HomeMy WebLinkAbout20E - AA SA BLVD 5TH ST BIKE LANESREQUEST FOR
COUNCIL ACTION
CITY COUNCIL MEETING DATE:
DECEMBER 17, 2019
TITLE:
CLERK OF COUNCIL USE ONLY:
APPROVED
APPROVE AN APPROPRIATION ❑ As Recommended
ADJUSTMENT AND AWARD A ElAmended
❑ OOrrdinance on 1" Reading
CONSTRUCTION CONTRACT TO VIDO ❑ Ordinance on 2ntl Reading
SAMARZICH, INC., IN THE AMOUNT OF ❑ Implementing Resolution
$3,776,881, FOR THE SANTA ANA ❑ Set Public Hearing For
BOULEVARD AND 5TH STREET
PROTECTED BIKE LANES PROJECT WITH
AN ESTIMATED TOTAL COST OF $4,484,000
(PROJECT NO 17-6880)
{STRATEGIC PLAN NO. 6, 1C}
/s/Kristine Ridge
CITY MANAGER
CONTINUED TO
1�1��►1�1i!I:Iq:7
RECOMMENDED ACTION
1. Approve an appropriation adjustment authorizing the expense of $799,830 from the Traffic
System Management, State Grants -Direct revenue account and appropriating the same
amount to the Active Transportation Program, Improvements Other Than Building expenditure
account.
2. Award a contract to Vido Samarzich, Inc., the lowest responsible bidder, in accordance with
the base bid, in the amount of $3,776,881, for construction of the Santa Ana Boulevard and
5th Street Protected Bike Lane Project, for the term beginning upon execution of the contract
and ending upon project completion, and authorize the City Manager to execute the contract
subject to non -substantive changes approved by the City Manager and the City Attorney.
Approve the Project Cost Analysis for a total estimated construction delivery cost of
$4,484,000, which includes $3,776,881 for the construction contract; $329,431 for contract
administration, inspection and testing; and a $377,688 project contingency (approximately 10%
of the construction contract amount).
DISCUSSION
The City of Santa Ana is developing safer, walkable streets for Santa Ana residents who are
dependent on walking or bicycling for transportation every day. Implementation of these types of
street improvements are the result of goals established by the City's Active Transportation Plan
(ATP) and ultimately provides safe bicycling and walking in the City, enhances non -motorized travel
infrastructure, and creates options to support the existing population.
20E-1
Award Contract to Vido Samarzich, Inc., for Santa Ana Boulevard
and 5th Street Protected Bike Lanes Project
December 17, 2019
Page 2
The project will install approximately 2.2 miles of protected bike lanes along Santa Ana Boulevard
and 5th Street (Exhibit 1). The proposed bike lanes will improve bicycle routes to and from schools,
parks, trails, local shopping centers, and high -density residential areas. The construction scope of
work includes a raised concrete median, asphalt concrete pavement, concrete sidewalks, curb and
gutter, and driveway approaches. Related improvements will provide Americans with Disabilities
Act curb ramps, pedestrian push buttons, traffic signs and striping, and a traffic signal video
detection system. The work will require relocating several water services from private property onto
the public right-of-way where they are typically located. Once completed, the improvements will
provide safe, fun, convenient, healthy, and environmentally friendly travel for all ages and abilities.
The City secured an Active Transportation Program grant in the amount of $4,484,000 for the Santa
Ana Boulevard and 5th Street Protected Bike Lanes Project. The grant award was included in the
approved Fiscal Year 2018-19 Capital Improvement Program. However, the September 17, 2019
City Council action approving the carryover of unspent Fiscal Year 2018-19 budgets only specified
$3,684,170 for this project. Staff is requesting an Appropriation Adjustment (Recommended Action
No. 1) to authorize expenditure of the additional $799,830 needed to establish the project budget
for the full $4,484,000 grant award.
Public Outreach and Contractor Participation
To provide an opportunity for local vendors to submit bids, a Notice Inviting Bids was advertised in
the Orange County Register newspaper on October 8 and 15, 2019. Bids were received
electronically via the City's web -based electronic bidding system, PlanetBids, on October 6, 2019.
Through the PlanetBids online portal, vendors may register to receive notifications on all current
and future City projects, as well as download contract documents, receive project updates and
submit bids electronically.
Project notifications were sent to 873 vendors, including 48 located in the City of Santa Ana, via
PlanetBids. Bid documents were requested from 67 vendors, and bids were received from 5
contractors. No bids were received from Santa Ana contractors.
Bid Results Summary
RANK
BIDDER'S NAME
LOCATION
BASE BID
1
Vido Samarzich, Inc.
Rancho Cucamonga
$3,776,881
2
Griffith Company
Santa Fe Springs
$4,673,090
3
Lonerock, Inc.
Irvine
$4,712,463
4
Excel Paving Co
Long Beach
$4,734,986
5
Walsh Construction Company II
Los Angeles
$5,400,000
All five bids were responsive. Vido Samarzich, Inc., submitted the lowest responsive bid (Exhibit 2)
in the amount of $3,776,881. Based on a bid analysis and a contractor's reference check, staff
recommends awarding the construction contract (Exhibit 3) to Vido Samarzich, Inc., in the amount
bid.
20E-2
Award Contract to Vido Samarzich, Inc., for Santa Ana Boulevard
and 5th Street Protected Bike Lanes Project
December 17, 2019
Page 3
Project Delivery
To deliver a complete project, in addition to the construction contract, the estimated total cost to
deliver the project also requires construction administration, inspection, and testing, along with an
allowance for contingencies to account for unexpected or unforeseen conditions. Construction
administration and inspection includes construction management; implementation of the City's
Community Workforce Agreement requirements; inspection of the Contractor's work to ensure
contract compliance, workmanship, and quality; and material testing. As indicated in the Cost
Analysis (Exhibit 4) and as summarized in the table below, the estimated total construction delivery
cost of the project is $4,484,000.
Construction Contract
$3,776,881
Construction Administration, Inspection, and Testing
$329,431
Contingencies
$377,688
ESTIMATED CONSTRUCTION DELIVERY COST
$4,484,000
STRATEGIC PLAN ALIGNMENT
Approval of this item supports the City's efforts to meet Goal #6 — Community Facilities &
Infrastructure, Objective #1 (Establish and maintain a Community Investment Plan for all City
assets), Strategy C (Invest resources and technology to extend the service life of existing
infrastructure to protect the City's investment and support a high quality of life standard).
ENVIRONMENTAL IMPACT
In accordance with the California Environmental Quality Act, the recommended actions are exempt
from further review. Categorical Exemption Environmental Review No. ER-2016-097 was filed for
the project.
FISCAL IMPACT
As indicated in the Cost Analysis (Exhibit 4), the estimated total construction delivery cost of the
project is $4,484,000, which includes the construction contract, contract administration, inspection,
testing, and project contingency. Approval of the requested Appropriation Adjustment will authorize
the expense of $799,830 from the Traffic System Management, State Grants -Direct revenue
account (No. 14817002-52025) and appropriate the same amount to the Active Transportation
Program, Improvements Other Than Building expenditure account (No. 14817613-66220).
The following table summarizes the funds budgeted to deliver construction of this project:
Fiscal Year
Accounting Unit-
Fund Description
Accounting Unit,
Amount
Account #
Account Description
APPROPRIATION ADJUSTMENT
FY 2019-20
14817613-66220
Traffic System
Active Transportation
Dec. -June
(Proj. 17-6880)
Management Grant
Program, Improvements
$799,830
Approved FY18-19 CIP
(Capital Grants Fund)
Other Than Building
CARRYOVER APPROPRIATION (Approved September 17, 2019)
20E-3
Award Contract to Vido Samarzich, Inc., for Santa Ana Boulevard
and 5th Street Protected Bike Lanes Project
December 17, 2019
Page 4
FY 2019-20
14817613-66220
Traffic System
Active Transportation
Dec. -June
(Proj. 17-6880)
Management Grant
Program, Improvements
$3,684,170
Approved FY18-19 CIP
(Capital Grants Fund)
Other Than Building
Total:
$4,484,000
All funds are scheduled for expenditure in Fiscal Year 2019-20.
