HomeMy WebLinkAbout20B - AA PATHWAY SANTIAGO CREEKREQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
DECEMBER 3, 2019
TITLE:
APPROVE AN APPROPRIATION
ADJUSTMENT, AMEND THE FY 2019-20
CAPITAL IMPROVEMENT PROGRAM,
AUTHORIZE A BUDGET REALLOCATION,
AND AWARD A CONSTRUCTION
CONTRACT TO ARAMEXX
CONSTRUCTION IN THE AMOUNT OF
$1,000,910, FOR THE LINCOLN AVENUE
PEDESTRIAN PATHWAY FROM PARK
LANE TO SANTIAGO CREEK PROJECT
WITH AN ESTIMATED TOTAL PROJECT
COST OF $1,201,886
(PROJECT NO 17-6802)
{STRATEGIC PLAN NO. 6, 1C}
CLERK OF COUNCIL USE ONLY:
APPROVED
❑ As Recommended
❑ As Amended
❑ Ordinance on 1"Reading
❑ Ordinance on 2ntl Reading
❑ Implementing Resolution
❑ Set Public Hearing For
K.�►rruma.>rr.�
/s/Kristine Ridge FILE NUMBER
CITY MANAGER
RECOMMENDED ACTION
1. Approve an appropriation adjustment to spend $43,000 from prior year fund balance in the
Select Street Construction Fund, Improvements Other Than Building expenditure account.
2. Approve an amendment to the Fiscal Year 2019-20 Capital Improvement Program to
include additional construction funds in the amount of $43,000 for the Lincoln Avenue
Pedestrian Pathway from Park Lane to Santiago Creek Project.
3. Authorize reallocation of $128,886 in unspent project funds to the Lincoln Avenue
Pedestrian Pathway from Park Lane to Santiago Creek Project (Project 17-6802) as
follows: $82,926 in Measure M2 Local Fairshare funds from the Cabrillo Park Sidewalk
Improvements project (Project 16-6862), $13,960 in Select Street Construction Gas Tax
funds from the Omnibus Concrete Repair project (Project 18-6864), and $32,000 in Select
Street Construction Gas Tax funds from the Lincoln/Fairhaven Access Trail project (Project
13-6795).
4. Award a contract to Aramexx Construction, the lowest responsible bidder, in accordance
with the base bid plus add Alternative Bid Items 54 and 55 in the amount of $1,000,910,
for construction of the Lincoln Avenue Pedestrian Pathway from Park Lane to Santiago
Creek Project, for the term beginning upon execution of the contract and ending upon
20B-1
Award Contract to Aramexx Construction for the Lincoln Avenue
Pedestrian Pathway from Park Lane To Santiago Creek Project
December 3, 2019
Page 2
project completion, and authorize the City Manager to execute the contract, subject to non -
substantive changes approved by the City Manager and the City Attorney.
5. Approve the Project Cost Analysis for a total estimated construction delivery cost of
$1,201,886, which includes $1,000,910 for the construction contract; $123,550 for contract
administration, inspection, and testing; and a $77,426 project contingency (approximately
7.7% of the construction contract amount).
DISCUSSION
The purpose of this project is to reestablish the ability for pedestrians to cross the Metrolink railroad
tracks at the intersection of Lincoln Avenue and Fairhaven Avenue. The project consists of a
pathway along Lincoln Avenue on the west side of the tracks, from Park Lane to Fairhaven Avenue,
and then to the Santiago Creek Trail (Exhibit 1).
After the full closure of the railroad crossing at Lincoln and Fairhaven by the California Public
Utilities Commission, the City pledged to pursue funding to restore pedestrian access. After two
attempts, Active Transportation funds were awarded to the City for the design and installation of a
pathway to reconnect the lost access. The pathway will connect pedestrians and bicyclists, and
will reduce walking and bicycling distances by 1 mile to get around the Fairhaven Avenue closure.
Before completing the project design, staff sought community input. Based on four community
input meetings, Public Works staff identified additional improvements beyond the intent of the grant
that were necessary to address the community's security concerns and to further invest in the
neighborhood. Features include taller and more aesthetically pleasing green screens along the
existing residential wall; new nighttime safety lighting; lockable and more aesthetically pleasing
gates to regulate access; and new park/trail security patrols. The pathway and surrounding areas
will have greater aesthetic appeal compared to today, with gates (non -chain link) to allow better
security of the pathway area after dusk, while providing daytime access as originally promised to
the community. Improvements also include new landscaping.
Once completed, the immediate surrounding area will benefit from enhanced aesthetics, better
access, and improved lighting, all of which will support bicycle and pedestrian travel. This pathway
project also aligns with the Southern California Association of Government's (SCAG) Regional
Transportation Plan (RTP) Goals adopted in April 2012 by providing access to an existing regional
trails.
The City secured an Active Transportation Program grant of $1,030,000 for construction of the
Lincoln Avenue Pedestrian Pathway project, which was included in the Council -approved Fiscal
Year 2018-19 Capital Improvement Program. However, the total estimated project construction
cost is $1,201,886 (Exhibit 2). Therefore, staff is requesting Council approval to appropriate
$43,000 of the $2.5 million in reclassified Gas Tax funds made available by Council action on
September 17, 2019 (Recommended Actions Nos. 1 & 2); and $128,886 in project budget
reallocations from completed Capital Improvement Program projects (Recommended Action No.
3). The Fiscal Year 2019-20 Capital Improvement Program will be amended to include the
additional $43,000 in Gas Tax funding (Exhibit 3).
20B-2
Award Contract to Aramexx Construction for the Lincoln Avenue
Pedestrian Pathway from Park Lane To Santiago Creek Project
December 3, 2019
Page 3
Public Outreach and Contractor Participation
To provide an opportunity for local vendors to submit bids, a Notice Inviting Bids was advertised in
the Orange County Register newspaper on October 8 and 13, 2019. Bids were received
electronically via the City's web -based electronic bidding system, PlanetBids, on October 22, 2019.
Through the PlanetBids online portal, vendors may register to receive notifications on all current
and future City projects, as well as download contract documents, receive project updates, and
submit bids electronically.
A total of 914 vendors, including 51 located in the City of Santa Ana, were notified of the project
via PlanetBids. 42 vendors requested bidding documents and 5 bids were received. No bids were
received from Santa Ana contractors.
Bid Results Summary
RANK
BIDDER'S NAME
LOCATION
BASE BID
BASE BID +
Items 54 & 55
1
Aramexx Construction
Claremont
$977,410
$1,000,910
2
H2m Construction Inc.
Glendale
$1,005,106
$1,019,106
3
Aid Builders Inc.
Los Alamitos
$1,236,351
$1,324,351
4
C.S. Legacy Construction, Inc.
Ontario
$1,423,900
$1,444,600
5
YAKAR
I Covina
$1,788,230
$1,821,230
All five bids were responsive, and Aramexx Construction submitted the lowest responsive bid
(Exhibit 4), in the amount of $1,000,910. Based on the bid analysis and a contractor's reference
check, staff recommends awarding the construction contract (Exhibit 5) to Aramexx Construction
in the amount bid.
Project Delivery
To deliver a complete project, in addition to the construction contract, the estimated total cost to
deliver the project also requires construction administration, inspection, and testing, along with an
allowance for contingencies to account for unexpected or unforeseen conditions. Construction
administration and inspection includes construction management; implementation of the City's
Community Workforce Agreement requirements; inspection of the Contractor's work to ensure
contract compliance, workmanship, and quality; and material testing. As indicated in the Cost
Analysis (Exhibit 2) and as summarized in the table below, the estimated total construction delivery
cost of the project is $1,201,886.
Construction Contract
$1,000'910
Construction Administration, Inspection, and Testing
$123,550
Contingencies
$77,426
ESTIMATED CONSTRUCTION DELIVERY COST
$1,201,886
r1-
Award Contract to Aramexx Construction for the Lincoln Avenue
Pedestrian Pathway from Park Lane To Santiago Creek Project
December 3, 2019
Page 4
STRATEGIC PLAN ALIGNMENT
Approval of this item supports the City's efforts to meet Goal #6 — Community Facilities &
Infrastructure, Objective #1 (establish and maintain a Community Investment Plan for all City
assets), Strategy C (invest resources and technology to extend the service life of existing
infrastructure to protect the City's investment and support a high quality of life standard).
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the recommended actions are exempt
from further review. Categorical Exemption Environmental Review No. ER-2017-58 was filed for
the project.
FISCAL IMPACT
As indicated in the Cost Analysis (Exhibit 2), the estimated total construction delivery cost of the
project is $1,201,886, which includes the construction contract, contract administration, inspection,
testing, and project contingency. Approval of the requested Appropriation Adjustment will authorize
expenditure of $43,000 from the prior year fund balance in the Select Street Construction Fund —
Improvements Other Than Building expenditure account (No. 05917663-66220).
The following table summarizes the funds budgeted to deliver construction of this project:
Fiscal
Accounting Unit-
Accounting Unit,
Fund Description
Amount
Year
Account #
Account Description
FY 2017-18 CAPITAL IMPROVEMENT PROGRAM APROVED BUDGET
Traffic System
Active Transportation
FY 2019-20
14817613-66220
Management Grant
Program, Improvements
$1,030,000
July -June
(Project 17-6802)
(Capital Grants Fund)
Other Than Building
APPROPRIATION ADJUSTMENT
HUTA 2103 Gas Tax,
FY 2019-20
05917663-66220
Select Street
Improvements Other
$43,000Than
July -June
(Project 17-6802)
Construction Fund
Building
PROJECT BUDGET REALLOCATIONS
Measure M2 Local
FY 2019-20
03217662-66220
Measure M Street
Fairshare,
$82 926
July -June
(Project 16-6862)
Construction Fund
Improvements Other
Than Building
HUTA 2103 Gas Tax,
FY 2019-20
05917663-66220
Select Street
Improvements Other
$13,960
July -June
(Project 18-6864)
Construction Fund
Than Building
Award Contract to Aramexx Construction for the Lincoln Avenue
Pedestrian Pathway from Park Lane To Santiago Creek Project
December 3, 2019
Page 5
FY 2
05917663-66220
Select Street
HUTA 2103 Gas Tax,
July -June
June
(Project 13-6795)
Construction Fund
Improvements Other
$32,000
Than Building
Total:
$1,201,886
All funds are scheduled for expenditure in Fiscal Year 2019-20.
