Loading...
HomeMy WebLinkAbout20B - AA RAILROAD ENHANCEMENTREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: SEPTEMBER 17, 2019 TITLE: APPROVE AN APPROPRIATION ADJUSTMENT ACCEPTING DEVELOPER FUNDS IN THE AMOUNT OF $296, 940 AND APPROVE AGREEMENTS WITH DEVELOPER AND RAILROAD COMPANY FOR INSTALLATION OF RAILROAD CLERK OF COUNCIL USE ONLY: APPROVED ❑ As Recommended ❑ As Amended ❑ Ordinance on 181 Reading ❑ Ordinance on 2nd Reading ❑ Implementing Resolution ❑ Set Public Hearing For ENHANCEMENTS ON DYER ROAD (DP2014-20) (STRATEGIC PLAN NO. 6, 1) CONTINUED TO FILE NUMBER CITY MARAGER RECOMMENDED ACTION 1. Authorize the City Manager to execute an agreement with BNSF Railway Company to construct railroad crossing enhancements on Dyer Road, for the term commencing September 17, 2019, and ending upon construction completion, for the estimated cost of $296,940, subject to non -substantive changes approved by the City Manager and City Attorney. 2. Authorize the City Manager to execute a reimbursement agreement with the Developer, PR/Broadstone Heritage I LLC, whereby the Developer agrees to pay the City for all costs related to the construction of railroad crossing enhancements on Dyer Road, for the term commencing September 17, 2019, and ending upon completion of all work and all reimbursements are paid in full, subject to non -substantive changes approved by the City Manager and City Attorney. Approve an appropriation adjustment recognizing a Developer deposit of $296,940 into the Select Street Construction, Developer Contributions In Lieu revenue account, and appropriating the same amount into the Select Street Construction, Contract Services - Professional expenditure account. DISCUSSION PR/Broadstone Heritage I LLC (Developer) is proposing to build a mixed -use development consisting of 1,400 residential units and 18,000 square feet of commercial space at 2001 East Dyer Road. Among a number of public improvements required of the development, a modification is needed to the railroad crossing on Dyer Road between Red Hill Avenue and Pullman Street (U.S. DOT Crossing 026711U -Exhibit 1). This modification triggers other upgrades to BNSF Railway 20B-1 Agreements with Developer and Railroad Company Railroad Crossing Improvements at 2001 East Dyer Road September 17, 2019 Page 2 equipment. BNSF Railway policy requires their direct coordination with public agencies and not developers. Therefore, the City must act as the lead agency in facilitating the improvements. The City will need to enter into two agreements. The first is a Reimbursement Agreement whereby the Developer agrees to deposit with the City the pass -through funds in the amount of $296,940 for the cost of the required railroad crossing improvements (Exhibit 2). The second agreement is with BNSF Railway Company to construct the required railroad crossing improvements for the estimated cost of $296,940 (Exhibit 3). The Reimbursement Agreement obligates the Developer to pay for any approved additional costs above the project estimate. STRATEGIC PLAN ALIGNMENT Approval of this item supports the City's efforts to meet Goal #6 — Community Facilities & Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City assets). ENVIRONMENTAL IMPACT There is no environmental impact associated with this action. The improvements are required as part of Project Environmental Impact Report EIR # 2015011028. FISCAL IMPACT There is no net cost to the City. Developer will pay the entire cost of the improvements estimated to be $296,940. This full amount will be deposited with the City and used to pay for actual project costs as invoiced by BNSF Railway. The requested Appropriation Adjustment will recognize the Developer deposit of $296,940 into the Select Street Construction, Developer Contributions In Lieu revenue account (No. 05917002- 57080), and appropriate the same amount into the Select