Fuad S. Sweiss, PE, PLS
Executive Director
Public Works Agency
FSS/NS/TC/MO
Exhibits: 1. Location Map
2. Bid Proposal
3. Construction Contract
4. Cost Analysis
Kathryn Downs, CPA
Executive Director
Finance and Management Services Agency
20E-4
u �
w
¢ m � F
x �
\ PVE m
J
l� 1
H SiSP S
Pp4 ,
St
P�41�yp x�
mQ
�i
5t
� VP
SZ w
F w
tASPiL�� N �
N. FRENCH ST Y
i
N. SPU RGEON ST
N. BUSH ST
N. MAIN ST
N. SYCAMORE ST
BROADWAY
® `w
w
z F
¢ N
H
w
S N ¢
N N
2
3 x
N. ROSS ST s
a
0
N. PARTON ST J.
a
z ¢
4
F
Z
fh
3
N. FLOWER ST
r
Exhibit 1
SAN TA ANA
Project No. 17-6880:
Pl SANTA ANA BOULEVARD AND 5TH
11KII 1XIIIA.IN Y I STREET PROTECTED BIKE LANES
20E-5
City of Santa Ana
Santa Ana Boulevard and
5th Street Protected Bike Lane ATPL -
5063 (17-6880), bidding on November 6, 2019 2:00 PM
Bid Results
Bidder Details
Vendor Name
Vida Samarzich, Inc.
Address
6829 Billings Place
Rancho Cucamonga, CA 91701
United States
Respondee
Vida L Samarzich
Respondee Title
Vice President
Phone
909-987-6377 Ext.
Email
vidosam@yahoo.com
Vendor Type
CADIR
License #
433210
CA DIR
Bid Detail
Bid Format
Electronic
Submitted
November 6, 2019 1:43:16 PM (Pacific)
Delivery Method
Bid Responsive
Bid Status
Submitted
Confirmation #
194948
Ranking
0
Respondee Comment
Buyer Comment
Attachments
File Title
File Name
General Forms
General Forms.pdf
Ownership Affidavit
Ownership Affidavit 17-6880.pdf
Bid Bond
Bid Bond 17-6880.pdf
Non -Collusion Affidavit
Non Collusion Affidavit 17-6880.pdf
Line Items
Type Item Code
Base Bid Items
1 Remove Tree
2 Remove Parking Meters
UOM city
EA 4
EA
1
3 Remove Fire Hydrant
EA 5
Unit Price
$1,200.00
$500.00
$1,000.00
Page 1
Printed 11/06/2019
EXHIBIT 2
File Type
General Farms
Ownership Affidavit (Notary
Public) - REQ Original Hard
Copy Submittal in Addition
Bid Bond Guaranty (Notary
Public) - REQ Original Hard
Copy Submittal in Addition
Non -Collusion Affidavit
(Notary Public) - REQ
Original Hard Copy Submittal
in Addition
Line Total Comment
$4,800.00
$500.00
$5,000.00
20E-6
City of Santa Ana
Page 2
Santa Ana Boulevard and 5th Street Protected Bike Lane
ATPL - 5063
(17-6880), bidding
on November 6, 2019 2:00 PM Printed 11 /06/2019
Bid Results
Type
Item Code
UOM
Qty
Unit Price
Line Total Comment
4
Relocate Fire Hydrant
EA
2
$6,500.00
$13,000.00
5
Relocate Mailbox
EA
1
$500.00
$500.00
6
Relocate Parking Meters
EA
11
$1,500.00
$16,500.00
7
Unclassified Excavation
CY
4930
$44.45
$219,138.50
8
Aggregate Base
TON
855
$45.00
$38,475.00
9
Asphalt Concrete Pavement
TON
955
$210.00
$200,550.00
10
Median Concrete
SF
4895
$18.00
$88,110.00
11
PCC Pavement with monolithic curb (6" Thick)
LF
3375
$110.00
$371,250.00
12
PCC Pavement with monolithic curb (8" Thick)
LF
785
$115.00
$90,275.00
13
PCC Sidewalk (4" Thick)
SF
4970
$9.00
$44,730.00
14
PCC Curb Type B-1
LF
2525
$35.00
$88,375.00
15
PCC A-2-6 Curb and Gutter (Modified)
LF
4670
$45.00
$210,150.00
16
PCC Crass Gutter
SF
1920
$18.00
$34,560.00
17
Curb Ramp including Truncated Dames
EA
54
$4,200.00
$226,800.00
18
Furnish and Install Complete Fire Hydrant Assembly
EA
5
$12,000.00
$60,000.00
19
Root Shaving
EA
2
$500.00
$1,000.00
Pl=iE 7hf.
City of Santa Ana
Santa Ana Boulevard and 5th Street Protected Bike Lane ATPL - 5063 (17-6880), bidding
on November 6, 2019 2:00 PM
Bid Results
Type Item Code
UOM
Qty
Unit Price
20 Parkway Culvert Type A *
EA
3
$5,000.00
21 Parkway Culvert Type B *
EA
3
$1,500.00
22 Adjust Storm Drain/Sewer Manhole to Grade
EA
5
$800.00
23 Adjust Water Valve Cans and Cover to Grade
EA
30
$300.00
24 Adjust Pull Box to Grade
EA
7
$500.00
25 SWPPP/NPDES (Risk Level 2)
LS
1
$15,000.00
26 Engineered Soil
CY
882
$65.00
27 '/," Crushed Stone
TON
1253
$45.00
28 Impermeable Liner
SF
16572
$1.50
29 Striping (4") Thermo
LF
2340
$4.00
30 Striping (8'912") Thermo
LF
6517
$5.00
31
Pavement Marking Thermo
LF
11713
$6.00
32
MMA
SF
16800
$7.00
33
Traffic Signs
EA
179
$400.00
34
Signing and Striping Removals
LS
1
$35,000.00
35
Traffic Signal and Signal Interconnect (5th St and Main St)
LS
1
$110,000.00
Page 3
Printed 11/06/2019
Line Total Comment
$15,000.00
$4,500.00
$4,000.00
$9,000.00
$3,500.00
$15,000.00
$57,330.00
$56,385.00
$24,858.00
$9,360.00
$32,585.00
$70,278.00
$117,600.00
$71,600.00
$35,000.00
$110,000.00
20E-8
City of Santa Ana
Page 4
Santa Ana Boulevard and 5th Street Protected Bike Lane ATPL - 5063 (17-6880),
bidding on November 6, 2019 2:00 PM Printed 11 /06/2019
Bid Results
Type
Item Code UOM
Qty
Unit Price
Line Total Comment
36
Traffic Signal and Signal Interconnect (5th St and Broadway)
LS
1
$100,000.00
$100,000.00
37
Traffic Signal and Signal Interconnect (5th St and Bush St)
LS
1
$95,000.00
$95,000.00
38
Video Detection System at 5th St and Broadway
LS
1
$40,000.00
$40,000.00
39
Video Detection System at 5th St and Main St
LS
1
$40,000.00
$40,000.00
40
Video Detection System at 5th St and Bush St
LS
1
$40,000.00
$40,000.00
41
Install 2" PVC Conduits
LF
160
$60.00
$9,600.00
42
Install 3" PVC Conduits
LF
60
$70.00
$4,200.00
43
Install 4" PVC Conduits
LF
350
$95.00
$33,250.00
44
12 — SMFO Cable
LF
1225
$3.00
$3,675.00
45
Fusion Spice 1 Strand SMFO
EA
2
$400.00
$800.00
46
IP Communication System at 5th St and Broadway
LS
1
$16,000.00
$16,000.00
47
CCTV and IP Communication System at 5th St and Main St
LS
1
$18,000.00
$18,000.00
48
Landscape "
LS
1
$130,000.00
$130,000.00
49
Planting of Shrubs and Succulents by OCCC
LS
1
$2,816.00
$2,816.00
50
Irrigation
LS
1
$450,000.00
$450,000.00
51
120 Day Plant Maintenance and Establishment Period
LS
1
$6,000.00
$6,000.00
20E-9
City of Santa Ana
Page 5
Santa Ana Boulevard and 5th Street Protected Bike Lane ATPL - 5063 (17-6880), bidding on
November 6, 2019
2:00 PM Printed 11 /06/2019
Bid Results
Type
Item Code UOM
City
Unit Price
Line Total Comment
52
Labor Agreement Oversight
LS
1
$15,000.00
$15,000.00
53
PCC Pvement with Mnolithic Curb (6" thick) with Thickened Edge
LF
2570
$110.00
$282,700.00
54
PCC A-2-6 Curb and Gutter (Modified) with Thickened Edge
LF
2695
$40.00
$107,800.00
55
Relocate Sign
EA
1
$500.00
$500.00
56
Remove Monument Sign
EA
1
$1,000.00
$1,000.00
57
Metal Hand Railing, Type A
LF
70
$125.00
$8,750.00
58
Truncated Domes
SF
360
$30.00
$10,800.00
59
Driveway Approach, Type B
SF
705
$16.00
$11,280.00
Subtotal
$3,776,380.50
Asterisk Notes per P-4 of Specifications - NOT part of Base Bid Calculation
60
' - The quantity for this bid item is shown for bid comparison only.