APPROVED AS TO FUNDS AND ACCOUNTS:
Fuad S. Sweiss, PE, PLS Kathryn Downs, CPA
Executive Director Executive Director
Public Works Agency Finance and Management Services Agency
FSS/TC/MO
Exhibits: 1. Location Map
2. Cost Analysis
3. Amended FY 2019-20 CIP Project Sheet
4. Bid Proposal
5. Construction Contract
r1-
NOT TO SCALE
_ _ rrs c GD
LISTING
GIDNAL
PATH
6
in
EVEN AV
DETAIL A
LOCATION MAP
Exhibit 1
SANTA ANA Project No. 17-6802:
P` A Lincoln Avenue Pedestrian Pathway from Park
PUBLIC„ RKSMEK� Lane to Santiago Creek ATPL-5063(177)
I►I-
EXHIBIT 2
COST ANALYSIS
CONSTRUCTION OF THE PROJECT NO. 17-6802: LINCOLN AVENUE
PEDESTRIAN PATHWAY FROM PARK LANE TO SANTIAGO CREEK ATPL-
5063(177)
Construction Contract
$
1,000,910
Contract Administration
$
54,436
Inspection and Testing
$
69,114
Contingencies
$
77,426
TOTAL ESTIMATED CONSTRUCTION COSTS
$
1,201,886
20B-7
§
■�
§�
§§
� §
■§
■CL
�■
;■
)
)
k\
0
\\
=
s
(:
6w U5
�
§
B
k
k
s
k
U
§\
§/
§¥
§\
�3
■
\
\
7
Exhibit 3
18/19/ oePQea Sheet qz to Proposed 192/uoeAmendment
LU
LU
Ir
00
§/
w
)3
/,
\LL §
0>
§
e■
)
)
)
»
\
(}j
()
e«
)4&
}��
}��
3
\
)
)
§
�
»
[
§
�
�
[
\
\
�
E
)
)
-
�
k
k
CO
/
(]F
%
/
)
§
{
:
E 3
£
E
2
\
\
{
/
City of Santa Ana
Lincoln Pedestrian Pathway
ATPL-5063(177) (17-6802), bidding
on October 22, 2019 2:00 PM (Pacific)
Bid Results
Bidder Details
Vendor Name
Aramexs Construction
Address
532 W First St Unit 202
Claremont, CA 91711
United States
Respondee
Salim Samour
Respondee Title
President
Phone
909-746-8066 Ext.
Email
info@aramexxgroupinc.com
Vendor Type
License #
CA DIR
Bid Detail
Bid Format
Electronic
Submitted
October 22, 2019 1:38:10 PM (Pacific)
Delivery Method
Bid Responsive
Bid Status
Submitted
Confirmation #
193440
Ranking
0
Respondee Comment
Buyer Comment
Attachments
File Title
File Name
Proposal - Santa Ana
Proposal - Santa ana.pdf
Ownership Aff
Ownership Aff.pdf
Bid Bond
Bid Bond.pdf
Non -Collusion
NonCollusion Aff.pdf
Line Items
Type Item Code
Base Bid Items
1 Remove Chain -Link Fence I Gate
2 Remove Sign
UOM Qty
LF 85
EA
2
3 Remove Tree
EA 1
Unit Price
$10.00
$400.00
$1,200.00
Page 1
Printed 10/25/2019
EXHIBIT 4
File Type
General Farms
Ownership Affidavit (Notary
Public) - REQ Original Hard
Copy Submittal in Addition
Bid Bond Guaranty (Notary
Public) - REQ Original Hard
Copy Submittal in Addition
Non -Collusion Affidavit
(Notary Public) - REQ
Original Hard Copy Submittal
in Addition
Line Total Comment
$850.00
$800.00
$1,200.00
I20R; O
City of Santa Ana
Page 2
Lincoln
Pedestrian Pathway ATPL-5063(177) (17-6802), bidding on October 22, 2019 2:00 PM (Pacific)
Printed 10/25/2019
Bid Results
Type
Item Code UOM
Qty
Unit Price
Line Total Comment
4
Clearing and Grubbing
LS
1
$37,000.00
$37,000.00
5
Remove Ballard
EA
2
$300.00
$600.00
6
Adjust Water Valve Box to Grade
EA
2
$450.00
$900.00
7
Adjust Survey Monument Box to Grade
EA
1
$1,200.00
$1,200.00
8
Adjust Sanitary Sewer Manhole Lid to Grade
EA
2
$1,000.00
$2,000.00
9
Relocate Gas Line Warning Past
EA
3
$600.00
$1,800.00
10
Remove / Abandon Conflicting Irrigation System
LS
1
$5,000.00
$5,000.00
11
Remove K-Rail
EA
3
$1,000.00
$3,000.00
12
Remove Vehicular Metal - Beam Guardrail and Posts
LF
30
$50.00
$1,500.00
13
Relocate Landscape Boulders
LS
1
$1,000.00
$1,000.00
14
Remove Residential Screen Wall (Includes Gates and Fencing)
LF
60
$20.00
$1,200.00
15
Fine Grading
SF
30550
$0.25
$7,637.50
16
Unclassified Excavation and Fill with Excavated Material
CY
713
$60.00
$42,780.00
17
Unclassified Excavation and Export of Excavated Material
CY
790
$105.00
$82,950.00
18
Construct Decomposed Granite Pathway with Organic Binder (Includes Aggregate Base)
SF
9565
$6.00
$57,390.00
19
Construct Decomposed Granite Pavement Concrete Header (Includes
Aggregate
Base)
LF
730
$19.00
$13,870.00
120IR;11a1
City of Santa Ana
Page 3
Lincoln
Pedestrian Pathway ATPL-5063(177) (17-6802), bidding on October 22, 2019 2:00 PM (Pacific)
Printed 10/25/2019
Bid Results
Type
Item Code UOM
Qty
Unit Price
Line Total Comment
20
Construct Colored Concrete Pavement (Includes Aggregate Base)
SF
780
$12.00
$9,360.00
21
Construct Asphalt Concrete Pavement (Includes Aggregate Base)
SF
151
$10.00
$1,510.00
22
Construct Concrete Curb (Includes Aggregate Base)
LF
75
$50.00
$3,750.00
23
Construct Concrete Curb and Gutter (Includes Aggregate Base)
LF
870
$40.00
$34,800.00
24
Construct Concrete Gross Gutter
SF
85
$21.00
$1,785.00
25
Construst Concrete Retaining Curb
LF
371
$41.00
$15,211.00
26
Install Detectable Warning Surface
SF
45
$38.00
$1,710.00
27
Construct Reinforced Concrete Pavement with Integral Curb / Wall (Pavement Portion w/ Base)
SF
930
$19.00
$17,670.00
28
Construct Reinforced Concrete Pavement with Integral Curb / Wall (Curb and Gutter
Portion w/ Base)
LF
106
$54.00
$5,724.00
29
Construct Reinforced Concrete Pavement with Integral Curb / Wall (Low
Wall Portion w/ Base)
LF
103
$255.00
$26,265.00
30
Install 6' Tall R/W Welded Wire Mesh Fence
LF
950
$80.00
$76,000.00
31
Install 6' Tall Modular Dual Panel Fence (Vine Planting Not Included)
LF
890
$110.00
$97,900.00
32
Paint Residential Screen Walls
LF
935
$27.00
$25,245.00
33
Construct 4" CMU Block Wall
LF
60
$200.00
$12,000.00
34
Install Entry Signage
EA
1
$21,000.00
$21,000.00
35
Install Roadway / SCRRA Sign
EA
3
$700.00
$2,100.00
,20IR I12
City of Santa Ana
Page 4
Lincoln
Pedestrian Pathway ATPL-5063(177) (17-6802),
bidding on October 22, 2019 2:00
PM (Pacific)
Printed 10/25/2019
Bid Results
Type
Item Code
UOM
Qty
Unit Price
Line Total Comment
36
Install Park Sign
EA
1
$7,000.00
$7,000.00
37
Install Fold Down Bollard
EA
2
$3,000.00
$6,000.00
38
Construct Grouted Rip -Rap Apron
SF
8
$1,200.00
$9,600.00
39
Construct Concrete Drainage Channel
EA
1
$7,000.00
$7,000.00
40
Construct 3" to 8" River Rack Drainage Swale
SF
240
$18.00
$4,320.00
41
Construct Straight Concrete Headwall
EA
1
$5,000.00
$5,000.00
42
Construct Flared Concrete Headwall
EA
1
$5,000.00
$5,000.00
43
Install 6" Diameter Dual Wall HOPE Pipe
LF
16
$200.00
$3,200.00
44
Install 12" Deep Imparted Class A Topsoil
SF
9850
$3.00
$29,550.00
45
Install Light Fixture, Pole, and Foundation
EA
10
$9,000.00
$90,000.00
46
Install Electrical Conduit Including Wires
LF
1000
$31.00
$31,000.00
47
Install Grounding Rod Well
EA
1
$616.00
$616.00
48
Install Meter Pedestal, Panelboard, and Utility Service
LS
1
$6,000.00
$6,000.00
49
Install Pull Box
EA
10
$500.00
$5,000.00
50
Orange County Conservation Corps (OCCC) Planting
LS
1
$3,416.00
$3,416.00
51
Irrigation System
LS
1
$100,000.00
$100,000.00
,20IR713
City of Santa Ana Page 5
Lincoln Pedestrian Pathway ATPL-5063(177) (17-6802), bidding on October 22, 2019 2:00 PM (Pacific) Printed 10/25/2019
Bid Results
Type
Item Code UOM City Unit Price
Line Total Comment
52
Landscaping—
LS 1 $40,000.00
$40,000.00
53
Labor Agreement Oversight
LS 1 $10,000.00
$10,000.00
Subtotal
$977,409.50
Add Alternative Bid One - NOT part of Base Bid Calculation
54
Install North End Single Leaf Swing Gate and Fencing
LS 1 $10,000.00
$10,000.00
55
Install South End Double Leaf Swing Gate and Fencing
LS 1 $13,500.00
$13,500.00
56
Install 8' Tall Modular Dual Panel Fence (Vine Planting Not Included)
LF 890 $156.00
$138,840.00
Subtotal
$162,340.00
Base Bid Asterisk Notes per P-4 of Specifications - NOT part of Base Bid Calculation
57
= The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the
"25%" limit as stated in Section 3-2 of
the Standard Specifications.