Street Construction, Contract Services - Professional expenditure account (No. 05917660-62300). FY 2019/20 budget transactions are summarized as follows: Fiscal Accounting Unit Fund Accounting Unit, Year — Account # Description Account Descri tion Amount REVENUE FY Select Street Select Street Construction, 2019/20 05917002-57080 Construction Developer Contributions In $296,940 Lieu Total Appropriation: $296,940 20B-2 Agreements with Developer and Railroad Company Railroad Crossing Improvements at 2001 East Dyer Road September 17, 2019 Page 2 Fiscal Accounting Unit Fund Accounting Unit, Year - Account # Description Account Descri tion Amount EXPENDITURE Select Street Select Street Construction, FY 19/20 05917660-62300 Construction Contract Services- $296,940 Professional Total Expenditures: $296,940 APPROVED AS TO FUNDS AND ACCOUNTS: titer o Fuad S. S iss, PE, PLS Kathryn Do ns, CPA y Executive ' ector Executive Director Public Work Agency Finance and Management Services Agency FSSM/G/TH Exhibits: 1. Location Map 2. Reimbursement Agreement with PR/Broadstone Heritage 3. BNSF Railway Agreement r�- EXHIBIT 1 r1- rI- REIMBURSEMENT AGREEMENT THIS REIMBURSEMENT AGREEMENT ("Agreement") is made and entered into on September 17, 2019 by and between the CITY OF SANTA ANA, a charter city and municipal corporation duly organized and existing under the Constitution and laws of the State of California ("City") and PR/BROADSTONE HERITAGE I LLC, a Delaware limited liability company ("Developer"). City and Developer are individually referred to herein as "Party" and together referred to herein as "Parties." WITNESSETH WHEREAS, City previously entered into or concurrently is entering into that certain Grade Crossing Signal Installation Agreement ("Crossing Agreement") with BNSF RAILWAY COMPANY, a Delaware Corporation ("Railroad"), BNSF File No. BF30011783, to provide for the improvement of a railway crossing on Dyer Road between Red Hill Avenue and Pullman Street ("Crossing"). WHEREAS, Developer is the developer of property in the City at the intersection of Dyer Road and Red Hill Avenue ("Development") that has received various approvals from the City. WHEREAS, City has imposed a condition on the Development requiring Developer to reimburse the City for its costs for the Crossing work under the Crossing Agreement, the estimate for which is $296,940, as detailed in the Crossing Agreement. NOW THEREFORE, THE PARTIES HERETO AGREE AS FOLLOWS: 1. Recitals. The recitals are true and correct, and are incorporated into this Agreement as though fully set forth as terms of this Agreement. 2. Payment. Developer hereby agrees to pay to City all amounts owing by the City to the Railroad under the Crossing Agreement within thirty (30) days following Developer's receipt of written request by the City evidencing City's obligation to pay such amounts to Railroad under the Crossing Agreement. 3. Documentation. The City shall promptly submit to Developer all correspondence and documentation provided by Railroad to City. City shall not amend or modify the Crossing Agreement without first obtaining Developer prior written consent. 4. Agreement Binding. This Agreement shall be binding upon and for the benefit of the Parties and their respective agents, assigns, directors, employees, executors, officers, representatives, and successors. 1205062.01/OC 372942-00005/8-28.19/mrf/kp 1 5. Entire Agreement. This Agreement constitutes the entire agreement between the Parties, and it is expressly understood and agreed that this Agreement may not be altered, amended, modified or otherwise changed in any respect or particular whatsoever except by writing duly executed by authorized representatives of the Parties hereto. 