This bid item shall not he subject to
the "25W limit as stated in Section 3-2 of
the Standard Specifications.
ea
0
0
0
61
1 = This bid item is considered a Specialty Item per Section 2-3.2 of
the Standard Specifications.
ea
0
0
0
Subtotal
0
Total
$3,776,380.50
ADDENDUM FOUR
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.: 17-6886
SANTA ANA BOULEVARD AND 5" STREET PROTECTED BIKE LANE
BID PROPOSAL
TO: CITY COUNCIL OF THE CITY OF SANTA ANA
FROM: Vido Samarzich, Inc.
REQUIREMENT:
The undersigned bidder declares that they have carefully examined the location of the proposed
work, that they have examined the Contract Documents in its entirety and hereby proposes to
furnish all material and do all the work required to complete the said work in accordance with said
plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following
schedule:
Item
Description
Qty
Unit
Unit Price
Amount
Street Improvements
1
Remove Tree
4
EA
$1,200
$ 4,800.00
2
Remove Parking Meters
1
EA
$ 5oo.00
$ 500.00
3
Remove Fire Hydrant
5
EA
$1,000.00
$ 5.000.00
4
Relocate Fire Hydrant
2
EA
$ 6,500.00
$ 13,000.00
5
Relocate Mailbox
1
EA
$ 500.00
$ 500.00
6
Relocate Parking Meters
11
EA
$ 1,500.00
$ 16,500.00
7
Unclassified Excavation
4930
CY
$44.45
$219,138.50
8
Aggregate Base
855
TON
$45.00
$ 38,475.00
9
Asphalt Concrete Pavement
955
TON
$ 21 o.00
$ 200,550.00
10
Median Concrete
4,895
SF
$18.00
$88,110.00
11
PCC Pavement with monolithic curb
(6" Thick)
3,375
LF
$ 110.00
$371.250.00
12
PCC Pavement with monolithic curb
(8" Thick)
785
LF
$ 115.00
$ 90,275.00
13
PCC Sidewalk (4" Thick)
4,970
SF
$ g,00
$ 44,730.00
P-1 ofP-19
20E-11
ADDENDUM FOUR
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.:17-6880
SANTA ANA BOULEVARD AND 5TH STREET PROTECTED BIKE LANE
Item
Description
Qty
Unit
Unit Price
Amount
14
PCC Curb Type B-1
2,525
LF
$ 35.00
$ 88,375.00
15
PCC A-2-6 Curb and Gutter
(Modified)
4,670
LF
$ 45.00
$ 21 Q150.o0
16
PCC Cross Gutter
1,920
SF
$ 18.00
$ 34,560.00
17
Curb Ramp including Truncated
Domes
54
EA
$ 4,200.00
$ 226,800.00
18
Furnish and Install Complete Fire
Hydrant Assembly
5
EA
$ 12,000.00
$ 60,000.00
19
Root Shaving
2
EA
$ 5oo.00
$1,000.00
20
Parkway Culvert Type A *
3
EA
$ 6,000.00
$ 15,000.00
21
Parkway Culvert Type B *
3
EA
$ 1,500.00
$ 4,500.00
22
Adjust Storm Drain/Sewer Manhole
to Grade
5
EA
$ 800.00
$ 4,000.00
23
Adjust Water Valve Cans and Cover
to Grade
30
EA
$ 300.00
$ 9,000.00
24
Adjust Pull Box to Grade
7
EA
$ 500.00
$ 3,500.00
25
SWPPP/NPDES (Risk Level 2)
1
LS
$ 15,00o.0o
$ 15,000.00
Water Quality
26
Engineered Soil
882
CY
$ 65.00
$ 57,330.00
27
3/d' Crushed Stone
1,253
TON
$45.00
$ 56,385.00
28
Impermeable Liner
16,572
SF
$ 1.5o
$ 24,858.00
Signing and Striping
29
Striping (411) Thermo
2,340
LF
$ 4.00
$ 9,360.00
30
Striping (8'712") Thermo
6,517
LF
$ 5.00
$ 32,585.00
31
Pavement Marking Thermo
11,713
LF
$ 6.00
$ 70,278.00
32
MMA
16,800
SF
$ zoo
$ 117,800.00
P-2 of P-19
20E-12
ADDENDUM FOUR
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.; 17-6880
SANTA ANA BOULEVARD AND 5TH STREET PROTECTED BIKE LANE
Item
Description
Qty
Unit
Unit Price
Amount
33
Traffic Signs
179
EA
$400.00
$ 71,600100
34
Signing and Striping Removals
1
LS
$35,000.00
$ 35,000.00
Traffic Signal Modification
35
Traffic Signal and Signal
1
LS
$ rto,000.06
$ tto,000.00
Interconnect (5th St and Main St)
36
Traffic Signal and Signal
1
LS
$ 100,000.00
S 100,006.00
Interconnect (5th St and Broadway)
37
Traffic Signal and Signal
1
LS
$ 95,000.00
$ 96,000.00
Interconnect (5th St and Bush St)
38
Video Detection System at 5"' St and
I
LS
$ 40,000.00
$40,000.00
Broadway
39
Video Detection System at 5"' St and
1
LS
$ 40,000.00
$ 40,000.00
Main St
40
Video Detection System at 5d' St and
1
LS
$ 40,000.00
$ 40.000.00
Bush St
41
Install 2" PVC Conduits
160
LF
$ 60.00
$ 9,600.00
42
Install 3" PVC Conduits
60
LF
$ 70.00
$ 4,200.00
43
Install 4" PVC Conduits
350
LF
$ s5.00
$ 33,250.00
44
12 — SMFO Cable
1,225
LF
$ 3,675.00
45
Fusion Spice I Strand SMFO
2
EA
L3.00
$ 600.0046
IP Communication System at 5"' St
I
LS
$16,000.00
and Broadway
47
CCTV and IP Communication
System at 51h St and Main St
I
LS
$ 18,06c.00
$18,006.00
Landscape and Irrigation
48
Landscape **
1
LS
$130,000.00
$ 130,000.00
49
Planting of Shrubs and Succulents by
I
LS
$ 2,816
$ 2,816
OCCC
50
Irrigation
I
LS
$450,000.00
$450,000.00
51
120 Day Plant Maintenance and
I
LS
$6,000.00
$ 6,000.00
Establishment Period
P-3 ofP-19
20E-13
ADDENDUM FOUR
CITY OF SANTA ANA
PROPOSAL
PROJECT NO,:17-6880
SANTA ANA BOULEVARD AND 5TH STREET PROTECTED BIIfE LANE
Item
Description
Qly
Unit
Unit Price
Amount
32
Labor Agreement Oversight
1
LS
$ 15,000
$ 15,000
53
PCC Pavement with Monolithic Curb
(6" thick) with Thickened Edge
2570
LF
$ tto.00
$ 282,700.00
54
PCC A-2-6 Curb and Gutter
(Modified) with Thickened Edge
2695
LF
$ a0.00
$ 107,800.00
55
Relocate Sign
I
EA
$ 500.00
S 500.00
56
Remove Monument Sign
I
EA
$ t,000.00
$ t,000.c0
57
Metal Hand Railing, Type A
70
LF
$125.00
$8a50.00
58
Truncated Domes
360
SF
$ 30.00
$ t 0,800.00
59
Driveway Approach, Type B
705
SF
$ 16.00
$ 11,280.00
TOTAL BASE BID $ 3,776,880.50
TOTAL BASE BID IN WORDS
Three million seven hundred seventy six thousand eight hundred eighty dollars and fifty cents.
