained
percentages and/or final estimates on engineering and construction contracts, and any and all notices and documents canceling or terminating the Company's liability
thereunder, and any such instruments so executed by any such Attomey-in-Fact shall be binding upon the Company as if signed by the President and scaled and effected
by the Corporate Secretary.
Be it Resolved it= the sigmaire of any authorized after and seal of the Company heretofore or hereafter affixed to any power of mnome-v or any certificate relating
thereto by facsimile, and any power of anomey or certificate baring facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to arty
bond ear undertaking in which it is attached.
IN WITNESS WHEREOF, The Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this
1st day of November, 2016.
ASIERICAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING COMPANY
Corporate Seals UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY
*�yC?0V 31=5^SUR te, eMD,Mae .a'Nuuva
A ii—.,
y� Wi eta 1> t Ban I.
1i�f Daniel P. AguilaViceP i J r,resident .
�°°"A e4an °j*nnnm'O' 4lyfyal�,M- °�nrn�nnr✓�
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the -
document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. _
State of California -,
County of Los Angeles SS:
On this Ist day of November, 2016, before me, Sabina Morgenstein, a notary public, personally appeared Daniel P. Aguilar, Vice President of American
Contractors Indemnity Company, Texas Bonding Company, United States Surety Company and U.S. Specialty Insurance Company who proved to me on
the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in
his authorized capacity, and that by his signature on the instrument the person, ear the entity upon behalf of which the person acted, executed the instrument
1 certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct.
WITNESS my hand and official seal.
SABINA h10RGENSTEIN
Commfssion 0 2129258
Signature (Seal) Notary public - California
Los Angeles County
My Comm. Eaolraa Noy 3. 2019
1, Kio Lo, Assistant Secretary of American Contractors Indemnity Company, Texas Bonding Company, United States Surety Company and U.S.
Specialty Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said
Companies, which is still in full force and effect; furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are in full
force and effect
In Witness Whereof, I have hereunto set my hand and affixed the seals of said Companies at Los Angeles, California this
3rd day
of June 0019
Corporate Seals '^•''y, .+ �. ,,y"" •,•��•��
tPr� �s ,,yy✓1✓fg SU9F'w. Na
R4Z O4iy 04 .
i funk Qj i E + 13"
Bond No. CSBA-10992 $'`..�,<,�,:lt,`° -,n, i.° ,ifi Secretary
r I(io Lc, Assistant
b s• :+ s
Agency No. 9472 1'ryo`o� " o��/'d'' a'R` ,e*� -�•
0
i
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.
State of California
County of San Bemardino
On 6/18/19 before me, Allyson Frededcksen, Notary Public
(insert name and title of the officer)
personally appeared Garrett Gentry
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
ALLYSON FREDERICKSEN
a Commlaion #2226564 C
WITNESS my hand and official seal. Notary Public • California InSonBernordinoCounty ^'
MY Comm. Expires December 24.2021
Signature (Seal)
23A-21
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6437
CITYWIDE SEWER MAIN IMPROVEMENTS
LIST OF SUB -CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all
subcontract work exceeding the following amount:
o Streets, highways including bridge projects: %:% of the bid or $10,000, whichever is greater
o Buildings, parks, or other projects: %:% of the bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State
Department of Industrial Relations (DIR).
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
Name Superior Pavement Markings
License #/Exp.
776306 8/31/2019
DIR Reg. #/Exp.
1000001476 6/30/2019
Location
5312 Cypress St. Cypress, CA.
Phone 714-995-9100
Type Of Work
Signing & Striping
Amount $
28,270.00
Name
License #/Exp.
DIR Reg. #/Exp.
License # _
Location _
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License # _
Location _
Phone
Type Of Work
Amount $
�V. MX
nature of Bidder
Name Mocon
License #/Exp.
565735 04/30/2021
DIR Reg. #/Exp.
1000009594 06/30/2019
Location
46-950 Jefferson St. Suite C-200. Indio.
Phone 503-580-4420
Type Of Work
Pipe Burst
Amount $
42,000.00
Name
License #/Exp.
DIR Reg. #/Exp.
License #
Location
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License # _
Location
Phone
Type OF Work
Amount $
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6437
CITYWIDE SEWER MAIN IMPROVEMENTS
REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER has performed similar work within the past three years.
City of Norco - 2870 Clark Ave. Norco, Ca.
Name and Address of Owner.
