Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
23A - PROJ CENTENNIAL PARK WALKWAY
REQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: OCTOBER 15, 2019 TITLE: APPROVE AN AMENDMENT TO THE FY 2019-20 CAPITAL IMPROVEMENT PROGRAM AND AWARD A CONSTRUCTION CONTRACT TO LEONIDA BUILDER, INC., IN THE AMOUNT OF $1,427,850 FOR THE CENTENNIAL PARK WALKWAY AND LIGHTING IMPROVEMENTS PROJECT, WITH A TOTAL DELIVERY COST OF $1,828,088 (PROJECT NOS. 18-7529 & 18-7528) {STRATEGIC PLAN NO. 6, 1G} /s/ Kristine Ridge CITY MANAGER RECOMMENDED ACTION CLERK OF COUNCIL USE ONLY: APPROVED ❑ As Recommended ❑ As Amended ❑ Ordinance on 1" Reading ❑ Ordinance on 2o° Reading ❑ Implementing Resolution ❑ Set Public Hearing For_ CONTINUED TO I�U�►l�1�1:3q:3 1. Approve an amendment to the Fiscal Year 2019-20 Capital Improvement Program Centennial Park Walkway Project to include additional Community Development Block Grant funds in the amount of $150,000. 2. Award a construction contract to Leonida Builder, Inc., the lowest responsible bidder, in accordance with the base bid in the amount of $1,427,850, for the term beginning upon execution of the contract and ending upon project completion, for construction of the Centennial Park Walkway and Lighting Improvements Project, and authorize the City Manager to execute the contract subject to non -substantive changes approved by the City Manager and the City Attorney. 3. Approve the Project Cost Analysis for a total estimated construction delivery cost of $1,828,088, which includes $1,427,850 for the construction contract, $214,178 for contract administration, inspection and testing, and a $186,060 project contingency (approximately 13% of the construction contract amount) using Community Development Block Grant (CDBG) funds. DISCUSSION Centennial Park is the largest City -owned park, located south of Edinger Avenue and west of Fairview Street (Exhibit 1). The park is heavily used by Santa Ana College, Hector Godinez High School, sports leagues, and many park patrons. Staff have identified existing walkways that are damaged and in need of repair, and existing wooden lighting poles that have deteriorated with age and require replacement. 23A-1 Amend FY 19-20 CIP and Award Contract to Leonida Builder, Inc., Centennial Park Walkway and Lighting Improvements Project October 15, 2019 Page 2 The scope of work includes the removal and replacement of failed walkways, concrete slabs, curbs, and brick pavers; removal of deteriorated wooden light poles; and construction of new concrete light pole assemblies with energy efficient LED fixtures, foundation, electrical conduit, and wiring. In addition, the work includes demolition of existing structures, signs and trees; construction of new bollards, guardrails, new decomposed granite walkways, river rock slope protection, Americans with Disabilities Act (ADA) access ramps; identification signs; slurry seal and restriping of parking lots. The project is expected to start in approximately November of 2019. Once the project is completed, these walkway and lighting improvements will enhance safety, reduce energy consumption, enrich the visual appearance of the community area, and park lighting will be improved and modernized. Public Outreach and Contractor Participation To provide an opportunity for local vendors to submit bids, a Notice Inviting Bids was advertised in the Orange County Register on August 2 and 7, 2019, and bids were received electronically via the City's web -based electronic bidding system, PlanetBids, on August 28, 2019. Through the PlanetBids online portal, vendors may register to receive notifications on all current and future City projects, as well as download contract documents, receive project updates, and submit bids electronically. A total of 63 vendors, were notified of the project via PlanetBids. 57 vendors requested bidding documents and 6 bids were received with no bids received from Santa Ana contractors. Bid Results Summary RANK BIDDER'S NAME LOCATION BASE BID 1 Leonida Builders, Inc. Santa Clarita $1,427,850 2 Alfaro Communications Construction, Inc. Compton $1,430,877 3 Vido Samarzich, Inc. Rancho Cucamonga $1,478,950 4 EBS GENERAL ENGINEERING INC Corona $1,557,659 5 Western Construction Specialists inc. Santa Fe Springs $1,599,915 6 YAKAR Covina $1,958,790 All 6 bids received were deemed responsive. Leonida Builders, Inc., submitted the lowest responsive bid in the amount of $1,427,850 (Exhibit 2). Based on the bid analysis and a contractor's reference check, staff recommends awarding the construction contract (Exhibit 3) to Leonida Builders, Inc., in the amount bid. 'When this project was advertised, the Centennial Park Walkway project number was erroneously stated as 18-7929." In order to be consistent with internal fiscal controls, all future references will be corrected to "18-7529." 23A-2 Amend FY 19-20 CIP and Award Contract to Leonida Builder, Inc., Centennial Park Walkway and Lighting Improvements Project October 15, 2019 Page 3 Protect Delivery To deliver a complete project, in addition to the construction contract, the estimated total construction delivery cost of the project will require construction administration, inspection, and testing, along with an allowance for contingencies to account for unexpected or unforeseen conditions. Construction administration and inspection includes construction management; implementation of the City's Community Workforce Agreement requirements; inspection of the Contractor's work to ensure contract compliance, workmanship, and quality; and material testing. As indicated in the Cost Analysis (Exhibit 4) and as summarized in the table below, the estimated total construction delivery cost of the project is $1,828,088. Construction Contract $1,427,850 Construction Administration, Inspection and Testing $214,178 Contingencies $186,060 ESTIMATED CONSTRUCTION DELIVERY COST $1,828,088 The total estimated construction delivery cost will cover all staffing costs, and no additional or separate funding will be used. Approval of Recommended Action No. 1 above will increase the Fiscal Year 2019-20 Capital Improvement Program (CIP), Centennial Park Walkway Project originally approved for $625,000 by adding $150,000 of Community Development Block Grant (CDBG) funds for an amended CIP total of $775,000. The added funds increase the project budget by 19% to include greater repairs needed. STRATEGIC PLAN ALIGNMENT Approval of this item supports the City's efforts to meet Goal #6 - Community Facilities & Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City assets), Strategy G (develop and implement the City's Capital Improvement Program in coordination with the Community Investment Plan [e.g., neighborhood streets, traffic improvements, etc.]). ENVIRONMENTAL IMPACT In accordance with the California Environmental Quality Act, the recommended actions are exempt from further review. Categorical Exemption Environmental Review No. ER-2019-74 was filed for the project. FISCAL IMPACT As indicated in the Cost Analysis (Exhibit 4), the estimated total construction delivery cost of the project is $1,828,088, which includes construction, contract administration, inspection, testing, and an authorized contingency of $186,060. Council action taken on September 17, 2019, to approve carryover, unspent funds included $150,000 in additional Community Development Block Grant 23A-3 Amend FY 19-20 CIP and Award Contract to Leonida Builder, Inc., Centennial Park Walkway and Lighting Improvements Project October 15, 2019 Page 4 funding for this project. With approval of the proposed amendment to the Fiscal Year 2019-20 CIP, the following table summarizes the funds available for expenditure to deliver construction of this project: Accounting Unit — Accounting Unit - Fiscal Year Account No. Fund Description Account No. Amount Project No. Description FY 2019-20 13518783-66220 Community CDBG Programs- $1,234,368 July -June (18-7529)- Development Block Improvements Other Grant Than Buildings FY 2019-20 13518783-66220 Community CDBG Programs- $593,720 July -June (18-7528) Development Block Improvements Other Grant Than Buildings Total $1,828,088 'When this project was advertised, the Centennial Park Walkway project number was erroneously stated as "18-7929." In order to be consistent with internal fiscal controls, all future references will be corrected to "18-7529." Fuad S. Sweiss, PE, PLS Executive Director Public Works Agency Steven A. Mendoza Executive Director Community Development Agency Lisa Rudloff Executive Director Parks, Recreation, and Community Services Agency FSS/TC/MO APPROVED AS TO FUNDS AND ACCOUNTS: Kathryn Downs, CPA Executive Director Finance and Management Services Agency Exhibits: 1. Location Map 2. Bid 3. Construction Contract 4. Cost Analysis 5. Amended FY 19-20 CIP Project Sheet 23A-4 LOCATION MAP (NOT TO SCALE) 1-J SANTA ANA Project Nos. 18-7929 & 18-7528: P` A Centennial Park Walkway and Lighting PUBLIC MRKSACENCY Improvements Project �P 1 City of Santa Ana Centennial Park Walkway Improvements & Centennial Park Lighting Improvements (18-7929 & 18-7528), bidding on Bid Results Bidder Details Vendor Name Leonida Builders, Inc. Address 15821 Live Oak Springs Canyon Rd. Santa Clarita , CA 91387 United States Respondee Panagiotis Leonida Respondee Title President Phone 909-275-3354 Ext. Email panikos@leonidabuilders.com Vendor Type CADIR License # 896772 CA DIR Bid Detail Bid Format Electronic Submitted August 28, 2019 1:23:22 PM (Pacific) Delivery Method Bid Responsive Bid Status Submitted Confirmation # 188617 Ranking 0 Respondee Comment Buyer Comment Attachments File Title General Ownership affidavit Bid Bond Non collusion List of Subcontractors Line Items Type Item Code Base Bid Proposal 1 Mobilization/Demobilization* File Name Bid Proposal Package with attachments.pdf Ownership affidavit - executed.pdf 190827 Bid Bond - executed.pdf Non -collusion - executed.pdf List of Subcontractors - executed.pdf uoM City Unit Price LS 1 $55,000.00 2 Demolition of existing structures, bollards, guardrails and ramps LS 1 $30,000.00 Page 1 Printed 09/12/2019 EXHIBIT 2 File Type General Forms Ownership Affidavit (Notary Public) - REQ Original Hard Copy Submittal in Addition Bid Bond Guaranty (Notary Public)- REQ Original Hard Copy Submittal in Addition Non -Collusion Affidavit (Notary Public) - REQ Original Hard Copy Submittal in Addition Subcontractor Listing Form Line Total Comment $56,000.00 $30,000.00 PlanetBids, Inc. 23A-6 City of Santa Ana Page 2 Centennial Park Walkway Improvements & Centennial Park Lighting Improvements (18-7929 & 18-7528), bidding on Printed 09/12/2019 Bid Results Type Item Code UOM Oty Unit Price Llne Total Comment 3 Remove and Dispose PCC sidewalks, PCC slabs, and brick pavers SF 31400 $3.00 $94,200.00 4 Remove and Dispose Signs EA 6 $500.00 $3,000.00 5 Remove and Dispose Trees EA 2 $2,000.00 $4,000.00 6 Precast Concrete Bollards EA 63 $450.00 $28,360.00 7 Existing Guardrail Improvements LS 1 $35,000.00 $35,000.00 8 PCC Sidewalk/Slabs (T=4") SF 14400 $12.00 $172,800.00 9 PCC Access Ramp (Type 1) SF 550 $18.00 $9,900.00 10 Brick Pavers SF 4100 $30.00 $123,000.00 11 Decomposed Granite CY 170 $150.00 $25,500.00 ______ 12- PCC Curb (Type B-1 with 8" curb face) LF 3100 $40.00 $124,000.00 13 PCC Curb (Type B-1 with 0" face) LF 90 $40.00 $3,600.00 14 Lake Edge Slope Improvements LS 1 $5,000.00 $5,000.00 15 Jetty Improvements LS 1 $10,000.00 $10,000.00 16 ADA RampAWalkway Improvements LS 1 $120,000.00 $120,000.00 17 Identification Signs EA 9 $1,000.00 $9,000.00 18 Slurry Seal SF 190000 $0.50 $95,000.00 PlanetBids, Inc. 23A-7 City of Santa Ana Page 3 Centennial Park Walkway Improvements & Centennial Park Lighting Improvements (18-7929 & 18-7528), bidding on Printed 09/12/2019 Bad Results Type Item Code UOM city Unit Price Line Total Comment 19 New Lighting at Centennial Park LS 1 $325,000.00 $325,000.00 20 Additional Light Pole EA 5 $4,000.00 $20,000.00 21 Additional Light Pole Assembly EA 5 $3,000.00 $15,000.00 22 Additional Wiring LF 300 $25.00 $7,500.00 23 Additional Conduit LF 300 $80.00 $24,000.00 24 Signing and Striping LS 1 $48,000.00 $48,000.00 25 Traffic Control LS 1 $16,000.00 $16,000.00 26 BMPs and Erosion Control Measures LS 1 $15,000.00 $15,000.00 27 Labor Agreement Oversight LS 1 $10,000.00 $10,000.00 - Subtotal $1,427,850.00 Asterisk Notes (per P-3 of P-17 of Specifications) - NOT part of Total Bid Calculation 28 `= Mobilization/Demobilization bid item is limited to a maximum of 5% of the Total Bid ea 0 0 0 Subtotal 0 Total $1,427,850.00 PlanetBids, Inc. 23A-8 CITY OF SANTA ANA PROPOSAL CENTENNIAL PARK IMPROVEMENTS: PROJECT NO. 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS PROJECT NO. 18-7529: CENTENNIAL PARK LIGHTING IMPROVEMENTS BID PROPOSAL TO: CITY COUNCIL OF THE CITY OF SANTA ANA FROM: Leonida Builders, Inc. REQUIREMENT: The undersigned bidder declares that they have carefully examined the location of the proposed work, that they have examined the Contract Documents in its entirety and hereby proposes to furnish all material and do all the work required to complete the said work in accordance with said plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following schedule: Item Description Qty Unit Unit Price Amount I Mobilization/Demobilization I LS $ 55,000.00 $ 55,000.00 - Demolition of existing structures, bollards, guardrails and ramps LS $ 30,000.00 $ 30,000.00 3 Remove and Dispose PCC sidewalks, PCC slabs, and brick pavers 31,400 SF $ 3.00 $ 94,200,00 4 Remove and Dispose Signs 6 EA $ 500.00 $ 3,000.00 5 Remove and Dispose Trees 2 EA $2,000.00 $ 4,000,00 6 Precast Concrete Bollards 63 EA $450.00 $ 28350.00 7 Existing Guardrail Improvements I LS $ 35,000.00 $ 35,000.00 8 PCC Sidewalk/Slabs (T=4") 14,400 SF $12 00 $ 172,800.00 9 PCC Access Ramp (Type 1) 550 SF $ 18.00 $ 9,900.00 10 Brick Pavers 4,100 SF $ 30.00 $ 123,000.00 21A W CITY OF SANTA ANA PROPOSAL CENTENNIAL PARK IMPROVEMENTS: PROJECT NO. 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS PROJECT NO. 18-7528: CENTENNIAL PARK LIGHTING IMPROVEMENTS Item Description Qty Unit Unit Price Amount 11 Decomposed Granite 170 Cy $150.00 $ 25,500,00 12 PCC Curb (Type B-1 with 8" curb face) 3,100 LF $40,00 $ 124,000.00 13 PCC Curb (Type B-1 with 0" face) 90 LF $ 40.00 $ 3,600.00 14 Lake Edge Slope Improvements 1 LS $5,000.00 $ 5,000.00 15 Jetty improvements I LS $10,000.00 $ 10,000.00 16 ADA Ramp/Walkway Improvements 1 LS $120,000.00 $ 120,000.00 17 Identification Signs 9 EA $1,000.00 $ 9,000.00 18 Slurry Seal 190,000 SF $0.50 $ 95,000.00 19 New Lighting at Centennial Park 1 LS $325,000-00 $ 325,000.00 20 Additional Light Pole 5 EA $4,000.00 $ 20,000.00 21 Additional Light Pole Assembly 5 EA $3,000.00 $15,000.00 22 Additional Wiring 300 LF $25.00 $ 7,500.00 23 Additional Conduit 300 LF $80.00 $ 24,000.00 24 Signingand Striping I LS $48,000.00 $48,000.00 25 Traffic Control 1 LS $16,000.00 $ 16,000.00 26 BMPs and Erosion Control Measures I LS $15,000.00 $ 15,000.00 2J/�►f 1� CITY OF SANTA ANA PROPOSAL CENTENNIAL PARK IMPROVEMENTS: PROJECT NO. 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS PROJECT NO. 18-7528: CENTENNIAL PARK LIGHTING IMPROVEMENTS Item Description Qty Unit Unit Price Amount 27 Labor Agreement Oversight I LS $ 10,000 $ 10,000 TOTAL BASE BID $ 1,427,850.00 The lowest responsible bidder shall be selected based on the total base bid. The City reserves the right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). * Mobilization/Demobilization bid item is limited to a maximum of 5% of the Total Bid. TIME FOR COMPLETION OF IMPROVEMENTS AND LIOUiDATED DAMAGES The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, within ninety (90) working days after the commencement date stated in the Notice to Proceed. The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard Specifications, shall be $1,300 per calendar day. NameofFirm Leonida Builders Signature of BIDDER _ Leonida Title President, Secretary & Treasurer (If an individual, so state. If a firm or co -partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) 2UkP11 CITY OF SANTA ANA PROPOSAL CENTENNIAL PARK IMPROVEMENTS: PROJECT NO. 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS PROJECT NO. 18-7528: CENTENNIAL PARK LIGHTING IMPROVEMENTS BIDDER'S STATEMENT BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent Construction Contract Agreement shall constitute the entire agreement between BIDDER and the AGENCY only after it has been accepted by the City Council, endorsed by the Clerkofthe Council with her signature and official seal noting hereon the action of approval of the Council, signed by the Public Works Agency Executive Director or his/her duly authorized agent, and signed by the City Attorney, denoting his approval of the form of this document, and its execution, and when it or an exact copy of it has been either delivered to BIDDER or deposited with the United States Postal Service properly addressed to the BIDDER with the correct postage affixed thereto. BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she will furnish AGENCY all required bonds and certificate of liability insurance within ten (10) business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof accompanying this proposal shall become the property of the AGENCY and shall be considered as payment of damages due to the delay and other causes suffered by AGENCY because of the failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S bond substituted in lieu thereof shall be returned to the undersigned. BIDDER understands that a bid is required for the entire work, the estimated quantities set forth in the bid schedule are solely for the purpose of comparing bids, and that final compensation under the contract will be based upon the actual quantities of work satisfactorily completed. The BIDDER also certifies that the bid is a balanced bid. In accordance with Section 7028.15 of the California Business and Professions Code, the undersigned certifies under penalty of perjury that the foregoing is true and correct. Name of Firm Leonida Builders, Inc. Signature of BIDDER Panagiotis Leonida Title President, Secretary & Treasurer (If an individual, so state. If firm or co -partnership, state the firm name and give the names of all individual co-partners composing the firm. If a corporation, state legal name of corporation, and names of President, Secretary, Treasurer and Manager, thereof.) L1A PlI% CITY OF SANTA ANA PROPOSAL CENTENNIAL PARK IMPROVEMENTS: PROJECT NO. 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS PROJECT NO. 18-7529: CENTENNIAL PARK LIGHTING IMPROVEMENTS CONTRACTOR'S LICENSING AND REGISTRATION STATEMENT The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she and all his/her subcontractors are registered with the State of California Department of Industrial Relations (DIR), and that the following is true and correct. Contractor's Name: Leonida Builders, Inc. Business Address: 15821 Live Oak Springs Canyon Rd. Santa Clarita CA, 91387 Business E-Mail Address: panikos@leonidabuilders.com Telephone: 909-275-3354 State Contractor's License No. and Class: 896772 / A, B, & C-8 License Expiration Date: 05/31/2021 State Dept. of Industrial Relations (DIR) Registration No.: 1000025666 State Dept, of Industrial Relations (DIR) Registration Expiration Date: A z 06/30/2021 Signed: Panagiotis Leonida Title: President, Secretary & Treasurer L 3A Pl 3 CITY OF SANTA ANA PROPOSAL CENTENNIAL PARK IMPROVEMENTS: PROJECT NO. 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS PROJECT NO. 18-7528: CENTENNIAL PARK LIGHTING IMPROVEMENTS PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well as California Code of Regulations. Title 8, Section 16.000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. Since the services are being performed as part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to Fully comply with such Prevailing Wage Laws. City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the commencement of this Agreement. Contractor shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the services available to interested parties upon request, and shall post copies at the Contractor's principal place of business and at the project site. Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising Out ofany failure or alleged failure to comply with the Prevailing Wage Laws. The undersigned certifies that the foregoing is true and connect. Name of Firm Leomda Builders, Inc, Signature of BIDDER Panapliotis Leonida Title President, Secretary & Treasurer (if an individual, so state) 2P3�A 14 CITY OF SANTA ANA PROPOSAL CENTENNIAL, PARK IMPROVEMENTS: PROJECT NO. I8-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS PROJECT NO. 18-7528: CENTENNIAL PARK LIGHTING IMPROVEMENTS OWNERSHIP AFFIDAVIT STAIR OF CAUFORNiA COUNTY OP ORANGE ) SS: CITY OF SANI A ANA Panagiotis Leonlda , being duly sworn, deposes and says: ❑ INDIViDOAL Ihit he/she is the party making the foregoing proposal: ❑ PAR'fNERSIIIP That he/she is a member of the co -partnership firm designated as: and �a•ho has been and is duly vested with the authority to males; and execute instumentc for the co -partnership by: who constitute the other members of the co -partnership, © CORPORATION That he is of: Presldenl, Secretary & Treasurer a corporation which is making the foregoing proposal; ❑ JOINT VENTURE That he is of one of the parties making the foregoing proposal as a joint venture, and the he/she has been and is duly vested with the authority to execute instruments Tor an on behalf of the parties making said bid who are, that such a bid is genuine and not collusive or sham, and has not in any manner sought by collusion to secure any advantage against the City of Santa Ana or any person interested in the proposed contract, for him If or any other person. Signature off3ld er +"t Subscribed and sworn to before me this 27 day of August 20 19 See Attached Signature of officer Administering Oath (Notary Public) I =P1 5 CALIFORNIA JURAT GOVERNMENT CODE § 8202 A notary public or other officer completing this certificate verifies only the Identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of Callfornla Countyofh KELLY VANIRA ORELL,4NA Notary Public California Los Angeles County D Commission Y 2289176 AY Comm. Expnes MAY 20, 2023 Place Notary Seal and/or Stamp Above Subscribed and sworn to (orrQffkr3led) before me on this 7-1 day of 20_a, by Date M ttth Year (and (2) Nome(s) of Signer(s) proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me. Signature Completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document �r1wl, ���L, a 4iy. Title or Type of Document: 4f�}6+`^y Document Date: �*AL4�� f I �/ I ` /r� 4 Number of Pages: ?- . Signer(s) Other Than Named Above: WA 02018 National Notary Association 23A-16 CITY OF SANTA ANA PROPOSAL CENTENNIAL PARK IMPROVEMENTS: PROJECT NO, 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS PROJECT NO, 18-7528: CENTENNIAL PARK LIGHTING IMPROVEMENTS KNOW ALL PRESENT that, LEONIOA GUILDERS, INC. , as BIDDER, and GREAT AMERICAN INSURANCE COMPANY , as SURETY, are held and firmly bound unto the CITY OF SANTA ANA, as AGENCY, in the penal sum of TEN PERCENT OF AMOUNT BID Dollars($ 10% ), Which is ten percent (lb°/u) of the total amount bid by BIDDER to AGENCY for the above -stated project, for the payment of which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these presents. THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to submit a bid to AGENCY for the above -stated project, if said bid is rejected, or if said bid is accepted and a contract is awarded and entered into by BIDDER in the manner and time specified, then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor of AGENCY. 1N WITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal 26TH day of AUGUST 2019 BIDDER* 115821 LIVE OAK SPRINGS CANYON ROAD SANTA CLARITA, CA 91387; 951-532-7717 Panagiotls Leonida President, Secretary and Treasurer SURETY* GREAT AMERICAN INSURANCE 750E CITY DRIVE SOUTH #470 ORANGE, CA 92868; 714-740-3117 Subscribed and sworn to before me 20_. Signature: Notary Public in and for the County of State of KEVIN VEGA, ATTORNEY -In -FACT this day of Provide BIDDER/ SURETY name, address, and telephone number and the name, title, address, and telephone number of authorized representative, See Attache;, P-8 of P-17 23A-17 GREAT AMERICAN INSURANCE CCMPANYQ Adminlsirative Office: 301 E 4TH STREET • CINCINNATI, OHIO 45202 • 513.369.5000 • FAX 613.723-2740 The number of persons authorized by this power of attorney is not more than FOUR Nat) 20974 POWER OFATTORN EY KNONVALLMEN OXTHESE PRESENTS: That lltBOREATAMERICAN INSURANCE COMPANY, a corporation organized andexlstng under and by virtue Of the Inwe of Ilia State orOhlo, does hereby uomintle, 4e1 Rod uplochil the person or persons rallied helms, each Individually if more Ilion one is nnmed, its Into mid lawfill allomey-in-fhc6 for it find in Its neuie, place mid stead to 0xceule oti behalf of the said Company. €s surety, nny and all bonds, wid0rtalcings And conlmots cf snrelyship, or other 1willen obligations in the nature thereof; provided Ihot the liability of the said Company on ugly sudr hand, undertaking or contract orsarelyshlp exeealed under this mtdiorily shall not exceed the limit stated belmv. Name Address Limit of Power PHILIP EVEGA ALL OF ALL HEVIN VEGA COVINA, CALIFORNIA $100,000,000 BRITTEN CHRISTIANSEN MYRNA F. SMITH 11lis Pe1l'er ofAborney revokes all previous passers issued on Will for the attorney(s)-finfact rallied above. IN WITNESS WHEREOF Ilrc GREAT AMERICAN INSURANCE COMPANY has caused these presents to be signed and attested by its appropriate o9lcers and its corporate sePI hereunto ntllscd this 29TH day of NOVEMBER 1 2017 Alto( GREATAMERICAN INSURANCE COMPANY m„ eu,low,l.S,,,,a, Oh'hlentil S'rlrlor Vice I'm0do" STATF. OF OHIO, COUNTY OF HAM I LTON - ss• DAVio C. ancew t877-077-24G51 On this 29TH day or NOVEMBER 2017 before me personally Appeared DAVID C. KITCHIN, tome known, being duly sworn, deposes and says dint Ile resides in Chicinand, oldo, Ihm he is a �ivisfoual Senior Vice Presidenl of the Band Division orCrent American Insurance Cornpmry, the Company described fit mid which oxeliuled the above lushill l; that he knows the scat orate sold company; tile, the seal n1J3xed to tba said fostnmgnt is such corporate seal: Ihat II was so a0lxed by KIIII ity of his ofPec ender the By -Lawn orsafd Company, end tint he Signed his none Iherelo by like solitarily. 1 i h { ri .rF rIn., n,. 1 1 �� a 40!/ 'this PoicerofAttonroy is granledby authority of the following resolutions adopted by the Hoard ofDireclor-S ofGreatAmerican Insurance Company b ' unnnimons ivdrsen consent dated June 9, 2008. RESOLVED.Thai ilia Dlvfslaanl Po'oslAurl, llre severe! Divlsl0nal Senior Ylce preslddns, Dlvlslonn! Vlee preslAervs mrd Dfetxmral AssLsrn+d 1?ce Pre.rldeas, a,- say rare of Iheill, he aid herehp Is molarizect front now to thin, to npporm Inte ar nrnre Atlorneyr-trr-rael to eaecule on behalf of the Canipa"I assresp nny ondis Amdn: sahrraki an tomiulean sore), ppoitt ar othersal,(jea obhgnlimo hr the nnttuv Uiereaf,•toprerrrfbe tHAG•respecfhrd dnlfes mrd !)ere rvspeclive ilrxlrs of Ar¢h' mrdtm•h)v rnNl1a renmke nary such appolnnnenl err any Ilnue RESOLVED FURTHER: That the Contpmtp seal and rlre signature of nap of toe aforesaid gfJlcerx and may Seererm), or Anniston! 5'ecrelaq• of the Cornpmtyv+ra)rherixred hyfor0stfle to ai9, pan er ofnhorwep or cerl�rote ofelefror givenfor the rrvcralon ofmry bond,, underrakurg, coNrnar ofsrtrelyship, Cr other sfv'lllen ah�garloa lot dre narmir!hereof, oreh slgnatury and seal when so nsed being hereby adopted by the Canrparry as the origloal signalre ofsech Wal), and fink ariginal sent of pile comnpony ra he valid slid bi"I npoa the Company rrldr lid saran force and effect as lhmrg)t manually ep ired. CERTIFICATION I, $TEPHEN C. HERAHA, Ass IMAM Secretary of Great Anierimn hlsurance Company, do hereby cerli fy Ihat the foregoing Poncer o:At(orney and the Resolutions 0f the Board of Aireclors of Jmm 9, 2008 have no( been revoked and Are now in ful I force and effect, Signed and scaled this 26th day or August 2019 a:�bm,a a'„rM1�l„o� 81 WEI(aa115) 23A-18 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of LOS ANGELES On 08/26/2019 Date personally appeared before me, PHILIP VEGA, NOTARY PUBLIC Kevin Vega, Attorney -in -Fact Here lnsert Name and Title of the Officer Name(s) of Signer(s) who proved to me on the basis of satisfactory evidence to be the persanK whose nameN Is/arm subscribed to the within instrument and acknowledged to me that helake/MW executed the same In his/tier/thelr authorized capacityQes.J, and that by his/heNlh& signature(* on the instrument the person(s), or the entity upon behalf of which the personN acted, executed the Instrument, �'"• PHILIP VEGA a Comm. a 2152121 �, '®_ A NOTARY PUBLIC-CALIFORNIA (� L09 ANGELES COUNTY �u,or.�° Mr CowN, GNv. MAY 31, PozU Place Notary Seal Above I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and al. Signature S1 Cure of Notary Public OPTIONAL Though this section is optional, completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document Title or Type of Document: Number of Pages: Document Date: Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer(s) Signer's Name: ❑ Corporate Officer — Title(s),: ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Signer's Name: ❑ Corporate Officer — Title(s): ❑ Partner — ❑ Limited ❑ General ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: 02014 National Notary Association • www.NationalNotary.org • 1-800-US NOTARY (1-800-876-6827) Item #5907 23A-19 CALIFORNIA ACKNOWLEDGMENT CIVIL CODE § 1189 A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California Countyof On ryr 2! /�'L I before me,_�iYcLf��'s'S Date Here! sett Nome and Title oft e Ofllcer personally appeared ��s1V,ta�4.�45 Q.0A /, of Signers) who proved tome an the basis of satisfactory evidence to be t e er5on(s) whose names e s hsrcdh to the within Instrument and ack<now ged to my tha h� FFfey executed the same In I elf authorized capscity(fes}, and that b hl /t lt�r signa re(s) on the instrument the persons), or the entity upon behalf of which the person(s) acted, executed the instrument. KELLY YANIRA ORELLANA • Notary Public - California - Los Angeles County is Commiulan C Z2g9416 My Comm. Expires May 20, 2023 Place Notary Seal and/or Stomp Above I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal - Signature Signature 4Sig chore of Notary Public OPTIONAL Completing this information can deter alteration of the document or fraudulent reattachment ofthls form to on unintended document. Description of Attached Doctapt7y g / ,/ Title or Type of Document: X, r fy� %�JW Document Date: (>-W9 Signer(s) Other Than Named Above: capacity(ies) Cli"iEci ad by Signer(s)_ ` SI er's Name: 4l?R ;rls LCpi%�GL! orate Off ker —' tle(s): .2. ❑ Partner — ❑ Until ❑ Gen ral ❑ Individual ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: NumberofPages: Signer's Name: ❑ Corporate Officer — Tltle(s): ❑ Partner— ❑ Limited ❑ General ❑ Individual El Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer is Representing: a@t . .... _ �3rs.�i4Fo�>,Iffi'641�3EtAt7l F�`at3� ©2018 National Notary Assoclatlon 23A-20 CITY OF SANTA ANA PROPOSAL CENTFNNIAL PARK IMPROVEMENTS: PROJECT NO. 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS PROJECT NO. 18-7528: CENTENNIAL PARK LIGHTING IMPROVEMENTS LIST OF SUB -CONTRACTORS Section 4100 et. seq. of the Public Contact Code requires listing of all subcontractors with the bid for all subcontract work exceeding the following amount: o Streets, highways including bridge projects: '/% of the bid or $10,000, whichever is greater o Buildings, parks, or other projects: !!% of the bid Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State Department of Industrial Relations (DIR). BIDDER proposes to subcontract certain portions of the work to the firms listed below: Name Chrisp Company License 4/Exp. 374600 DIR Reg. #/Exp• 1000000306 / 06/30/2022 Location Bloomington, CA Phone 909-746-0356 Type Of Work Signing and striping Amount $ $46,000.00 Name License #/Exp. DIR Reg.#/Exp. License # Location Phone Type Of Work Amount $ Name License 4/Exp. DIR Reg.#/Exp. License # Location Phone Type Of Work Amount $ Panagictis Leonida Signature i der President, Secretary & Treasurer Name Socal stormwater runoff Solution services inc License #/Exp• DIR Reg. #/Exp-. PW-LR-1000435627 / 06/30/2020 Location Sherman Oaks, CA Phone 310-343-8313 Type Of Work BMP and erosion control Amount $ $15,000.00 Name License 4/Exp. DIR Reg. 4/Exp. License # Location Phone Type Of Work Amount $ Name License 4/Exp. DIR Reg. 4/Exp. License # _ Location _ Phone Type Of Work Amount $ 23AP271 CITY OF SANTA ANA PROPOSAL CENTENNIAL PARK IMPROVEMENTS: PROJECT NO. 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS PROJECT NO. 18-7528: CENTENNIAL PARK LIGHTING IMPROVEMENTS REFERENCES The following are the names, addresses, and telephone numbers for THREE public agencies for which the BIDDER has performed similar work within the past three years. City of Wildomar - 23873 Clinton Keith Rd. Wildomar, CA 92595 Name and Address of Owner. Matt Bennett 951-677-7751 Name and Telephone Number of person familiar with project. $1,080,050.00 Mullblrade impropernenis, tltelutled but not limited to, pedestrian/cycle Valk: walNlys, and concrete work April 2018 Contract Amount Type of Work Date Completed City of Moreno Valley - 141777 Frederick St, Moreno Valley, CA 92553 Name and Address of owner. Danny Astroga / 951-413-3119 / dannya@moval org Name and Telephone Number of person familiar with project. $1,205,127.00 GAIy Wde molturedalmamveag ¢: matured put act limited to, ADA upgrades pIiztrienktog reila en1Wel" s, stermsMitrIcidinage, trench,snorng, andpaving Contract Amount Type of Work 3. City of Fontana - 8353 Sierra Avenue Fontana, CA 92335 Name and Address o f owner. Jeff Kim / 909-350-6724 / JKim(6fontana,nrn Name and Telephone Number of person familiar with project. November 2018 Date Completed $672,830.00 Parking for expansion, tree removal, and electrical work March 2019 Contract Amount Type of Work Date Completed The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance and bonds. Great American Insurance Company- 714-740-3117 750 The City Drive South #470, Orange, CA 92868 C&D Bonding & Insurance Services / Philip E. Vega - President 534 East Badillo Street Covina, CA 91723 / 626-859-1000 23"k 22 CITY OF SANTA ANA PROPOSAL CENTENNIAL PARK IMPROVEMENTS: PROJECT NO. 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS PROJECT NO. 18-7528: CENTENNIAL PARK LIGHTING IMPROVEMENTS ADDITIONAL REFERENCES The following are the names, addresses, and telephone numbers for THREE public agencies for which the BIDDER or Subcontractor has performed similar work in the past five years. I , City of Beaumont - 550 E, 6th Street, Beaumont CA 92223 Name and Address of Owner, Kevin Norville 951-769-8520 Name and Telephone Number of person familiar with project. $496,900.00 CDBG Citywide Concrete Repairs and ada upgrade Contract Amount Type of Work 2. City of Banning - 99 E Ramsey Street Banning, CA 92220 Name and Address of owner, Art Vela 951-922-3130 Name and Telephone Number of person familiar with project. $368,000.00 Multi -trade improvement, included but not limited to,ada upgrades at Lion Park_ Contract Amount Type of Work 3. City of Moreno Valley - 141777 Frederick St. Moreno Valley, CA 92553 April 2017 Date Completed April 2016 Date Completed Name and Address of owner. Margery Lazarus 951-413-3133 Name and Telephone Number of person familiar with project. $239,500.00 Work includes but is not limited to ,clearing and grubbing, grading and earthwork, PCC sidewalks May 2016 Contract Amount Type of Work Date Completed The following are the names, addresses, and telephone numbers of all brokers and sureties from whom BIDDER intends to procure insurance and bonds. Great American Insurance Company- 714-740-3117 750 The City Drive South #470, Orange, CA 92868 C&D Bonding & Insurance Services / Philip E Vega - President 534 East Badillo Street Covina, CA 91723 / 626-859-1000 Af 23 CITY OF SANTA ANA PROPOSAL CENTENNIAL PARK IMPROVEMENTS: PROJECT NO. 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS PROJECT NO. 18-7528: CENTENNIAL, PARK LIGHTING IMPROVEMENTS NON -COLLUSION AFFIDAVIT (Title 23 United Slates Code Section 112 and Public Contract Code Section 7106) In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106 the BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any other BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any other BIDDER, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Note: The above Non -collusion Affidavit is part of the Proposal. BIDDERS are cautioned that making afalse certification may subject the certifier to criminal prosecution. Signed State of California County of Subscribed and sworn to (or affirmed) before me on this day of , 20 , by , proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me Notary Public Signature Notary Public Seal Z3A L14 CALIFORNIA JURAT GOVERNMENT CODE § 8202 �H�FRF��`.P`a{altd'b'� k _ " S66EE5xfRf_bS�Yd. kr�t�l kli<dttMi3C�A£Ot '�Krih`�+5fii44YitHi458did A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California Countyof t-6`�--t'' "r jcW KELL), YANIRA ORELLANA �= Notary Public - California 7 .. Las Angeles County Commission p 2289476 My Comm. Expires May 20, 2022 Place Notary Seal and/or Stomp Above Subscribed and sworn to (or -al before me on this —Li— day of 20--M—, by Date - nth Year (and (2) Nome(s) of Signer(sJ proved to me on the basis of satisfactory evidence to be the person(s) who appeared before me. Signature gn of Notary Public Completing this information can deter alteration of the document or fraudulent reattachment of this form to an unintended document. Description of Attached Document J Title or Type of Document: l�lorl —C61t L uSloYl ��(1 /.�;� Document Date: Ain"t Number of Pages: J Signer(s) Other Than Na ed Above: 1A A �f}X""1081 (c)2018 National Notary Association 23A-25 CITY OF SANTA ANA PROPOSAL CENTENNIAL PARK IMPROVEMENTS: PROJECT NO. 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS PROJECT NO. 18-7528: CENTENNIAL PARK LIGHTING IMPROVEIVIENTS NON-DISCRIMINATION CERTIFICATE The undersigned contractor or corporate officer, during the performance of this contract, certifies as follows: The Contractor shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, or national origin. The Contractor shall take affirmative action to ensure that applicants are employed, and that employees are treated during employment without, regard to their race, color, religion, sex, or national origin. Such action shall include, but not be limited to, the following: employment, upgrading, demotion, or transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other forms of compensation; and selection for training, including apprenticeship. The Contractor agrees to post in conspicuous places, available to employees and applicants for employment, notices to be provided setting forth the provisions ofthis nondiscrimination clause. 2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf of the Contractor, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, sex, or national origin. 3. The Contractor shall send to each labor union or representative of workers with which he/she has a collective bargaining agreement or other contract or understanding, a notice to be provided advising the said labor union or workers' representatives of the Contractor's commitments under this section, and shall post copies of the notice in conspicuous places available to employees and applicants for employment. 4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24, 1965, and of the rules, regulations, and relevant orders of the Secretary of Labor. 5. The Contractor shall furnish all information and reports required by Executive Order 11246 of September 24, 1965, and by rules, regulations, and orders ofthe Secretary of Labor, or pursuant thereto, and will permit access to his/her books, records, and accounts by the administering agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with such rules, regulations, and orders. 6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this contract or with any of the said rules, regulations, or orders, the contract may be canceled. terminated, or suspended in whole or in part and the Contractor may be declared ineligible for further Government contracts or federally assisted construction contracts in accordance with procedures authorized in Execution Order 11246 of September 24, 1965, and such other sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise provided by law. 4 CITY OF SANTA ANA PROPOSAL CENTENNIAL PARK IMPROVEMENTS: PROJECT NO. 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS PROJECT NO. 18-7528: CENTENNIAL PARK LIGHTING IMPROVEMENTS 7. The Contractor shall include the portion of the sentence immediately preceding paragraph (I) and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section 204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding upon each subcontract or purchase order as the administering agency may direct as means of enforcing such provisions, including sanctions for noncompliance; provided, however, that in the event the Contractor becomes involved in, or is threatened with, litigation with a subcontractor or vendor as a result of such direction by the administering agency, the Contractor may request that the United States enter into such litigation to protect the interests of the United States. 8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stars. 1939, and as amended, no discrimination shall be made in the employment of persons upon public works because of race, religious creed, color, national origin, ancestry, physical handicaps, mental condition, marital status, or sex of such persons, except as provided in Section 1420, and any contractor of public works viol this Section is subject to all the penalties imposed for a violation of the Chapter. Signed: 1/ v Title: President, Secretary & Treasurer Firm: Leonida Builders, Inca Date: 08/27/19 2JA'L / CITY OF SANTA ANA PROPOSAL CENTENNIAL PARK IMPROVEMENTS: PROJECT NO. 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS PROJECT NO. 18-7528: CENTENNIAL PARK LIGHTING IMPROVEMENTS STATEMENT REGARDING APPRENTICESHIP REOU[REMENTS The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor Code regarding employment of apprentices, and understands that contractors on contracts exceeding $30,000 or 20 working days shall: I. Apply to thejoint apprenticeship committee administering the apprenticeship standards of the craft or trade in the area ofthe site of the public work for a certificate approving the contractor under the apprenticeship standards for the employment and training of apprentices in the area or industry affected. 