ea 0 0
0
58
= 1-gallon and 5-gallon planting shall be performed by OCCC. For the landscaping bid item, only the price to furnish the materials for the
installation of the 1-gallon and 5-gallon planting shall be included. The labor for the OCCC installation work for 1 and 5-gallon plants is included in Bid Item
50.
ea 0 0
0
59
t - This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
ea 0 0
0
Subtotal
0
Total
$1,139,749.50
I20R; IAA
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: Aramexx Group Inc
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with said
plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following
schedule:
Item
Description
Qty
Unit
Unit Price
Amount
1
Remove Chain -link
85
LF
$ I p i
$�
Fence / Gate
2
Remove Sign
2
EA
$ �
flab ,
$
j{bb
3
Remove Tree
I
EA
$ IZCo
$ 66
112
4
Clearing and Grubbing
1
LS
$
$
31 rnba
31 po 0
i
5
Remove Bollard
2
EA
$
$
(,e0
6
Adjust Water Valve
2
EA
$
$
Box to Grade
t1 So
q bo
7
Adjust Survey
1
EA
$
$
Monument Box to
( 7 D V
I ti 6 b
Grade
8
Adjust Sanitary Sewer
2
EA
$
$
Manhole Lid to Grade
I I b&6
'Lob c,
9
Relocate Gas Line
3
EA
$
$
Warning Post
(oeo
1$ eo
10
Remove / Abandon
1
LS
$
$
Conflicting Irrigation
j 666
10N60
System
11
Remove K-Rail
3
EA
$
$
(IbeA
3�(�p0
12
Remove Vehicular
30
LF
$
$
Metal - Beam
S"a
I 1 S bo
Guardrail and Posts
P-1 ofP-19
20B-15
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
Item
Description
Qty
Unit
Unit Price
Amount
13
Relocate Landscape
Boulders
1
LS
$
I i CI�6
$
1 obo
�
14
Remove Residential
60
LF
$
$
Screen Wall (Includes
�p
Zpb
Gates and Fencing)
15
Fine Grading
30,550
SF
$
$
LS
?,637� sa
16
Unclassified
713
CY
$
$
Excavation and Fill
(en:
y2r?
with Excavated
$ b
Material
17
Unclassified
790
CY
$
$
Excavation and Export
Ips
1219s0
of Excavated Material
18
Construct
9,565
SF
$
$
Decomposed Granite
Pathway with Organic
q o
Binder (Includes
Aggregate Base
19
Construct
730
LF
$
$
Decomposed Granite
Pavement Concrete
Header (Includes
Aggregate Base
20
Construct Colored
780
SF
$
$
Concrete Pavement
`2 .
3 6
(Includes Aggregate
Base
21
Construct Asphalt
151
SF
$
$
Concrete Pavement
I p
(Includes Aggregate
11510
Base
22
Construct Concrete
75
LF
$
$
Curb (Includes
Aggregate Base
23
Construct Concrete
870
LF
$
$
Curb and Gutter
t1 p
y e ab
(Includes Aggregate
Base
24
Construct Concrete
85
SF
$
$
Cross Gutter
25
Construct Concrete
Retaining Curb
371
LF
$
1 ~
$
1 $ 211
26
1 Install Detectable
45
SF
$
Warning Surface
P-2 of P-19
20B-16
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
27
Construct Reinforced
930
SF
$
$
Concrete Pavement
with Integral
q
l 1 0
Curb/Wall (Pavement
Portion w/ Base
28
Construct Reinforced
106
LF
$
$
Concrete Pavement
with Integral
S t j,
57 2 t�
Curb/Wall (Curb and
Gutter Portion w/
Base
29
Construct Reinforced
103
LF
$
$
Concrete Pavement
with Integral
Curb/Wall (Low Wall
Portion w/ Base
30
Install 6' Tall R/W
950
LF
$
$
b 6
Welded Wire Mesh
$D
p
Fence
31
Install 6' Tall Modular
890
LF
$
$
Dual Panel Fence
I V
Q'j Qoc
(Vine Planting Not
Included
32
Paint Residential
935
LF
$
$
Screen Walls
2Z !
33
Construct 4" CMU
60
LF
$
job%
$
Block Wall
11/Daa
34
Install Entry Signage
1
EA
$
$
211pbb
-l.l,aoa
35
Install Roadway /
3
EA
$
$
SCRRA Sign
'1 o b
Z e 1 b b
36
Install Park Sign
1
EA
$
$
� 1peo
71br]o
37
Install Fold Down
2
EA
$
$
Bollard
3 aee
4 pe o
38
Construct Grouted
8
SF
$
$
9 600
Rip -Rap Apron
1t1,60
39
Construct Concrete
1
EA
$
$
Drainage Channel
c3b
40
Construct 3" to 8"
240
SF
$
$
River Rock Drainage
I
L1 �gy0
Swale
41
Construct Straight
1
EA
$
$
Concrete Headwall
42
Construct Flared
Concrete Headwall
1
EA
$
�1 b a b
$
S l a 6a
43
Install 6" Diameter
16
LF
$
$
Dual Wall HDPE Pipe
Z o a,
r�-
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
44
Install 12" Deep
9850
SF
$
$
Imported Class A
,'
2 9 SD
Topsoil
45
Install Light Fixture,
10
EA
$ a
$ a
Pole, and Foundation
46
Install Electrical
1,000
LF
$
$
Conduit including
Wires
47
Install Grounding Rod
1
EA
$
$ 1
Well
(e 1 Ie
48
Install Meter Pedestal,
1
LS
$
$
Panelboard, and
�00 6
Utility Service
49
Install Pull Box
10
EA
$
Sotl
$
$�he'�
50
Orange County
1
LS
$3,416.00
$3,416.00
Conservation Corps
OCCC Planting
51
Irrigation System
1
LS
$
$ (aC a
06`t16 e
52
Landscaping"
1
LS
$
4anee
$ 4c, J C'& o
53
Labor Agreement
1
LS
$10,000
$10,000
Oversight
TOTAL BASE BID $ ! 7-7 / 901'SD
ADD ALTERNATES
Item
Description
Qty
Unit
Unit Price
Amount
1
Install North End
1
LS
$
$
Single Leaf Swing
16, 06 b
j D �nbb
Gate and Fencing
2
Install South End
1
LS
$
$
Double Leaf Swing
13)Sbb
�31>bb
Gate and Fencing
3
Install 8' Tall Modular
890
LF
$ S(, !
$
Dual Panel Fence
Planting Not
(Vine
Included)
TOTAL ADD ALTERNATE BID $ ((�2J 3 9 c6
P-4 of P-19
20B-18
CITY• OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
** 1-gallon and 5-gallon planting shall be performed by OCCC. For the landscaping bid item, only
the price to furnish the materials for the installation of the I -gallon and 5-gallon planting shall be
included. The labor for the OCCC installation work for 1- and 5-gallon plants is included in Bid
Item 50.
t This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown
above, within one -hundred (100) working days after the commencement date stated in the Notice
to Proceed.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $1,500 per calendar day.
Name of Firm Aramexx Group
Signature of BIDDER
Salim Samour - Pres
Title
- Manager
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
P-5 of P-19
20B-19
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
BIDDER'S STATEMENT
BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent
Construction Contract Agreement shall constitute the entire agreement between BIDDER and the
AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the Council
with her signature and official seal noting hereon the action of approval of the Council, signed by
the Public Works Agency Executive Director or his/her duly authorized agent, and signed by the
City Attorney, denoting his approval of the form of this document, and its execution, and when it
or an exact copy of it has been either delivered to BIDDER or deposited with the United States
Postal Service properly addressed to the BIDDER with the correct postage affixed thereto.
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she
will furnish AGENCY all required bonds and certificate of liability insurance within ten (10)
business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof
accompanying this proposal shall become the property of the AGENCY and shall be considered
as payment of damages due to the delay and other causes suffered by AGENCY because of the
failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages
actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S bond
substituted in lieu thereof shall be returned to the undersigned.
BIDDER understands that a bid is required for the entire work, the estimated quantities set forth
in the bid schedule are solely for the purpose of comparing bids, and that final compensation under
the contract will be based upon the actual quantities of work satisfactorily completed. The
BIDDER also certifies that the bid is a balanced bid.
In accordance with Section 7028.15 of the California Business and Professions Code, the
undersigned certifies under penalty of perjury that the foregoing is true and correct.
Name of f
Signature
Salin
Title Presi
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
- Manager
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
CONTRACTOR'S LICENSING AND REGISTRATION STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she and
all his/her subcontractors are registered with the State of California Department of Industrial
Relations (DIR), and that the following is true and correct.