6. Governing Law, This Agreement shall be governed by, construed in accordance with, and interpreted under the laws of the State of California and shall be deemed to have been entered into in the City, for purposes of venue no matter where the Agreement is actually executed. Both parties agree that the state and/or federal courts located in Orange County, California, shall be the venue for any action or proceeding that may be brought in connection with this Agreement. 7. Severability. If any provision of this Agreement shall be determined to be contrary to law or unenforceable, the remaining provisions shall be severable and enforceable in accordance with their terms. 8. Counterparts. This Agreement may be executed in multiple identical counterparts, including the transmission of counterparts via electronic means, each of which shall be deemed an original, but all of which together will constitute one and the same instrument. 9. No Third Party Beneficiaries. This Agreement is made and entered into for the sole protection and benefit of the Parties and any successor or assign of the Parties. No other person shall have any right of action based upon any provision of this Agreement. 10. Authority to Execute. The person or persons executing this Agreement on behalf of each individual Party warrants that he or she/they have the authority to execute this Agreement on behalf of the particular Party and has the authority to bind the particular Party to the performance of the obligations of this Agreement. 11. Waiver. No waiver of any breach, failure of any condition, or any right or remedy contained in or granted by the provisions of this Agreement shall be effective unless it is in writing and signed by the Party waiving the breach, failure, right, or remedy. No waiver of any breach, failure, or right or remedy shall be deemed a waiver of any other breach, failure, right or remedy, whether or not similar, nor shall any waiver constitute a continuing waiver unless the writing so specifies. 12. The Agreement Term. This Agreement shall commence on the date first written above and stay in effect until all reimbursements payable by Developer to City hereunder are paid in full. 13. Notices. Any notice to be given in connection with this Agreement shall be in writing and directed to the addresses below or such other addresses as either Party may later specify in writing. Notice is deemed effective on the date it is given if hand -delivered and on 1205062.01/OC 372942-00005/e-28-19/mrf/kp 2 the day delivered if by overnight mail. Notice given by U.S. mail shall be deemed effective three (3) days after it is deposited in the U.S. Mail, postage prepaid and addressed as follows: CITY: City of Santa Ana 20 Civic Center Plaza P.O. Box 1988 Santa Ana, CA 92702 Attn: Clerk of the Council DEVELOPER: PR/Broadstone Heritage I LLC 450 Newport Center Drive Suite 550 Newport Beach, CA 92660 Attn: Kim Bucklew These Parties agree to the foregoing: CITY OF SANTA ANA, a charter city and municipal corporation Kristine Ridge, City Manager APPROVED AS TO FORM: By: John . Funk, Assistant City Attorney ATTEST: By: Daisy Gomez, Clerk of the Council 1205062.01/OC 372942-0000518-28-19/mrf/kp 3 "Developer" PR/BROADSTONE HERITAGE I LLC, a Delaware limited liability company By: Heritage Village OC LLC, a Delaware limited liability company, its sole member By: PR/Heritage Holdings LLC, a Delaware limited liability company, its sole member By: Broadstone Heritage Alliance, LLC, a Delaware limited liability company, its member By: ,+/ b Name: Kim Bucklew Title: Member 1205052.01/0C 372942-00005/7-30-19/mrf/kp 20B-10 GRADE CROSSING SIGNAL INSTALLATION AGREEMENT BNSF File No.: BF10011783 Mile Post 176.30 Line Segment 7655 Dyer Road U.S. DOT Number 026711U Irvine Industrial Lead Subdivision THIS GRADE CROSSING SIGNAL INSTALLATION AGREEMENT (hereinafter called, "Agreement"), is executed to be effective as of 201_, by and between the City of Santa Ana, a charter city and municipal corporation duly organized and existing under the