2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the apprenticeship standards. 3. Contribute to the fund or funds in each craft or trade in which he/she employs journeymen or apprentices on the public work, in the same amount or upon the same basis and in the same manner as the other contractors, except contractors not signatory to the trust agreement shall pay a like amount to ��Caiifornia Apprenticeship Council. b`' Signed: Title: President, Secretary & Treasurer Firm: Leonida Builders, Inc. Date: 08/27/19 � f CITY OF SANTA ANA PROPOSAL CENTENNIAL PARK IMPROVEMENTS: PROJECT NO. 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS PROJECT NO. 18-7528: CENTENNIAL PARK LIGHTING IMPROVEMENTS STATEMENT REGARDING "ANTI -KICKBACK REQUIREMENTS The undersigned is submitting this proposal for performing by contract the work required by these bid documents, agrees to comply with the Copeland "Anti -Kickback" Act (18 USC 74) as supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that each contractor or subcontractor shall be prohibited from inducing, by any means, any person employed in the construction or repair of public work, to give up any part of the compensation to which he/she is othe ` e entitled. Signed: Title: President, Secretary & Treasurer Firm: Leonida Builders, Inc. Date: 08/27/19 CITY OF SANTA ANA PROPOSAL CENTENNIAL PARK IMPROVEMENTS: PROJECT NO. 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS PROJECT NO. 18-7528: CENTENNIAL PARK LIGHTING IMPROVEMENTS PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE In conformance with Public Contract Code Section 10162, the BIDDER shall complete, under penalty of perjury, the following questionnaire: Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented from bidding on, or completing a federal, state, or local government project because of a violation of law or a safety regulation? Yes No X If the answer is yes, explain the circumstances in the following space. ilk f M CITY OF SANTA ANA APPENDIX H CENTENNIAL PARK IMPROVEMENTS: PROJECT NO. 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS PROJECT NO. 18-7528: CENTENNIAL PARK LIGHTING IMPROVEMENTS CDBG REQUIREMENTS 23A-31 EXHIBIT 1 City of Santa Ana Section 3 Contract Clause These Clauses are to be inserted in all contracts A. The work to be performed under this contract number 18-7929 & 18-7528 by and between the City of Santa Ana, hereinafter referred to as "City" and Leonlda Builders, Inc , hereinafter referred to as "Contractor", is subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended 12U.S.C. 1701u (section 3). The purpose of Section 3 is to ensure that employment and other economic opportunities generated HUD assistance or HUD -assisted projects covered by Section 3, shall, to the greatest extent feasible, be directed to low -and very low-income persons. B. The parties to this contract agree to comply with HUD's regulations in 24 CFR Part 135, which implement Section 3. As evidenced by their execution of this contract, the parties to this contract certify that they are under no contractual or other constraint that would prevent them from complying with the Part 135 regulations. C. The contractor agrees to send to each labor organization or representative of workers with which the Contractor has an agreement or other understanding, if any, a notice advising the labor organization or workers' representative of the Contractor's commitments under this Section 3 clause, and will post copies of the notice in conspicuous places at the work site where both employees and applicants for training and employment positions can see the notice. The notice shall describe the Section 3 preference, shall set forth minimum number and job titles subject to hire, availability, of apprenticeship and training positions, the qualifications for each; and the name and location of the person(s) taking applications for each of the positions; and the anticipated date the work shall begin. D. The Contractor agrees to include a Section 3 clause in every subcontract subject to compliance with regulations in 24 CFR Part 135, and agrees to take appropriate action, upon a finding that the subcontractor is in violation of the regulations in 24 CFR part 135. The Contractor will not subcontract with any subcontractor where the Contractor has notice or knowledge that the subcontractor has been found in violation of the regulations in 24 CFR Part 135. F. The Contractor will certify that any vacant employment positions, including training positions, that are tilled (I) after the Contractor is selected but before the contract is executed, and (2) with persons other than those to whom the regulations of 24 CFR part 135 require employment opportunities to be dir ected, were not to circumvent the Contractor's obligations under 24 CFR part 135. Noncompliance with regulations in 24 CFR Part 135 may result in sanctions, termination of this contract for default, and debarment or suspension from future HUD assisted projects. The Contractor by this signature affixed hereto declares under penalty of perjury: Contractor has read City requirements and accepts all its requirements contained therein for all of his/her operations within the City of Santa Ana.. 9 Signature ntractor 896772 / A, B, & C-8 Contractor License Number & Designation Panagiotis Leonid@ President, Secretary and Treasurer 08/27/19 Print Name and Title Date - 060926434 Federal DUNS Number, 23A-32 EXHIBIT 2 City of Santa Ana Section 3 New Hire Calculation Form Project Name: Centennial Park Walkways and Lighting Improvements 18-7929118-7528 Project Location: 3000 W Edinger Avenue Santa Ana CA 92704 Street City State Zip Contractor Name: Leonida Builders, Inc. Contractor Contact: Panagiotis Leonida Contractor Telephone Number: 909-275-3354 Contractor Email Address:_ Pan ikosOleonidabuildlets. com Section 3 Resident Hiring Goals Trade/Craft Number of New Hires If at a later date there is a position available for training. or employment we will advertise for individuals under 7MI.n by contacting Santa Ana work center clo Araceli Delqado at Total Number of New Hires: 0 1 Total number of Section 3 resident new hires necessary to comply with contract: 0 08/27/19 Signature of .ntractor Date 23A-33 "If at a later date there is a position available for training and employment we will advertise for individuals under Section 3 by contacting Santa Ana work center c/o Araceli Delgado at 714-565-2654, and posting advertisment on indeed.com EXHIBIT 3 City of Santa Ana Section 3 Employment Opportunity Notice Pursuant to Section 3 of the Housing and Urban Development Act of 1968, as amended, 12, U.S.C. 170u, the City of Santa Ana is pleased to announce construction employment opportunities for low-income individuals residing in the following area(s) of the City of Santa Ana: PROJECT(S) LOCATION(S): 3000 W Edinger Ave, Santa Ana, CA 92704 CONSTRUCTION TRADE EMPLOYMENT OPPORTUNITIES: Upon availability trade, included but are not limited to, Laborer, Cement Mason, Operating engineer, Electrician. If you have work experience in the construction trades listed above, and you live in the areas) listed above, call 909-275-3354 (contractor's or subcontractor's name), at Leonka Builders. Inc. (contractor's or subcontractor's telephone number) for an employment application. For additional information on the City of Santa Ana's Section 3 Economic Opportunities Plan, please call Community Development Agency, at 714-647-5445. 23A-34 EXHIBIT 8 Contractor's Section 3 Affirmative Action Plan Centennial Park Walkways Improvements (18-7929) and Centennial Park Lighting Improvements (18-7528) Project Number and Title The undersigned contractor agrees to implement the following affirmative action steps directed at increasing the utilization of lower income residents and business concerns located within the County of Orange. Take affirmative action to ensure that employees or applicants for employment or training are not discriminated against because of race, color, religion, sea or national origin. 2. Send a notice of the contractor's Section 3 com mitment to each labor organization or representative of workers and p ost a copy of the notice at a conspicuous place available to employees and applicants for employment or training. 3. To the greatest extent feasible, make a good faith effort to recruit for employment or training lower income residents from the County, and to award contracts to business concerns which are located in or owned in substantial part by persons residing in the County through use of: local advertising media, signs placed at the project site and notification to community organizations and public or private institutions operating within or serving the project area such as Service Employment and Redevelopment (SER), Opportunities Industrialization Center (OIC), Urban League, Contracted Employment Program, U.S. Employment Service, Chamber of Commerce, labor unions, trade associations and business concerns. 4. Maintain a I lc of all low-income area residents who applied for employment or training either on their own or on referral from any source, and the action taken with respect to each area resident. S. Maintain a ti le of all business concerns located in the County who submitted a bid for work on the project, and the action taken with respect to each bid. 6. Maintain records, including copies of cor respondence, memoranda, etc., which document that a ffirmative action steps have been taken. 7. Incorporate the Section 3 clause provisions inall subcontracts, and require subcontractor(s) to submit a Section 3 Affirmative Action Plan, Leonida Builders, Inc. J/ Company Name Si nat re of Contractor 15821 Live Oak Springs Canyon Rd, Santa Clarita CA, 91387 Address: Street, City, State, Zip 060926434 DUNS Number Panagiotis Leonida Printed Name President, Secretary & Treasurer Title 23A-35 EXHIBIT 9 City of Santa Ana Section 3 Contract Award Consideration Bidder's Name: Leonida Builders, Inc. Please check the numbered statement that is applicable to your business: My business qualifies as a Section 3 business concern: If you have checked statement NUMBER I please read the attached Section 3 Business Concern Preference - Bidding Requirements. (Please check the applicable qualification for statement number 1) J 1% owned by Section 3 residents; or Permanent, full-time employees include at least 30% Section 3 residents; or Will subcontract more than 25% of the dollar award of all subcontracts to be awarded to business concern(s) that meet either of the two preceding qualifications. Note: You are required to list all subcontractors and owner -operators in your bid statement. 2. X My business does not qualify as a Section 3 business concern. Note: Section 3 business concern definitions are located in this project's Contract Documents & Specifications Manual withip1he section titled Section 3 Economic Opportunities Plait. O8/27/19 Signature of Business Owner Date Panagiotis Leonida President, Secretary and Treasurer Print Name 23A-36 EXHIBIT 12 CITY OF SANTA ANA WOMEN OWNED/MINORITY BUSINESS OWNED ENTERPRISES (W/MBE) GOOD FAITH EFFORTS Project Name: Centennial Park Walkways Improvements (18-7929) and Centennial Park Lighting Improvements (18-7528) Project Number: 18-7929 s 16-7528 Project Location: 3000 W Edinger Ave, Santa Ana, CA 92704 Pursuant to 24 CFR Pail85 § 85.36 (e) of Code of Federal Regulations, contractor must take all necessary affirmative steps to assu re that minority business Firms, women's business enterprises and labor surplus firms are used whenever possible. Contractor shall submit the following information to demonstrate that a goof faith effort has been made to comply with the above section of the Code of Federal Regulations. Submittal of this form, in and of itself, may not provide sufficient documentation to demonstrate that goof faith effort was made. Documentation such as copies of advertisement, letters of solicitation, telephone logs, rejected quotes, etc. shou Id accompany this form. 1. The names and dates of advertisement of each newspaper, trade paper, and minority -focus paper in which a request for W/MBE participation for this project was placed by the bidder: Names of News aver Date of Advertisement Posted an Advertisment on Classifiedad,com 08/26/19 2. The names and dates of written notices sent to 'A'/MBE soliciting bids for this project and methods used for following up initial solicitation to determine with certainty whether the W/MBE were interested. Names of W/MBE Solicited Dates of Solicitation Follow-up Methods and Dates Western Materials- Supplier Decomposed granite 08/26/19 entailed 08/26/19, called Selina Aves 323-579-1112 ext 11 CAT Tracking, Inc. - striping and signing 08/26/19 08/26 emailed estimating @cattracking i ne.co m, spoke to Arthur Garrett 08/26 3. The items of work which the bidder made available to W/MBE lrms, including, where appropriate, any breaking down of the contracts into economically feasible units to facilitate W/MBE participation, and the information furnished to W/MBE such as plans, specifications, and requirements for the work. Items of Work: concrete & masonry, demolition, excavation and grading, electrical work, erosion control, signing and striping, paving, slurry seal, suppliers, sitawork Breakdown of Items: Itemized to multiple trades or types of work Information Furnished: Plans and specifications made available on emails or upon request per the advedisment free of charge, F �DOCSIPROPSVCSIHUDFORMSIMBIJ5B04AMB- Section3Specs. DOC 23A-3 ■ EXHIBIT 12 (cont.) 4. Efforts made to assist W/MBE in obtaining bonding, lines otcredit or insurance, and any technical assistance related to the plans, specifications and requirements for the work which was provided to W/MBE: Plans and specifications made available on emails or upon request per the advertament free of charge 5. Any additional data to support a demonstration of good faith effort, such as contracts with W/MBE assistance agencies: None I declare under penalty of perjury that the foregoing information is true and correct to the best of nay knowledge. I understand that the City of Saota Ana and/or the U.S. Department of Housing and Urban: Development may verify the information provided herein in connection with DU/hIBB compliance evaluationlaudit activities and that failure to fully and truthful!}+ mplete this form may result in economic or other sanctions. Ai /1 Sienature: Name: Panaglotls Leonlda Title: President, Secretary 8 Treasurer Date: oar27n9 Name of Contractor/Subcontractor: Leonida Builders, Inc. Contractor/Subcontractor Identification CSLB no. 896772 Number: Address (Street, City, State, Zip): 15821 Live Oak Springs Canyon Rd, Santa Clarita CA, 91387 Business Racial/Ethnic/Gender Code: Circle the numeric code which indicates the racial/ethnic/gender character of the owner(s) and controller(s) of 5I9ie of the business. When 51% or more is not owned and controlled by any single racial/ethnicity/gender category, circle the code which seems most appropriate. I = White Americans 2 = Black Americans 3 = Native Americans Woman Owned Business: Circle One: Yes or 4 = Hispanic Americans 5 = Asian/Pacific Americans 6 = I Iasidic .Jews L® F•DOCSIPROPSVCSIHUDFORMSIMOU5804AMS-5ec[io13SpecyD00 23A-38 8/26/2019 Requesting Certified Subcontractor/Supplier Bids - Classified Ad Hello, Kelly Orellana not you? Your stuff Help Post an ad ($fie} 1 g t SEARCH Construction Services& ISeareh for_ Remodeling Services: Construction & Remodeling • All Categories • Jobs • Vehicles • Items for Sale • Pets • Real Estate • For Ren • Services • Personals • Community. • All Services • Automotive Services Beauty &Salon Se i -es • Caregivers & Baby Sitting • Cleaning Services • Construction & Remodeling • Financial Services • Health & Wellness • Home Services • Insurance • Lawn & Garden Services • hggal Services bli• rk ing� Services Moving MovingpS Star gQ • Office Services • Real Estate Services • Training & Education services • Web Design & Tech • Weddings & Photogt_apby • Zip or City • Los Angeles: San Gabriel Valley, • Los A geles: Central • More locations —r Your ad has been posted. Post another ad Edit this ad Help page Your stuff Share your ad for more visibility! Santa Ana, CA in Santa SEARCH Ana, CA httpS:Y/ w ..Glassifledads.com/construction_remodeling/l63xwmxdh23A-39 1/3 8/26/2019 Requesting Certified Subcontractor/Supplier Bids - Classified Ad Requesting Certified Subcontractor/Supplier Bids Share & Like Share this u n Ad 4473968537 Created: August26,2019 Updated: August 26, 2019 Expires: September 2, 2019 Viewed: 0 times Avoid scams Signs of fraud: wire transfer, money orders, cashier checks, payment via gift cards, shipping, escrow, "transaction protection", "guarantee". Be safe by dealing locally. Read more R&port this ad Overview Respond to this Ad Ad number:4473968537 Contact Kelly Orellana City:Santa Ana, CA Zip:92703 Posted in: Orange County, Construction & Remodeling Description Estimating, Leonida Builders, Inc. is a General Contractor bidding the City of Santa Ana- Centennial Park improvements Project nos 18- 7929 / 18-7528. This project bids on Wednesday August28, 2019 at 2:00pm. We are requesting bids from all interested Certified Local Business, WBE & MBE. Bids are requested for, but not limited to, the following: Concrete & Masonry Demolition Excavation & Grading Electrical work Erosion Control Irrigation Landscaping Signing and striping Roads and Paving Slurry seal Suppliers - ex. decomposite granite, turncated domes, Site work Please contact us if you would be interested in providing a bid, and we will forward the plans and specifications for your review. Please note, our bid must be delivered to the owner before 2:00ptu on August 28, 2019 Thank you, Leonida Builders, inc. 13851 Santa Ana Ave.. https://www.classifiedads.com/construction_remodeling/l63xwmxdh 23A-40 2/3 8/2612019 Requesting Certified Subcontractor/Supplier Bids - Classified Ad Fontana, CA 92337 Tel:(909) 275-3354 Fax: (95 1) 566-4022 Respond to this Ad Your name Your email Message Send Message Report this ad Type of problem: O Harassment O Spam O Scam or fraud O Wrong category O Violation of terms O Other (please comment) YOLtt' email (optional) kelly(gleonidabuilders.com L7 I would like a response IJRL (optional) Comment (optional) Send report L Sending... k Sending... Ads rdhl[ d to conshvcfion rcmoddiug Remodeling Contractors Fir , Submit Zip Code & Projeer. Second, Get Up To Four Free Quotes. LocalRemodelingQuotes.com Construction Remodeling - Information Here Find Construction Remodeling. Search More Results Here! www.consum •rseareh com/Construction Remodeling esults About Locations More information Terms of Use Privacy Help Contac CareersBBI g © 2019 Class iftedAds.emn, Inc. All rights reserved. hops llwww.classifiedads.com/construction_remodeling/163xwmxclhl 23A-41 3/3 Kelly Orellana From: Kelly Crellana Sent: Monday, August 26, 2019 1:46 PM To: Selina Aves Subject: quote for City of Santa Ana - Centennial Park Improvements project no. 18-7929/ 18-7528 Attachments: Bid Set Centennial Park Site Imp Plans (24x36).pdf Estimating, Could you please provide a quote of 170 CY of Decomposed Granite and any other material you can supply for the project named above. I have attached the plans and specification for your review. Project location: City of Santa Ana, CA Bidding : 08/28/19 I'm using Adobe Acrobat. You can view "190823 Specifications. pdf" at: https:/✓documentcloud.adobe.com/link/track?uri=um%3Aaaid%3Ascds% 3AUS%3A7dO253ff-ad8a-4657-9Oc3- 871285590abb Thank you, Kelly Orellana Executive Office Manager Leonida Builders, Inc. 13851 Santa Ana Ave. Fontana, CA 92337 Tel: (909) 275-3354 Fax: (951)566-4022 23At-42 Kelly Orellana From: Kelly Orellana Sent: Monday, August 26, 2019 12:48 PM To: estimating@cattrackinginc,com Cc: Panikos Leonida Subject: Proposal request for City of Santa Ana - Centennial Park Walkway Improvement Attachments: Bid Set Centennial Park Site Imp Plans (24x36).pdf Estimating, Could you please provide a proposal for the project named above. I have attached the specifications and plans for your review. Please note project bids 08/28/19 at 2:00 pm. Please forward your proposal as soon as possible. I'm using Adobe Acrobat. You can view "190823 Specifications,pdf" at: https://docu mentcloud.adobe.com/I i n k/track? uri=urn%3Aaa id%3Ascds%3AUS%3A7dO253ff-adBa-4657-90c3- 871285590abb Thank you, Kelly Orellana Executive Office Manager Leonida Builders, Inc. 13851 Santa Ana Ave. Fontana, CA 92337 7 el: (909) 275-3354 Pax: (951) 566-4022 23A143 EXHIBIT 14 CERTIFICATION OF NON -SEGREGATED FACILITIES Federally Assisted Projects The Federally assisted construction contractor certifies that he does not maintain or provide for his employees any segregated facilities at any of his establishments, and that he does not permit his employees to perform their service at any location, under his control, where segregated facilities are maintained. The federally assisted construction contractor certifies further that he will not maintain or provide for his employees any segregated facilities at any of his establishments, and that he will not permit his employees to perform their services at any location, under his control, where segregated facilities are maintained. The federally assisted construction contractor agrees that a breach of this certification is a violation of the Equal Opportunity clause in this contract. As used in this certification, the term `segregated facilities" means any waiting rooms, work areas, restrooms and washrooms, restaurants and other eating areas, time clocks, locker rooms and other storage or dressing areas, parking lots, drinking fountains, recreation or entertainment areas, transportation, and housing facilities provided for employees which are segregated by explicit directive or are in fact segregated on the basis of race, creed, color, or national origin, because of habit local custom or otherwise. The Federally assisted construction contractor agrees that (except where he has obtained identical certifications from proposed subcontractor(s) for specific time periods) he will obtain identical certifications from proposed subconu'actor(s) prior to the award of subcontracts exceeding $10,000 which are not exempt from the provisions of the equal Opportunity clause, and that he will retain such certifications in his files. NOTE: The penalty for making false statements in offers is prescribed in 18 U.S.C. 1001 Company: Leonida Builders, im liotis Leomcla Title: President, Secretary & Treasurer Date: 08/27/19 r F'.