Contractor's Name: Aramexx Groun Inc
Business Address: 532 West First St. #202 Claremont CA 91711
Business E-Mail Address: Info@aramexxgroupinc.com
Telephone:
Z MMO
State Contractor's License No. and Class:
License Expiration Date:
State Dept. of Industrial Relations (DIR)
Registration No.:
State Dept. dus ial a ' ns (DIR)
Registration Ex ' ti Date:
Signed:
Title: President
�LSiki�F���ibTd
1000010179
6-30-20
r�-
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT
Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well as
California Code of Regulations, Title 8, Section 16,000, et seq., ("Prevailing Wage Laws"), which
require the payment of prevailing wage rates and the performance of other requirements on "public
works" and "maintenance" projects. Since the services are being performed as part of an applicable
"public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and since the
total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing
Wage Laws.
City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the
commencement of this Agreement. Contractor shall make copies of the prevailing rates of per
diem wages for each craft, classification or type of worker needed to execute the services available
to interested parties upon request, and shall post copies at the Contractor's principal place of
business and at the project site.
Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and
agents free and harmless from any claim or liability arising out of any failure or alleged failure to
comply with the Prevailing Wage Laws.
The undersigned certifies that the foregoing is true and correct.
Name of Firm
Signature of 1311.
Title President
(if an individual, so state)
ri-
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
OWNERSHIP AFFIDAVIT
STATE OF CALIFORNIA )
COUNTY OF ORANGE ) SS:
CITY OF SANTA ANA )
Salim SamOur , being duly sworn, deposes and says:
❑ INDIVIDUAL That he/she is the party making the foregoing proposal:
❑ PARTNERSHIP That he/she is a member of the co -partnership firm designated as:
and who has been and is duly vested with the authority to make and execute instruments
for the co -partnership by:
who constitute the other members of the co -partnership.
® CORPORATION That he is of:
Aramexx Group Inc
a corporation which is making the foregoing proposal:
❑ JOINT VENTURE That he is of:
one of the parties making the foregoing proposal as a joint venture, and the he/she has been
and is duly vested with the authority to execute instruments for an on behalf of the parties
making said bid who are:
that such a bid is genuine and not collusive or sham, and has not in any manner sought by collusion
to secur ad anta a inst the City of Santa Ana or any person interested in the proposed
contract, for f or an er person.
Signature of Bidder
Subscribed and sworn to before me this day of 20
"Please see attached"
Signature of officer Administering Oath (Notary Public)
P-9 of P-19
20B-23
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
-validity of that document.
State of California
County of Los Angeles
On VG�6'1& It' 2019 before me,
personally appeared Salim Samour
R. Gallardo Samour, Notary Public
(insert name and title of the officer)
who proved to me on the basis of satisfactory evidence to be the person whose name(,q'isfare
subscribed to the within instrument and acknowledged to me that hefshefthey executed the same in
his/4eWt*reiii,authorized capacity{ies} and that by hi.slhe ;".!:cm signaturewon the instrument the
personf,8); or the entity upon behalf of which the personjsracted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature
R. GALLARDO SAMOUR
Notary Public - California
San Bernardino County
Commission
kx
My
= 2285846
Comm. Expires May 10, 2023
(Seal)
20B-24
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
KNOW ALL PRESENT that,
Aramexx Group Inc. dba Aramexx Construction , as BIDDER, and
United States Fire Insurance Company as SURETY,
are held and firmly bound unto the CITY OF SANTA ANA, as AGENCY, in the penal sum of
Ten Percent of Total Bid Amount Dollars ($ 10.0% of Bid ), which is ten percent (10%)
of the total amount bid by BIDDER to AGENCY for the above -stated project, for the payment of
which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to
submit a bid to AGENCY for the above -stated project, if said bid is rejected, or if said bid is
accepted and a contract is awarded and entered into by BIDDER in the manner and time specified,
then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor
of AGENCY.
---- N 3VITNESS WHEREOF the parties hereto have set their names, titles, hands, and seal this
- 1 day of October 2019
ER*
.c oup In . Aramexx Construction, 532 W. First Street, Ste 202, Claremont, CA 91711, (909)746
_�`\\�`\• SRi1M SR•xettR � t BN'(
SURETY*
Fire Insurp-n�e Compan)f, 3�5 Madison Avenue, Morristown, NJ 07962, (973)490-6600
Vanessa Copeldnd, Attorney -in -Fact, 151'Kalmus Dr., Ste A201, Costa Mesa, CA 92626, (714)546-5100
Subscribed and sworn to before me see Attached this day of
20_ 1y�
Si-nature:IbY 5 AAA°tA"CD„
Notary Public in and for the County of
, State of
* Provide BIDDER/ SURETY name, address, and telephone number and the name, title, address,
and telephone number of authorized representative.
P-10 ofP-19
20B-25
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT CIVIL CODE 1189
A notary public or other officer completing this certificate verifies only the identity of the individual who signed the
document to which this certificate is attached and not the truthfulness, accuracy, or validity of that document.
State of California
County of Orange )
On 10�lloq —beforeme-NatassiaKirk-SmithNotary Public,
personally appeared Vanessa Copeland
Name(s) ofSigner(s)
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the
within instrument and acknowledged to me that he/she/they executed the same in hisi`her/their, authorized
capacity(ies), and that by hisfher/their signature(&) on the instrument the person(s), or the entity upon behalf of
which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the
NATASSIAKIKK-SW_D7i laws of the State of California that the foregoing
f; �" • - Notary rPargiec�oCaCi�forma paragraph is true and correct.
`. to Commission k 1253818
< '�-` µy Comm. Expires Aug 12, zozz J WITNESS my hand and offi '
r
Signatur
Signature blic
Place Notary Seat Above
-------------------___w___�_ OPTIONAL
Though the information below is not required by law, it may prove valuable to persons relying on the document
and could present fraudulent and reattaclmient of this form to another document.
Description of Attached Document
Type or Title of Document:
Document Date:
Signer(s) Other Than Named Above:
Capacity(ies) Claimed by Signer(s)
Signer's Name: Vanessa Copeland
❑ Individual
❑ Corporate Officer — Title(s):
❑ Partner: ❑Limited ❑ General
® Attorney in Fact
❑ Trustee
❑ Guardian or Conservator
❑ Other:
Signer Is Representing:
Number of Pages:
Capacity(ies) Claimed by Signer(s)
Signer's Name:
❑ Individual
❑ Corporate Officer — Title(s):_
❑ Partner: ❑Limited ❑ General
❑ Attorney in Fact
❑ Trustee
❑ Guardian or Conservator
❑ Other:
Signer Is Representing:
Rev. 1-15
20B-26
PO WER OF ATTORNEY
UNITED STATES FIRE INSURANCE COMPANY
PRINCIPAL OFFICE - MORRISTO WN, NEW JERSEY
01016
KNOW ALL MEN BY THESE PRESENTS: That United States Fire Insurance Company, a corporation duly organized and existing under the laws of the
state of Delaware, has made, constituted and appointed, and does hereby make, constitute and appoint:
Eric Lowey, Mark Richardson, Vanessa Copeland, Kevin Cathcart, Shawn Blume
each, its true and lawful Attomey(s)-In-Fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and
deliver: Any and all bonds and undertakings of surety and other documents that the ordinary course of surety business may require, and to bind United States
Fire Insurance Company thereby as fully and to the same extent as if such bonds or undertakings had been duly executed and acknowledged by the
regularly elected officers of United States Fire Insurance Company at its principal office, in amounts or penalties not exceeding: Fifty Million
Dollars ($50,000,000).
This Power of Attorney limits the act of those named therein to the bonds and undertakings specifically named therein, and they have no authority to
bind United States Fire Insurance Company except in the manner and to the extent therein stated.
This Power of Attorney revokes all previous Powers of Attorney issued on behalf of the Attomeys-In-Fact named above and expires on January 31, 2020.
This Power of Attorney is granted pursuant to Article IV of the By -Laws of United States Fire Insurance Company as now in full force and effect,
and consistent with Article III thereof, which Articles provide, in pertinent part:
Article IV, Execution of Instruments - Except as the Board of Directors may authorize by resolution, the Chairman of the Board, President,
any Vice -President, any Assistant Vice President, the Secretary, or any Assistant Secretary shall have power on behalf of the Corporation:
(a) to execute, affix the corporate seal manually or by facsimile to, acknowledge, verify and deliver any contracts, obligations, instruments
and documents whatsoever in connection with its business including, without limiting the foregoing, any bonds, guarantees, undertakings,
recognizances, powers of attorney or revocations of any powers of attorney, stipulations, policies of insurance, deeds, leases, mortgages,
releases, satisfactions and agency agreements;
(b) to appoint, in writing, one or more persons for any or all of the purposes mentioned in the preceding paragraph (a), including affixing the
seal of the Corporation.
Article III, Officers, Section 3.11, Facsimile Signatures. The signature of any officer authorized by the Corporation to sign any bonds,
guarantees, undertakings, recognizances, stipulations, powers of attorney or revocations of any powers of attomey and policies of insurance
issued by the Corporation may be printed, facsimile, lithographed or otherwise produced. In addition, if and as authorized by the Board of
Directors, dividend warrants or checks, or other numerous instruments similar to one another in form, may be signed by the facsimile
signature or signatures, lithographed or otherwise produced, of such officer or officers of the Corporation as from time to time may be
authorized to sign such instruments on behalf of the Corporation. The Corporation may continue to use for the purposes herein stated the
facsimile signature of any person or persons who shall have been such officer or officers of the Corporation, notwithstanding the fact that he
may have ceased to be such at the time when such instruments shall be issued.
IN WITNESS WHEREOF, United States Fire Insurance Company has caused these presents to be signed and attested by its appropriate officer and
its corporate seal hereunto affixed this 10'^ day of March, 2016.
UNITED STATES FIRE INSURANCE COMPANY
Anthony R. Slimowicz, Executive Vice President
State of New Jersey)
County of Morris )
On this 10ih day of Mach 2016, before me, a Notary public of the State of New Jersey, came the above named officer of United States Fire
Insurance Company, to me personally known to be the individual and officer described herein, and acknowledged that he executed the foregoing
instrument and affixed the seal of United States Fire Insurance Company thereto by the authority of his office. n
SONIA SCALAR,a �L.