Constitution and laws of the State of California, herein represented and acting through its City Council (hereinafter called, "AGENCY"), and BNSF-RAILWAY COMPANY, a Delaware Corporation (hereinafter called, "RAILROAD"). WITNESSETH: WHEREAS, in the interest of aiding vehicular travel and public safety, the AGENCY is undertaking a project to install railroad crossing signals and activation equipment at the Dyer Road crossing; WHEREAS, the Dyer Road crossing is located between Red Hill Avenue and Pullman Street at U.S. DOT crossing 026711U as indicated on Exhibit "A", attached hereto and incorporated herein; WHEREAS, the parties agree that the RAILROAD will receive no ascertainable benefit from the installation of advance warning signs, pavement marking stop bars or crossing signal equipment (hereinafter collectively called, "Crossing Signal Equipment"); WHEREAS, the AGENCY is paying for the acquisition and installation of items 8, 9 and 11 listed under the Construction Notes section of Exhibit `B-1 ", attached hereto and incorporated herein, said items are hereinafter collectively called "Crossing Signal Equipment" at Dyer Road crossing; WHEREAS, the RAILROAD agrees to purchase and install, at AGENCY'S sole expense, the said Crossing Signal Equipment described in the scope of work herein, and upon the terms and conditions set forth below; EXHI_11 WHEREAS, the RAILROAD agrees said Crossing Signal Equipment can and will be installed prior to any other improvement listed in said Exhibit "11-1 ", and Exhibit `B-2 attached hereto and incorporated herein; WHEREAS, the improvements listed in said Exhibits `B-l" and Exhibit `B-2" can be installed by a third party before or after said Crossing Signal Equipment; NOW, THEREFORE, in consideration of the mutual covenants and agreements of the parties contained herein, the receipt and sufficiency of which are hereby acknowledged, the parties agree as follows: ARTICLE I — SCOPE OF WORK 1. The term "Project" as used in this agreement includes said Crossing Signal Equipment and any and all work related to the installation thereof to make it operational at U.S. DOT crossing 026711U, indicated on said Exhibit "A" and Exhibit "B-1" which are attached hereto and incorporated herein, including, but not limited to, any and all changes to telephone, telegraph, signal and electrical lines and appurtenances, installation of advance warning signs and pavement marking stop bars, installation of any new crossing surface, temporary and permanent track work, fencing, grading, alterations to or new construction of drainage facilities, preliminary and construction engineering and contract preparation, and disposal of scrap. ARTICLE 11—RAILROAD OBLIGATIONS In consideration of the covenants of AGENCY set forth herein and the faithful performance thereof, RAILROAD agrees as follows: 1. The RAILROAD will, using its own labor forces under applicable labor agreements, install said Crossing Signal Equipment. The work will be performed at AGENCY's expense and in accordance with the MUTCD and the plans and specifications approved by AGENCY. The plans and specifications are attached to this Agreement as said Exhibits "B-l" and `B-21 and incorporated herein. 2. The detailed estimate of RAILROAD'S Project cost include construction engineering, installation labor (including the costs, if anv, of electrical set -vice from a public utility), traffic control, administration costs, plan review costs, permit costs and material costs required for the Project are attached hereto as Exhibit "C" and incorporated herein. In the event construction for the Project has not commenced within (6) months following the effective date of this Agreement, RAILROAD may, in its sole and absolute discretion, revise the cost estimates set forth in said Exhibit "C". In such event, the revised cost estimates will become a part of this Agreement as though originally set forth herein. Any item of work incidental to the items listed on Exhibit "C" not specifically mentioned therein may be included as a part of this Agreetent upon written approval of AGENCY, which approval will not be unreasonably withheld. 