The lowest responsible bidder shall be selected based on the total base bid. The City reserves the
right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any).
* The quantity for this bid item is shown for bid comparison only. This bid item shall not be
subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual
amount for this item will be dictated by the actual quantity used, and the Agency reserves the
right to increase or decrease the quantity of this item accordingly.
•r This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications.
** This item shall not include planting of shrubs and succulents as they will be planted by
Orange County Conservation Corps per proposal in Appendix H
TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES
PROJECTS WITH COVERAGE UNDER THE NATIONAL POLLUTANT DISCHARGE
ELIMINATION SYSTEM (NPDP,S) GENERAL PERMIT FOR STORM WATER
PA ofP-19
20E-14
ADDENDUM FOUR
CITY OF SANTA ANA
PROPOSAL
PROJECT NO.:17-6880
SANTA ANA BOULEVARD AND STa STREET PROTECTED BIKE LANE
The undersigned bidder hereby proposes to complete all requirements and items outlined in the
most current Construction General Permit, within two hundred fitly (250) working days after the
commencement date stated in the Notice to Proceed.
The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard
Specifications, shall be $ 2100 per calendar day.
Name of Firm
Signature of BIl
Title Vice President
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
Corporation: Vido Samarzich, Inc.
Vido Samarzich - President
Vido L. Samarzich -Vice President
Monika Samarzich - Secretary
P-5 ofP-19
20E-15
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 17-6880
SANTA ANA BOULEVARD AND 5TH STREET PROTECTED BIKE LANE
BIDDER'S STATEMENT
BIDDER understands and agrees that this Bid Proposal, Contract Documents and subsequent
Construction Contract Agreement shall constitute the entire agreement between BIDDER and the
AGENCY only after it has been accepted by the City Council, endorsed by the Clerk of the Council
with her signature and official seal noting hereon the action of approval of the Council, signed by
the Public Works Agency Executive Director or his/her duly authorized agent, and signed by the
City Attorney, denoting his approval of the form of this document, and its execution, and when it
or an exact copy of it has been either delivered to BIDDER or deposited with the United States
Postal Service properly addressed to the BIDDER with the correct postage affixed thereto.
BIDDER further agrees that upon delivery (as defined above) of the accepted agreement he/she
will furnish AGENCY all required bonds and certificate of liability insurance within ten (10)
business days or the funds, check, draft, or BIDDERS bond substituted in lieu thereof
accompanying this proposal shall become the property of the AGENCY and shall be considered
as payment of damages due to the delay and other causes suffered by AGENCY because of the
failure to furnish the necessary bonds and because it is distinctly agreed that the proof of damages
actually suffered is difficult to ascertain; otherwise said funds, check, drafts, or BIDDER'S bond
substituted in lieu thereof shall be returned to the undersigned.
BIDDER understands that a bid is required for the entire work, the estimated quantities set forth
in the bid schedule are solely for the purpose of comparing bids, and that final compensation under
the contract will be based upon the actual quantities of work, srti„flrK orily completed. The
BIDDER also certifies that the bid is a balanced bid.
In accordance with Section 7028.15 of the California Business and Professions Code, the
undersigned certifies under penalty of perjury that the foregoing is true and correct.
Name of Firm Vido Samarzic#, Inc.
Signature of BIDDER
Title Vice President
(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of
all individual co-partners composing the firm. If a corporation, state legal name of corporation,
and names of President, Secretary, Treasurer and Manager, thereof.)
Corporation: Vido Samarzich, Inc.
Vido Samarzich - President
Vido L. Samarzich - Vice President
Monika Samarzich - Secretary
20 P 6
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 17-6880
SANTA ANA BOULEVARD AND 5TH STREET PROTECTED BIKE LANE
CONTRACTOR'S LICENSING AND REGISTRATION STATEMENT
The undersigned contractor, or corporate officer, declares under penalty of perjury that he/she and
all his/her subcontractors are registered with the State of California Department of Industrial
Relations (DIR), and that the following is true and correct.
Contractor's Name: Vido Samarzich, Inc
Business Address: 6829 Billings Place, Rancho Cucamonga, CA 91701
Business E-Mail Address: Vldosam@yahoo.com
Telephone: (909) 987-6377
State Contractor's License No. and Class: 433210 Class A
License Expiration Date:
12/31 /2020
State Dept. of Industrial Relations (DIR)
Registration No.:
State Dept. of Industrial Relations (DIR)
Registration ExWatio4Dgte:
Signed:
Title: Vice President
1000013213
6/30/2020
i6Cp*
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 17-6880
SANTA ANA BOULEVARD AND 5TH STREET PROTECTED BIKE LANE
PREVAILING WAGE COMPLIANCE AND MONITORING STATEMENT
Contractor is aware of the requirements of California Labor Code Section 1720, et seq., as well as
California Code of Regulations, Title 8, Section 16,000, et seq., ("Prevailing Wage Laws"), which
require the payment of prevailing wage rates and the performance of other requirements on "public
works" and "maintenance" projects. Since the services are being performed as part of an applicable
"public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and since the
total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing
Wage Laws.
City shall provide Contractor with a copy of the prevailing rates of per diem wages in effect at the
commencement of this Agreement. Contractor shall make copies of the prevailing rates of per
diem wages for each craft, classification or type of worker needed to execute the services available
to interested parties upon request, and shall post copies at the Contractor's principal place of
business and at the project site.
Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and
agents free and harmless from any claim or liability arising out of any failure or alleged failure to
comply with the Prevailing Wage Laws.
The undersigned certifies that the foregoing is true and correct
Name of Firm
Signature of BI.
Title Vice President
(if an individual, so state)
�a Plb
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 17-6880
SANTA ANA BOULEVARD AND 5TH STREET PROTECTED BIKE LANE
OWNERSHIP AFFIDAVIT
STATE OF CALIFORNIA )
COUNTY OF ORANGE )SS.
CITY OF SANTA ANA )
Vido L. Samarzieh being duly sworn, deposes and says:
❑ INDIVIDUAL That he/she is the party making the foregoing proposal:
❑ PARTNERSHIP That lie/she is a member of the co -partnership firm designated as:
and who has been and is duly vested with the authority to make and execute instruments
for the co -partnership by:
who constitute the other members of the co -partnership.
CORPORATION That he is of VldoSarnarzich, Inc.
a corporation which is making the foregoing proposal:
❑ JOINT VENTURE That he is or:
one of the parties making the foregoing proposal as ajoint venture, and the he/she has been
and is duly vested with the authority to execute instruments for an on behalf of the parties
making said bid who are:
that such a bid is genuine and not collusive or sham, and has not in any manner sought by collusion
to secure any advantage against the City of Santa Ana or any person interested in the proposed
contract, fa. him syl�r any other person.
Signature of Bidder
Subscribed Subscribed and sworn to before me this day of 20
SEE ATTACHED JURAT
Signature of officer Administering Oath (Notary Public)
2PO"tPIb
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate
is attached, and not the truthfulness, accuracy, or
validity of that document.
State of California
County of LOS ANGELES
Subscribed and sworn to (or affirmed) before me on this 6TH
day of NOVEMBER , 20 19, by VIDO L. SAMARZICH
proved to me on the basis of satisfactory evidence to be the
person(s) who appeared before me.