NOTARY PUBLIC OF NEW JERSEY Sonia Scala - (Notary Public)
MY COMMISSIONEXPIRES 3/25/2024
No.2163686
1, the undersigned officer of United States Fire Insurance Company, a Delaware corporation, do hereby certify that the original Power of Attorney of which
the foregoing is a full, true and correct copy is still in force and effect and has not been revoked.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the corporate seal of United States Fire Insurance Company on thess"' day
of October- 2019
UNITED STATES FIRE INSURANCE COMPANY
Peter M. Quinn, Senior Vice President
20B-27
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
-validity of that document.
State of California
County of Los Angeles
On Qc-ror3E2 )7+^ 2011 before me, R. Gallardo Samour, Notary Public
(insert name and title of the officer)
personally appeared Salim Samour
who proved to me on the basis of satisfactory evidence to be the person,(ewhose nameXishwe
subscribed to the within instrument and acknowledged to me that hefsheAhey executed the same in
his/"'^''rc6theif-authorized capacity(ia4 and that by hisMeFlthei signatureXon the instrument the
personJsy, or the entity upon behalf of which the person,(a'facted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature G�>�1�� \ (Seal)
R. GALLAR00 SAMOUR
Notary Public - California
?'= San Bernardino County
4f ` Commission: 2285946
My Comm. Expires May 10, 2023
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
LIST OF SUB -CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all
subcontract work exceeding the following amount:
o Streets, highways including bridge projects: %z% of the bid or $10,000, whichever is greater
o Buildings, parks, or other projects: %:% of the bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State
Department of Industrial Relations (DIR).
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
Name M EL pcctti'r- (?"-T I M.) Name
License #/Exp. f,-ij�- • Lx> ibl o ci l q License #/Exp.
DIR Reg. #/Exp. L ' b "t-v ibo o&49 8q DIR Reg. #/Exp.
Location CAS• qAt.¢ CA Location
Phone 151 .4'1 i .3966 Phone
Type Of Work rt.�Ta%e *L Type Of Work
Amount $ Z l F ibb Amount $
Name b.J&N"Nwe 14lizX (PMz ft7l
License #/Exp. 19"1 o5g 6 (Z -31-19
DIR Reg.#/Exp. Ibbobb9`"1$ 6"Sb-U
License # g7 C 5 $L
Location I b b b be, "l V"1
Phone 5L2 • $•2eSa
Type Of Work f Q q'
Amount $ 1� -i b JDd b
Name
License #/Exp.
DIR Reg.#/Exp.
License # _
Location _
Phone
Type Of Work
Amount $
Signi thtrcLof E dder
Name
License #/Exp.
DIR Reg. #/Exp.
License #
Location
Phone
Type Of Work
Amount $
Name
License #/Exp.
DIR Reg. #/Exp.
License # _
Location _
Phone
Type Of Work
Amount $
rI- •
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER has performed similar work within the past three years.
I PLEASE SEE ATTACHED
2.
Name and Address of Owner.
Name and Telephone Number of person familiar with project.
Contract Amount
Name and Address of owner.
Type of Work
and Telephone Number of person familiar with project.
Contract Amount
and Address of owner.
Type of Work
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work
Date Completed
Date Completed
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
S&L Risk Management and Insurance Solutions Pinnacle Surety
1447 Ford St. Suite 103 Redlands, CA 92374 151 Kalmus Dr. Suite A201, Costa Mesa, CA 92626
909-253-7742
951-271-8637
P-12 ofP-19
20B-30
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
ADDITIONAL REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER or Subcontractor has performed similar work in the past five years.
I . PLEASE SEE ATTACHED
Name and Address of Owner.
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work Date Completed
2.
Name and Address of owner.
3.
Name and Telephone Number of person familiar with
Contract Amount
and Address of owner.
Type of Work
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work
Date Completed
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
S&L Risk Management and Insurance Solutions Pinnacle
1447 Ford St. Suite 103, Redlands, CA 92374
151 11dlIRUJ Ll., Al1llC HLvl, l.wta iviwq er�
909-253-7742 92626
286E 31
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
NON -COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and Public Contract Code Section 7106)
In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106 the
BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed
person, partnership, company, association, organization, or corporation; that the bid is genuine and
not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other
BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired,
connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall
refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by
agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any
other BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any
other BIDDER, or to secure any advantage against the public body awarding the contract of anyone
interested in the proposed contract; that all statements contained in the bid are true; and, further,
that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown
thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will
not pay, any fee to any corporation, partnership, company association, organization, bid
depository, or to any member or agent thereof to effectuate a collusive or sham bid.
Note: The above Non-coil`,,��+RRn Affidavit is part of the Proposal. BIDDERS are cautioned
that r�ial Ng affalse c�ation may subject the certifier to criminal prosecution.
Signed
State of California
County of PLEASE SEE ATTACHED
Subscribed and sworn to (or affirmed) before me on this day of , 20_, by
, proved to me on the basis of satisfactory evidence to be the person(s)
who appeared before me
Notary Public Signature
Notary Public Seal
P-14 of P-19
20B-32
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.
State of California County of Los Angeles )
On OG.TC fRLV— 22K9 2c'Iq before me, R. Gallardo Samour, Notary Public
(insert name and title of the officer)
personally appeared Salim Samour
who proved to me on the basis of satisfactory evidence to be the personorwhose nameXis/efe-
subscribed to the within instrument and acknowledged to me that he/sheAhey executed the same in
his/4e0theif- authorized capacitykW4, and that by hiss ;eFAhei signatureXon the instrument the
personf, ,, or the entity upon behalf of which the person0f acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
WITNESS my hand and official seal.
Signature
R. GALLARDO SAMOUR
I No ry Public - California
San Bernardino County
Commission: 2285846
My Camm, Expires May 10, 2023'
(Seal)
20B-33
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
NON-DISCRIMINATION CERTIFICATE
The undersigned contractor or corporate officer, during the performance of this contract, certifies
as follows:
The Contractor shall not discriminate against any employee or applicant for employment
because of race, color, religion, sex, or national origin. The Contractor shall take affirmative
action to ensure that applicants are employed, and that employees are treated during
employment without, regard to their race, color, religion, sex, or national origin. Such action
shall include, but not be limited to, the following: employment, upgrading, demotion, or
transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other
forms of compensation; and selection for training, including apprenticeship. The Contractor
agrees to post in conspicuous places, available to employees and applicants for employment,
notices to be provided setting forth the provisions of this nondiscrimination clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf
of the Contractor, state that all qualified applicants will receive consideration for employment
without regard to race, color, religion, sex, or national origin.
3. The Contractor shall send to each labor union or representative of workers with which he/she
has a collective bargaining agreement or other contract or understanding, a notice to be
provided advising the said labor union or workers' representatives of the Contractor's
commitments under this section, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24,
1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Contractor shall furnish all information and reports required by Executive Order 11246 of
September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant
thereto, and will permit access to his/her books, records, and accounts by the administering
agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with
such rules, regulations, and orders.
6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract may be canceled,
terminated, or suspended in whole or in part and the Contractor may be declared ineligible for
further Government contracts or federally assisted construction contracts in accordance with
procedures authorized in Execution Order 11246 of September 24, 1965, and such other
sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of
September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise
provided by law.
P-15 ofP-19
20 B-34
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
7. The Contractor shall include the portion of the sentence immediately preceding paragraph (1)
and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless
exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section
204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding
upon each subcontract or purchase order as the administering agency may direct as means of
enforcing such provisions, including sanctions for noncompliance; provided, however, that in
the event the Contractor becomes involved in, or is threatened with, litigation with a
subcontractor or vendor as a result of such direction by the administering agency, the
Contractor may request that the United States enter into such litigation to protect the interests
of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as
amended, no discrimination shall be made in the employment of persons upon public works
because of race, religious creed, color, national origin, ancestry, physical handicaps, mental
condition, marital status, or sex of such persons, except as provided in Section 1420, and any
contractor of pub ' works violpuag this Section is subject to all the penalties imposed for a
violation of the Cfiwer. n \\
Title: President
Firm: Aramexx Group Inc
Date: 10-22-19
Msf 35
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor
Code regarding employment of apprentices, and understands that contractors on contracts
exceeding $30,000 or 20 working days shall:
1. Apply to the joint apprenticeship committee administering the apprenticeship standards of the
craft or trade in the area of the site of the public work for a certificate approving the contractor
under the apprenticeship standards for the employment and training of apprentices in the area
or industry affected.
2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the
apprenticeship standards.
3. Contribute to the fund or funds in each craft or trade in which he/she employs journeymen or
apprentices on the public work, in the same amount or upon the same basis and in the same
manner as the o con racto cept contractors not signatory to the trust agreement shall
pay a like amount t he aliforn' pprenticeship Council.
Signed: \
Title: President
Firm: Aramexx Group Inc
Date: 10-22-19
P-17 of P-19
20B-36
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
STATEMENT REGARDING "ANTI -KICKBACK" REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by these
bid documents, agrees to comply with the Copeland "Anti -Kickback" Act (18 USC 74) as
supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that
each contractor or subcontractor shall be prohibited from inducing, by any means, any person
employed in the couction or r it of public work, to give up any part of the compensation to
which he/she is otIh Ise title .
Signed:
Title: President
Firm: Aramexx Group Inc
Date: 10-22-19
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CREEK
ATPL-5063(177)
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE
In conformance with Public Contract Code Section 10162, the BIDDER shall complete,
under penalty of perjury, the following questionnaire:
Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a
proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented from
bidding on, or completing a federal, state, or local government project because of a violation of
law or a safety regulation?
Yes No x
If the answer is yes, explain the circumstances in the following space.
AfM
532 W. First St. #202
Claremont, CA 91711
City of Santa Ana
Jerome Center Landscape Drainage —
Feb. 2019 —
20 Civic Center
Planting, PCC walkway, precast concrete,
April 2019
Santa Ana, CA 92701
irrigation.