\DOCS\PROPSVCS\HUOF OR MSMBU5604AMB-Se,[,.n3S,,c DOC 23A-44 To the City of EXHIBIT 15 NONCOLLUSION AFFIDAVIT (Title 23 United States Code Section 112 and Public Contract Code Section 7106) DEPARTMENT OF PUBLIC WORKS In accordance with Title 23 United States Code Section 112 and Pub] is Contract Code 7106, the bidder declares that the bid is not made in the interest or, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or set icited any other bidder to put in afalse or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, of conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contact; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. Leonida Builders, Inc. Name of Contractor 15821 Live Oak Springs Canyon Rd. Santa Clarita CA. 91387 Address Panagiotis Leonida Signal a and Title President, Secretary & Treasurer 08/27/19 Date F. 00CSTROPSVCSIHU❑ FORM SIMBU5B04AMB- Section35pecs, OOC 23A-45 EXHIBIT 16 FEDERAL LOBBYIST REQUIREMENTS CERTIFICATION Name of Firm: Leonida Builders, Inc, Date: 08/27/19 Address: 1gR21 1 ive flak Snrinns (.anvnn Rrl Santa Clanta. State: California Zip Code: 91387 Telephone: 909-275-3354 Acting on behalf of the above -named firm as its Authorized Of icial, 1 make the following Certification to the Department of Housing and Urban Development (HUD) and the Community Development Commission, County of Los Angeles: 1) No Federal appropriated funds have been paid, by or on behalf of the above -named firm to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of C ongress, or an employee of a Member of Congress in co nnection with the awarding of any Federal contract, the making of any Federal grant, loan, or cooperative agreement, and any extension, continuation, renewal, amendment, or modification thereof, and 2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing of attempting to influence an officer or employee or any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the above -named firm shall complete and submit Standard Form —LET, "Disclosure Form to Report Lobbying" in accordance with its instructions; and 3) The above -named firm shall require that the language of this certification be included in the award documents for all sub -awards at all tiers (including subcontracts, sub -grants, and contracts under grants, loans, and cooperative agreements) and that all sub -recipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into the transaction imposed by Section 1352 Title 31 U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. Authorized Official: Name: Panagiotis Leonida Titles Signature: fl Date: President, Secretary & Treasurer 08/27/19 F IDOCSIPROPSVCSIHUDFORMSIMBU5BOdAMB- Secfion35pecs.DOC 23A-46 EXHIBIT 17 CERTIFICATION OF UNDERSTANDING AND AUTHORIZATION Project Name: Centennial Park Walkways Improvements (18-7929) and Centennial Park Lighting Improvements (18-7528) Project Number: 18-7929 & 18-7528 This is to certify that the principals and the authorized payroll officer, below, have read and understand the label - standards clauses pertaining to the subject project. The following person(s) is designated as the payroll officer for the undersigned and is authorized to sibn the Statement of Compliance, which will accompany our weekly certified payroll reports for this project: Panagiotis Leonida Payroll Officer's Name Payroll Officer's Signature Leonida Builders, Inc. Contractor/Subcontractor by Signature Panagiotis Leonida Printed Name President, Secretary & Treasurer Title 08/27/19 Date 896772 / A. B, & C-8 Contractor/Subcontractor License No. 060926434 WNS Number FIDOCSIPROPSVCSIHUDFORMSIMBUSD04AMB-SWrli 35pecs DOC 23A-47 8/27/2019 Search Results I System for Award Management vim. e...ds lane, I'nr NAll.aul Wi iM A NPWWAYTO SIGN IN- iryoualucad,h,ve . µ1 rrmNou"No axn>:,°:". aSAKI occoun[, use your SAM email for logiagov. Imatmgov FAQn ® euaor.akM.......1 to Mnm( xirtduletl malmenonre sammay, ogry4(2px9 M1om 8:oo AM nu:op NM (8pT), Search Results Current Search Terms: Leonida builders, inc.4 nt11 a lord>I I Save PDF Export Results Pdnt I s ill P I, ( t . , I, r, I. �eacending. •� Your search for Leonida builders, Me.' rchlrned the tollcnvin,g results... 11ntlS- LFONIDA BUILDERS, INC. DWi S: Ioul-s4.44 Has Acli„e Gxduson: No 3XID atlon Ento e7/m/2e=e rn:yM.m ereesi,vauen:.w m.eres R:c.enl. Itl�r I C :-LCotle: 7ERP. Vkx�Ce[alls ooDAAc, oeu.orjmtrpotts t1: No 3::arr_t Itdi,,dx Piv6dlnCu ItAPI l4 ;eov Dula3ttma deer"ibilil: Gg1g.ejl-V, CIr"u Slnole rvn'," Rdiq• Ge:;' , , alnn:l I Iti M1 Ro: I I,lp Save Per Export Results Prn[ https:H1 .sam.gov/SAM/pages/public/searchRecords/search Resul'23 A —48 1/1 8/28/2019 Company Update - Dun & Bradstreet Jeild56C 1.800.700.2733 Selected Company: LEONIDA BUILDERS, INC. D-U-N-S M 06-092-6434 Overview Business Summary Company Name: LEONIDA BUILDERS, INC. D-U-N-S M 06-092-6434 DBA's: N/A Address: 15821 Live Oak Springs Canyon Rd City: Santa Clarita State: CA Zip: 91387 Phone: 9515327717 Principal: PANAGIOTIS LEONIDA Year Started: 2011 Employs: 24 which includes officer(s). SIC Code(s): 15420101 Commercial and office building, new construction 15419905 Industrial buildings, new construction, nec NAICS Code(s): 236210 Industrial Building Construction 236220 Commercial and Institutional Building Construction Legal Structure: CORPORATION Special Events There have been no special events repoiled to D&B for this company. History and Operations Officers and Directors Current Officers Name Title PANAGIOTIS LEONIDA PRESIDENT Current Directors Name PANAGIOTIS LEONIDA Company History Welcome, Panaeiolis x Sign out 23A-49 httpsl/www.dandb.com/product/ecomm/companyupdatePrintReport?execution=e3s 1 1/8 8/28/2019 Company Update - Dun & Bradstreet Contractor of industrial buildings. Contractor of nonresidential buildings, specializing in new construction of commercial or office buildings. Territory : Local. Operations Employees 24 which includes officer(s). Facilities Occupies premises in building. Location Central business section on side street. U.S. Branch There are currently no U.S. branches listed in this company report. U.S. Subsidiary There are currently no U.S. subsidiaries listed in this company report International Branch There are currently no international branches listed in this company report. International Subsidiary There are currently no international subsidiaries listed in this company report. Payments Payment Summary Total Total Dollai Largest High Credit 'A"i nays Slow Received Amount Payment summary Terms <31 3'1-60 51-90 01+ Tap Industries Short -turn busn credit 1 2 Public finance 2 1 Misc business credit 2 Nonclassified 2 What lumber/millwork 1 Mfg structural metal 1 Mfg read ymix concrete Misc equipment rental 1 Personal credit 1 Insurance carrier 1 Other Categories $50,000 I $8 500 $2,750 I $1,250 i $100,000 $100,000 $55,000 $7,500 $1,000 $250 $40,000 80% 10 10 0 0 $7,500 88% 12 0 I 0 0 $2,500 55% 0 45 0 0 $750 100% 0 0 0 0 $100,000 50% 0 0 50 0 $100.0001 50% 1 50 0 0 0 $55,000 0% $7.500 0% $1,000 100% $250 100% Cash experiences 7 $1,400� $250 23A-50 https://www.d a nd b.com/p rod u ct/e co m mtcom pa nyu pdatePri ntReport?execution=e3s 1 50 0 50 0 0 50 50 0 0 a 0 0 0 0 0 0 218 8/28/2019 Company Update - Dun & Bradstreet Total Total Dollar Largest High Credit Within Days Slow Received Amount Payment surnniory Terms <31 31-60 61-90 91, Unknown 0 $0 $0 —1 Unfavorable 0 $0 $0 comments Placed for collections 0 $0 $0 with D&B: I Other 1 0 WA $0 Total In D&B's file 21 $327.650 $100,000 The highest Now Owes on file Is $75,000 The highest Past Due on file is $75,000 There are 21 payment experience(s) In D&Bs file for the most recent 24 months, with 12 experience(s) reported during the last three month period - Payment Details Total (Last 24 Months): 21 Dato 0 Paying Record High Credit Now Owes Past Due Selling Terms Last sale ,If (Mo ) 0712019 Ppt $1,000 $1,000 $0 1 mo 0712019 Pet $750 $750 $0 1 me 0712019 Pet $500 $500 $0 1 me 07/2019 Ppt-Slow 30 $100,000 $75,000 $75,000 N30 Imo 07/2019 Ppt-Slow 60 $2,500 $1000 $0 1me 07/2019 Ppt-Slow 90 $100,000 $75,000 $20.000 1me 07/2019 Slaw 30-90 $55,000 $45,000 $35,000 N30 1 me 0712019 Slow 60-90 $7,500 $0 $0 1 me 07/2019 (009) $250 .so $0 Cash account 1 me O6/2019 (010) $250 - -- Cash account 1 me I 06/2019 (011) $50 -- -- Cash ecccunt 1 me 0512019 Ppt $40,000 $40,000 $0 1 me 9 0312019 (013) $100 - - Cash account 1 me 1012018 (014) $250 - -- Cash account 1 me 0912018 Ppt - - - $0 $250 $0 1 me 0712018 Slow $1,000 - - 1 me 042018 Slow 30-60 $10,000 $10,000 $500 2-3 me. 0312018 (018) $250 - - 1 me 0312018 (019) $250 -- - Cash account 1 me 0212018 Pot $7,500 - - 1 Me 122017 (021) $250 - -- Cash account 1 me Payments Detail Key: Ni 30 or more days beyond terms 23A-51 https://www.d a nd b. co m/prod uct/ecom m/co m pa nyu pdate Pri nt Re po rt?execution=e 3s 1 3/8 8/28/2019 Company Update - Dun & Bradstreet Accounts are sometimes placed for collection even though the existence or amount of the debt is disputed. Payment experiences reflect how bills are met in relation to the terms granted. In Some Instances payment beyond terms can be the result of disputes over merchandise, skipped Invoices etc. Each experience shown is from a separate supplier, Updated trade experiences replace those previously reported. Finances Key Financial Comparisons This Company's Operating Results Year Over Year Net Sales NA NA NA Gross Profit NA NA NA Net Profit NA NA NA 1 Dividends! Withdrawals NA NA NA Working Capital NA NA i NA This Company's Assets Year Over Year Cash NA NA NA Accounts Receivable NA NA NA Notes Receivable NA NA NA I Inventories NA NA NA Other Current NA NA NA Total Current NA I NA NA Fixed Assets NA NA NA Other Non Current NA NA NA Total Assets NA NA NA This Company's Liabilities Year Over Year Accounts Payable NA NA NA Bank Loan NA NA NA Notes Payable NA NA NA Other Current NA NA NA Total Current NA NA NA Long Term Debt NA NA NA Defferred Credit NA NA NA I Net Worth NA NA NA Total Liabilities And Net Worth NA NA NA Balance Sheet Fiscal Consolidated Statement Dated 23A-52 https:/1vvwwv.dandb,comlproducUecomm/companyupdatePrintReport?execution=e331 418 8/28/2019 Company Update - Dun & Bradstreet We currently do not have any recent financial statement on file for this business. Key Business Ratios (Industry Median is based on this number of firms: ) Me it ustry This Company - IndCuardle r.9ediao Solvency Quick Ratio NA NA NA Current Ratio NA NA NA Current Liabilities to Net Worth NA NA NA Current Liabilities to Inventory NA NA NA Total Current NA NA NA Fixed Assets to Net Worth NA NA NA Efficiency Collection Period NA NA NA Inventory Turn Over - NA NA NA Sales to N1NC NA NA NA Acct Pay to Sales NA NA NA Profitability Return on Sales NA NA NA Return on Assets NA NA NA Return on NetWorth NA NA NA Public Filings Summary This following public filing data includes both open and closed Filings found in D&S'c database on this company. It Is for informational purposes only and is not the official record, Certified copies can be obtained from the official source. Record Type 1 of Rec*.rds Mnsl Recent Filing Dale UCC Filing 6 02115/0019 Government History 1 N/A Details 23A-53 https://w .dandb.comlproduct/ecomm/companyupdatePrintReport?execution-e3s1 5/8 8/28/2019 Company Update - Dun & Bradstreet j I . . . . . . . is No judgments have been reported to D&B on this company. ;iulD Type: Secured Party, Debtor: Filing Number: Filed With: Date Filed: Latest Info Received: Original Filing Number: Original UCC Filed Date; Collateral: Type: Secured Party: Debtor: Filing Number: Filed With: Data Filed: Latest Info Received: Original Filing Number: Original UCC Filed Date: No liens have been reported to D&B on this company. No suits have been reported to D&B on this company. All Inventory and proceeds - All Account(s) and proceeds -AII General intangibles(s) and proceeds -AII Equipment and proceeds - All Chattel paper and proceeds Original JPMORGAN CHASE BANK, NA, LOUISVILLE, KY LEONIDA BUILDERS, INC. 177600272648 08/08117 08/25/17 All Inventory and proceeds - All Account(s) and proceeds - All General intangibles(s) and proceeds - All Equipment and proceeds -AII Chattel paper and proceeds Original JPMORGAN CHASE BANK, NA, LOUISVILLE, KY LEONIDA BUILDERS, INC. 167546776150 09/20/16 10/07/16 Collateral: Equipment including proceeds and products Type: Original Secured Party: CIT BANK, N.A., JACKSONVILLE. FL Debtor: LEONIDA BUILDERS, INC. Filing Number: 197690652550 Filed With: Date Filed: 01/07/19 Latest Info Received: OV25119 Original Filing Number: 23A-54 https://y.dandb.com/producUecomm/companyupdatePrintReport?execution=e3s1 a 8/28/2019 Company Update - Dun &. Bradstreet Original UCC Filed Date; Collateral: Equipment and proceeds Type: Original Secured Party: WESTERN EQUIPMENT FINANCE, INC., DEVILS LAKE, ND Debtor: LEONIDA BUILDERS, INC, Filing Number: 187688294043 Filed With: Date Filed; 12/19/18 Latest Info Received: 01/04/19 Original Filing Number: Original UCC Filed Date: Collateral: Equipment and proceeds Type: Original Secured Party, WELLS FARGO BANK, N.A., LINCOLNSHIRE, IL Debtor: LEONIDA BUILDERS, INC. Filing Number: 177618885485 Filed With: Date Filed: 11/30/17 Latest Info Received: 12/12/17 Original Filing Number: Original UCC Filed Date: Collateral: Type; Original Secured Party: CATERPILLAR FINANCIAL SERVICES CORPORATION, NASHVILLE, TN Debtor; LEONIDA BUILDERS, INC. Filing Number: 197697304107 Filed With: Date Filed: 02M4/19 Latest Info Received: 02/15/19 Original Filing Number: Original UCC Filed Date: G'anhrnpp;ias No bankruptcies have been reported to D&B on this co,pany. G,IV cr nrv,on t l lI; rniy Borrower(Dir/Guar): NO Administrative Debt: NO Contractor: NO Grantee: NO Party excluded NO from federal prograni Labor Surplus Area: N/A Small Business: YES (2019) S(A) Firm: NIA 23A-55 https:)/www.dandb.com/product/ecomm/compa nyupdatePri ntReport?execution=e3s 1 7/8 a/28/zots Company Update - Dun & Bradstreet Privacy Policy ( Terms of Use 23A-56 https://w .dandb.com/product/ecomm/companyupdatePrintReport?execution-e3sl 8/8 Federally Required Documents to be Submitted with Your Bid Proposal Packet and Prior to the Award of Contract Specific federal requirements must be met for this U.S. Department of Housing and Urban Development (I IUD) funded project. The Citv of Santa Ana's Contact: Community Development Agency City of Santa Ana 20 Civic Center Plaza, M-25 Santa Ana, CA 92701 Phone (714) 647-5445 Fax (714)647-6549 www.santa-ana.orei THIS CONTRACT IS SUBJECT TO SFCTION 3 RF.OifIRF.MFNTS_ The following documents) MUST be fully tilled out and sobmittcd with the bird nronnsal nick; • Proof of registration in the System forAward Management to be filed by contractor • Proof of registration in the D&B Data Universal Numbering System (111LLt:U_hrnrlrrte. do b. cnn�/i Clndnte%onmcrn vinnkunJa toil Section 3 Contract Clause (Exhibit 1). To be filed by contractor. • New Ffire Calculation Form (Exhibit 2). To be filed by contractor. • Contractor's Section 3 Affirmative Action Plan (Exhibit 8). To be filed by contractor. • Section 3 Cond•actAward Considerations (Exhibit 9). To be filed by contractor. • Women/Minority Business Owned Enterprises Good Faith Efforts (Exhibit 12). To be filed by contractor. • Noncollusion Affidavit (Exhibit 15). To be filed by contractor. • Federal Lobbyist Requirements Certification (Exhibit 16). To be filed by contractor. • Certification and Understanding gfAathorization (Exhibit 17). To be filed by contractor and subcontractor(s). • *Additional Wage Rate Classification.* if the contractor needs an additional job classification, the contractor must submit -with the bid package a written, signed request naming the work classification(s) and the wage rate(s), including any fringe benefits that are proposed. The following document(s) shall be completed by the contractor and/or subcontractor(s), as specified, and filed with the City's Labor/Section 3 Contact prior to award of contract on the project: • Proof of registration in the System for Award Management (www.sane.gov) to be Bled by subcontractor(s) • Section 3 Contract Clause (Exhibit 1). To be filed by subcontractor • Project Wage Rate Sheet To be filed by contractor and any subcontractor(s). 23A-57 The following document(s) shall be completed by the contractor and/or subcontractor(s), as specified, and filed with the City's Labor/Section 3 Contact prtor to start of con-gryction on the project: • Section 3 Employment Opportunity Notice (Exhibit 3). To be filed by contractor and any subcontractor(s). Section 3 Resident Certification Form (Exhibit 4). To be filed by contractor and subcontractor(s). • Section 3 Business Concern Opportunity Notice (Echihit 5). To be tiled by contractor. • Section 3 Business Concern Eligibility Certificate (Exhibit 6). To be filed by contractor and subcontractor(s). • Certification for Applicable Fringe Benefit Payments (Exhibit 13). To be filed by contractor and any subcontractor(s). • Cei4ificatioit ofNon-Segregated Facilities (Eshibit 14). To be tiled by contractor and any subcontractor(s). • Certiftcation with Regard to the Performance ofPrevious Contracts or Subcontracts Subject to the Equal Opportunity Clause and the Filing ojRequired Reports. To be filed by contractor and any subcontractor(s). Note: The prime contractor is responsible for the frill compliance of all employers (subcontractors) In regard to labor standards, Section 3 provisions, and W/MBE provisions applicable to this project. 23A-58 NOTICE: "This is a federally assisted construction project (CDBG funded) and Federal labor standards, including Davis -Bacon &Section 3 requirements, will be enforced." 23A-59 U.S. DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT HUD FORM 4230A REPORT OF ADDITIONAL CLASSIFICATION AND RATE OMB Approval Numbar 2501-00I1 (Exp, 09/3012006) 1. FROM (name and address of requesting agency) Ct%y o P �/1, f�12�C 2. PROJECT NAME AND NUMBER e��anni� l yat-k h/alkrvl y lmpm an.4Tark II 9 hh ►► itr0WPUvti+— -742--q -7 $- 1 3. LOCATION OF PROJECT (City, County and State) G4-�'r o/ , krt �Jrcrn P C 4. BRIEF DESCRIPTION OF PROJECT 5. CHARACTER OF CONSTRUCTION L2r ❑ Building ZROSIdential ❑ Heavy her(specify) ❑ Highway 6. WAGE DECISION NO. (include modification number, if any) 7. WAGE DECISION EFFECTIVE DATE C142D190017 I/2-Lq1a1' COPY ATTACHED a. WORK CLASSIFICATION(S) HOURLY WAGE RATES BASIC WAGE FRINGE BENEFIT(S) (if any) muck, , -r-_ 9. PRIME CONTRACTOR (n me, address) Lunt q %d-l:5,,1 //ZC 10. SUBCONTRACTOWEMPLOYER, IF APPLICABLE (name, address) rS2/ c tJ'V Dak- sprin tag yort Rol. r/ CCe2r,, G`'fi/3d Check All That Apply: ❑ The work to be performed by the additional classification(s) is not performed by a classification in the applicable wage decision. ❑ The proposed classification is utilized in the area by the construction industry. ❑ The proposed wage rale(s), including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage decision. [] The interested parties, including the employees or their authorized representatives, agree on the classification(s) and wage rate(s). Supporting documentation attached, inCludi ig applicable wage decision. Check One: ❑ Approved, meets all criteria. DOL confirmation requested. ❑ One or more classifications fail to meet all criteria as explained in agency referral. DOL decision requested. FOR HUD USE ONLY LR2000: Agency Representative Dare Log in: (Typed name and signature) Log out: Phone Number HUD-423M(e.04) PREVIe113 EOmON I6 O65OLETE us r 23A-60 8/28l2019 beta.SAM.gov "General Decision Number: CA20190017 07/26/2019 Superseded General Decision Number: CA20180028 State: California Construction Type: Residential Counties: Imperial, Los Angeles, Orange, Riverside, San Bernardino, San Luis Obispo, Santa Barbara and Ventura Counties in California. RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 4 stories) Note: Under Executive Order, (EO) 13658, an hourly minimum wage of $10.60 for calendar year 2019 applies to all contracts subject to the Davis -Bacon Act for which the contract is awarded (and any solicitation was issued) on or after lanuary 1, 2015. If this contract is covered by the ED, the contractor must pay all workers in any classification listed on this wage determination at least $10.60 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2019. If this contract is covered by the ED and a classification considered necessary for performance of work on the contract does not appear• on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CPU 5.5(a)(1)(ii) (or the ED minimum wage rate,if it is higher than the conformed wage rate). The ED minimum wage rate will be adjusted annually. Please note that this ED applies to the above -mentioned types of contracts entered into by the federal government that are subject to the Davis -Bacon Act itself, but it does not apply to contracts subject only to the Davis -Bacon Related Acts, including those set forth at 29 CFR S.