Dan Cutherson - (951) 270-5627
Name and Telephone Number of person familiar with project.
$1,000,000.00 Underground Utilities and Concrete May 2019
Contract Amount Type of Work Date Completed
2, City of Orange - 300 E. Chapman Ave. Orange, Ca.
Name and Address of owner.
Cole Stunv - (714) 920-6046
Name and 1 elephone Number oI person laminar with project.
$1,604,925.00 Underground Utilities and Concrete
Contract Amount Type of Work
3, City of Fullerton - 303 W. Commonwealth Ave. Fullerton, CA.
Name and Address of owner.
Jose Madena - (714) 738-6863
Name and Telephone
$1,200,000.00
Contract Amount
of person tamwar with project.
Underground Utilities and Concrete
Type of Work
December 2018
Date Completed
On -Going
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
Commercial Surety Bond Agency - 1411 N. Batavia St. Orange, CA. - Dan Huckabay (714) 516-1232
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6437
CITYWIDE SEWER MAIN IMPROVEMENTS
ADDITIONAL REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER or Subcontractor has performed similar work in the past five years.
2.
3.
Name and Address of Owner.
Name and Telephone Number of person familiar with project.
Contract Amount
Name and Address of owner.
Type of Work
Name and Telephone Number of person familiar with project.
Contract Amount
Name and Address of owner.
Type of Work
Name and Telephone Number of person familiar with project.
Date Completed
Date Completed
Contract Amount Type of Work Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
101JO
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6437
CITYWIDE SEWER MAIN IMPROVEMENTS
NON -COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and Public Contract Code Section 7106)
In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106 the
BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed
person, partnership, company, association, organization, or corporation; that the bid is genuine
and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited
any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded,
conspired, connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that
anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly,
sought by agreement, communication, or conference with anyone to fix the bid price of the
BIDDER or any other BIDDER, or to fix any overhead, profit, or cost element of the bid price,
or of that of any other BIDDER, or to secure any advantage against the public body awarding the
contract of anyone interested in the proposed contract; that all statements contained in the bid are
true; and, further, that the BIDDER has not, directly or indirectly, submitted his or her bid price
or any breakdown thereof, or the contents thereof, or divulged information or data relative
thereto, or paid, and will not pay, any fee to any corporation, partnership, company association,
organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham
bid.
Note: The above Non -collusion Affidavit is -part of the Proposal. BIDDERS are
cautioned that making a false certification may subject the certifier to criminal
Signed
State of California
County of
Subscribed and sworn to (or affirmed) before me on this day of , 20_, by
, proved to me on the basis of satisfactory evidence to be the
person(s) who appeared before me
� SO,?- ft C E, 4
Notary Public Signature Notary Public Seal
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate
is attached, and not the truthfulness, accuracy, or
validity of that document.
State of California
County of San Bernardino
Subscribed and sworn to (or affirmed) before me on this 18th
day of June , 2019 , by Garrett Gentry
proved to me on the basis of satisfactory evidence to be the
pers
ALLYSON FREDERICKSEN
a eMy
Commission #2226564 C
yNotary Public • California m
MSon Bernardino County Comm. Fxo�es December 24, 2021
(Seal) Signature
`t Y iv
23A-26
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6437
CITYWIDE SEWER MAIN IMPROVEMENTS
NON-DISCRIMINATION CERTIFICATE
The undersigned contractor or corporate officer, during the performance of this contract, certifies
as follows:
1. The Contractor shall not discriminate against any employee or applicant for employment
because of race, color, religion, sex, or national origin. The Contractor shall take affirmative
action to ensure that applicants are employed, and that employees are treated during
employment without, regard to their race, color, religion, sex, or national origin. Such action
shall include, but not be limited to, the following: employment, upgrading, demotion, or
transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other
forms of compensation; and selection for training, including apprenticeship. The Contractor
agrees to post in conspicuous places, available to employees and applicants for employment,
notices to be provided setting forth the provisions of this nondiscrimination clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on
behalf of the Contractor, state that all qualified applicants will receive consideration for
employment without regard to race, color, religion, sex, or national origin.
3. The Contractor shall send to each labor union or representative of workers with which he/she
has a collective bargaining agreement or other contract or understanding, a notice to be
provided advising the said labor union or workers' representatives of the Contractor's
commitments under this section, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24,
1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Contractor shall furnish all information and reports required by Executive Order 11246
of September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or
pursuant thereto, and will permit access to his/her books, records, and accounts by the
administering agency and the Secretary of Labor for purposes of investigation, to ascertain
compliance with such rules, regulations, and orders.