3. RAILROAD will furnish all labor, materials, toots and equipment for the railroad portion of the work required for the construction of said Project. 20B-12 4. The RAILROAD will, at AGENCY'S expense, dispose of all scrap from the RAILROAD'S work hereunder. 5. The RAILROAD will finalize and complete billing of all incurred costs under this Agreement no later than 6 months following completion of Crossing. Signal Equipment installation. ARTICLE III — AGENCY OBLIGATIONS In consideration of the covenants of RAILROAD set forth herein and the faithful performance thereof, AGENCY agrees as follows: 1. AGENCY must perform, at AGENCY'S expense, the following work: a) Installation of a pavement marking stop bar in accordance with the Manual on Uniform Traffic Control Devices (hereinafter called, "MUTCD"). b) Installation of advance warning signs in accordance with the MUTCD. 2. The AGENCY will approve the location of the signals and signal bungalow prior to installation by RAILROAD. 3. The actual costs for engineering, materials and labor (including third party charges for the installation of electrical service) associated with the installation of the Crossing Signal Equipment must be paid by the AGENCY (including taxes, such as applicable sales and use taxes, business and occupation taxes, and similar taxes) as shown in Exhibit C. 4. In the event the services of a consultant are needed after execution of this Agreement due to any exigency of the RAILROAD and the Project, the AGENCY and the RAILROAD will mutually agree, in writing, as to the selection of a consultant and the applicable scope of work to be performed by such consultant. All work performed hereunder by any consultant and any resulting costs must be paid by AGENCY as apart of the costs for the Project. 5. During the installation of the Crossing Signal Equipment, the RAILROAD will send AGENCY progressive invoices detailing the costs of the work performed by RAILROAD under this Agreement. AGENCY must reimburse RAILROAD for completed force -account work within forty-five six (6) months of the date of the invoice for such work. Upon completion of the Project, RAILROAD will send AGENCY a detailed invoice of final Project costs, segregated as to labor and materials for each item in the recapitulation shown on Exlvbit "C". Pursuant to this section, AGENCY must pay the final invoice within six (6) months of the date of the final invoice. 3 20B-13 6. The AGENCY must have advance railroad crossing warning signs and standard pavement markings hi place at the crossing location indicated on said Exhibit "A" (if the same are required by the MUTCD) prior to the acceptance of this Project by the AGENCY. The AGENCY assumes full responsibility for the maintenance of advance warning signs and pavement markings and agrees to hold harmless and indemnify the RAILROAD for any claims, damages or losses, in whole or in part, caused by or due to the AGENCY'S failure to maintain the advance warning signs and markings or other requirements of the MUTCD. 7. The AGENCY must give RAILROAD's Manager of Public Projects written Notice to Proceed with the railroad portion of the work after receipt of necessary funds for the Project and this agreement is executed by all parties. BNSF will not begin the railroad work (including, without limitation, procurement of supplies, equipment or materials) until written notice to proceed is received from Agency. 8. BNSF must give Agency a written notice of estimated project start for Agency coordination. This notice by no means executes BNSF start of construction and shall only be used for city coordination of construction. 