Michael Ortiz
714-615-0892
MOrtiz@santa-ana.org
City of Rialto
Renaissance Parkway Landscaping
Dec. 2018 —
290 W. Rialto Ave.
Improvement—
April 2019
Rialto, CA 92376
Irrigation, planting, DG, installation of river
Kavous Emami
cobble with mortar and boulders.
909-628-6234
kvaouse@kecengineers.com
City of Diamond Bar
City Entry Monuments —
Aug. 2018 —
21810 Copley Drive
Grading, irrigation, planting, electrical.
Dec. 2018
Diamond Bar, CA 91765
Carl Sutherland
714-560-8680
csutherland@tait.com
RSCCD Facility Planning
Water Conservation Irrigation Controller
Dec. 2018-
2323 North Broadway
Upgrade
Dec. 2018
Suite 112
Phase 2. -
Santa Ana, CA92706
Investigate existing irrigation, install upgraded
irrigation.
City of Laguna Beach
Laguna Canyon Frontage Road Improvements—
Dec. 2018-
479 Ocean Avenue
Clear and grub, grading, irrigation, planting.
Jan. 2019
Laguna Beach, CA 92651
Tri Nguyen
949-497-0741
tnguyenc@lagunabeachcitv.net
County of Orange
Yorba Regional ADA Improvements —Construct
Sept. 2018
OC Public Works
PCC walkways and picnic table pads, DG
— Nov. 2018
300 N. Flower Street
paving, P.T.D.F header, detectable warning
Santa Ana, CA 92703
systems, site furnishings, concrete transition
Nicholas Murray
patch, hydroblasting, concrete demo.
714-667-8800
City of Brea
Brea Sports Park Landscape Improvements —
Sept. 2018
One Civic Center Circle
Clear and grub, irrigation, planting, grading.
— Oct. 2018
Brea, CA 92821
Bill Bowlus
714-990-7694
20B-39
532 W. First St. #202
Claremont, CA 91711
billb@citvofbrea.net
City of Claremont
Bollard Footing Installation Project —Saw
Sept. 2018
207 Harvard Avenue
cutting asphalt, replacing asphalt sections with
— Oct. 2018
Claremont, CA 91711
removable concrete bollards.
Enrique Villalobos
909-399-5479
evilialobos@ci.claremont.ca.us
City of Buena Park
City Entry Sign on Beach Boulevard at the
July 2018-
6650 Beach Boulevard
South City Limit— Clear and grub, sawcut and
Sept. 2018
Buena Park, CA 90622
remove curb and gutter, electrical system;
Ken Kim
pedestal with meter, lighting, conduit,
714-562-3688
conductors, trenching, directional boring, 8"
kkim@buenaoark.com
curb and gutter, curb and gutter transition, AC
slot patch, remove and reconstruct concrete
sidewalk, grading, planting, irrigation, sign
monument, traffic control.
RSCCD Facility Planning
Water Conservation Irrigation Controller
May 2018 —
2323 North Broadway
Upgrade- Investigate existing irrigation, install
June 2018
Suite 112
upgraded irrigation.
Santa Ana, CA92706
City of Ontario
Trail and Concrete Mow Strip Installation — DG,
Jan. 2018 —
Park and Maintenance Dept
concrete mow curb, grading, planting.
April 2018
1425 South Bon View Avenue
Ontario, CA 91761
Adrian Escamilla
909-395-2635
City of Tustin
El Camino Real /Jamboree Road Median
Jan. 2018-
300 Centennial Way
Modifications and Striping Revisions —Traffic
Feb. 2018
Tustin, CA 92780
control, excavation, construct median curb,
Krys Saldivar
construct PCC mow strip, pavers, AC roadway
714-573-3172
section, type E traffic loops.
ksaldivarl2tULtinca.org
City of Bellflower
SR-91 Eastbound On and Off Ramp at
Jan. 2018 —
16600 Civic Center Drive
Bellflower Phase 2 Landscape Improvements—
March 2018
Bellflower, CA 90706
traffic control, irrigation, planting.
Philip Wang
562-804-1424 ext. 2254
P W ang@ bellflower .org
City of Orange
Katella Avenue Sidewalk Improvements —
Dec. 2017 —
300 W. Chapman Avenue
clearing and grubbing, traffic control,
Jan. 2018
Orange, CA 92866-1591
excavation, construct concrete sidewalk,
rl- -1
532 W. First St. #202
Claremont, CA 91711
Randy Nguyen
grading, mow curb removal and restoration,
714-744-5531
landscape, irrigation, construct retaining curb,
rnguven@citvogorange.org
construct commercial driveway, construct
sidewalk, full depth AC, relocate backflow,
adjust valve box and water meter to grade.
City of Santa Ana
Edinger Avenue Landscape Improvements
Dec. 2017 —
Public Works Agency
Willits -Sullivan Community Beautification —
Feb. 2018
20 Civic Center Plaza
Landscaping and irrigation on multiple streets
Santa Ana, CA 92701
in the city.
Victor So
714-647-5076
yso@santa-a L2M
City of Pasadena
East Arroyo Neighborhood Connector Trail
Jan. 2018—
Dept of Public Works
Improvements at Central Arroyo —Asphalt
Feb. 2018
100 North Garfield Avenue
wearing course, planting, site furnishings,
Pasadena, CA 91109
hardscape, construct swale, stone wall.
Kris Markarian
Cahuilla Indian Reservation
Softball Field and Access Road —Grading, turf
March 2017
Anza, Riverside County, CA
installation, irrigation, fencing, site furnishings.
—May 2017
Angela Medrano
951-763-5549
angelammedrano@yahoo.com
City of Claremont
Pooch Park Renovations — Irrigation, DG, site
July 2017 —
207 Harvard Avenue
furnishings, CMU Wall, landscaping, install
Dec. 2017
Claremont, CA 91711
detention system.
Carl Dillman
909-399-5431
csneed@ci.claremont.ca.us
City of Laguna Niguel
Pacific Island Drive Palm Tree Irrigation —
March 2017
30111 Crown Valley Parkway
concrete, boring, landscape, irrigation.
—April 2017
Laguna Niguel, CA 92677
Jerry Sollom
949-362-4349
isollom citvoflagunaniguel.or�
City of Claremont
College Park Lighting — install new lighting
Dec. 2017 —
207 Harvard Avenue
system.
Dec. 2017
Claremont, CA 91711
Dave Rogers
909-399-5431
Accord Interests, LLC
HD Supply Repairs — parking lot renovations.
Dec. 2017 —
20B-41
euw"ymmmmome mrun.
532 W. First St. #202
Claremont, CA 91711
11719 Bee Cave Road
Dec. 2017
Suite 301
Austin, TX 78738
Tom Santaniello
512-600-1880
tas@accordinterests.com
RSCCD Facility Planning
Irrigation Controller Upgrades - Investigate
March 2017
2323 North Broadway
existing irrigation, install upgraded irrigation.
—Sept.
Suite 112
2017
Santa Ana, CA92706
Joe Melendez
714-480-7531
Melendez ioe@rsccd.edu
CALTRANS
08-OR4804 Vegetation Control —Construction
Dec. 2016-
1727 30`h Street
on state highway in San Bernardino County, in
July 2017
Sacramento, CA 95816
Ontario on route 10 from 0.2 mile East of
Dave Benson
Vineyard Ave. overcrossingto 0.1 mile East of
951-232-6478
Miliken Ave. and in Chino on route 60 from 0.2
David. benson@dot.ca.¢ov
mile West of Mountain Ave. undercrossing to
Euclid Ave. undercrossing.
CALTRANS
09-OR5404 Rock Blanket —Construction on
Sept. 2016
1727 30th Street
state highway in San Bernardino County in
—Jan. 2017
Sacramento, CA 95816
Hesperia and Victorville from 0.2 mile North of
Dave Benson
Joshua Street overcrossing 0.2 mile North of
951-232-6478
Mojave Drive overcrossing.
David.benson@dot.ca.gov
City of La Habra
La Habra Heights Park Irrigation System
June 2016-
1425 N. Hacienda Road
Upgrade — Upgrade of existing irrigation
August
La Habra Heights, CA 90631
system. Installation of new controller, new
2016
Lori Askew
remote control valves, new sprinkler heads,
lakew@lhhcity.o[g
mainline and lateral piping.
Morongo Board of Mission
Morongo Roundabouts Landscape
Oct. 2015—
Indians
Improvements —Installation of new California
Dec. 2016
12700 Pumarra Road
native landscape and irrigation, electrical
Banning, CA 92220
lighting, underground boring, service
Karen Woodard
pedestals, concrete hardscape, cobble paving,
951-755-5124
fence, and grading.
kwoodard@moroneo-nsn.eov
City of Anaheim
Little Peoples Park Remodel and Improvements
Oct. 2015 —
200 S. Anaheim Boulevard
— Demolition of existing concrete walk paths
Feb. 2016
Anaheim, CA 92805
and landscape, irrigation, new wrought iron
20 B-42
532 W. First St. #202
Claremont, CA 91711
Blair Fickett
fence, natural stone pilasters, brick pavers,
714-765-5166
drinking fountains, lighting, site furnishings.
Bfickett@anaheim.net
City of Claremont
College Park Landscape and Irrigation
Oct. 2015-
207 Harvard Avenue
Improvements — Baseball field renovations,
Jan. 2016
Claremont, CA 91711
irrigation, DG mulch, DG trails, concrete
Kristin Mikula
walkways, mow curbs and running track.
909-399-5460
kmikula@ci.claremont.ca.us
Metro
North Hollywood Sustainable Parking
April 2015 —
1 Gateway Plaza
Demonstration Project — Construction of
Sept. 2015
Los Angeles, CA 90012
temporary parking lot and multi -use trail,
Awny Malek
heavy grading and export, compaction, laser
213-922-6268
grading, landscape and irrigation. TemPark
malaka@metro.net
installation, drive approaches, fencing, utility
coordination and installation.