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the ED is available at www.dol.gov/whd/govcontracts. 23A-61 https:/ibeta. sam.gov/wage-determination/CA20190017/4/document 1 /49 8/28/2019 Modification Number 0 1 2 3 4 A5BE0005-002 e7/01/2018 Publication Date 01/94/2019 02/01/2019 e2/22/2019 05/03/2019 07/26/2019 Rates Fringes Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems)..,.,$ 39.72 20.81 Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls) ...........................$ 27.92 19.31 ASBE0005-004 07/02/2018 Rates Fringes Asbestos Removal worker/hazardous material handier (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not) ... ,$ 19.93 11.72 * BRCA0004-001 05/01/2018 Rates Fringes beta.SAM.gov Bricklayer; Marble Setter Los Angeles County ..... .....$ 39.91 15.4S Orange County ...............$ 39.13 " " 2 3A-62 https://beta.sam.gov/wage-determination/CA20190017/4/document 2/49 8/28/2019 beta.SAM.gov Riverside 6 San Bernardino Counties ....................$ 39.07 14.57 Ventura County ..............$ 39.22 16.93 *The wage scale for prevailing wage projects performed in Blythe, China lake, Death Valley, Fort Irwin, Twenty -Nine Palms, Needles and 1-15 corridor (Barstow to the Nevada State Line) will be Three Dollars ($3.00) above the standard San Bernardino/Riverside County hourly wage rate BRCA0004-004 11/91/2017 IMPERIAL Rates Fringes BRICKLAYER; MARBLE SETTER .... ...-$ 47.36 16.79 * BRCA0004-009 05/01/2018 SAN LUIS OBISPO AND SANTA BARBARA COUNTIES Rates Fringes BRICKLAYER; MARBLE SETTER ........ $ 40.34 15.10 *The wage scale for prevailing wage projects performed in Blythe, China lake, ❑eath Valley, Fort Irwin, Twenty -Nine Palms, Needles and 1-15 corridor (Barstow to the Nevada State Line) will be Three Dollars ($3.00) above the standard San Bernardino/Riverside County hourly wage rate ---------------------------------------------------------------- BRCA0018-001 07/01/2017 Rates Fringes MARBLE FINISHER... ........ ...... $ 30.93 12.95 TILE FINISHER__ .............. $ 25.98 11.23 ------------- ORCA0019-002 07/01/2017 SAN LUIS 09ISPO AND SANTA BARBARA Rates Fringes 23A-63 https://beta.sam.gov/wage-determination/CA20190017/4/document 3/49 8/28/2019 beta.SAM.gov TILELAVER .......................$ 37.76 16.37 BRCA0018-003 07/01/2017 IMPERIAL, LOS ANGELES, ORANGE, RIVERSIDE, SAN BERNARDINO & VENTURA Rates Fringes TILE LAVER .......................$ ---------------------------------------------------------------- 37.76 16.37 BRCAOOIS-010 09/01/2017 Rates Fringes TERRAZZO FINISHER ................$ 29.75 12.91 TERRAZZO WORKER/SETTER ........... $ 36.75 13.92 -------------------------------------------------------------- CARP0409-003 07/01/2018 Rates Fringes Drywall (1) Work on Wood -Framed Single Family Homes, and Wood -Framed Apartment Buildings up to and including 4 Stories Drywall Installer/Lather ... $ 22.10 11.08 stocker/Scrapper ....... ....$ 10.00 6.67 (2) All other Work Drywall Installer/Lather...$ 42.41 19.17 Stocker/Scrapper ...... .....$ 10.00 6.67 --------------._______.______--_______.________------_----------- CARP0409-004 07/01/2018 Work on wood frame single family homes and apartments up to and including 4 stories: Rates Fringes CARPENTER Cabinet installer...........$ 41.84 17.48 2 3A-64 hops://beta.&am.gcv/wage-determination/CA20190017/4/document 4/49 8/28/2019 bela.SAM.gov Fence builder ...............$ 31.63 16.73 Framer & finish carpenter...$ 42.54 17.48 Insulation installer........$ 41.84 17.48 Roof loader of shingles...,. 16.32 11.58 Shingler.....................$ 28.70 11.58 Subterranean garage concrete construction and carpenters performing on grade slab concrete construction ................$ 28.18 11.58 CARP0469-009 07/01/2008 Rates Fringes Modular Furniture Install er...... $ 19.00 7.41 ----------------------------------------- ELECO011-003 01/30/2017 LOS ANGELES Rates Fringes ELECTRICIAN (does not include fire alarm, hold-up alarm, burglar alarm and surveillance systems) ............ $ 20.20 9.70 ELECOOII-006 12/31/2018 COMMUNICATIONS AND SYSTEMS WORK LOS ANGELES COUNTY Rates Fringes Communications System Installer ...................$ 36.07 3%+14.43 Technician ..... ......... ....$ 33.30 3%+27.82 SCOPE OF WORK: Installation, testing, service and maintenance of systems utilizing the transmission and/or transference of voice, sound, vision and digital for commercial, educational, security and entertainment purposes for the following: TV monitoring and surveillance, background - foreground music, intercom and telephone interconnect, 2 3A-6 rJ https://beta.sam.gov/wage-determination/CA20190017/4/document 5/49 8/28/2019 beta.SAM.gov microwave transmission, multi -media, multiplex, nurse call systems, radio page, burglar alarms and fire alarms. Communication Systems that transmit or receive information and/or control systems that are intrinsic to the above listed systems; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding all other data systems or multiple systems which include control function or power supply; excluding installation of raceway systems, conduit systems, line voltage work, and energy management systems. ' ELEC0413-002 01/01/2019 SANTA BARBARA COUNTY Rates Fringes Electricians ......... .............$ 31.50 3%+3.00 WORK AT VANDENBERG AFB: $3.75 additional per hour, ________________________________________________________________ ELEC0413-004 12/31/2018 COMMUNICATIONS AND SYSTEMS WORK SANTA BARBARA COUNTY Rates Fringes Communications System Installerr.....................$ 35.12 3G+12.71 SCOPE OF WORK: Installation, testing, service and maintenance of systems utilizing the transmission and/or transference of voice, sound, vision and digital for commercial, educational, security and entertainment purposes for the following: TV monitoring and surveillance, background - foreground music, intercom and telephone interconnect, microwave transmission, multi -media, multiplex, nurse call systems, radio page, burglar alarms and fire alarm (see last paragraph below). Communication Systems that transmit or receive informations and/or control systems that are intrinsic to the above 2 3A-6 /„� V https://beta,sam.gov/wage-determination/CA20190017/4/document 6/49 8/28/2019 beta.SAM.gov listed systems; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding all other data systems or, multiple systems which include control function or power supply; excluding installation of raceway systems, conduit systems, line voltage work, and energy management systems. Fire alarm work shall be performed at the current inside electrician total cost package. ELEC0440-002 01/01/2018 RIVERSIDE Rates Fringes ELECTRICIAN ...................... 1 39.77 23.24 ELEC0440-005 12/31/2018 COMMUNICATIONS AND SYSTEMS WORK RIVERSIDE AND SAN BERNARDINO COUNTIES Rates Fringes Communications System Installer ,,,,,,,,,,,,,,,,,,,$ 33.09 15.89 Technician ..................$ 33.09 15.89 SCOPE OF WORK: Installation, testing, service and maintenance OE systems utilizing the transmission and/or transference of voice, sound, vision and digital for commercial, educational, security and entertainment purposes for the following: TV monitoring and surveillance, background - foreground music, intercom and telephone interconnect, microwave transmission, multi -media, multiplex, nurse call systems, radio page, burglar alarms and fire alarms. Communication Systems that transmit or receive information and/or control systems that are intrinsic to the above listed systems; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding all other data systems or multiple systems which include control function or power supply; excluding 2 3A-6 1 7 https://beta.sam.gov/wage-determinaticn/CA20190017/4/document 7/49 8/28/2019 beta SAM.gov installation of raceway systems, conduit systems, line voltage work, and energy management systems. ------------------------------------------___--_-_---____--__-_ ELECe441-002 02/25/2019 ORANGE Rates Fringes ELECTRICIAN ................. ....$ 26.50 9.11 ---------------------------------------------------------------- ELEC0477-003 12/31/2019 SAN BERNARDINO Rates Fringes ELECTRICIAN ..... .......... ........ $ 27.25 3%+7.10 ----------___•----------------------------------------""-------- ELECBS69-003 06/04/2018 IMPERIAL Rates Fringes ELECTRICIAN 1 to 3 Stories_. ...... 33.38 3%+6.61 ---------------------------------------------------------------- ELECO639-002 03/01/2017 SAN LUIS OBISPO Rates Fringes ELECTRICIAN.. .....................$ 23.50 7.72 -------------------------------------------- ELECO639-003 12/26/2016 COMMUNICATIONS AND SYSTEMS WORK SAN LUIS OBISPO COUNTY Rates Fringes Communications System 2 3A-68 https:iibeta.sam.gov/wage-determination/CA20190017/4/document 8149 8/28/2019 beta.SAM.gov Installer,,,,,,,,,,,,,,,,,,,$ 32.50 11.66 Technician ...................$ 30.89 11.66 SCOPE OF WORK: Installation, testing, service and maintenance of systems utilizing the transmission and/or transference of voice, sound, vision and digital for commercial, educational, security and entertainment purposes for the following: TV monitoring and surveillance, background - foreground music, intercom and telephone interconnect, microwave transmission, multi -media, multiplex, nurse call systems, radio page, burglar alarms and fire alarm (see last paragraph below). Communication Systems that transmit or receive information and/or control systems that are intrinsic to the above listed systems; inclusion or exclusion of terminations and testings of conductors determined by their function; excluding all other data systems or multiple systems which include control function or power supply; excluding installation of raceway systems, conduit systems, line voltage work, and energy management systems. Fire alarm work shall be performed at the current inside electrician total cost package. --- ---------------------------------------"--- ELECO952-002 12/31/2018 VENTURA Rates Fringes CABLE SPLICER All work within 32 road miles or less from the nearest base point..... ..... $ 43.73 27.41 ELECTRICIAN All work within 32 road miles or less from the nearest base point.....,,,,,$ 39.08 26.99 ALL WORK MORE THAN 32 ROAD MILES FROM NEAREST BASE POINT: Add $5.00 to the basic hourly rate. BASE POINTS: the main Post Office in the cities of Camarillo, Oak View, Oxnard, Santa Paula and Ventura. 23A-69 https:lfbeta.sem.gov/wage-determinationiCA20190017/4/dccument 9149 8/28/2019 beta.SAM.gov ---------------------------------------------------------------- ELECO952-004 12/31/2018 COMMUNICATIONS AND SYSTEMS WORK VENTURA COUNTY ONLY Rates Fringes Communications System Installer .......... ......... $ 34.37 14.61 Technician, .............. ..,$ 30.10 12.78 SCOPE OF WORK: Installation, testing, service and maintenance of systems utilizing the transmission and/or transference of voice, sound, vision and digital for commercial, educational, security and entertainment purposes for the following: TV monitoring and surveillance, background - foreground music, intercom and telephone interconnect, microwave transmission, multi -media, multiplex, nurse call systems, radio page, burglar alarms and fire alarm (see last paragraph below). Communication Systems that transmit or receive information and/or control systems that are intrinsic to the above listed systems; inclusion or exclusion of terminations and castings of conductors determined by their function; excluding all other data systems or multiple systems which include control function or power supply; excluding installation of raceway systems, conduit systems, line voltage work, and energy management systems. Fire alarm work shall be performed at the current inside electrician total cost package. ELEVOOOS-004 01/91/2019 SAN LUIS OBISPO Rates Fringes ELEVATOR MECHANIC. ...... ........ $ 67.56 34.125 FOOTNOTE: PAID VACATION', Employer contributes 8% of regular hourly 2 3A-7 0 https:/Ibeta.sam.gov/wage-determination/CA20190017/4/document 10/49 8/2812019 beta.SAM.gov rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day. -------------------------- ELEV0018-004 el/01/2019 IMPERIAL, LOS ANGELES, ORANGE, RIVERSIDE, SAN BERNARDINO, SANTA BARBARA AND VENTURA Rates Fringes ELEVATOR MECHANIC ................$ 55.58 34.125 FOOTNOTE: PAID VACATION: Employer contributes 8% of regular, hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day. ENGIO012-001 07/01/2018 Rates Fringes OPERATOR: Power Equipment (Cranes, Piledriving & Hoisting) GROUP I ....................$ 46.65 25.25 GROUP 2....................$ 47.43 25.25 GROUP 3....................$ 47.72 25.25 GROUP 4......... ...........$ 47.86 25.25 GROUP 5....... ............. $ 48.08 25.25 GROUP 6— ....... ......... 48.19 25.25 GROUP 7....................$ 48.31 25.25 GROUP 8— .................. 48.48 25.25 GROUP 9....................$ 48.65 25.25 GROUP 10....................$ 49.65 25.25 GROUP 11....................$ 50.65 25.25 GROUP 12....................$ 51.65 25.25 GROUP 13............... _...$ 52.65 25.25 2 3A-7 1 https://beta.Sam.gGViW age-determ ination/CA20190017/4/document 11 /49 8/2812019 OPERATOR: Power Equipment GROUP I ....................$ 45.30 25.2S GROUP 2....................$ 46.08 25.25 GROUP 3....................$ 46.37 25.25 GROUP 4....................$ 47.86 25.2S GROUP 5............ ........ $ 45.96 25.25 GROUP 6....................$ 48.08 25.2S GROUP 7....................$ 49.18 25.25 GROUP 8....................$ 48.19 25.25 GROUP 9....................$ 49.29 25.25 GROUP 10....................$ 48.31 25.25 GROUP 11..................- $ 49.41 25.25 GROUP 12....................$ 49.48 25.25 GROUP 13....................$ 48.58 25.25 GROUP 14....................$ 48.61 25.25 GROUP 15....................$ 48.69 25,25 GROUP 16....................$ 48.81 25.25 GROUP 17....................$ 48.98 25.25 GROUP 1B..... - .............$ 49.08 25.25 GROUP 19....................$ 49.19 25.25 GROUP 20....................$ 49.31 25.25 GROUP 21....................$ 49.48 25.25 GROUP 22....................$ 49.58 25.25 GROUP 23....................$ 49.69 25.25 GROUP 24....................$ 49.81 25,25 GROUP 25....................$ 49.98 25.25 PREMIUM PAY: $3.75 per hour shall be paid on all Power Equipment Operator work on the followjng Military Bases China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator. CRANES, PILEDRIVING AND HOISTING EQUIPMENT CLASSIFICATIONS GROUP 1: Engineer oiler; Fork lift operator (includes Toed, lull or similar types) beta.SAM.gov GROUP 2: Truck crane oiler 23A-72 https:/lbeta.sam.govlwage-determiratio n/CA2019001714ldc cum ent 12149 8/2812019 bela.SAM.gov GROUP 3; A -frame or winch truck operator; Ross carrier operator (jobsite) GROUP 4: Bridge -type unloader and turntable operator; Helicopter hoist operator GROUP 5: Hydraulic boom truck; Stinger crane (Austin -Western or similar type); Tugger, hoist operator (1 drum) GROUP 6: Bridge crane operator; Crater crane operator; Hoist operator (Chicago boom and similar type); Lift mobile operator; Lift slab machine operator (Vagtborg and similar types); Material hoist and/or manlift operator; Polar gantry crane operator; Self Climbing scaffold (or similar type); Shovel, backhoe, dragline, clamshell operator (over 3/4 yd, and up to 5 cu. yds. mrc); Tugger hoist operator GROUP 7: Pedestal crane operator; Shovel, backhoe, dragline, clamshell operator (over 5 cu. yds. mrc); Tower crane repair; Tugger hoist operator (3 drum) GROUP 8: Crane operator (up to and including 25 ton capacity); Crawler transporter operator; Derrick barge operator (up to and including 25 ton capacity); Hoist operator, stiff legs, Guy derrick or similar type (up to and including 25 ton capacity); Shovel, backhoe, dragline, clamshell operator (over 7 cu, yds., M.R.C.) GROUP 9: Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and including 50 tons mrc); Highline cableway operator; Hoist operator, stiff legs, Guy derrick or similar type (over 25 tons up to and including 50 tons mrc); K-crane operator; Polar crane operator; Self erecting tower crane operator maximum lifting capacity ten tons GROUP 10: Crane operator (over 50 tons and up to and including 100 tons mrc); Derrick barge operator (over 50 tons up to and including 100 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 50 tons up to and including 100 tons min), Mobile tower crane operator (over 50 tons, up to and including 100 tons M.R.C.); Tower crane operator and tower gantry GROUP 11: Crane operator (over 100 tons and up to and including 200 tons mrc); Derrick barge operator (over 100 A / 3A- 17 3 https:i/beta.sam.gov/wage-determination/CA20190017/4/document 13/49 8/2812019 beta, SAM.gov tons up to and including 200 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 100 tons up to and including 200 tons mrc); Mobile tower crane operator (over 200 tons up to and including 200 tons mrc) GROUP 12: Crane operator (over 200 tons up to and including 300 tons mrc); Derrick barge operator (over 200 tons up to and including 300 tans mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 200 tons, up to and including 300 tans mrc); Mobile tower crane operator (over 200 tons, up to and including 300 tons mrc) GROUP 13: Crane operator (over 300 tons); Derrick barge operator (over 300 tans); Helicopter pilot; Hoist operator, stiff legs, Guy derrick or similar type (over 300 tons); Mobile tower crane operator (over 300 tons) POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Bargeman; Brakeman; Compressor operator; Ditch Witch, with seat or similar type equipment; Elevator operator -inside; Engineer Oiler; Forklift operator (includes lord, lull or similar types under 5 tans; Generator operator; Generator, pump or compressor plant operator; Pump operator; Signalman; Switchman GROUP 2: Asphalt -rubber plant operator (nurse tank operator); Concrete mixer operator -skip type; Conveyor operator; Fireman; Forklift operator (includes load, lull or similar types over 5 tons; Hydrostatic pump operator; oiler crusher (asphalt or concrete plant); Petromat laydown machine; P3U side dum jack; Screening and conveyor machine opprator (or similar types); Skiploader (wheel type up to 314 yd. without attachment); Tar pot fireman; Temporary heating plant operator; Trenching machine oiler GROUP 3: Asphalt -rubber blend operator; Bobcat at, similar type (side steer); Equipment greaser (rack); Ford Ferguson (with dragtype attachments); Helicopter radioman (ground); Stationary pipe wrapping and cleaning machine operator GROUP 4: Asphalt plant fireman; Backhoe operator (mini -max or similar type); Boring machine operator; Boxman or mixerman (asphalt or, concrete); Chip spreading machine operator; Concrete cleaning decontamination machine operator; Concrete Pump Operator (small portable); Drilling machine ` n 3A- 1 4 https:llbeta.sam.gov/wage-determination/CA2019001 7/4ldocu ment [[fER] 8/28/2019 beta.SAM.gov operator, small auger types (Texoma super economotic or similar types - Hughes 100 or 200 or similar types - drilling depth of 30' maximum); Equipment greaser (grease truck); Guard rail post driver operator; Highiine cableway signalman; Hydra -hammer -hero stomper; Micro Tunneling (above ground tunnel); Power concrete curing machine operator; Power concrete saw operator; Power -driven jumbo form setter operator; Power sweeper operator; Rock Wheel Saw/Trencher; Roller operator (compacting); Screed operator (asphalt or concrete); Trenching machine operator (up to 6 ft.); vacuum or much truck GROUP 5: Equipment Greaser (Grease Truck/Multi Shift). GROUP 6: Articulating material hauler; Asphalt plant engineer; Batch plant operator; Bit sharpener; Concrete joint machine operator (canal and similar type); Concrete planer operator; Dandy digger; Deck engine operator; Derrickman (oilfield type); Drilling machine operator, bucket or auger types (Calweld 100 bucket or similar types - Watson 1000 auger or similar types - Texoma 330, 500 or 600 auger or similar types - drilling depth of 45' maximum); Drilling machine operator (including water wells); Hydrographic seeder machine operator (straw, pulp or seed), Jackson track maintainer, or similar type; Kalamazoo Switch tamper, or similar type; Machine tool operator; Maginnis internal full slab vibrator, Mechanical berm, curb or gutter(concrete or asphalt); Mechanical finisher operator (concrete, Clary -Johnson -Bidwell or similar); Micro tunnel system (below ground); Pavement breaker, operator, (truck mounted); Road oil mixing machine operator; Roller operator (asphalt or finish), rubber -tired earth moving