10. The total amount to be expended under this Agreement by AGENCY is set forth on Exhibit C, which amount shall be subject to actual costs and expenses of BNSF. ARTICLE IV- JOINT OBLIGATIONS In consideration of the mutual covenants of the parties contained herein and the premises, the parties mutually agree as follows: 1. All cost records of the RAILROAD pertaining to said Project will be open to inspection and audit at any reasonable time by representatives of the AGENCY (including the legislative auditor and fiscal analyst for the AGENCY) for a period of one (1) years from the date of the final RAILROAD invoice under this Agreement. 2. Upon completion of the installation of said Project, the RAILROAD,'Mll at its sole cost and expense, operate and maintain the Crossing Signal Equipment. 3. Notwithstanding the preceding provision, if any regulations, ordinances, acts, rules or other laws subsequently passed or amended by the AGENCY or any other appropriate governmental or legislative authority increase the AGENCY'S portion of maintenance costs under this Agreement, RAILROAD will receive the benefit of any such regulations, ordinances, acts, rules or other laws and the AGENCY'S increased portion of maintenance costs will be incorporated into and made a part of this Agreement. 4. If a railway or a highway improvement project necessitates rearrangement, relocation, or alteration of the Crossing Signal Equipment installed hereunder, the costs for such 20B-14 rearrangement, relocation or alteration will be the responsibility of the party requesting such changes. 5. If any of the Crossing Signal Equipment is partially or wholly destroyed, then such repair and/or replacement costs must be distributed among the parties as follows: a) In the event the RAILROAD's negligence destroys or damages the Crossing Signal Equipment, RAILROAD must reimburse AGENCY for the costs to replace or repair such Crossing Signal Equipment. b) In the event the Crossing Signal Equipment is damaged or destroyed by any other cause, AGENCY must, at its sole cost and expense, replace or repair such Crossing Signal Equipment. 6. If the Crossing Signal Equipment installed hereunder cannot, through age, be maintained, or, by virtue of its obsolescence, requires replacement, the cost of installation of new crossing signal equipment will be negotiated by the parties hereto on the basis of the current Federal Aid Railroad Signal Program participation and applicable AGENCY at the time of such replacement is warranted. 7. This Agreement will inure to the benefit of and be binding on the parties hereto, their successors, and assigns. 8. In the event any paragraph contained in this Agreement or any item, part, or term within any particular paragraph is determined by a court of competent jurisdiction to be invalid or unenforceable, the validity of the remaining paragraphs or items will not be affected; and the rights and obligations of the parties will be construed and enforced as if this Agreement did not contain that particular paragraph or item held to be invalid or unenforceable. 9. This Agreement may be signed in counterparts, any one of which will be deemed to be an original. The parties further agree that any facsimile copy of a party's signature is valid and binding to the same extent as an original signature. 20B-15 N NVlii\BSS WHEREOF, the parties hereto have executed this Agreement as of the day and year first above written. APPROVED AS TO FORM J01WFunk Auiwot City Attorney BNSF RAILWAY COMPANY 13y:. Printed Name: %t,riz* fiDg}ylS 'ritle: / u- 1 6 Pra l ebis V CITY OF SANT'A ANA By: Printed Name: 20B-16 lax 41 ` i *ur Via_ to Yi'sr°•\` �. ;.+Srxww�. .J +!d % 2f; r"! TM ;�rh• f � • to J" d •!� ' s.t �qa . �5g4. ✓/ ✓" /'�` � f {: ��' "�� ♦t, 1� • .. ;boy � i + s � I'}x, �Fir� ♦ Y l FO .'