City of Fontana
Foothill Blvd. Median Landscape from Cherry
March 2014
8353 Sierra Ave
Ave to Hemlock Ave — Median work, removal
—Aug. 2015
Fontana, CA 92335
and export of soil, grading, boring, irrigation,
Christopher Smethurst
electrical service pedestals, cobble paving,
909-350-6649
palm tree planting, natural cobble swales.
City of Menifee
Newport Road Widening —Median work,
Oct. 2014
29714 Haun Road
removal and export of soil, grading, boring,
Jan. 2015
Menifee, CA 92586
irrigation, cobble.
Carlos Geronimo
951-639-1368
cgeronlmo@citvofmenifee.us
Chaffey School District
Ontario High School Quad Modernization —
Aug. 2014 —
901 West Francis St.
Installation of 6" mainline, irrigation,
Dec. 2014
Ontario, CA 91762
landscaping.
909-460-5886
20 B-43
March 12, 2019
Subject: ARAMEXX CONSTRUCTION
To Whom It May Concern:
This letter is my personal recommendation for Aramexx Construction. The City of Buena Park
awarded a contract to Aramexx Construction to construct a City Entry Monument Sign on
Beach Boulevard in the City of Buena Park. The project scope consisted of construction of the
sign including footing, landscaping, irrigation, electrical system, traffic control, and
appurtenances. This company has successfully completed the project in timely manner to the
satisfaction of the City in November 2018.
Lupe Gallardo, who managed the project for Aramexx Construction, was professional and
provided outstanding service to the City. She was responsive, readily available for
communication, provided organized paper work, and willing to negotiate on change orders,
which attributed to the smooth completion of the project.
Sincerely, n rI n
Nabil S. Nenein, P.E.
Director of Public Wo s/City Engineer
6650 Beach Boulevard I P.O. Box 5009 1 Buena Park, CA 1 90622.5009 1 [7141 562-3500 1 BuenaPark.cam
�:ur..il�ir:�arrrtrt,�r:�v�rv����`,6yza;yrr�na.117�i' ,,.�,u� :e1�3a+�«em-rr
DEPARTMENT OF TRANSPORTATION
DISTRICT' 8
CONSTRUCITON DIVISON (MS1202)
464 WEST' 4TH STREET, 6e1 RDOR
SAN BERNARDINO, CA 92401-1400
PHONE (909) 383-4563
PAX (909) 383-6913
TTY (909) 383-6300
October 17, 2018
To Whom It May Concern
Making Conservation
a California Way of Life.
I write this letter of recommendation for Aramexx Construction. I have had the.pleasure of
working with Aramexx Construction on two (2) projects for District 8 (Riverside and San
Bernardino Counties). One in Victorville on I-15 and another on I-10 In Ontario. The contract
work included Rock Blanket, Minor Concrete installations and Irrigation Repairs.
On both projects Aramexx Construction performed high quality work and were timely required
paperwork.
They were eager to partner with the department and sincerely endeavor to provide the best
quality work. I have no doubt that Aramexx Construction will perform admirably on all projects
on which they are involved.
I welcome the opportunity to work with Aramexx Construction on future projects.
Sincerely,
David Benson
Resident Engineer
"Frovide a sgfi, saslainable, integrated and efficient transportation system
to enhance Califomia's economy and livability"
20B-45
Oro
NnA
LANDSCAPE
ARCHITECTS
February 6, 2017
Subject: Aramexx Construction
To Whom It May Concern:
In my capacity as Consult Project Manager & Landscape Architect for The
Morongo Band of Mission Indians, I worked closely with Aramexx
Construction on the Morongo Trail / Interstate 10 Roundabout Landscape
Improvement Project in early 2016.
Aramexx Construction was the successful low bidder and performed
construction of the project. Aramexx Construction's work and dedication to
the project were a major part of its success and timely completion.
Aramexx provided great knowledge of value engineering and
constructability methods for this improvement project.
With the help and dedication of Aramexx Construction Project Manager
Lupe Lainez and Construction Superintendent, Bruce Gallardo, the tribe
and Caltrans received a high quality project in a safe and timely manner.
Aramexx is a great candidate to perform landscape construction projects for
any local agency. Feel free to contact me at (619) 300-2782 if you have
any questions.
Sincerely,
Brett J. Allen
Construction Manager / Project Manager / Landscape Architect
VDLA —Van Dyke Landscape Architects
Landscape Architecture 462 Stevens Avenue, Suite 107, Solana Beach, CA 92075-2042
Planning Tel: 619,294.8484 • Fax: 619.574.0626 • E-mail: admin@vdla.us • Web: www.vdla.us
Water Management principals: Mitch Phillippe, ASLA, CA LLA #3781 • Yale Hooper, CID, CILIA
Graphic Communications Associates: Ling Chan, ASLA, CA LLA #5435, LEED AP
_
20 B-47
m
o
\2/0
0
\
\
\j
i/,§E!!
) /
�
\
-
E
;,
)0Z
;
C.
\(
:|,E■
\[
}/\\
k�\)
|
S
` «•
E0
!246
:,
r!
:[,I{{]I
!` I
!|
!!
\ )
E2})k}
)
/�
\ ®
|
,�`
;L 0
!,
-{
lkiei//
!,»
,®
;!
!
, {§!
{
}
\j\}ki/
|;
k/!},
\
\
\
■/
{
/||!!!!!
\\
,
1
!!)
Mmi
e
Yam_/__
!|\
p�
O
9
O
G
a
K
LL
m
O
O
LL
O
O
L
L
S
C
G
k
i
LL
LL
�
W
>
h
W
a m
S
G
W
�afr"
N 2
R c
-E�
C
0&
D
pp�
m
y W F WF
N 2
R E
C C
3
R
m
ano
R0u
i.
WvEp
m
a- E
a 3
S
W (J
5
� Em,
ry
E.`�Ex
a.
oi+
do=
mo
g
m N
t ri a d
d£
N n
o H a
a
z
0 N W
« d
q
a c c
W R
`o
W
c a
N E o
m° 1 m 2
E
o c
£ W
m
u w
m`
00
W
E�
o�C
N
N
O N
0
C D
V
J2 w-
W -
C
3
02, N
m
D
Wo cng
Il
V
LL
Eat
mx 3�
c
L)
c N N
vc
02o�o
�5ry�
�miu
E�
Q C
R W
d WC
C
°wE�V
d�V
C ma
ap•v$���U
�Wi
4C_T
W
CDO
O
Y
TtCV
y
L
R
n L yWy T
'y W U
Fc
pm, s W
y�, y
O
W
IIjfL
3
o
�' 3�
T
#� E
x n C
°' I .2
°> C
"�
O rj
m
-N
W &"io
�°�^',�°�^
«om
dvm
Saon
a
Wcle
=um-
cn£_£y
tea=
m
uo.m
5'm ter
cT)__Y
Iv -
M
m
�0
E
G
o
o
R
n V
cc
3
£
W
N
m 'w
O
o
m
rv-
`
r
v
.q w
O
m 3
n
O
.2
N VC
y
8
E
v
!E
x'o
C 0
a m ✓
a
yp j
O
�'
W
u $
NN
O
roc c
E o
m
'e x
.Y m
T
0
k y
}
5 O
'C m
�
III
�J�qO
rl- -•
mr,
Id
r o mw
gaga o$Q;o
RR O
iE n„'E
EOx �Ka_F
`i8 'S 2E2 as
as
,E a553� >gS$m is E E$H
I
20B-51
20B-52
Exhibit 5
CITY OF SANTA ANA
CONSTRUCTION CONTRACT
PROJECT 17-6802
LINCOLN AVENUE PEDESTRIAN PATHWAY FROM PARK LANE TO SANTIAGO CREEK
[ATPL-5063(177)]
This CONSTRUCTION CONTRACT is made and entered into this 3rd day of December, 2019 by and
between the City of Santa Ana, California, a charter city and municipal corporation organized and existing
under the Constitution and laws of the State of California (hereinafter "CITY"), and Aramexx
Construction (hereinafter "CONTRACTOR"),
WITNESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the satisfaction
of the City Engineer of the CITY, the Lincoln Avenue Pedestrian Pathway from Park Lane to Santiago
Creek Project (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in
accordance with the Contract Documents prepared by the City's Public Works Agency and approved
by the City Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the Standard
Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK OF
IMPROVEMENT the sum total amount not to exceed One Million Nine Hundred Nine Dollars and
Fifty Cents ($1,000,909.50), as set forth and identified in the BID PROPOSAL, which is attached
hereto and incorporated herein as Exhibit "A", line items 1-55.
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of work
will correspond therewith, but reserves the right to increase or decrease the amount of any class or
portion of the work or to omit portions of the work as may be deemed necessary or advisable.
fry uwuvzon
Page I of 3
20B-53
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including
commencing construction within the timeframe therein specified after issuance of a Notice to Proceed.
The CONTRACTOR wil I pay, and will require all subcontractors to pay, all employees on the WORK
OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage established for
such work as set forth in the wage determinations for this work in accordance with applicable State
and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA maybe found on the City'swebsite
at:
http*/Iwww santa-ana org/12wa/documcnts/CW A,pdff
CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work (Performance Bond), and one in the amount of One Hundred Percent (100%)
of the Contract price to guarantee payment of all claims for labor and materials furnished (Payment
Bond). This Contract shall not become effective until such bonds are supplied to and approved by the
CITY.
CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance, For projects up to Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand Dollars ($10,000)
or Twenty Percent (20%) of the final contract price. For projects above Five Hundred Thousand
Dollars ($500,000), the Warranty Bond amount shall be the greater of One Hundred Thousand Dollars
($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the CITY.