12.1
IIIIYIIIXIgII11WM111111pM1111111111IIII
DESMOND O. W1IRRENWj
COMM. 02190634
Notary Public - CaItfornia
Rlmmule County ■
y Comm. ExOn6 Apr. 9, 2021 g
NMWRIIIWNW104"011mllllllllll111M
"L,--,
(Seal) Signature
20E-20
Bond No.: VIDSA-2064
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.;17-6880
SANTA ANA BOUI..1= VARD AND 5TH STREET PROTECTED BIKE LANE
KNOW ALL PRESENT that,
Vido Samarzich, Inc. as BIDDER, and
Fidelity and Deposit Company of Maryland, as SURETY,
are held and firmly bound unto the CITY OF SANTA ANA, as AGENCY, in the penal sun of _
Ten Percent Of The Total Amount Bid Dollars ($ 10% Of Bid 1, which is ten percent (10%)
of the total amount bid by BIDDER to A(il NCY for the above -stated project, for the payment of
which sum, BIDDER and SURETY agree to be bound, jointly and severally, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION ARE SUCH that, whereas BIDDER is about to
submit a bid to AGENCY for the above -stated project, if said bid Is rejected, or if said bid is
accepted and a contract Is awarded and entered into by BIDDER in the manner and time specified,
then this obligation shall be null and void, otherwise it shall remain in full force and effect in favor
of AGENCY.
IN WITNESS WHEREOF the parties hereto have set their names, titles, hands, and sea! this
31st day of October , 20AR.
BIDDER*
Vido
�rw�iIC
SURETY*
Randy Sp n, Attorney
`µSubscribed and sworn o before me
Signature;
Notary Public in and for the County of
6829 Billings Place
777 S. Figueroa Street, Suite 3900
Los Angeles, CA 90017
Telephone: (619) 235-1388
, State of
this day of
r Provide BIDDER/ SURETY name, address, and telephone number and the name, title, address,
and telephone ntunber of authorized representative.
P-10 of P-19
20E-21
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New
York, the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY
AND DEPOSIT COMPANY OF MARYLAND a corporation of the State of Illinois (herein collectively called the "Companies"), by
Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8, of the By -Laws of said Companies, which are
set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, constitute,
and appoint Randy SPOHN, Ashley M. SPOHN, Matthew R. DOBYNS and Hamilton KENNEY, all of Santa Ana, California, EACH,
its true and lawful agent and Attorney -in -Fact, to make, execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any
and all bonds and undertakings, and the execution of such bonds or undertakings in pursuance of these presents, shall be as binding upon
said Companies, as fully and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected
officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York., the regularly elected officers of the
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland., and the regularly elected
officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills, Maryland., in their own proper
persons.
The said Vice President does hereby certify that the extract set froth on the reverse side hereof is a true copy of Article V, Section 8, of
the By -Laws of said Companies, and is now in force.
IN WITNESS WHEREOF, the said Vice -President has hereunto subscribed his/her names and affixed the Corporate Seals of the said
ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, and
FIDELITY AND DEPOSIT COMPANY OF MARYLAND, this 20th day of September, A.D. 2019.
sooGNi 11upe (OT','.il
im
AI
ATTEST:
ZURICH AMERICAN INSURANCE COMPANY
COLONIAL AMERICAN CASUALTY AND SURETY COMPANY
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
By: Robert D. Murray -'
Vice President -
By: Dawn E. Brown ._
Secretary -
State of Maryland -
County of Baltimore
On this 20th day of September} A.D. 2019, before the subscriber, a Notary Public of the State of Maryland, duty commissioned and qualified,
Robert D. Murray, Vice President and Dawn E. Brown, Secretary of the Companies, to the personally known to be the Individuals and officers
described in and who executed the preceding instrument, and acknowledged the execution of same, and being by me duly sworn, deposeth and saith, that
he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals of said Companies, and
that the said Corporate Seals and the signature as such officer were duly affixed and subscribed to the said instrument by the authority and direction of the
said Corporations,
IN ''TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and yearfirst above written.
�J°,valatj'f
\:1:.:):.11��4.,.
�y-
4'.w'arhCrL Cif. �•-Y-
•''ry�l%iij�i
Constance A. Dumr, Notary Public
ijx+%',
llllll
My Commission Expires: July 9, 2023
illn\\`
20E-22
EXTRACT FROM BY-LAWS OF THE COMPANIES
"Article V, Section 8, Attorneys -in -Fact. The Chief Executive Officer, the President, or any Executive Vice President or Vice President
may, by written instrument under the attested corporate seal, appoint attorneys -in -fact with authority to execute bonds, policies,
recognizances, stipulations, undertakings, or other like instruments on behalf of the Company, and may authorize any officer or any such
attorney -in -fact to affix the corporate seal thereto; and may with or without cause modify of revoke any such appointment or authority at any
time."
CERTIFICATE
1, the undersigned, Vice President of the ZURICH AMERICAN INSURANCE COMPANY, the COLONIAL AMERICAN
CASUALTY AND SURETY COMPANY, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that the
foregoing Power of Attorney is still in full force and effect on the date of this certificate; and I do further certify that Article V, Section 8, of
the By -Laws of the Companies is still in force.
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the ZURICH AMERICAN INSURANCE COMPANY at a meeting duly called and held on the 15th day of December 1998.
RESOLVED: "That the signature of the President or a Vice President and the attesting signature of a Secretory or an Assistant Secretary
and the Seal of the Company may be affixed by facsimile on any Power of Attorney,.. Any such Power or any certificate thereof bearing such
facsimile signature and seal shall be valid and binding on the Company."
This Power of Attorney and Certificate may be signed by facsimile under and by authority of the following resolution of the Board of
Directors of the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY at a meeting duly called and held oil the 5th day of
May, 1994, and the following resolution of the Board of Directors of the FIDELFI'Y AND DEPOSIT COMPANY OF MARYLAND at a
meeting duly called and held on the 10th day of May, 1990,
RESOLVED: "That the facsimile or mechanically reproduced seal of the company and facsimile or mechanically reproduced signature
of any Vice -President, Secretary, or Assistant Secretary of the Company, whether made heretofore or hereafter, wherever appearing upon a
certified copy of any power of attorney issued by the Company, shall be valid and binding upon the Company with the same force and effect
as though manually affixed.
IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seals of the said Companies,
this 31$t day of October , 2019.
.- y
Brian M. Hodges, Vice President
TO REPORT A CLAIM WITH REGARD TO A SURETY BOND, PLEASE SUBMIT A COMPLETE DESCRIPTION
OF THE CLAIM INCLUDING THE PRINCIPAL ON THE BOND, THE BOND NUMBER, AND YOUR CONTACT
INFORMATION TO:
Zurich Surety Claims
1299 Zurich Way
Schaumburg, IL 60196-1056
w ww. rep ortsfelai msO,zurichn a. corn
800-626-4577
20E-23
CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT
A notary public or other officer completing this certificate verities only the identity of the
individual who signed the document to which this certificate is attached, and not the truthfulness,
accuracy, or validity of that document.
State of CALIFORNIA
County of ORANGE
On October 31st, 2019 before me, ERIKA GUIDO, NOTARY PUBLIC,
personally appeared RANDY SPOHN
❑ who proved to me on the basis of satisfactory evidence to be the person(a)
whose name(s) is/are subscribed to the within instrument and
acknowledged to me that he/she/they executed the same in his1he
authorized capacity fies), and that by his/her/thei signature(s) on the
instrument the personfs), or the entity upon behalf of which the person(s)
acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of
ERIKAGUIDO California that the foregoing paragraph is true and correct.
COMM. # 2190052 :E
NOTARY PUBLIC CALIFORNIA 30
ORANGE COUNTY N WITNESS my. an ,.mhand d official seal.
t
J�My comm. expires May 5, 2D21 /
J
Signa u4oft,'q
OPTIONAL
Though the data below is not required by law, it may prove valuable to persons relying on the document and
could prevent fraudulent reattachment of this form.
CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT
❑ INDIVIDUAL
❑ CORPORATE OFFICER
❑ PARTNER(S) ❑ LIMITED
® ATTORNEY -IN -FACT
❑ TRUSTEE(S)
❑ GUARDIAN/CONSERVATOR
❑ OTHER:
SIGNER IS REPRESENTING:
NAME OF PERSON(S) OR ENTITY(IES)
ACKNOWLEDGMENT
A notary public or other officer completing this
certificate verifies only the identity of the individual
who signed the document to which this certificate is
attached, and not the truthfulness, accuracy, or
validity of that document.