6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract may be canceled,
terminated, or suspended in whole or in part and the Contractor may be declared ineligible
for further Government contracts or federally assisted construction contracts in accordance
with procedures authorized in Execution Order 11246 of September 24, 1965, and such other
sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of
September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as
otherwise provided by law.
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6437
CITYWIDE SEWER MAIN IMPROVEMENTS
7. The Contractor shall include the portion of the sentence immediately preceding paragraph (1)
and the provisions of paragraphs (1) through (7) in every subcontract or purchase order
unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to
Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be
binding upon each subcontract or purchase order as the administering agency may direct as
means of enforcing such provisions, including sanctions for noncompliance; provided,
however, that in the event the Contractor becomes involved in, or is threatened with,
litigation with a subcontractor or vendor as a result of such direction by the administering
agency, the Contractor may request that the United States enter into such litigation to protect
the interests of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as
amended, no discrimination shall be made in the employment of persons upon public works
because of race, religious creed, color, national origin, ancestry, physical handicaps, mental
condition, marital status, or sex of such persons, except as provided in Section 1420, and any
contractor of public works violating this Section is subject to all the penalties imposed for a
violation of the Chapter.
Signed:a
Title: Gt, J P-14 &me
Firm: G.J. Gentry General Engineering, Inc.
Date: 6/19/19
r
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6437
CITYWIDE SEWER MAIN IMPROVEMENTS
STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor
Code regarding employment of apprentices, and understands that contractors on contracts
exceeding S30,000 or 20 working days shall:
1. Apply to the joint apprenticeship committee administering the apprenticeship standards of
the craft or trade in the area of the site of the public work for a certificate approving the
contractor under the apprenticeship standards for the employment and training of apprentices
in the area or industry affected.
2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the
apprenticeship standards.
3. Contribute to the fund or funds in each craft or trade in which he/she employs journeymen or
apprentices on the public work, in the same amount or upon the same basis and in the same
manner as the other contractors, except contractors not signatory to the trust agreement shall
pay a like amount to the California Apprenticeship Council.
Signed: BbVxl
Title: pAd ks.Aft,, e
Firm: G.J. Gentry General Engineering, Inc.
Date: 6/19/19
r � •
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6437
CITYWIDE SEWER MAIN IMPROVEMENTS
STATEMENT REGARDING "ANTI -KICKBACK" REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by
these bid documents, agrees to comply with the Copeland "Anti -Kickback" Act (18 USC 74) as
supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that
each contractor or subcontractor shall be prohibited from inducing, by any means, any person
employed in the construction or repair of public work, to give up any part of the compensation to
which he/she is otherwise entitled.
Title: eww eutw,, ,,
Firm: G.J. Gentry General Engineering, Inc.
Date: 6/19/19
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6437
CITYWIDE SEWER MAIN IMPROVEMENTS
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE
In conformance with Public Contract Code Section 10162, the BIDDER shall complete,
under penalty of perjury, the following questionnaire:
Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a
proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented
from bidding on, or completing a federal, state, or local govemment project because of a
violation of law or a safety regulation?
Yes No X
If the answer is yes, explain the circumstances in the following space.
w-�
MAYOR
Miguel A. Pulido
MAYOR PRO TEM
Juan Villegas
COUNCILMEMBERS
Cecilia Iglesias
David Penaloza
Vicente Sarmiento
Jose Soloric
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
20 Civic Center Plaza • P.O. Box 1988. M-85
Santa Ana, California 92702
w .santa-ana.ora
(714)647.3320
June 5, 2019
ADDENDUM ONE
CITY MANAGER
Kristine Ridge
CITY ATTORNEY
Sonia R. Carvalho
ACTING CLERK OF THE COUNCIL
Norma Mitre -Ramirez
SUBJECT: PROJECT 17-6437 CITYWIDE SEWER MAIN IMPROVEMENTS
The following changes/clarifications have been made to the SPECIFICATIONS of the subject
project:
1. BID PROPOSAL; Pages P-1 to P-3
REPLACE with:
Revised BID PROPOSAL; Pages (P-1 to P-3) of P-17 (See Attachment)
Description of changes:
- Add Bid Item 22- Backflow Prevention Device
2. APPENDIX A- DEFINITION OF BID ITEMS
ADD:
Bid Item No. 22 — Backflow Prevention Device:
Contractor shall install backflow prevention device from (Rectorseal) and tie to newly
constructed sewer lateral and existing pipe leading into private property. See Appendix G
of the Project Specifications. No substitutions will be allowed.