� r� iF}dl::L�ER�. �;� ♦..,� ..4' `:!'1_qt ",' RN 'Y u��klt rrtiiFr3' `. t� �.. ._ T°,ifP .. � y_. Exhibit "ti" [bisect plans and specifications detailing Railroad's work] 8 .1ya��k • y C b u l9 f9f���Si�S3" Fagt` m IFi3x`¢Fefgn6€sfg€sf€a� 0 a�• - -- 000 O 00 O OO OOOmODO it a 2 s A Al t �V"iSeSnP-15R$ re7',F I - AI 1 i _ II ® '�`�"p.T'�uq"� � .... ✓ M 9 vl :, w"'°is� ss r QQQ._ .a�7•�n�.vr Q�v Jlj) Gv3'rEL9'*'.(� .,5�y .v =Li^.'bi�� W.MnYJ �ll / - n, r. `$. M•.'°J e b2 '._,II •'`•d"+-y It ' n.. II 52 � L6J -__ � _ 6 ean' b'N � � �� - ! •"_A.3A It i'�3oe �` � y_ CAAaSX tI e • I .f�1 - � - nil g , �I _S� .. - lit 1 � •tiP, I i a= ... _ n -- - e.r •� it 6 1';1t:,, 1ttt1 ��� € II t I 3 itr I5' 20B-19 § 20 B- O Exhibit "C" JINSERT ESTIMATE OF RAILROAD'S COSTS IIEREj 9 20B-21 LOCATION: IRVIN P. [,No I•A,K PLANITENINUMIIEI- ,,R)24,565 PRol-1-1 IYOF: DNSP IIAIE%vAY CUM1IY,\NY OPERATED U1'. BNSF RAILWAY COMPANY )OINrrACRrTI': SANTA A,NA BILLABLE (V-): IUO.O NIA TL DATE: LOCATION CODE: 482170 TRICK "[VIT: 9 SII,UULUS STATUS: BOYANIERICAN PURPOSE. JUSTIFICATION AND DESCRIPTION CITS PLAN I'FENI DOCUmI:N'F (FOR INTERNAL RN'Sr ILVLAVAY USE ONLY) LINE. SEGMENT : 71.55 MILEPOST. 176.3 DIVISION: CA SUBDIVISION; IRVINE ND PINK ENGR. DIVISION: SOU CALII'ORNIA I'AN SLATE: C\. CO: OILANCE SPONSOR: VP ENGLNEHUNC. DEP'r CODE:: \10%VGII DERAILMP:NT CODE. AFT: NUMBER: RFA NUMBEII : CPAR NUMIIER BUDGET YEAR 20I9 BUDGET CLASS: 10 REI'ORI'INC. OFFICE; 443 PROJECr T Y'PE; sPP DOTNUAIIIER: 0267I1U STINIULUS FIND TYPE, FIOVA DYER ROAD-SAN'TA ANA. CA; RFPLACR CONS rANI%VARNING I FLASIIERS i GATES: C,\I.IFORNLA DI\': S:\N DIF.CO SUBUI V; LS J655: NIP ❑ IJ. DOT9 02671 IU; SEO= 69613 MON7110 PUWVR UTILITY C051' CEN-EER 616112. 111E NIATE:RIAL LIST BELOW REFLECTS TYPICAL REPRESENTATIVE PACKAGUS USED FOR Es rINIAI ING PURPGSF:S ONLY. TIIIS FSTIdIA'fIC 15 GO(!D FUR IR6 DAPS. Tllli. ESTIMATE IS SUBJECT TO CHANGE IN COST FOR LABOR NIATERIAL, AND OVERREAD. CONTRACTS RAVE BEEN ESTABLISHED FOR PORT IONS 01: SIGNAL WORK ON THE RNSF RAILROAD. ..............I................ SIGNAL \VORK ONLY.... I ........... I.............. THE CITY OF SANI'A AN\ IS FUNDING I W%OF'I'illS PROJECT. A:ANT.AIN PROPRIETARY CONFIDGNTLLLI'IY. PRIMARY FUNDING SOURCE IS FRBS\ " BUY ANIERICA(NI APPLIES " LAIIOR WSTS U - lOig15 Mr11T2RIAI. COSTS 9 I 11 U 9 9_'A54 O n U U 69-U6 I69,>16 169,5`n TOTA1COSTS TOTALS 1 11 -- R u ^96.9Jp 26) SY SDili MAINTENANCE AND PLANNINU PRINI'EDON: 93,28,1019 ESIINIAI'BREF.NU111RR: 1109295565.4-2S IMIMATED UY: WALKER COSPING D:\'If.. RJ/'_LL 2UIU I`RINTFF.D BY: WAI. KER Page 1 of 5 20B-22 ACCT CST RSV PPE DESCRIPTION MIST OT NM CASH NONCASH OPER R--%MVAL 8 400 SIGNAL SHOP LABOR- CAP 0.01 00 MH 1 •LABORSUBTGTAL 1 0 0 0 :ADDITIVES DA OVERAEADS I •GANG SUBTOTAL SIGSHOP-IM.- SIGNAL SHOP LABOR, I MAN 2 0 0 0 1120 319 400 9911 ELECTRICAL MATERIAL 1.00 LS N 1560 • MATERIAL SUBTOTAL 1.500 0 0 0 0AD➢IT7VE5 USETAX OFFLTNE TRANSPORTATION18 129 18 •GANG SUBTOTAL CIE COA,NG-IM- ELECTRICAL GANG. I MAN 1,647 0 0 0 8 40D 1037 SIGNAL FIELD-RHPIACE 952D7 0.0 MH 24,949 4,402 •LABOR SUBTOTAL - -- - 24,949 0 4.402 0 1120 313 400 9911 ARRESTOR, MDSA-2 XS 1.00 EA N 697 1120 313 40D 9911 BATTERY, 20 VGL-255, 9 VG _350 1.00 LS N 6,761 1120 313 40C 9911 BELLE 4.00 EA N 823 1120 313 400 9911 BONDING MATERIAL I.CO LS N 3D0 1120 313 400 WlI BUNGALOW B.R8 W/AC 1.00 LS N 10,142 1120 313 400 5911 BUNGALOW MATERIAL 1.00 LSH 7.564 1120 313 400 9911 CABL$2C/6TW 5D0.00 ITT 610 1120 313 400 9911 CABLE, 3C/2 250.00 FT N 1,433 1120 313 400 9911 CABLE, 5C/10 50D.00 PT N 940 1120 313 400 9911 CABLH,5C/6 1000.00 .FTN 4.130 1120 313 4W 3911 CADLE.7C14 1000.00 FT N 1.740 1120 313 400 9911 CANTILEVER 2m EA N 31.650 1120 3I3 400 9911 CHARGERS, 12M (20140/60) 3.W BA N 3,110 1120 313 400 9911 CONDUIT, STEEL 4• 200.00 FT 3,w 1120 313 400 9911 CONSTANT WARNING, 3IP4, ITK 1.00 EA N 16,232 1120 313 400 9911 EVENT RECORDER 1.00 FAN 3,250 I l20 313 400 9911 FIELD MATERIAL LOD Ls 7,372 1120 