Page 2 of 3
20B-54
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST:
DAISY GOMEZ
Clerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By
JFUNK
A sistant City Attorney
RECOMMENDED FOR APPROVAL:
FUAD SWEISS, PE, PLS
Executive Director
Public Works Agency
CIT1OF SANTA ANA
KRISTINE RIDGE
City Manager
CONTRACTOR:
A m a onstr c,
NAME:SALIM SAVIOUR
TITLE: PRESIDENT
Page 3 of 3
20B-55
City of Santa Ana
Lincoln Pedestrian Pathway
ATPL-5063(177) (17-6802), bidding
on October 22, 2019 2:00 PM (Pacific)
Bid Results
Bidder Details
Vendor Name
Aramexs Construction
Address
532 W First St Unit 202
Claremont, CA 91711
United States
Respondee
Salim Samour
Respondee Title
President
Phone
909-746-8066 Ext.
Email
info@aramexxgroupinc.com
Vendor Type
License #
CA DIR
Bid Detail
Bid Format
Electronic
Submitted
October 22, 2019 1:38:10 PM (Pacific)
Delivery Method
Bid Responsive
Bid Status
Submitted
Confirmation #
193440
Ranking
0
Respondee Comment
Buyer Comment
Attachments
File Title
File Name
Proposal - Santa Ana
Proposal - Santa ana.pdf
Ownership Aff
Ownership Aff.pdf
Bid Bond
Bid Bond.pdf
Non -Collusion
NonCollusion Aff.pdf
Line Items
Type Item Code
Base Bid Items
1 Remove Chain -Link Fence I Gate
2 Remove Sign
UOM Qty
LF 85
EA
2
3 Remove Tree
EA 1
Unit Price
$10.00
$400.00
$1,200.00
Page 1
Printed 10/25/2019
EXHIBIT A
File Type
General Farms
Ownership Affidavit (Notary
Public) - REQ Original Hard
Copy Submittal in Addition
Bid Bond Guaranty (Notary
Public) - REQ Original Hard
Copy Submittal in Addition
Non -Collusion Affidavit
(Notary Public) - REQ
Original Hard Copy Submittal
in Addition
Line Total Comment
$850.00
$800.00
$1,200.00
I20&; 66
City of Santa Ana
Page 2
Lincoln
Pedestrian Pathway ATPL-5063(177) (17-6802), bidding on October 22, 2019 2:00 PM (Pacific)
Printed 10/25/2019
Bid Results
EXHIBIT A
Type
Item Code UOM
Qty
Unit Price
Line Total
Comment
4
Clearing and Grubbing
LS
1
$37,000.00
$37,000.00
5
Remove Ballard
EA
2
$300.00
$600.00
6
Adjust Water Valve Box to Grade
EA
2
$450.00
$900.00
7
Adjust Survey Monument Box to Grade
EA
1
$1,200.00
$1,200.00
8
Adjust Sanitary Sewer Manhole Lid to Grade
EA
2
$1,000.00
$2,000.00
9
Relocate Gas Line Warning Past
EA
3
$600.00
$1,800.00
10
Remove / Abandon Conflicting Irrigation System
LS
1
$5,000.00
$5,000.00
11
Remove K-Rail
EA
3
$1,000.00
$3,000.00
12
Remove Vehicular Metal - Beam Guardrail and Posts
LF
30
$50.00
$1,500.00
13
Relocate Landscape Boulders
LS
1
$1,000.00
$1,000.00
14
Remove Residential Screen Wall (Includes Gates and Fencing)
LF
60
$20.00
$1,200.00
15
Fine Grading
SF
30550
$0.25
$7,637.50
16
Unclassified Excavation and Fill with Excavated Material
CY
713
$60.00
$42,780.00
17
Unclassified Excavation and Export of Excavated Material
CY
790
$105.00
$82,950.00
18
Construct Decomposed Granite Pathway with Organic Binder (Includes Aggregate Base)
SF
9565
$6.00
$57,390.00
19
Construct Decomposed Granite Pavement Concrete Header (Includes
Aggregate
Base)
LF
730
$19.00
$13,870.00
,20IR 67
City of Santa Ana
Page 3
Lincoln
Pedestrian Pathway ATPL-5063(177) (17-6802), bidding on October 22, 2019 2:00 PM (Pacific)
Printed 10/25/2019
Bid Results
EXHIBIT A
Type
Item Code UOM
Qty
Unit Price
Line Total
Comment
20
Construct Colored Concrete Pavement (Includes Aggregate Base)
SF
780
$12.00
$9,360.00
21
Construct Asphalt Concrete Pavement (Includes Aggregate Base)
SF
151
$10.00
$1,510.00
22
Construct Concrete Curb (Includes Aggregate Base)
LF
75
$50.00
$3,750.00
23
Construct Concrete Curb and Gutter (Includes Aggregate Base)
LF
870
$40.00
$34,800.00
24
Construct Concrete Gross Gutter
SF
85
$21.00
$1,785.00
25
Construst Concrete Retaining Curb
LF
371
$41.00
$15,211.00
26
Install Detectable Warning Surface
SF
45
$38.00
$1,710.00
27
Construct Reinforced Concrete Pavement with Integral Curb / Wall (Pavement Portion w/ Base)
SF
930
$19.00
$17,670.00
28
Construct Reinforced Concrete Pavement with Integral Curb / Wall (Curb and Gutter
Portion w/ Base)
LF
106
$54.00
$5,724.00
29
Construct Reinforced Concrete Pavement with Integral Curb / Wall (Low
Wall Portion w/ Base)
LF
103
$255.00
$26,265.00
30
Install 6' Tall R/W Welded Wire Mesh Fence
LF
950
$80.00
$76,000.00
31
Install 6' Tall Modular Dual Panel Fence (Vine Planting Not Included)
LF
890
$110.00
$97,900.00
32
Paint Residential Screen Walls
LF
935
$27.00
$25,245.00
33
Construct 4" CMU Block Wall
LF
60
$200.00
$12,000.00
34
Install Entry Signage
EA
1
$21,000.00
$21,000.00
35
Install Roadway / SCRRA Sign
EA
3
$700.00
$2,100.00
City of Santa Ana
Page 4
Lincoln
Pedestrian Pathway ATPL-5063(177) (17-6802),
bidding on October 22, 2019 2:00
PM (Pacific)
Printed 10/25/2019
Bid Results
EXHIBIT A
Type
Item Code
UOM
Qty
Unit Price
Line Total
Comment
36
Install Park Sign
EA
1
$7,000.00
$7,000.00
37
Install Fold Down Bollard
EA
2
$3,000.00
$6,000.00
38
Construct Grouted Rip -Rap Apron
SF
8
$1,200.00
$9,600.00
39
Construct Concrete Drainage Channel
EA
1
$7,000.00
$7,000.00
40
Construct 3" to 8" River Rack Drainage Swale
SF
240
$18.00
$4,320.00
41
Construct Straight Concrete Headwall
EA
1
$5,000.00
$5,000.00
42
Construct Flared Concrete Headwall
EA
1
$5,000.00
$5,000.00
43
Install 6" Diameter Dual Wall HOPE Pipe
LF
16
$200.00
$3,200.00
44
Install 12" Deep Imparted Class A Topsoil
SF
9850
$3.00
$29,550.00
45
Install Light Fixture, Pole, and Foundation
EA
10
$9,000.00
$90,000.00
46
Install Electrical Conduit Including Wires
LF
1000
$31.00
$31,000.00
47
Install Grounding Rod Well
EA
1
$616.00
$616.00
48
Install Meter Pedestal, Panelboard, and Utility Service
LS
1
$6,000.00
$6,000.00
49
Install Pull Box
EA
10
$500.00
$5,000.00
50
Orange County Conservation Corps (OCCC) Planting
LS
1
$3,416.00
$3,416.00
51
Irrigation System
LS
1
$100,000.00
$100,000.00
20IR 69
City of Santa Ana
Lincoln Pedestrian Pathway ATPL-5063(177) (17-6802), bidding on October 22, 2019 2:00 PM (Pacific)
Bid Results
Type Item Code UOM City Unit Price
52 Landscaping**
LS 1 $40,000.00
53 Labor Agreement Oversight
LS
Add Alternative Bid One - NOT part of Base Bid Calculation
54 Install North End Single Leaf Swing Gate and Fencing
1
LS 1
55 Install South End Double Leaf Swing Gate and Fencing
LS 1
56 Install 8' Tall Modular Dual Panel Fence (Vine Planting Not Included)
$10,000.00
Subtotal
$10,000.00
$13,500.00
Page 5
Printed 10/25/2019
EXHIBIT A
Line Total Comment
$40,000.00
$10,000.00
$977,409.59
$10,000.00
$13,500.00
LF 890 $156.00 $138,840.00
Subtotal $162,340.00
Base Bid Asterisk Notes per P-4 of Specifications - NOT part of Base Bid Calculation
57 = The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to the "25%" limit as stated in Section 3-2 of
the Standard Specifications.
ea 0 0 0
58 = 1-gallon and 5-gallon planting shall be performed by OCCC. For the landscaping bid item, only the price to furnish the materials for the
installation of the 1-gallon and 5-gallon planting shall be included. The labor for the OCCC installation work for 1 and 5-gallon plants is included in Bid Item
50.
ea 0 0 0
59 t - This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
ea 0 0 0
Subtotal 0
Total $1,139,749.50
CITY• OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6802
LINCOLN AVE. PEDESTRIAN PATHWAY PARK LN. TO SANTIAGO CIEI XHI BIT A
ATPL-5063(177)
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
** 1-gallon and 5-gallon planting shall be performed by OCCC. For the landscaping bid item, only
the price to furnish the materials for the installation of the I -gallon and 5-gallon planting shall be
included. The labor for the OCCC installation work for 1- and 5-gallon plants is included in Bid
Item 50.
t This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown
above, within one -hundred (100) working days after the commencement date stated in the Notice
to Proceed.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $1,500 per calendar day.
Name of Firm Aramexx Group
Signature of BIDDER
Salim Samour - Pres
Title
- Manager
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
P-5 of P-19
20B-61