Total pages for Addendum One = 5 23A-32
MAYOR
Miguel A. Pulido
MAYOR PRO TEM
Juan Villegas
COUNCILMEMBERS
Cecilia Iglesias
David Penaloza
Vicente Sariento
Jose Solodo
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
20 Civic Center Plaza • P.O. Box 1988. M-85
Santa Ana, California 92702
www.santa-ana.ora
(714) 647.3320
June 6, 2019
CITY MANAGER
Kristine Ridge
CITY ATTORNEY
Soria R. Carvalho
ACTING CLERK OF THE COUNCIL
Nara 64tre-Ramirez
ADDENDUM TWO
SUBJECT: PROJECT 17-6437 CITYWIDE SEWER MAIN IMPROVEMENTS
The following changes/clarifications have been made to the CONTRUCTION PLANS AND
of the subject project:
ITEM 1- NOTICE INVITING BIDS
CURRENT -
NOTICE IS HEREBY GIVEN that the City of Santa Ana will receive Bids electronically via PlanetBids
on or before the hour of 2:00 pm, June 11, 2019. No late bids will be accepted. No other method of bid
submittal will be accepted for:
M9111IM6
NOTICE IS HEREBY GIVEN that the City of Santa Ana will receive Bids electronically via PlanetBids
on or before the hour of 4:00 pm, June 13, 2019. No late bids will be accepted. No other method of bid
submittal will be accepted for:
ITEM 2- CONSTRUCTION PLAN, SHEET 14 OF 15
REPLACE -
Replace Project Plan Sheet 14 of 15; See Attachment
Total pages for Addendum Two (including attachment) = 3
23A-33
MAYOR
Miguel A. Pulido
MAYOR PRO TEM
Juan villegas
COUNCILMEMBERS
Cecilia Iglesias
David Penaloza
Vicente Sarniento
Jose Solorio
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
220 S. Daisy Ave (M-85)
Santa Ana, California 92702
wvnv.santa-ana.orc
(714)647-3320
ADDENDUM THREE
CITY MANAGER
Kristine Ridge
CITY ATTORNEY
Sonia R. Carvalho
ACTING CLERK OF THE COUNCIL
Norma Mitre-
Ramirez
SUBJECT: PROJECT NO. 17-6437; CITYWIDE SEWR MAIN IMPROVEMENTS
The following changes/clarifications have been made to the plans and specifications of the
subject project:
I. ADDENDUM TWO
ITEM I
NOTICE IS HEREBY GIVEN that the City of Santa Ana will receive Bids electronically via
PlanetBids on or before the hour of 2:00 pm, June 13, 2019. No late bids will be accepted. No
other method of bid submittal will be accepted for:
MODIFY:
NOTICE IS HEREBY GIVEN that the City of Santa Ana will receive Bids electronically via
PlanetBids on or before the hour of 2:00 pm, June 19, 2019. No late bids will be accepted. No
other method of bid submittal will be accepted for:
Total pages for Addendum One = 1
ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME.
FOR THE CITY OF SANTA ANA
i
(Ann tldo-F tandeVE��
A*
or Civil Engineer
SANTA ANA CITY COUNCIL
Miguel A. pw4w Juan valepaa vicenle Sa Mio Wa ld Penwcza Jose SIMe
wyoe reuWed s wads warna
'Mmst
my,6do hLIM;Lpyr Marx ft m mane va•m�emaIDsartrana en rz nelena®zero. ar•a rn
vacant Ceo4a1 asUf
wam a wmV 4
L+p1es�II_i.Js �,L
MAYOR
Miguel A Pulido
MAYOR PRO TEM
Juan Villegas
COUNCILMEMBERS
Cecilia Iglesias
David Penaloza
Vicente Sarmiento
Jose Soldrio
CITY OF SANTA ANA
PUBLIC WORKS AGENCY
220 S. Daisy Ave (M-85)
Santa Ana, California 92702
www.santa-ana.org
(714)647.3320
CITY MANAGER
Kristine Ridge
CITY ATTORNEY
Sonia R. Carvalho
ACTING CLERK OF THE COUNCIL
Norma Mare -Ramirez
ADDENDUM FOUR
SUBJECT: PROJECT NO.17-6437; CITYWIDE SEWR MAIN IMPROVEMENTS
The following changes/clarifications have been made to the plans and specifications of the subject
project:
I. ADDENDUM ONE
ITEM 1
REPLACE with:
Revised BID PROPOSAL; Pages (P-I to P-3) of P-17 (See Attachment)
Description of changes:
• Thickness clarification (T=2") -Bid Item 5
• Quantity Adjustment - Bid Item 6
2. APPENDIX A DEFENITION OF BID ITEMS
Page 2 of 6
CURRENT
Bid Item No. 4 - Asphalt Concrete (AC) Paving
This work under this item consist of furnishing the material and placing asphalt concrete pavement;
preparing, grading, and compacting the subgrade; and leveling course in accordance with the
provisions of Section 302-5, "Asphalt Concrete Pavement," of the Standard Specifications and
contract documents.