State of California
County of LOS ANGELES
On NOVEMBER 6, 2019
before me, DESMOND G. WARREN, NOTARY PUBLIC
(insert name and title of the officer)
personally appeared VIDO L. SAMARZICH
who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are
subscribed to the within instrument and acknowledged to me that he/she/they executed the same in
his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the
person(s), or the entity upon behalf of which the person(s) acted, executed the instrument.
I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing
paragraph is true and correct.
Hill III]IInn111IIII 1111"III 1[III Ipill, II.III IIIIOM II,1110,1,11...
DESMOND G. WARREN z
COMM.#219004
WITNESS my hand and official seal. Notary Public - cslilornla
Riverside Counly Y
My Comm. E„pirw Apr. 9, 2021
Arwewwivwwexrmmm,vexoxn
Signature (Seal)
20E-25
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 17-6880
SANTA ANA BOULEVARD AND 5TH STREET PROTECTED BIKE LANE
LIST OF SUB -CONTRACTORS
Section 4100 et. seq. of the Public Contract Code requires listing of all subcontractors with the bid for all
subcontract work exceeding the following amount:
o Streets, highways including bridge projects: ''/a% of the bid or $10,000, whichever is greater
o Buildings, parks, or other projects: Y:% of the bid
Section 1725.5 of the Public Contract Code requires all Subcontractors be registered with the State
Department of Industrial Relations (DIR).
BIDDER proposes to subcontract certain portions of the work to the firms listed below:
Name Case Land Survevino. Inc
License #/Exp.
L5411
DIR Reg. #/Exp.
1000001533
Location
Orange, CA
Phone (714)
628-8948
Type Of Work
Surveying
Amount $
40,000.00
Name BC Traffic Specialist
License #/Exp. 877686
DIR Reg. #/Exp. 1000407561
License #
Location Orange, CA
Phone (714)493-5906
Type Of Work Striping and Signage
Amount $ 235,000.00
Name Kato Landscape. Inc
License #/Exp.
806122
DIR Reg. #/Exp.
1000000086
License #
Location Fountain Valley, CA
Phone (714)
963-4615
Type Of Work
Landscaping and Irrigation
Amount $ 498,000.00
Signature of Bidder
Name Pavement Recycling Systems, Inc
License #/Exp.
569352
DIR Reg. #/Exp.
1000003363
Location
Jurupa Valley, CA
Phone (951)682-1091
Type Of Work
Asphalt Grinding
Amount $
171,000.00
Name Dynalectric
License #/Exp. 550173
DIR Reg.#/Exp. 1000001129
License #
Location Los Alamitos, CA
Phone (714)828-7000
Type Of Work Electrical
Amount $ 399,000.00
Name
License #/Exp.
DIR Reg. #/Exp.
License #
Location
Phone
Type Of Work
Amount $
f ilefig
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 17-6880
SANTA ANA BOULEVARD AND 5T11 STREET PROTECTED BIKE LANE
REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER has performed similar work within the past three years.
1. SEE ATTACHED INFORMATION
Name and Address of Owner.
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work Date Completed
2. SEE ATTACHED INFORMATION
Name and Address of owner.
Name and Telephone Number of person familiar with project
Contract Amount
Type of Work
3. SEE ATTACHED INFORMATION
Name and Address of owner.
Name and Telephone Number of person familiar with project.
Contract Amount
Type of Work
Date Completed
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
Surety = Zurich - Fidelity Deposit Company of Maryland
777 S. Figueroa Street, Suite 3900, Los Angeles, CA - (619) 235-1388
Broker: R S Bonding & Insurance Agency, Inc.
1633 E. 4th Ave, Ste. 228, Santa Ana, CA 92701 - (714) 541-4700
idtf /
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 17-6880
SANTA ANA BOULEVARD AND 5TH STREET PROTECTED BIKE LANE
ADDITIONAL REFERENCES
The following are the names, addresses, and telephone numbers for THREE public agencies for
which the BIDDER or Subcontractor has performed similar work in the past five years.
1. SEE ATTACHED INFORMATION
Name and Address of Owner.
Name and Telephone Number of person familiar with project.
Contract Amount Type of Work Date Completed
2. SEE ATTACHED INFORMATION
Name and Address of owner
Name and Telephone Number of person familiar with project
Contract Amount
3. SEE ATTACHED INFORMATION
Name and Address of owner.
Type of Work
Name and Telephone Number of person familiar with project.
Contract Amount
Type of Work
Date Completed
Date Completed
The following are the names, addresses, and telephone numbers of all brokers and sureties from
whom BIDDER intends to procure insurance and bonds.
Surety: Zurich - Fiedelity and Deposit Company of Maryland
777 S. Figueroa Street, Suite 3900, Los Angeles, CA - (619) 235-1388
Broker: R S Bonding & Insurance Agency, Inc.
1633 E. 4th Ave, Ste. 228, Santa Ana, CA 92701 - (714) 541-4700
VIDO SAMARZICH, INC.
General Engineering Contractor No. 433210 A
6829 BILLINGS PLACE, RANCHO CUCAMONGA, CALIFORNIA 91701 TELEPHONE 909-987-6377
FAX 909-987-8988
COMPLETED CONSTRUCTION
PROJECT REFERENCES
1. Project Name: La Palma Ave Sidewalk Improvements
Owner: City of Anaheim
Phone Number: (714) 765-5052
Engineer/Contact: Mr. Joel Jordan
Contract Amount: $479,000.00
Date of Completion: 2019
2. Project Name: Wilshire Avenue Bicycle Blvd Improvements
Owner: City of Fullerton
Phone Number: (714) 738-6853
Engineer/Contact: Mr. David Grantham
Contract Amount: $2,100,000.00
Date of Completion: 2019
3. Project Name: FY 17-18 ADA Access Ramp Improvements at Various Locations
Owner: City of Rancho Cucamonga
Phone Number: (909) 774-4070
Engineer/Contact: Mr. Romeo David
Contract Amount: $975,000.00
Date of Completion: 2018
4. Project Name: Wilshire Avenue Water and Sewer Improvement Project
Owner: City of Fullerton
Phone Number: (714) 738-6895
Engineer/Contact: Mr. Gar Huang
Contract Amount: $550,000.00
Date of Completion: 2018
5. Project Name: Elm/Maiden Area Street, Sewer and Water Improvements
Owner: City of Fullerton
Phone Number: (714) 773-0049
Engineer/Contact: Mr. Joseph Hernandez
Contract Amount: $2,200,000.00
Date of Completion: 2018
Page 1 of 6
20E-29
VIDO SAMARZICH, INC.
General Engineering Contractor No. 433210 A
6829 BILLINGS PLACE -RANCHO CUCAMONGA, CALIFORNIA 91701 TELEPHONE 909-987-6377
FAX 909-987-8988
6. Project Name: Anaheim Hills Road Water Main Replacement
Owner: City of Anaheim
Phone Number: (714) 863-8020
Engineer/Contact: Mr. Luis Tapia
Contract Amount: $600,000.00
Date of Completion: 2018
7. Project Name: CDBG ADA Wheelchair Access Ramp Replacement at Various Locations
Owner: City of Orange
Phone Number: (714) 744-5566
Engineer/Contact: Mr. Matthew Lorenzen
Contract Amount: $204,300.00
Date of Completion: 2018
8. Project Name: 2017 Citywide Curb Ramp Improvements
Owner: City of Laguna Beach
Phone Number: (949) 497-0741
Engineer/Contact: Mr. Tri Nguyen
Contract Amount: $285,000.00
Completion Date: 2017
9. Project Name: Safe Routes to School Improvements, Phase 3
Owner: City of Glendale
Phone Number: (818) 402-0225
Engineer/Contact: Mr. Gary Edsall
Contract Amount: $908,000.00
Date of Completion: 2017
10. Project Name: Heim Ave at Canal St Storm Drain Improvements
Owner: City of Orange
Phone Number: (714) 744-5566
Engineer/Contact: Mr. Matthew Lorenzen
Contract Amount: $99,000.00
Date of Completion: 2017
11. Project Name: Citywide Sidewalk Repair Project FY 15-16
Owner: City of Santa Monica
Phone Number: (951) 522-4505
Engineer/Contact: Mr. Craig Wheeler
Contract Amount: $878,000.00
Date of Completion: 2017
Page 2 of 6
20E-30
VIDO SAMARZICH, INC.