equipment (single engine, up to and including 25 yds. struck); Self-propelled tar pipelining machine operator; Skiploader operator (crawler and wheel type, over 3/4 yd, and up to and including 1-1/2 yds.); Slip form pump operator (power driven hydraulic lifting device for concrete forms); Tractor operator -bulldozer, tamper -scraper (single engine, up to 100 h.p. flywheel and similar types, up to and including D-5 and similar types); Tugger hoist operator (1 drum); ultra high pressure waterjet cutting tool system operator; Vacuum blasting machine operator GROUP 7: Welder - General GROUP 8: Asphalt or concrete sureading operator (tamping aL3Hft 3 w _75 https:!lbeta.sam.gov/wage-determinationlCA20190017/4/document 15149 8/28/2019 beta.SAM.gov finishing); Asphalt paving machine operator (Barber Greene or similar type); Asphalt -rubber distribution operator; Backhoe operator (up to and including 3/4 yd.), small ford, Case or similar; Cast -in -place pipe laying machine operator; Combination mixer and compressor operator (gunite Work); Compactor operator (self-propelled); Concrete mixer operator (paving); Crushing plant operator; Drill Doctor; Drilling machine operator, Bucket or auger types (Calweld 150 bucket or similar types - Watson 1500, 2000 2500 auger or similar, types - Texoma 700, 800 auger or similar types - drilling depth of 60' maximum); Elevating grader operator; Grade checker; Gradall operator; Grouting machine operator; Heavy-duty repairman; Heavy equipment robotics operator; Kalamazoo balliste regulator or similar, type; Kalman belt loader and similar type; Le Tourneau blob compactor or similar type; Loader operator, (Athey, Euclid, Sierra and similar types); Mobark Chipper or similar; Ozzie padder or similar types; P.C. slot saw; Pneumatic concrete placing machine operator (Hadley-Presswell or similar type); Pumperete gun operator; Rock Drill or similar types; Rotary drill operator (excluding caisson type); Rubber -tired earth -moving equipment operator (single engine, caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. up to and including 50 cu. yds. struck); Rubber -tired earth -moving equipment operator (multiple engine up to and including 25 yds. struck); Rubber -tired scraper operator (self -loading paddle wheel type -John Deere, 1040 and similar single unit); Self- propelled curb and gutter machine operator; Shuttle buggy; Skiploader operator (crawler and wheel type over 1-1/2 yds. up to and including 6-1/2 yds.); Soil remediation plant operator; Surface heaters and planer operator; Tractor compressor drill combination operator; Tractor operator (any type larger than D-5 - 100 flywheel h.p, and over, or similar -bulldozer, tamper, scraper and push tractor single engine); Tractor operator (boom attachments), Traveling pipe wrapping, cleaning and bending machine operator; Trenching machine operator (over 6 ft. depth capacity, manufacturer's rating); trenching Machine with Road Miner attachment (over 6 ft depth capacity): Ultra high pressure waterjet cutting tool system mechanic; Water pull (compaction) operator GROUP 9: Heavy Duty Repairman GROUP Cu: Drilling machine operator, Bucket or auger types 3A- 1 V https://beta.sam.gov/wage-determination/CA20190017/4/document 16/49 8/28/2019 (Calweld 200 B bucket or similar types -Watson 3000 or 5000 bela.SAM.gov auger or similar types-Texama 900 auger or similar types -drilling depth of 105' maximum); Dual drum mixer, dynamic compactor LDC350 (or similar types); Monorail locomotive operator (diesel, gas or electric); Mercer patrol -blade operator (single engine); Multiple engine tractor operator (Euclid and similar type -except Quad 9 cat.); Rubber -tired earth -moving equipment operator (single engine, over 50 yds. struck); Pneumatic pipe ramming tool and similar types; Prestressed wrapping machine operator; Rubber -tired earth -moving equipment operator (single engine, over 50 yds. struck); Rubber tired earth moving equipment operator (multiple engine, Euclid, caterpillar and similar over, 25 yds. and up to 50 yds. struck), Tower crane repairman; Tractor loader operator (crawler and wheel type over 6-1/2 yds.); Woods mixer operator (and similar Pugmill equipment) GROUP 11: Heavy Duty Repairman - Welder Combination, Welder - Certified. GROUP 12: Auto grader operator; Automatic slip form operator; Drilling machine operator, bucket or auger types (Calweld, auger 200 CA or similar types - Watson) auger 6000 or similar types - Hughes Super Duty, auger 200 or similar types - drilling depth of 175' maximum); Hoe ram or similar with compressor; Mass excavator operator less Cho 750 cu. yards; Mechanical finishing machine operator; Mobile form traveler operator; Motor patrol operator (multi -engine); Pipe mobile machine operator; Rubber -tired earth- moving equipment operator (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck); Rubber -tired self- loading scraper operator (paddle -wheel -auger type self -loading - two (2) or more units) GROUP 13: Rubber -tired earth -moving equipment operator operating equipment with push-pull system (single engine, up to and including 25 yds. struck) GROUP 14: Canal liner operator; Canal trimmer operator; Remote- control earth -moving equipment operator (operating a second piece of equipment: $1.00 per hour additional); Wheel excavator operator (over 750 cu. yds.) GROUP 15: Rubber -tired earth -moving equipment operator, operating equipment with push-pull system (single engine, 2 3A-7 7 https'.//beta.sam.gov/wage-determination/CA20190017/4/document 17/49 8/28/2019 beta.SAM.gov Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber -tired earth -moving equipment operator, operating equipment with push-pull system (multiple engine -up to and including 25 yds. struck) GROUP 16: Rubber -tired earth -moving equipment operator, operating equipment with push-pull system (single engine, over 50 yds. struck); Rubber -tired earth -moving equipment operator, operating equipment with push-pull system (multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 5o yds. struck) GROUP 17: Rubber -tired earth -moving equipment operator, operating equipment with push-pull system (multiple engine, Euclid, Caterpillar and similar, over 50 cu. yds. struck); Tandem tractor operator (operating crawler type tractors in tandem - Quad 9 and similar type) GROUP 18: Rubber -tired earth -moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - single engine, up to and including 25 yds. struck) GROUP 19: Rotex concrete belt operator (or similar types); Rubber -tired earth -moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds.and up to and including 50 cu. yds. struck); Rubber -tired earth -moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination) excluding compaction units - multiple engine, up to and including 25 yds. struck) GROUP 20: Rubber -tired earth -moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - single engine, over 50 yds. struck); Rubber -tired earth -moving equipment operator, operating in tandem (scrapers, belly dumps, and similar types in any combination, excluding compaction units - multiple engine, Euclid, caterpillar and similar, over 25 yds. and up to 50 yds. struck) GROUP 21: Rubber -tired earth -moving equipment operator, A 3A- 1 V httpsalbeta.sam.govlwage-determination/CA20190017/4ldocument 18149 8/28/2019 beta.SAM.gov operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck) GROUP 22: Rubber -tired earth -moving equipment operator, operating equipment with the tandem push-pull system (single engine, up to and including 25 yds. struck) GROUP 23: Rubber -tired earth -moving equipment operator, operating equipment with the tandem push-pull system (single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber -tired earth -moving equipment operator, operating with the tandem push-pull system (multiple engine, up to and including 25 yds. struck) GROUP 24: Rubber -tired earth -moving equipment operator, operating equipment with the tandem push-pull system (single engine, over 50 yds. struck); Rubber -tired earth -moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck) GROUP 25: Concrete pump operator -truck mounted; Rubber -tired earth -moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck) IRON0433-005 01/01/2019 REMAINING COUNTIES Rates Fringes IRONWORKER Fence Erector ..:..............$ 32.58 23.41 Ornamental, Reinforcing and Structural ..............$ 39.00 32.05 PREMIUM PAY; $6.90 additional per hour at the following locations: 2 3A- 1 V https://beta.sam.gov/wage-determination/CA2019001 7/4/document 19/49 8/28/2019 beta.SAM.gov China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center -Goldstone, San Clemente Island, San Nicholas Island, Susanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg Ana $4.00 additional per hour at the following locations; Army Defense Language Institute - Monterey, Fallon Air Base, Naval Post Graduate School - Monterey, Yonne Marine Corps Logistics Center $2.00 additional per hour at the following locations: Port Hueneme, Port Mugu, U.S. Coast Guard Station - Two Rock LAB00220-003 07/01/2018 Residential, 4 Stories SAN LUIS OBISPO AND SANTA BARBARA COUNTIES Rates Fringes LABORER GROUP 1..................... 1 34.24 19.07 GROUP 2.... ........ ......... $ 34.79 19.07 GROUP 3.....................$ 35.34 19.07 GROUP 4..... ....... ..... .... $ 36.89 19.07 GROUP 5.................. _ $ 37.24 19.07 LABORER CLASSIFICATIONS GROUP 1: Cleaning and handling of panel forms; Concrete screeding for rough strike -off; Concrete, water curing; Demolition laborer, the cleaning of brick if performed by a worker performing any other phase of demolition work, and the cleaning of lumber; Fire watcher, limber, brush loader, piler and debris handler; Flag person; Gas, oil and/or water pipeline laborer; Laborer, asphalt -rubber material loader; Laborer, general or construction; Laborer, general clean-up; Laborer, landscaping; Laborer, jetting; Laborer, 23A-80 https://beta.sam.govlwage-determination/CA2019001714 /document 20/49 beta.SAM.gov temporary water and air lines; Material hose operator (walls, slabs, floors and decks); Plugging, filling of shee bolt holes; Dry packing of concrete and patching; post hole digger (manual);Railread maintenance, repair track person and road beds;Streetcar and railroad construction track laborers; Rigging andsignaling; Scaler; Slip form raiser; Slurry seal crew (mixer operator, applicator operator, squeegee person, shuttle person, top person), filling of cracks by any method on any surface; Tar and mortar; Tool crib or tool house laborer; Traffic controlby any method; Window cleaner; Wire mesh pulling - all concrete pouring operations GROUP 2: Asbestos abatement; Asphalt shoveler; Cement dumper (on 1 yd. or larger mixer and handling bulk cement); Cesspool digger and installer; Chucktender; Chute handler, pouring concrete, the handling of the chute from readymix trucks, such as walls, slabs, decks, floors, foundation, footings, curb, gutters and sidewalks; Concrete curer, impervious membrane and form oiler; Cutting torch operator (demolition); Fine grader, highways and street paving, airport, runways and similar type heavy construction; Gas, oil and/or water pipeline wrapper - pot tender and form person; Guinea chaser; Headerboard person - asphalt installation of all asphalt overlay fabric and materials used for reinforcing asphalt; Laborer, packing rod steel and pans; Membrane vapor barrier installer; Power broom sweeper (small); Riprap stonepaver, placing stone or wet sacked concrete; Rote scraper and tiller; Sandblaster (pat tender); septic tank digger and installer (lead); Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredder; Underground laborer, including caisson bellower GROUP 3: Buggymobile person; Concrete cutting torch; Concrete pile cutter; Driller, jackhammer, 2-1/2 ft, drill steel or longer; Dri-pak-it machine; Gas, oil and/or water pipeline wrapper, 6-in. pipe and over, by any method, inside and out; High scaler (including drilling of same); Hydro seeder and similar type; Impact wrench multi -plate; Kettle person, pot person and workers applying asphalt, lay-kold, creosote, lime caustic and similar type materials ("'applying"" means applying, dipping, brushing or handling of such materials for pipe wrapping and waterproofing); Operator of pneumatic, gas, electric tools, vibrating machine, pavement breaker, air blasting, come-alongs, and `n 3A-V 1 https:i/beta.sam.govlwage-determination/CA20190017/4/document PAER] 8/28/2019 similar mechanical tools not separately classified herein; beta.SAM.gov operation of remate controlled robotic tools in connection with Laborer's work; Pipelayer's backup person, coating, grouting, making of joints, sealing, caulking, diapering and including rubber gasket joints, pointing and any and all other services; Power, post hole digger; Rock slinger; Rotary scarifier or multiple head concrete chipping scarifier; Steel headerboard and guideline setter; Tamper, Barko, backer and similar type; Trenching machine, hand -propelled GROUP 4: Any worker exposed to raw sewage; Asphalt raker, lute person, ironer, asphalt dump person and asphalt spreader boxes (all types); Concrete core cutter (walls, floors or ceilings), grinder or sander; concrete saw person, cutting walls or flat work, scoring old or new concrete; Cribber, shorer, lagging, sheeting and trench bracing, hand -guided lagging hammer; Head rock Slinger; Laborer, asphalt -rubber distributor boat person; Laser beam in connection with laborers' work; Over -size concrete vibrator operator, 70 lbs. and over; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in theditch until completion of operation, including any and all forms of tubular material, whether pipe, metallic or non-metallic,conduit and any other stationary type of tubular device used for the conveying of any substance or element, whether water, sewage, solid gas, air, or other product whatsoever and without regard to the nature of material from which the tubular material is fabricated; No -joint pipe and stripping of same; Prefabricated manhole installer; Sandblaster (nozzle person), water blasting,Porta Shot -Blast; Traffic lane closure, Certified. GROUP 5: Blaster powder, all work of loading holes, placing and blasting of all powder and explosives of whatever type, regardless of method used for such loading and placing; Driller: All power drills, excluding jackhammer, whether core, diamond, wagon, track, multiple unit, and any and all types of mechanical drills without regard to the form of motive power; Toxic waste removal; Boring system electronic tracking locator LABOO220-006 07/01/2018 23A-82 https://beta.sam.gov/wage-deterniination/CA20190017141document 22/49 8/28/2019 beta.SAM,gov SAN LUIS OBISPO AND SANTA BARBARA COUNTIES Rates Fringes Brick Tender... ............ ...32.26 18.40 LAB00300-002 07/01/2018 LOS ANGELES COUNTY Rates Fringes Brick Tender .....................$ 32.26 18.40 LAD00300-004 07/01/2018 Residential, 4 Stories LOS ANGELES COUNTY Rates Fringes LABORER GROUP 1.....................$ 34.24 19.07 GROUP 2.....................$ 34.79 19.07 GROUP 3...... .......... ::... $ 35.34 19.07 GROUP 4...... ........ ....... $ 36.89 19.07 GROUP 5......................$ 37.24 19.07 LABORER CLASSIFICATIONS GROUP 1: Cleaning and handling of panel forms; Concrete screeding for rough strike -off; Concrete, water curing; Demolition laborer, the cleaning of brick if performed by a worker performing any other phase of demolition work, and the cleaning of lumber; Fire watcher, limber, brush loader, piler and debris handler; Flag person; Gas, oil and/or water pipeline laborer; Laborer, asphalt -rubber material loader; Laborer, general or construction; Laborer, general clean-up; Laborer, landscaping; Laborer, jetting; Laborer, temporary water and air lines; Material hose operator (walls, slabs, floors and decks); Plugging, filling of shoe bolt holes; Dry packing of concrete and patching; post hole digger (manual);Railroad maintenance, repair track person and road beds;Streetcar and railroad construction track laborers; Rigging andsignaling; Scaler; Slip form raiser; ` n „Q 3 A _Q 3 https:Hbeta.sam.gov/wage-determination/CA20190017/4ldccument 23/49 8/28/2019 beta.SAM.gov Slurry seal crew (mixer operator, applicator operator, squeegee person, shuttle person, tap person), filling of cracks by any method on any surface; Tar and mortar; Tool crib or tool house laborer; Traffic control by any method; Window cleaner; Wire mesh pulling - all concrete pouring operations GROUP 2: Asbestos abatement; Asphalt shoveler; Cement dumper (on 1 yd. or larger mixer and handling bulk cement); Cesspool digger and installer; Chucktender; Chute handler, pouring concrete, the handling of the chute from readymix trucks, such as walls, slabs, decks, floors, foundation, footings, curb, gutters and sidewalks; Concrete curer, impervious membrane and form oiler; Cutting torch operator (demolition); Fine grader, highways and street paving, airport, runways and similar type heavy construction; Gas, oil and/or water pipeline wrapper - pot tender and form person; Guinea chaser; Headerreard person - asphalt installation of all asphalt overlay fabric and materials used for reinforcing asphalt; Laborer, packing rod steel and pans; Membrane vapor barrier installer; Power broom sweeper (small); Riprap stonepaver, placing stone or wet sacked concrete; Rota scraper and tiller; Sandblaster (pot tender); Septic tank digger and installer (lead); Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredder; Underground laborer, including caisson bellower GROUP 3: Buggymobile person; Concrete cutting torch; Concrete pile cutter; Driller, jackhammer, 2-1/2 ft. drill steel or longer; ori-pak-it machine; Gas, oil and/or water, pipeline wrapper, 6-in. pipe and over, by any method, inside and out; High scaler (including drilling of same); Hydro seeder and similar type; Impact wrench multi -plate; Kettle person, pot person and workers applying asphalt, lay-Imld, creosote, lime caustic and similar type materials ("'applying"" means applying, dipping, brushing or handling of such materials for pipe wrapping and waterproofing); Operator of pneumatic, gas, electric tools, vibrating machine, pavement breaker, air blasting, came-alongs, and similar mechanical tools not separately classified herein; operation of remote controlled robotic tools in connection with Laborer's work; Pipelayer's backup person, coating, grouting, making of joints, sealing, caulking, diapering and including rubber gasket joints, pointing and any and all other services; Power post hole digger; Rock slinger;2 3A-84 https://beta.sam.gov/wage-determination/CA20190017/4ldocurrent 24/49 8/28/2019 beta.SAM.gov Rotary scarifier or multiple head concrete chipping scarifier; Steel headerboard and guideline setter; Tamper, Barka, Wacker and similar type; Trenching machine, hand -propelled GROUP 4: Any worker exposed to raw sewage; Asphalt raker, lute person, ironer, asphalt dump person and asphalt spreader boxes (all types); Concrete care cutter (walls, floors or ceilings), grinder or sander; Concrete saw person, cutting walls or flat work, scoring old or new concrete; Cribber, shorer, lagging, sheeting and trench bracing, hand -guided lagging hammer; Head rock Slinger; Laborer, asphalt -rubber distributor boot person; Laser beam in connection with laborers' work; Over -size concrete vibrator operator, 70 lbs. and over; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in theditch until completion of operation, including any and all forms of tubular material, whether pipe, metallic or non-metallic,conduit and any other stationary type of tubular device used for the conveying of any substance or element, whether, water, sewage, solid gas, air, or other product whatsoever and without regard to the nature of material from which the tubular material is fabricated; No -joint pipe and stripping of same; Prefabricated manhole installer; Sandblaster (nozzle person), water blasting,Porta Shot -Blast; Traffic lane closure, Certified. GROUP S: Blaster powder, all work of loading holes, placing and blasting of all powder and explosives of whatever type, regardless of method used for such loading and placing; Driller: All power drills, excluding jackhammer, whether core, diamond, wagon, track, multiple unit, and any and all types of mechanical drills without regard to the farm of motive power; Toxic waste removal; Boring system electronic tracking locator LAB003e O-006 01/01/2018 Rates Fringes Asbestos Removal Laborer ......... $ 33.19 17.78 SCOPE OF WORK: Includes site mobilization, initial site cleanup, site preparation, removal of asbestos containing 3A-8 rJ https:Ubeta,sam.gov/wage-determiiiationlCA20190017/4/document 25/49 8/28/2019 beta.SAM.gov material and toxic waste (including lead abatement and any other toxic material), encapsulation, enclosure and disposal of asbestos containing materials and toxic waste(including lead abatement and any other toxic materials) by hand or with equipment or machinery; scaffolding, fabrication of temporary wooden barriers and assembly of decontamination stations. LAB00300-007 07/01/2018 Residential, 3 Stories and under Rates Fringes Laborers (1) Cleanup, Fencing (Chain Link or Wood), Landscaping.,,...... ........ 32.76 15.82 (2) All Other Work ...... .....$ 33.76 15.82 LABOO585-002 07/01/2018 Residential, 4 Stories VENTURA COUNTY Rates Fringes LABORER GROUP I .............. .......