Payment at the price bid per Ton shall be considered as full compensation for doing all work as
specified above, and no additional or separate compensation will be allowed therefore.
�i�
SANTA ANA CITY COUNCIL
Mg, IA Puldo JwavLapaa veame saimemo DzA Pena'!ma Jam Samoo WWI eaclaqamas
Malmo Mary Vim ram, wu45 wval a2 wam3 wam4 Wnae
p2LygQnma.ana= !bmaMumo-an•4m na.ymcowmi4m 4ry en Loiwror95an�saw om MquaRwlA,um
23A-36
Exhibit 3
CITY OF SANTA ANA
CONSTRUCTION CONTRACT
PROJECT 17-6437
CITYWIDE SEWER MAIN IMPROVEMENTS PROJECT
This CONSTRUCTION CONTRACT is made and entered into this 20`s day of Auguest, 2019 by and
between the City of Santa Ana, California, a charter city and municipal corporation organized and
existing under the Constitution and laws of the State of California (hereinafter "CITY"), and G.J. Gentry
General Engineering, Inc. (hereinafter "CONTRACTOR').
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
1. CONTRACTOR agrees to perform all the work and famish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the
satisfaction of the City Engineer of the CITY, the Citywide Sewer Main Improvements Project
(hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in accordance with
the Contract Documents prepared by the City's Public Works Agency and approved by the City
Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the
Standard Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK
OF IMPROVEMENT the sum total amount not to exceed One Million Two Hundred Sixty-nine
Thousand Eighty-nine Dollars and Eight -four Cents ($1,269,089.84), as set forth and identified in
the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A."
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of
work will correspond therewith, but reserves the right to increase or decrease the amount of any
class or portion of the work or to omit portions of the work as may be deemed necessary or
advisable.
rev. 09/01/2017 23A-37 Page 1 of 3
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including
commencing construction within the timeframe therein specified after issuance of a Notice to
Proceed.
5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the
WORK OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage
established for such work as set forth in the wage determinations for this work in accordance with
applicable State and Federal law.
If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's
website at:
hqp://www.santa-ana.org/pwa/documents/CWA.pdf
CONTRACTOR shall, after award of this Contract, famish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work (Performance Bond), and one in the amount of One Hundred Percent
(100%) of the Contract price to guarantee payment of all claims for labor and materials furnished
(Payment Bond). This Contract shall not become effective until such bonds are supplied to and
approved by the CITY.
8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred
Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand
Dollars ($10,000) or Twenty Percent (20%) of the final contract price. For projects above Five
Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of One
Hundred Thousand Dollars ($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the
CITY.
23A-38 Page 2 of 3
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST:
DAISY GOMEZ
CLERK OF THE COUNCIL
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By:
J644N FUNK
Assistant City Attorney
RECOMMENDED FOR APPROVAL:
FUAD SWEISS, PE, PLS
Executive Director
Public Works Agency
CITY OF SANTA ANA
KRISTINE RIDGE
City Manager
CONTRACTOR:
G.J. Gentry General Engineering, Inc.
NAME: .ric ''S
TITLE:QrG 4 4e--�
23A-39
Page 3 of
23A-40
Exhibit 4
COST ANALYSIS
CONSTRUCTION OF THE PROJECT NO.-17-6437 CITYWIDE SEWER MAIN
IMPROVEMENTS
Construction Contract
$
_11269,090
Contract Administration
$
89,900
inspection and Testing
$
100,464
Contingencies
$
170,046
TOTAL ESTIMATED CONSTRUCTION COSTS
Is
1,629;500
23A-41
23A-42