313 400 9911 FILL DIRT 20.00 Cy N 500 1120 313 400 9911 FOUNDATION, CANT 2.00 EA N 6,615 1120 313 400 9911 FOUNDATION, STEEL 4D0 PA N 2,693 1120 313 400 9911 GALE KEEPER 4,00 EA N 6.668 1120 313 400 9911 GATE MECHANISM, S-60 4.00 BA N 21.821 1120 313 400 9911 HAWK 48 DIM 1.00 EA N 1,930 1120 313 400 9911 LED LIGHT 28.00 EA 5.111 1120 313 400 9911 LIGRTOUTDE'lUCTOR 2.00 EA 1.826 1120 313 400 9911 RELAY 4D11 EA N 3.000 1120 313 403 9911 S11INT, NBS 2.30 EA N 2012 1120 .313 400 9911 SLIRFACB ROCK 10.00 CS• N 500 • MATERLU, SUBTOTAL, 157,822 0 0 0 1120 367 400 9911 CONTRACI'ENOINBRRING 1.00 LS N 8,000 112D 399 400 9911 BUNGALOW, WIREANDTESf 1.00 LSN 4,418 1120 399 400 9911 DIRECTIONAL BORING 300.00 Pi N 15,000 • OTHER SUBTOTAL 27 418 0 0 0 •ADDITIVES PAYROLL ASSOCIATED COSTS DAOVERHBADS 16,3U9 2,877 2QUIPMBNTEKPENSES 27,076 4,778 5,64S 979 1NSURANCEEXPENSES 4.366 770 USETAX 13,146 OfFLCKU TRANSPGRTAttON 1,911 • GANG SUBTOTAL SMM-LU-5M -SIGNAL FIELD LABOR, 5 MAN 273.545 0 13,906 0 1120 910 490 9911 AC POWER SERVICE 1.00 EA N 5.000 •OTHER SUBTOTAL 5.000 0 0 0 •GANG SUBTOTAL NONE. -NO GANG NEEDED 5.000 0 0 0 PROJELTSUBTOTA1. CONTINGENCIES 260,I1E 0 13,806 0 BILL PREPARATION PER 0 0 0 0 2,90-1 0 138 0 PROJECT GROSS COST LESS COST PAM BY O7HE.TS 282,996 0 13,944 0 282,996 0 13944 0 Page 2 of 5 20B-23 ACCT CST RSN PPE DESCWP71O\ QTY/ST OT lNh[ CASH NONCASH CPER REMOVAL PROJECTNETCOST Paso 3 of 5 20B-24 "' MAWTAW PROP.R�M'ARY CONT1DEtFf1ALITY •rr•. BNSFRAILWAY COMPANY FHPM ESTIMATE FOR SANTA ANA LOCATION IRVINEINDPARK DETAILSOFSSN}IAT➢ PLAN ITEM: 000295565 VERSION: 6 PURPOSE, JUST6[CAT10N AND DESCIUPfiON OVER ROAD . SANTA ANA, CA; REPLACE CONSTANT WARNING I FLASHERS/ GATES; CALIFORNIA DIV: SAN DIEGO SUBDIV; LS 7655; MP I763; DOT# o2b711U, SEQ# 69618 MONTHLY POW ER UR1.17Y COST CENTER : 61692. THE MATERALLIST BELOW REFLECTS TYPICAL REPRESENTATIVE PACRAGES USED FOR ESTIMATING PURPOSES ONLY, THIS ESTIMATE 15 GOOD FOR ISODAYS. THEEST/MLATE IS EUDIECFTO CHANCE IN COST FOR LABOR, MATERIAL, AND OVERGEAD. CONTRACTS HAVE BEEN ESTABLISHED FOR PORTIONS OF SIGNAL WORK ON THE DNSF RAILROAD. «•..•.,....w.............••• SIGNAL WORK ONLY...........w«. •• .•o-.ww«. THE C 17Y OF SANTA ANA IS FUNDING 10o%OF THIS PROTECT. MARMAIN PROPRIETARY CONFIDENTTALIIY, PRIMARY FUNDING SOURCE IS FHWA •• BUY AMHRTCA@T APPLIES -- DESCRIPTION LABOR SIGNALFIELD-REPLACE SIGNALSHOP LABOR. CAP PAYROLLASSOCLATED COSTS DAOVERHEADS EQUIPMENT EXPENSPS INSURANCE EXPENSES TOTALLABORCOST MATERIAL muu«••w ARRPSTOH MDSA I XS BATTERY, 20 VGL- S,9 VGL.350 BELLS BONDING MATERIAL BUNGALOW 8X8 W/AC 13UNCALOWNIATBIUAL CABLF. 217/6 TOY CABLE, 3C/2 CABLE. 5C/10 CABLE, JOY, CABLE, 7C/14 CANTILEVER CHARGERS, 12/80 (20/40/60) CONDUIT,ST'EELe CONSTANT WARNINO,XP4, ITK BLECTRICAL MATERIAL EVENT RECORDER FIETD MATEHWL PILL DIRT FOUNDATION,CANT I FOUNDATION, STEEL GATEKEEPER OATH MECHANISM, 5-60 EAWK 48 DIN LEDLIGHT IfGHT OUT DETBCTOR RELAY SHUNT, N➢S SURFACE ROCK Page 4 of 5 Ulm 952.0 MII 0.01 MH 1.0 EA N 1.0 LS N 4.0 EA N 1.0 LS N 1.0 LS N 1.0 LS N 500.0 FT N 250.0 FTN 500.0 PT N 1000.0 FT N 1000.0 FT N 2.0 EA N 3.0 RA N 2000 IT N 1.0 EA N 1.0 LS N 1.0 EA N 1.0 LS N 20.0 CY N 20 EA N 4.0 EA N 4.0 EA N 4,0 EA N 1.0 EA N 78.0 EA N 2.0 EA N 4.0 EA N 20 EA N 10.0 CY N COST TOTALS 29,351 19,186 31,855 6,527 92,056 697 6,763 823 Soo 10,142 7,564 610 1,453 940 4,130 1,740 31,650 3,110 3,064 IS,= 1,500 3,250 7,372 son 6,63fi 2,693 6,643 21,891 1,930 5,111 1,826 3,000 .Zola 500 9Z056 20B-25 USE TAX OFFLR4E TRANSPORTATION TOTA: XATE]1 COST OTHER ACPOIVERSFAVICB OUNGALOIV, RTRB AND TEST CONTRACT ENGINEBRINO DIRECTIONALBORINC TOTAL OTF:ER ITEMS COST PROJECT SUBTOTAL COWINOENCIES BILLPREPARATJONFEE GROSS PROJECT COST LESS COST PAID BY BNSF TOTAL BILLABLE COST Page 5 of 5 13,275 169.526 :69.526 1.0 EA N 5,000 LO LS N 4,416 1.0 LS N 8,000 300.0 FT N 15,000 32,418 32.419 294.000 0 2.940 296,940 0 256,940 20B-26