General Engineering Contractor No. 433210 A
6829 BILLINGS PLACE, RANCHO CUCAMONGA, CALIFORNIA 91701
12. Project Name: FY 16/17 Curb Access Ramp Installation Project
Owner: City of Huntington Beach
Phone Number: (714) 536-5259
Engineer/Contact: Mr. Joe Fuentes
Contract Amount: $679,000.00
Date of Completion: 2017
13. Project Name: Comstock Avenue Water Main Improvements
Owner: City of Whittier
Phone Number: (562) 567-9302
Engineer/Contact: Mr. Carl Hassel
Contract Amount: $578,000.00
Date of Completion: 2017
14. Project Name: Monterey Road Street Improvements
Owner: City of South Pasadena
Phone Number: (626) 590-0570
Engineer/Contact: Mr. Alex Chou
Contract Amount: $1,550,000.00
Date of Completion: 2017
15. Project Name: Fletcher Avenue Reconstruction
Owner: City of South Pasadena
Phone Number: (702) 204-4025
Engineer/Contact: Mr. Mark Peterson
Contract Amount: $878,000.00
Date of Completion: 2016
16. Project Name: Patterson Street Reconstruction
Owner: City of Fullerton
Phone Number: (714) 732-9060
Engineer/Contact: Mr. Pete Acosta
Contract Amount: $675,000.00
Date of Completion: 2016
17. Project Name: Magnolia/Bolsa Intersection Widening
Owner: City of Westminster
Phone Number: (714) 548-3464
Engineer/Contact: Ms. Theresa Tran
Contract Amount: $975,000.00
Date of Completion: 2016
Page 3of6
TELEPHONE 909-987-6377
FAX 909-987-8988
20E-31
VIDO SAMARZICH, INC.
General Engineering Contractor No. 433210 A
6829 BILLINGS PLACE, RANCHO CUCAMONGA, CALIFORNIA 91701
18. Project Name: 2015 Water Main Improvements
Owner: City of Westminster
Phone Number: (714) 548-3456
Engineer/Contact: Mr. Tuan Pham
Contract Amount: $1,100,000.00
Date of Completion: 2016
19. Project Name: Red Hill Lake Modernization
Owner: City of Rancho Cucamonga
Phone Number: (909) 477-2740
Engineer/Contact: Mr. Romeo David
Contract Amount: $300,000.00
Date of Completion: 2016
20. Project Name: 2015 Concrete Improvements
Owner: City of Inglewood
Phone Number: (714) 468-7319
Engineer/Contact: Mr. Hunter Nguyen
Contract Amount: $425,000.00
Date of Completion: 2015
21. Project Name: El Centro Avenue Rehabilitation
Owner: City of South Pasadena
Phone Number: (626) 590-0570
Engineer/Contact: Mr. Alex Chou
Contract Amount: $1,100,000.00
Date of Completion: 2015
22. Project Name: Concrete Bus Pads
Owner: City of Rancho Cucamonga
Phone Number: (714) 548-3456
Engineer/Contact: Curt Billings
Contract Amount: $175,000.00
Date of Completion: 2015
23. Project Name: ADA Wheelchair Ramps
Owner: City of Orange
Phone Number: (714) 744-5566
Engineer/Contact: Mr. Matthew Lorenzen
Contract Amount: $275,000.00
Date of Completion: 2015
Page 4 o 1' 6
TELEPHONE 909-987-6377
FAX 909-987-8988
20E-32
VIDO SAMARZICH, INC.
General Engineering Contractor No. 433210 A
6829 BILLINGS PLACE, RANCHO CUCAMONGA, CALIFORNIA 91701
24. Project Name: 2014 Water Improvement
Owner: City of Westminster
Phone Number: (714) 548-3456
Engineer/Contact: Mr. Tuan Pham
Contract Amount: $1,100,000.00
Date of Completion: 2015
25. Project Name: ADA Sidewalk Improvement
Owner: City of Artesia
Phone Number: (951) 314-6984
Engineer/Contact: Mr. Chuck Burkhardt
Contract Amount: $200,000.00
Date of Completion: 2014
26. Project Name: YLHS Park Bryant Cross Feeder Pipeline
Owner: Yorba Linda Water District
Phone Number: (714) 701-3104
Engineer/Contact: Mr. Joe Polimino
Contract Amount: $675,000.00
Date of Completion: 2013
27. Project Name: County Road Storm Drain
Owner: City of Pomona
Phone Number: (909) 322-7471
Engineer/Contact: Mr. Dave Barron
Contract Amount: $570,000.00
Date of Completion: 2013
28. Project Name: Adams Square Park
Owner: City of Glendale
Phone Number: (818) 548-2864
Engineer/Contact: Mr. Hagop Kassabian
Contract Amount: $1,100,000.00
Date of Completion: 2010
29. Project Name: Various Public Work Purchase Orders and Contracts 2000-2013
Owner: City of Pasadena
Phone Number: (626) 484-5640
Engineer/Contact: Mr. Dale Torstenbo - dtorstenbo@cityofpasadena.net
Contract Amount: $2,500,000.00
Date of Completion: 2000-2013
Page 5 of 6
TELEPHONE 909-987-6377
FAX 909-987-8988
20E-33
VIDO SAMARZICH, INC.
General Engineering Contractor No. 433210 A
6829 BILLINGS PLACE, RANCHO CUCAMONGA, CALIFORNIA 91701
30. Project Name: Misc Park Improvements From 2000-2010
Owner: City of Glendale
Engineer/Contact: George Balteria — (951) 201-2710
Peter Vierheilig — pvierheilig@ci.glendale.ca.us
Contract Amount: $3,500,000.00
Date of Completion: 2000-2010
Page 6 of 6
TELEPHONE 909-987-6377
FAX 909-987-8988
20E-34
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 17-6880
SANTA ANA BOULEVARD AND 5Tti STREET PROTECTED BIKE LANE
NON -COLLUSION AFFIDAVIT
(Title 23 United States Code Section 112 and Public Contract Code Section 7106)
In conformance with Title 23 United States Code Section 112 and Public Contract Code 7106 the
BIDDER declares that the bid is not made in the interest of, or on behalf of, any undisclosed
person, partnership, company, association, organization, or corporation; that the bid is genuine and
not collusive or sham; that the BIDDER has not directly or indirectly induced or solicited any other
BIDDER to put in a false or sham bid, and has not directly or indirectly colluded, conspired,
connived, or agreed with any BIDDER or anyone else to put in a sham bid, or that anyone shall
refrain from bidding; that the BIDDER has not in any manner, directly or indirectly, sought by
agreement, communication, or conference with anyone to fix the bid price of the BIDDER or any
other BIDDER, or to fix any overhead, profit, or cost element of the bid price, or of that of any
other BIDDER, or to secure any advantage against the public body awarding the contract of anyone
interested in the proposed contract; that all statements contained in the bid are true; and, further,
that the BIDDER has not, directly or indirectly, submitted his or her bid price or any breakdown
thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will
not pay, any fee to any corporation, partnership, company association, organization, bid
depository, or to any member or agent thereof to effectuate a collusive or sham bid.
Note: Theve Non -collusion Affidavit is part of the Proposal. BIDDERS are cautioned
}hat eking y fa se certification may subject the certifier to criminal prosecution.