$ 34.24 19.07 GROUP 2.....................$ 34.79 19.07 GROUP 3.....................$ 35.34 19.07 GROUP 4.....................$ 36.89 19.07 GROUP 5— ...... ........... 37.24 19,07 LABORER CLASSIFICATIONS GROUP 1: Cleaning and handling of panel forms; Concrete screeding for rough strike -off; Concrete, water curing; Demolition laborer, the cleaning of brick if performed by a worker performing any other phase of demolition work, and the cleaning of lumber; Fire watcher, limber, brush loader, piler and debris handler; Flag person; Gas, oil and/or water pipeline laborer; Laborer, asphalt -rubber material loader; Laborer, general or construction; Laborer, generals ` 3A-/}�(/q► 8 V https://beta.sam.gov/wage-determination/CA20190017/4/document 26149 8/28/2019 beta, SAM.gov clean-up; Laborer, landscaping; Laborer, jetting; Laborer, temporary water and air lines; Material hose operator (walls, slabs, floors and decks); Plugging, filling of shee bolt holes; Dry packing of concrete and patching; post hole digger (manual.);Railroad maintenance, repair track person and road beds;Streetcar and railroad construction track laborers; Rigging andsignaling; Scaler; Slip form raiser; Slurry seal crew (mixer operator, applicator operator, squeegee person, shuttle person, top person), filling of cracks by any method on any surface; Tar and mortar; Tool crib or tool house laborer; Traffic control by any method; Window cleaner; Wire mesh pulling - all concrete pouring operations GROUP 2: Asbestos abatement; Asphalt shoveler; Cement dumper (on 1 yd. or larger, mixer and handling bulk cement); Cesspool digger and installer; Chucktender; Chute handler, pouring concrete, the handling of the chute from readymix trucks, such as walls, slabs, decks, floors, foundation, footings, curb, gutters and sidewalks; Concrete curer, impervious membrane and form oiler; Cutting torch operator (demolition); Fine grader, highways and street paving, airport, runways and similar type heavy construction; Gas, oil and/or water pipeline wrapper - pot tender and form person; Guinea chaser; Headerboard person - asphalt installation of all asphalt overlay fabric and materials used for reinforcing asphalt; Laborer, parking rod steel and pans; Membrane vapor barrier installer; Power broom sweeper (small); Riprap stonepaver, placing stone or wet sacked concrete; Roto scraper and tiller; Sandblaster (pot tender); Septic tank digger and installer (lead); Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredder; Underground laborer, including caisson bellower GROUP 3: Buggymobile person; concrete cutting torch; Concrete Rile cutter; Driller, jackhammer, 2-112 ft, drill steel on longer; Dri-pak-it machine; Gas, oil and/or water pipeline wrapper, 6-in. pipe and over, by any method, inside and out; High scaler (including drilling of same); Hydro seeder and similar type; Impact wrench multi -plate; Kettle person, pot person and workers applying asphalt, lay-kold, creosote, lime caustic and similar type materials (""applying"'' means applying, dipping, brushing or handling of such materials for pipe wrapping and waterproofing); Operator of pneumatic, gas, electric tools, vibrating !- / 3A-VQ 7 https:/lbeta,sam.gov/wage-determination/CA20190017/4/document 27/49 8/28/2019 beta.SAM.gov machine, pavement breaker, air blasting, come-alongs, and similar mechanical tools not separately classified herein; operation of remote controlled robotic tools in connection with Laborer's worlq Pipelayer's backup person, coating, grouting, making of joints, sealing, caulking, diapering and including rubber gasket joints, pointing and any and all other services; Power post hole digger; Rack clinger; Rotary scarifier or multiple head concrete chipping scarifier; Steel headerboard and guideline setter; Tamper, Barka, Wacker, and similar type; Trenching machine, hand -propelled GROUP 4: Any worker exposed to raw sewage; Asphalt raker, Into person, ironer, asphalt dump person and asphalt spreader boxes (all types); Concrete core cutter (wa115, floors or ceilings), grinder or sander; Concrete saw person, cutting walls or flat work, scoring old or new concrete; Cribber, sharer, lagging, sheeting and trench bracing, hand -guided lagging hammer; Head rock stinger; Laborer, asphalt -rubber distributor boot person; Laser beam in connection with laborers' work; Over -size concrete vibrator operator, 70 lbs. and over; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in theditch until completion of operation, including any and all forms of tubular material, whether pipe, metallic or non-metallic,ccnduit and any other stationary type of tubular device used for the conveying of any substance or element, whether water, sewage, solid gas, air, or other product whatsoever and without regard to the nature of material from which the tubular material is fabricated; No -joint pipe and stripping of same; Prefabricated manhole installer; Sandblaster (nozzle person), water blasting,Porta Shot -Blast; Traffic lane closure, Certified. GROUP 5: Blaster powder, all work of loading holes, placing and blasting of all powder and explosives of whatever type, regardless of method used for such loading and placing; Driller: All power drills, excluding jackhammer, whether core, diamond, wagon, track, multiple unit, and any and all types of mechanical drills without regard to the form of motive power; Toxic waste removal; Boring system electronic tracking locator LABOO585-004 07/01/2018 2 3A-8 8 https://beta.sani.goviwage-determination/CA20190017/4/document 28/49 8/28/2019 bela.SAM.gov VENTURA COUNTY Rates Fringes Brick Tender— ...... ........... % 32.26 18.40 LABOO652-002 07/01/2018 Residential, 4 Stories ORANGE COUNTY Rates Fringes LABORER GROUP 1.....................$ 34.24 19.07 GROUP2.....................$ 34.79 19.07 GROUP 3.....................8 35.34 19.07 GROUP 4................/.....$ 36.89 19.07 GROUP 5.... ................. $ 37.24 19.07 LABORER CLASSIFICATIONS GROUP l: Cleaning and handling of panel forms; Concrete screening for rough strike -off; Concrete, water curing; Demolition laborer, the cleaning of brick if performed by a worker performing any other phase of demolition work, and the cleaning of lumber; Fire watcher, limber, brush loader, piler and debris handler; Flag person; Gas, oil and/or water pipeline laborer; Laborer, asphalt -rubber material loader; Laborer, general or construction; Laborer, general clean-up; Laborer, landscaping; Laborer, jetting; Laborer, temporary water and air lines; Material hose operator (walls, slabs, floors and decks); Plugging, filling of shee bolt holes; Dry packing of concrete and patching; post hole digger (manual);Railroad maintenance, repair track person and road beds;Streetcar and railroad construction track laborers; Rigging andsigoaling; Scaler; Slip form raiser; Slurry seal crew (mixer operator, applicator operator, squeegee person, shuttle person, top person), filling of cracks by any method on any surface; Tar and mortar; Tool crib or tool house laborer; Traffic control by any method; Window cleaner; Wire mesh pulling - all concrete pouring operations 23A-89 https://beta.sam.gov/wage-determination/CA20190017/4/document 29/49 8/28/2019 beta.SAM,gov GROUP 2: Asbestos abatement; Asphalt shoveler; Cement dumper (on 1 yd. or larger mixer and handling bulk cement); Cesspool digger and installer; Chucktender; Chute handler, pouring concrete, the handling of the chute from readymix trucks, such as walls, slabs, decks, floors, foundation, footings, curb, gutters and sidewalks; Concrete curer, impervious membrane and form oiler; Cutting torch operator (demolition); Fine grader, highways and street paving, airport, runways and similar type heavy construction; Gas, oil and/or water pipeline wrapper - pot tender and form person; Guinea chaser; Headerboard person - asphalt installation of all asphalt overlay fabric and materials used for reinforcing asphalt; Laborer, packing red steel and pans; Membrane vapor barrier installer; Power broom sweeper (small); Riprap stonepaver, placing stone or wet sacked concrete; Rote scraper and tiller; Sandblaster (pot tender); Septic tank digger and installer (lead); Tank scaler and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredder; Underground laborer, including caisson bellower GROUP 3: Buggymobile person; Concrete cutting torch; Concrete Pile cutter; Driller, jackhammer, 2-1/2 ft. drill steel or longer; Dri-pak-it machine; Gas, oil and/or water pipeline wrapper, 6-in. pipe and over, by any method, inside and out; High scaler (including drilling of same); Hydra seeder and similar type; Impact wrench multi -plate; Kettle person, pot person and workers applying asphalt, lay-kold, creosote, lime caustic and similar type materials (""applying"" means applying, dipping, brushing or handling of such materials for pipe wrapping and waterproofing); Operator of pneumatic, gas, electric tools, vibrating machine, pavement breaker, air blasting, come-alongs, and similar mechanical tools not separately classified herein; operation of remote controlled robotic tools in connection with Laborer's work; Pipelayer's backup person, coating, grouting, making of joints, sealing, caulking, diapering and including rubber gasket joints, pointing and any and all other services; Power post hole digger; Rock slinger; Rotary scarifier or multiple head concrete chipping scarifier; Steel headerboard and guideline setter; Tamper, Barka, Wacker and similar type; Trenching machine, hand -propelled GROUP 4: Any worker exposed to raw sewage; Asphalt raker, lute person, ironer, asphalt dump person and asphalt 2 3A-9 U https://beta.sam.gov/wage-determination/CA20190017/4/document 30/49 8/28/2019 beta.SAM.gov spreader boxes (all types); Concrete core cutter (walls, floors or ceilings), grinder or sander; Concrete saw person, cutting walls or flat work, scoring old or new concrete; Cribber, sharer, lagging, sheeting and trench bracing, hand -guided lagging hammer; Head rock Slinger; Laborer, asphalt -rubber distributor boot person; Laser beam in connection with laborers' work; over -size concrete vibrator operator, 70 lbs. and over; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in theditch until completion of operation, including any and all forms of tubular material, whether pipe, metallic or non-metallic,conduit and any other stationary type of tubular device used for the conveying of any substance at, element, whether water, sewage, solid gas, air, or other product whatsoever and without regard to the nature of material from which the tubular material is fabricated; No -joint pipe and stripping of same; Prefabricated manhole installer; Sandblaster (nozzle person), water blasting,Porta Shot -Blast; Traffic lane closure, Certified, GROUP 5: Blaster powder, all work of loading holes, placing and blasting of all powder and explosives of whatever type, regardless of method used for such loading and placing; Driller: All power drills, excluding jackhammer, whether core, diamord, wagon, track, multiple unit, and any and all types of mechanical drills without regard to the form of motive power; Toxic waste removal; Boring system electronic tracking locator LAB00652-004 07/01/2018 ORANGE COUNTY Rates Fringes Brick Tender... ......... _ ... __$ 32.26 18.40 LAB00783-003 07/01/2918 Residential, 4 Stories SAN BERNARDINO COUNTY Rates Fringes 23A-91 https://beta.sam.gov/wage-determination/CA20190017/4/document 31149 812812019 beta.SAM.gov LABORER GROUP 1.... .................$ 34.24 19.07 GROUP 2.......... ........... 1 34.79 19.07 GROUP 3......................$ 35.34 19.07 GROUP 4......................$ 36.89 19.07 GROUP 5.....................$ 37.24 19.07 GROUP .......................$ 35.84 18,24 LABORER CLASSIFICATIONS GROUP 1: Cleaning and handling of panel forms; Concrete screening for rough strike -off; Concrete, water curing; Demolition laborer, the cleaning of brid< if performed by a worker performing any other phase of demolition work, and the cleaning of lumber; Fire watcher, limber, brush loader, piler and debris handler; Flag person; Gas, oil and/or water pipeline laborer; Laborer, asphalt -rubber material loader; Laborer, general or construction; Laborer, general clean-up; Laborer, landscaping; Laborer, jetting; Laborer, temporary water and air lines; Material hose operator, (walls, slabs, floors and decks); Plugging, filling of shee bolt holes; Dry packing of concrete and patching; post hole digger (manual);Railroad maintenance, repair track person and road beds;Streetcar and railroad construction track laborers; Rigging andsignaling; Scaler; Slip form raiser; Slurry seal crew (mixer operator, applicator operator, squeegee person, shuttle person) top person), filling of cracks by any method an any surface; Tar and mortar; Tool crib or tool house laborer; Traffic control by any method; Window cleaner; Wire mesh pulling - all concrete pouring operations GROUP 2: Asbestos abatement; Asphalt shoveler; Cement dumper (on 1 yd. or larger mixer and handling bullk cement); Cesspool digger and installer; Chucktender; Chute handler, pouring concrete, the handling of the chute from readymix trucks, such as walls, slabs, decks, floors, foundation, footings, curb, gutters and sidewalks; Concrete curer, impervious membrane and form oiler; Cutting torch operator (demolition); Fine grader, highways and street paving, airport, runways and similar type heavy construction; Gas, oil and/or water pipeline wrapper - pot tender and form person; Guinea chaser; Headerboard person - asphalt installation of all asphalt overlay fabric and materials used for reinforcing asphalt; Laborer, packing rod steel 2 3A-° 2 https:e/beta.sam.gov/wage-determination/CA20190017/4/document 32/49 812812019 beta.SAM.gov and pans; Membrane vapor, barrier installer; Power broom sweeper (small); Riprap stonepaver, placing stone or wet sacked concrete; Rots, scraper and tiller; Sandblaster (pot tender); Septic tank digger and installer (lead); Tank scaler, and cleaner; Tree climber, faller, chain saw operator, Pittsburgh chipper and similar type brush shredder; Underground laborer, including caisson bellower GROUP 3: Buggymobile person; Concrete cutting torch; Concrete pile cutter; Driller, jackhammer, 2-1/2 ft. drill steel or longer; Dri-pak-it machine; Gas, oil and/or water pipeline wrapper, 6-in. pipe and over, by any method, inside and out; High scaler (including drilling of same); Hydro seeder and similar, type; Impact wrench multi -plate; Kettle person, pot person and workers applying asphalt, lay-kold, creosote, lime caustic and similar type materials (""applying"' means applying, dipping, brushing or handling of such materials for pipe wrapping and waterproofing); Operator of pneumatic, gas, electric tools, vibrating machine, pavement breaker, air blasting, come-alongs, and similar mechanical tools not separately classified herein; operation of remote controlled robotic tools in connection with Laborer's work; Pipelayer's backup person, coating, grouting, making of joints, sealing, caulking, diapering and including rubber gasket joints, pointing and any and all other services; Power post hole digger; Rock stinger; Rotary scarifier or multiple head concrete chipping scarifier; Steel headerboard and guideline setter; Tamper, Barka, Wacker and similar type; Trenching machine, hand -propelled GROUP 4: Any worker exposed to raw sewage; Asphalt raker, lute person, ironer, asphalt dump person and asphalt spreader boxes (all types); Concrete core cutter (walls, floors or ceilings), grinder or sander; Concrete saw person, cutting walls or flat work, scoring old or new concrete; Cribber, sharer, lagging, sheeting and trench bracing, hand -guided lagging hammer; Head rock Slinger; Laborer, asphalt -rubber distributor boot person; Laser beam in connection with laborers' work; over -size concrete vibrator operator, 70 lbs. and over; Pipelayer performing all services in the laying and installation of pipe from the point of receiving pipe in theditch until completion of operation, including any and all forms of tubular material, whether pipe, metallic or non-metallic,conduit and any other stationary type of tubular device used for the 2 3A-Q 3 https:Ubeta,sam.gov/wage-determination/CA20190017/4/document 33/49 8/28/2019 conveying of any substance or element, whether water, sewage, solid gas, air, or other product whatsoever and without regard to the nature of material from which the tubular material is fabricated; No -joint pipe and stripping of same; Prefabricated manhole installer; Sandblaster (nozzle person), water blasting,Porta Shot -Blast; Traffic lane closure, Certified. GROUP 5: Blaster powder, all work of loading holes, placing and blasting of all powder and explosives of whatever type, regardless of method used for such loading and placing; Driller: All power drills, excluding jackhammer, whether core, diamond, wagon, track, multiple unit, and any and all types of mechanical drills without regard to the form of motive power; Toxic waste removal; Boring system electronic tracking locator --------------------------- LAB00783-006 07/01/2018 SAN BERNARDINO COUNTY Rates Fringes Brick Tender .....................$ --------------------------------------------------------- 32.26 18.40 LAD01184-001 07/01/2018 Rates Fringes Laborers: (HORIZONTAL DIRECTIONAL DRILLING) (1) Drilling Crew Laborer...$ 35.70 14.03 (2) Vehicle Operator/Hauler.$ 35.87 14.03 (3) Horizontal Directional Drill Operator ..............$ 37.72 14.03 (4) Electronic Tracking Locatof................. ....$ 39.72 14.03 Laborers: (STRIPING/SLURRY SEAL) GROUP 1.....................$ 35.86 16.21 GROUP 2........... .......... $ 37.16 16.21 GROUP 3.....................$ 39.17 16.21 GROUP 4.....................$ 40.91 16.21 beta.SAM.gov LABORERS - STRIPING CLASSIFICATIONS 23A-94 https:11beta, saNo. govlwage-deterun ination/CA20190017/4ldocument 34)49 r. PUP1z1112-1 beta.SAM.gov GROUP 1: Protective coating, pavement sealing, including repair and filling of cracks by any method on any surface in parking lots, game courts and playgrounds; carstops; operation of all related machinery and equipment; equipment repair technician GROUP 2: Traffic surface abrasive blaster; pot tender - removal of all traffic lines and markings by any method (sandblasting, waterblasting, grinding, etc.) and preparation of surface for coatings. Traffic control person: controlling and directing traffic through both conventional and moving lane closures; operation of all related machinery and equipment GROUP 3: Traffic delineating device applicator: Layout and application of pavement markers, delineating signs, rumble and traffic bars, adhesives, guide markers, other traffic delineating devices including traffic control. This category includes all traffic related surface preparation (sandblasting, waterblasting, grinding) as part of the application process. Traffic protective delineating system installer: removes, relocates, installs, permanently affixed roadside and parking delineation barricades, fencing, cable anchor, guard rail, reference signs, monument markers; operation of all related machinery and equipment; power broom sweeper GROUP 4: Striper: layout and application of traffic stripes and markings; hot thermo plastic; tape traffic stripes and markings, including traffic control; operation of all related machinery and equipment --------------------------------------------------------------- LABO1184-003 07/01/2018 Residential, 4 Stories IMPERIAL AND RIVERSIDE COUNTIES Rates Fringes LABORER GROUP 1.....................$ 34.24 19.07 GROUP 2.....................$ 34.79 19.07 GROUP 3— ...... .......... —$ 35.34 19.07 2 3A-9 5 https7/beta.sam.gov/wage-determination/CA20190017/4/dacument 35/49 8/28/2019 beta, SAM.gov GROUP 4.....................$ 36,89 19.07 GROUP 5.................... ...$ 37.24 19.07 LABORER CLASSIFICATIONS GROUP 1: Cleaning and handling of panel forms-, Concrete screeding for rough strike -off; concrete, water curing; Demolition laborer, the cleaning of brick if performed by a worker performing any other phase of demolition work, and the cleaning of lumber; Fire watcher, limber, brush loader, piler and debris handler; Flag person; Gas, oil and/or water pipeline laborer; Laborer, asphalt -rubber material loader; Laborer, general or construction; Laborer, general clean-up; Laborer, landscaping; Laborer, jetting; Laborer, temporary water and air lines; Material hose operator (walls, slabs, floors and decks); Plugging, filling of shee bolt holes; Dry packing of concrete and patching; past hole digger (manual); Railroad maintenance, repair track person and road beds;Streetcar and railroad construction track laborers; Rigging andsignaling; Scaler; Slip form raiser; Slurry seal crew (mixer operator, applicator operator, squeegee person, shuttle person, top person), filling of cracks by any method on any surface; Tar and mortar; Tool crib or tool house Laborer; Traffic control by any method; Window cleaner; Wire mesh pulling - all concrete pouring operations GROUP 2: Asbestos abatement; Asphalt shoveler; Cement dumper (on I yd. or larger mixer and handling bulk cement); cesspool digger and installer; Chucktender; Chute handler, pouring concrete, the handling of the chute from readymix trucks, such as walls, slabs, decks, floors, foundation, footings, curb, gutters and sidewalks; Concrete curer, impervious membrane and form oiler; cutting torch operator (demolition); Fine grader, highways and street paving, airport, runways and similar type heavy construction; Gas, oil and/or water pipeline wrapper - pot tender and form person; Guinea chaser; Headerboard person - asphalt installation of all asphalt overlay fabric and materials used for reinforcing asphalt; Laborer, packing rod steel and pans; Membrane vapor barrier installer; Power broom sweeper (small); Riprap stonepaver, placing stone or wet sacked concrete; Roto scraper and tiller; Sandblaster (pot tender); Septic tank digger and installer (lead); Tank scaler and cleaner; Tree climber, faller, chain saw q► operator, Pittsburgh chipper and similar type brush 2 3A-Q /V https://beta.sam.govlwage-determination/CA2019001714/document 36/49 8/28/2019 shredder; Underground laborer, including caisson bellower beta.SAM.gov GROUP 3: Buggymobile person; Concrete cutting torch; Concrete pile cutter; Driller, jackhammer, 2-1/2 ft. drill steel or, longer; ori-pak-it machine; Gas, oil and/or water pipeline wrapper, 6-in. pipe and over, by any method, inside and out; High scaler (including drilling of same); Hydro seeder and similar type; Impact wrench multi -plate; Kettle person, pot person and workers applying asphalt, lay -(cold, creosote, lime caustic and similar type materials (""applying'' means applying, dipping, brushing or handling of such materials for pipe wrapping and waterproofing); Operator of pneumatic, gas, electric tools, vibrating machine, pavement breaker, air blasting, come-alongs, and similar mechanical tools not separately classified herein; operation of remote controlled robotic tools in connection with Laborer's work; Pipelayer's backup person, coating, grouting, making of joints, sealing, caulking, diapering and including rubber gasket joints, painting and any and all other services; Power post hole digger; Rock stinger; Rotary scarifier or multiple head concrete chipping scarifier; Steel hsaderboard and guideline setter; Tamper, Barks, Wacker and similar type; Trenching machine, hand -propelled GROUP 4: Any worker exposed to raw sewage; Asphalt raker, lute person, ironer, asphalt dump person and asphalt spreader boxes (all types); Concrete core cutter (walls, floors or ceilings), grinder or sander; Concrete saw person, cutting walls or flat work, scoring old or new concrete; Cribber, sharer, lagging, sheeting and trench bracing, hand -guided lagging hammer; Head rock slinger; Laborer, asphalt -rubber distributor boot person; Laser beam in connection with laborers' work; Over -size concrete vibrator operator, 70 lbs, and over; Pipeloyer performing all services in the laying and installation of pipe from the point of receiving pipe in theditch until completion of operation, including any and all forms of tubular material, whether pipe, metallic or non-metallic,conduit and any other stationary type of tubular device used for the conveying of any substance or element, whether water, sewage, solid gas, air, or other product whatssever and without regard to the nature of material from which the tubular material is fabricated; No -joint pipe and stripping of same; Prefabricated manhole installer; Sandblaster (nozzle person), water blasting,Porta Shot -Blast; Traffic 2 3A-V ■ https://beta.sam.gov/wage-determination/CA2019001 714 /document 37/49 8/28/2019 lane closure, Certified, beta.SAM.gov GROUP S: Blaster powder, all work of loading holes, placing and blasting of all powder and explosives of whatever type, regardless of method used for such loading and placing; Driller: All power drills, excluding jackhammer, whether core, diamond, wagon, track, multiple unit, and any and all types of mechanical drills without regard to the form of motive power; Toxic waste removal; Boring system electronic tracking locator LABO1184-005 07/01/2018 IMPERIAL AND RIVERSIDE COUNTIES Rates Fringes Brick Tender ................... „ $ 32.26 18.4E LABO1414-002 08/08/2018 Rates Fringes Laborers: (1 to 3 Stories) Plaster Clean -Up Laborer....$ 33.82 19.40 Plaster Tender ..............$ 36.37 19.40 Laborers: (4 Stories) Plaster Clean-up Laborer ... .$ 33.82 19.40 Plaster Tender ..............$ 36.37 19.40 Work on a swing stage scaffold: $1.00 per hour additional. Work at Military Bases - $3.00 additional per hour: Coronado Naval Amphibious Base, Fort Irwin, George AFB, Marine Corps Air Station-29 Palms, Imperial Beach Naval Air Station, Marine Corps Logistics Supply Base, Marine Corps Pickle Meadows, Mountain Warfare Training Center, Naval Air Facility -Seeley, North Island Naval Air Station, Vandenberg APB, -------------------------- _ _ ...------------------------ PAIN0036-005 07/01/2018 Rates Fringes 23A-98 https.dbeta. saOn. govlwage-determination/CA2019001 7/4/document 38/49 812812019 beta.SAM.gov PAINTER (including lead abatement) Imperial, Las Angeles, Orange, Riverside & San Bernardino (1) Repaint ................$ 27.59 14.92 (2) All other work .... .,,.,.$ 31.12 15.04 (3) Journeyman & Industrial .................$ 32.02 12.93 San Luis Obispo, Santa Barbara & Ventura (1) Repaint ................$ 24,40 14.82 (2) All other work ......... $ 29.04 14.98 (3) Journeyman & Industrial .................$ 32.52 15.44 ---------------------------------------------------------------- PAIN0036-011 10/01/2018 IMPERIAL, LOS ANGELES, ORANGE, RIVERSIDE, SAN BERNARDINO, SAN LUIS OBISPO, SANTA BARBARA AND VENTURA COUNTIES Rates Fringes DRYWALL FINISHER/TAPER.......... ,$ 24,02 17.01 ---------------------------------------------------------------- PAIND036-014 10/01/2018 IMPERIAL Rates Fringes GLAZIER ...........................$ 43.55 19.72 PAIN0036-018 06/01/2018 LOS ANGELES, ORANGE, RIVERSIDE, SAN BERNARDINO, SANTA BARBARA AND VENTURA Rates Fringes GLAZIER ...................... .... $ 42.20 25.50 FOOTNOTE: Additional $1.25 per hour for work in a condo, from the third (3rd) floor and up. Additional $1.25 per 2 3A-9 9 https://beta.sam.gov/wage-determinationlCA20190017/4/document 39/49 8/28/2019 beta.SAM.gov hour for work on the outside of the building from a swing stage or any suspended contrivance, from the ground up. ---------------------------------------------------------------- FAIN0036-020 01/01/2019 IMPERIAL Rates Fringes SOFT FLOOR LAVER .................$ 31.02 14.37 --------------------------------------------------------------- PAIN0169-007 01/01/2018 SAN LUIS OBISPO Rates Fringes GLAZIER ...... .................... $ 35.00 26.26 ---------------------------------------------------------- PAIN1247-003 01/01/2019 LOS ANGELES, ORANGE, RIVERSIDE, SAN BERNAROINO, SAN LUIS OBISPO, SANTA BARBARA AND VENTURA Rates Fringes SOFT FLOOR LAVER ..... ............ $ 35.3S 14.56 PLAS0200-002 08/02/2017 IMPERIAL, KERN, LOS ANGELES, ORANGE, RIVERSIDE, SAN BERNARDINO, SAN LUIS OBISPO, SANTA BARBARA AND VENTURA Rates Fringes PLASTERER. 1 - 3 stories, ... ...... 32.61 20.08 4-stories........ ........... $ 35.61 20.08 ---------------------------------------------------------------- PLAS0500-003 07/01/2018 Rates Fringes 23A-100 https://beta.sam.gov/wage-determination/CA20190017/4ldocument 40/49 8/28/2019 CEMENT MASON/CONCRETE FINISHER ... $ 35.7S 22.48 ---------------------------------------------------------------- PLUM0016-011 09/01/2e18 Rates Fringes PLUMBER/PIPEFITTER Residential .... ............. $ 40.23 18.08 ._________________________________s____.___________.____.______ PLUM0250-001 09/04/2017 LOS ANGELES AND ORANGE Rates Fringes REFRIGERATION MECHANIC Refrigeration Fitter ....... .$ 45.50 21.65 ROOF0036-001 08/01/2019 LOS ANGELES, ORANGE, RIVERSIDE, SAN BERNARDINO, SAN LUIS OBISPO, SANTA BARBARA AND VENTURA Rates Fringes Roofer ............... ............ $ 38.12 16.97 FOOTNOTE: Pitch premium: Work on which employees are exposed to pitch fumes or required to handle pitch, pitch base or pitch impregnated products, or any material containing coal tar pitch, the entire roofing crew shall receive $1.75 per hour ""pitch premium"" pay. _____________________________________________________ __ "______ ROOP0045-003 07/01/2018 IMPERIAL beta.SAM.gov Rates Fringes Roofer ........... ................ $ 31.00 8.62 .................................................._ .-...... .. SFCA0669-065 04/01/2018 23A-101 https://beta.sam.govlwage-determination/CA20190017/4/document 41/49 8/28/2019 beta.SAM.gov AREA 1: IMPERIAL COUNTY; LOS ANGELES COUNTY (does not include the city of Pomona, Catalina Island, and that part of Los Angeles County within 25 miles of the city limits of Las Angeles); ORANGE COUNTY (does not include Catalina Island; San Clemente Island; City of Santa Ana; and remainder, of Orange County within 25 miles of the city limits of Los Angeles); RIVERSIDE COLNTY; AND SAN BERNARDINO COUNTY (does not include the northern part of City of Chino, or the cities of Montclair and Ontario) AREA 2: SAN LUIS OBISPO, SANTA BARBARA COUNTIES, VENTURA (does not include Part Hueneme, Port Mugu, the city of Santa Paula, and that part of Ventura County within 25 miles of the city limits of Las Angeles) COUNTIES Rates Fringes SPRINKLER FITTER Area 1............... ....... $ 38.28 15.84 Area 2............... ....... $ 38.85 21,87 SFCA0709-002 01/01/2018 LOS ANGELES COUNTY (the city of Pomona, Catalina Island, and that part of Los Angeles County within 25 miles of the city limits of Los Angeles); ORANGE COUNTY (San Clemente Island, the city of Santa Ana, and that part of Orange County within 25 miles of the city limits of Los Angeles); SAN BERNARDINO COUNTY (the northern part of the city of Chino, and the cities of Montclair and Ontario); VENTURA COUNTY (Port Hueneme, Port Mugu, the city of Santa Paula, and that part of Ventura County within 25 miles of the city limits of Los Angeles) Rates Fringes SPRINKLER FITTER .................$ 42.26 2S.92 SHEE01OS-001 07/01/2018 AREA 1: LOS ANGELES COUNTY (South of a straight line drawn between Borman and Big Pines, excluding the area South of Imperial Highway East of the Los Angeles River, excluding the cities of Long Beach, Claremont, and Pomona, excluding Catalina Island) 23A-102 http s: // beta. sa m. gov/wa ge-determ i nation/CA201 90 0 1 7/4/d ocu me nt 8/28/2019 beta.SAM.gov AREA 2: LOS ANGELES (Remainder), ORANGE, RIVERSIDE & SAN BERNARDINO COUNTIES Work on general sheet metal and heating and air conditioning on single family dwellings, multiple family dwellings, track homes and apartment buildings individually conditioned by separate and independent units or systems Rates Fringes SHEET METAL WORKER AREA I... . ... .......... $ 26.57 10.41 AREA 2...................... 1 29.54 19.09 SHEE0206-003 07/01/2017 IMPERIAL Rates Fringes Sheet Metal (TECHNICIAN),. ....... $ 27.70 8.43 SHEET METAL WORKER ....... ........ $ 36.88 26.52 SHEET METAL TECHNICIAN - SCOPE: a. Existing residential buildings, both single and multi -family, where each unit is heated and/or cooled by a separate system b. New single family residential buildings including tracts. c. New multi -family residential buildings, not exceeding five stories of living space in height, provided each unit is heated or cooled by a separate system. Hotels and motels are excluded. d. LIGHT COMMERCIAL WORK: Any sheet metal, heating and air conditioning work performed on a project where the total construction cost, excluding land, is under $1,000,006 e. TENANT IMPROVEMENT WORK: Any work necessary to finish interior spaces to conform to the occupants of commercial buildings, after completion of the building shell ------------------------------------------- SHEE0273-001 08/01/2018 SAN LUIS OBISPO, SANTA BARBARA AND VENTURA Rates Fringes 23A-103 blips: flibetan sa TEL g ovIwa g e-d eterm inationlCA2019001 7/4/document 43149 8/28/2019 beta.SAM.gov SHEET METAL WORKER ....... ......... $ 43.88 28.97 HOLIDAYS: New year's Day, Martin Luther King Day, President's Day, Good Friday, Memorial Day, Indepdendence Day, Labor Day, Veterans Day,Thankisgiving Day & Friday after, Christmas Day _--_____________________________________________________________ TEAM0011-001 07/01/2018 Rates Fringes Truck drivers; GROUP 1....................$ 30.59 28.59 GROUP 2— .................. 30.74 28.59 GROUP 3....................$ 30.87 28.59 GROUP 4....................$ 31.06 28.59 GROUP 5....................$ 31.09 28.59 GROUP 6....................$ 31.12 28.59 GROUP 7....................$ 31.37 28.59 GROUP 8.....................$ 31.62 28.59 GROUP 9....................$ 31.82 28.59 GROUP 10....................$ 31.12 28.59 GROUP 11....................$ 32.62 28.59 GROUP 12....................$ 33.05 28,59 WORK ON ALL MILITARY BASES - $3.00 PER HOUR ADDITIONAL: [29 palms Marine Base, Camp Roberts, China Lake, Edwards AFB, E1 Centro Naval Facility, Fort Irwin, George AFB, Marine Corps Logistics Base at Nebo & Perna, Mountain Warfare Training Center, Bridgeport, Point Arguello, Point Conception, Vandenberg AFB] TRUCK DRIVERS CLASSIFICATIONS GROUP 1: Truck driver GROUP 2: Driver of vehicle or combination of vehicles - 2 axles; Traffic control pilot car excluding moving heavy equipment permit load; Truck mounted broom GROUP 3: Driver of vehicle or, combination of vehicles - 3 axles; Boot person; Cement mason distribution truck; Fuel truck driver; Water truck - 2 axle; Dump truck, less that „ 3 A _ 1 04 https://beta.sam.gov/wage-determination/CA2019001 7/4/document 44/49 WEV2019 16 yds, water level; Erosion control driver beta.SAM.gov GROUP 4: Driver of transit mix truck, under 3 yds.; Dumparete truck, less than 6-112 yds. water level GROUP 5: Water truck, 3 or more axles; Truck greaser and tire person ($0.50 additional for tire person); Pipeline and utility working truck driver, including winch truck and plastic fusion, limited to pipeline and utility work; Slurry truck driver GROUP 6: Transit mix truck, 3 yds. or more; Dumperete truck, 6-1/2 yds. water level and over; Vehicle or combination of vehicles - 4 or more axles; Oil spreader truck; Dump buck, 16 yds. to 25 yds, water level GROUP 7: A Frame, Swedish crane or similar; Forklift driver; Ross carrier driver GROUP 8: Dump truck, 25 yds. to 49 yds. water level; Truck repair person; Water pull - single engine; Welder GROUP 9: Truck repair person/welder; Low bed driver, 9 axles or over GROUP 10: Dump truck - 50 yds, on more water level; Water pull - single engine with attachment GROUP 11: Water pull - twin engine; water pull - twin engine with attachments; Winch truck driver - $1.25 additional when operating winch or similar special attachments GROUP 12: Boom Truck 17K and above WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. Note: Executive Order (ED) 13706, Establishing paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis -Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the RE, the contractor must provide n 3A- 1 05 https://beta.sam.gov/wage-determination/CA20190017/4/document (- 45149 8/28/2019 beta.SAM.gov employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health -related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health -related needs, including preventive care; or for reasons resulting from, at, to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gdv/whd/govcontracts, Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "'identifiers"'' that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than —SU— or ""UAV6"" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014, PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. 23A-106 httpss.//beta.sam.gov/wage-determinatlon/CA20190017/4/document 46/49 8/28/2019 beta.SAM.gov Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the "'SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non -union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number. 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classifications) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2914. VAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A VAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. 23A-107 https://beta.sam.govlwage-determination/CA20190017/4/document 47149 8/28/2019 WAGE DETERMINATION APPEALS PROCESS beta.SAM.gov 1.) Has there been an initial cecision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter " a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis -Bacon survey program, If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requester considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative 3A- 1 08 hops://beta.sam.govlwage-determinatic n/CA20190017/4/document 48/49 8/28/2019 Review Board (formerly the Wage Appeals Board). Write to: beta.SAM.gov Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W, Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION' 23A-109 https://beta.sam.gov/wage-determination/CA20190017l4/document 49149 EXHIBIT 3 CITY OF SANTA ANA CONSTRUCTION CONTRACT PROJECT 18-7929 & 18-7528 CENTENNIAL PARK WALKWAY AND LIGHTING IMPROVEMENTS PROJECT This CONSTRUCTION CONTRACT is made and entered into this 15s' day of October, 2019 by and between the City of Santa Ana, California, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California (hereinafter "CITY"), and Leonida Builder, Inc. (hereinafter "CONTRACTOR"). WH'NESSETH: The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows: 1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction of the City Engineer of the CITY, the Centennial Park Walkway and Lighting Improvements Project (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in accordance with the Contract Documents prepared by the City's Public Works Agency and approved by the City Council. 2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard Specifications for Public Works Construction and which include the following: • Notice Inviting Bids • Information to Bidders • Bid Proposal • Bid Bond • Contract Form • Contract Bonds • General Provisions • Special Provisions • Technical Provisions and Project Plans • Community Workforce Agreement • Appendices In case of conflict between the Contract Documents, the precedence of documents shall be as established in the Standard Specifications for Public Works Construction. 3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF IMPROVEMENT the sum total amount not to exceed One Million Four Hundred Twenty -Seven Thousand Eight Hundred Fifty and No Cents ($1,427,850.00), as set forth and identified in the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A." The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate quantities only, and the City does not expressly or by implication agree that the actual amount of work will correspond therewith, but reserves the right to increase or decrease the amount of any class or portion of the work or to omit portions of the work as may be deemed necessary or advisable. rev. 09/01/2017 23A-110 Page 1 of 3 4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including commencing construction within the timeframe therein specified after issuance of a Notice to Proceed. 5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the WORK OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for such work as set forth in the wage determinations for this work in accordance with applicable State and Federal law. 6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement (CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's website at: http://www.santa-ana.org/pwa/documents/CWA.pdf 7. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY, one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%) of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment Bond). This Contract shall not become effective until such bonds are supplied to and approved by the CITY. 8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond shall also be required as a condition of project acceptance. For projects up to Five Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($10,000) or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars ($100,000) or Ten Percent (10%) of the final contract price. 9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY. // 23A-111 Page 2 of 3 IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and year first above written. ATTEST: DAISY GOMEZ Clerk of the Council APPROVED AS TO FORM: SONIA R. CARVALHO City Attorney By: .IVI IN FUNK Assistant City Attorney RECOMMENDED FOR APPROVAL: FUAD SWEISS, PE, PLS Executive Director Public Works Agency CITY OF SANTA ANA KRISTINE RIDGE City Manager CONTRACTOR: Leonida Builders, I NAME: Panaggofis onida dent TITLE: Presi, S oretary & Treasurer 23A-112 Page 3 of 3 COST ANALYSIS CONSTRUCTION OF THE PROJECT NO. 18-7929 & 18-7528: CENTENNIAL PARK WALKWAY AND LIGHTING IMPROVEMENTS Construction Contract $ 1,427,850 Contract Administration $ 94,786 Inspection and Testing $ 119,392 Contingencies $ 186,060 TOTAL ESTIMATED CONSTRUCTION COSTS $ 1,828,088 EXHIBIT 4 23A-113 F W W m Y a� U® N� P W LL cr Qa F W �LL > 0a �g U J F a U �L 01 o o m o m ma¢m,_.mge w�mo:°'o,EQ e= G Q G e Q m N t d O C1 U y m y 3 I m v E y'g 2 m o 0 =°mamiaNirriEQ� Y a a y°y°waaiac w Y C N Q!9 c y Lu Z U G w �¢aaimeoe ®ceY=a�ca i m m m 0 m EL UcoM 0 E m Rm ® J C LU Y CtS O Q F m U — U G �LT w W LT 0 U Ua LL a LL yv N LL LL 0 0 0 0 0 0 0 0 15 0 za ~ LL ~ O U LL ® E f~9 w o LU 2 i a ® w D 0 c m au F 3 F 3� ., R i• s d` 9 L °%� > ssnana Y s ss B G ze 3 Q 9 sRm n 4mx•mfs „�- < io.r.xs slaw^6 Y Z u 3 � '^3 we .i $s uu T� S ••+nit iy g & k 3 .. arve,onrex wm,y M1 0 a Co 6 M c 0 CO h a IZIC I EXHIBIT 5