Signed
State of California
County of
Subscribed and sworn to (or affirmed) before me on this (/ day of , 20g, by
✓IDo L. sy+«�at2tt-o proved to me on the basis of satisfactory evidence to be the persona
who appeared before me
-11x LI IIII:� IIxI1011111111111111111111gII11M11111111111111111111111111N1-C
Notary Public ignature
DESMONDG.WARREN
s COMM. #2190534
°m Notary Public - California 'o
Riverside County
My Comm. E)Onm Apr. 9,. 2021
m xwxxxxxxxxNxwwrxlxnxlmmwnxn�
Notary Public Seal
Z-6 91A
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 17-6880
SANTA ANA BOULEVARD AND 5TH STREET PROTECTED BIKE LANE
NON-DISCRIMINATION CERTIFICATE
The undersigned contractor or corporate officer, during the performance of this contract, certifies
as follows:
The Contractor shall not discriminate against any employee or applicant for employment
because of race, color, religion, sex, or national origin. The Contractor shall take affirmative
action to ensure that applicants are employed, and that employees are treated during
employment without, regard to their race, color, religion, sex, or national origin. Such action
shall include, but not be limited to, the following: employment, upgrading, demotion, or
transfer; recruitment or recruitment advertising; layoff or termination; rates of pay or other
forms of compensation; and selection for training, including apprenticeship. The Contractor
agrees to post in conspicuous places, available to employees and applicants for employment,
notices to be provided setting forth the provisions of this nondiscrimination clause.
2. The Contractor shall, in all solicitations or advertisements for employees placed by or on behalf
of the Contractor, state that all qualified applicants will receive consideration for employment
without regard to race, color, religion, sex, or national origin.
3. The Contractor shall send to each labor union or representative of workers with which he/she
has a collective bargaining agreement or other contract or understanding, a notice to be
provided advising the said labor union or workers' representatives of the Contractor's
commitments under this section, and shall post copies of the notice in conspicuous places
available to employees and applicants for employment.
4. The Contractor shall comply with all provisions of Executive Order 11246 of September 24,
1965, and of the rules, regulations, and relevant orders of the Secretary of Labor.
5. The Contractor shall furnish all information and reports required by Executive Order 11246 of
September 24, 1965, and by rules, regulations, and orders of the Secretary of Labor, or pursuant
thereto, and will permit access to his/her books, records, and accounts by the administering
agency and the Secretary of Labor for purposes of investigation, to ascertain compliance with
such rules, regulations, and orders.
6. In the event of the Contractor's non-compliance with the nondiscrimination clauses of this
contract or with any of the said rules, regulations, or orders, the contract may be canceled,
terminated, or suspended in whole or in part and the Contractor may be declared ineligible for
further Government contracts or federally assisted construction contracts in accordance with
procedures authorized in Execution Order 11246 of September 24, 1965, and such other
sanctions may be imposed and remedies invoked as provided in Executive Order 11246 of
September 24, 1965, or by rule, regulations, or order of the Secretary of Labor, or as otherwise
provided by law.
MCA
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 17-6880
SANTA ANA BOULEVARD AND 5TH STREET PROTECTED BIKE LANE
7. The Contractor shall include the portion of the sentence immediately preceding paragraph (1)
and the provisions of paragraphs (1) through (7) in every subcontract or purchase order unless
exempted by rules, regulations, or orders of the Secretary of Labor issued pursuant to Section
204 of Executive Order 11246 of September 24, 1965, so that such provisions will be binding
upon each subcontract or purchase order as the administering agency may direct as means of
enforcing such provisions, including sanctions for noncompliance; provided, however, that in
the event the Contractor becomes involved in, or is threatened with, litigation with a
subcontractor or vendor as a result of such direction by the administering agency, the
Contractor may request that the United States enter into such litigation to protect the interests
of the United States.
8. Pursuant to California Labor Code Section 1735, as added by Chapter 643 Stats. 1939, and as
amended, no discrimination shall be made in the employment of persons upon public works
because of race, religious creed, color, national origin, ancestry, physical handicaps, mental
condition, marital status, or sex of such persons, except as provided in Section 1420, and any
contractor of public works violating this Section is subject to all the penalties imposed for a
violation of the Chaptee/XI
Si ned: %/ /�
Title:
Vice President
Firm:
Vido Samarzich, Inc.
Date:
11 /612019
ME�f*
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 17-6880
SANTA ANA BOULEVARD AND 5TH STREET PROTECTED BIKE LANE
STATEMENT REGARDING APPRENTICESHIP REQUIREMENTS
The undersigned BIDDER is familiar with the requirements of Section 1777.5 of the State Labor
Code regarding employment of apprentices, and understands that contractors on contracts
exceeding $30,000 or 20 working days shall:
1. Apply to the joint apprenticeship committee administering the apprenticeship standards of the
craft or trade in the area of the site of the public work for a certificate approving the contractor
under the apprenticeship standards for the employment and training of apprentices in the area
or industry affected.
2. Employ the number of apprentices or the ratio of apprentices to journeymen stipulated in the
apprenticeship standards.
3. Contribute to the fund or funds in each craft or trade in which he/she employs journeymen or
apprentices on the public work, in the same amount or upon the same basis and in the same
manner as the other contractors, except contractors not signatory to the trust agreement shall
pay a like amount to e C lif rnia Apprenticeship Council.
Signed: 1 � f
Title: Vice President
Firm: Vido Samarzich, Inc.
Date: 11 /6/2019
MCA
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 17-6880
SANTA ANA BOULEVARD AND 5TH STREET PROTECTED BIKE LANE
STATEMENT REGARDING "ANTI -KICKBACK" REQUIREMENTS
The undersigned is submitting this proposal for performing by contract the work required by these
bid documents, agrees to comply with the Copeland "Anti -Kickback" Act (18 USC 74) as
supplemented in the Department of Labor regulations (29 CFR, Part 3). This act provides that
each contractor or subcontractor shall be prohibited from inducing, by any means, any person
employed in the construction or repair of public work, to give up any part of the compensation to
which he/she is otherwiiZentitied
Signed: 1 ,,,4 .;(-
Title: Vice President
Firm: Vido Samarzich, Inc.
Date: 11 /6/2019
1 •
CITY OF SANTA ANA ADDENDUM TWO
PROPOSAL
PROJECT NO.: 17-6880
SANTA ANA BOULEVARD AND 5TH STREET PROTECTED BIKE LANE
PUBLIC CONTRACT CODE SECTION 10162 QUESTIONNAIRE
In conformance with Public Contract Code Section 10162, the BIDDER shall complete,
under penalty of perjury, the following questionnaire:
Has the BIDDER, any officer of the BIDDER, or any employee of the BIDDER who has a
proprietary interest in the BIDDER, ever been disqualified, removed, or otherwise prevented from
bidding on, or completing a federal, state, or local government project because of a violation of
law or a safety regulation?
Yes No
If the answer is yes, explain the circumstances in the following space.
L i9e.-P41V
CITY OF SANTA ANA EXHIBIT 3
CONSTRUCTION CONTRACT
PROJECT 17-6880
SANTA ANA BOULEVARD AND 5TH STREET PROTECTED BIKE LANE [ATPL-5063(170)]
This CONSTRUCTION CONTRACT is made and entered into this 17v' day of December, 2019 by and
between the City of Santa Ana, California, a charter city and municipal corporation organized and
existing under the Constitution and laws of the State of California (hereinafter "CITY"), and Vido
Samarzich, Inc. (hereinafter "CONTRACTOR").
WII'NESSETH:
The CITY and the CONTRACTOR, for the consideration hereinafter named, mutually agree as follows:
1. CONTRACTOR agrees to perform all the work and furnish all the materials at its own cost and
expense necessary to construct and complete in a good and workmanlike manner and to the
satisfaction of the City Engineer of the CITY, the Santa Ana Boulevard and 5 s Street Protected Bike
Lane Project (hereinafter referred to as the "WORK OF IMPROVEMENT") identified in and in
accordance with the Contract Documents prepared by the City's Public Works Agency and approved
by the City Council.
2. The complete Construction Contract consists of the "Contract Documents" as defined by the
Standard Specifications for Public Works Construction and which include the following:
• Notice Inviting Bids
• Information to Bidders
• Bid Proposal
• Bid Bond
• Contract Form
• Contract Bonds
• General Provisions
• Special Provisions
• Technical Provisions and Project Plans
• Community Workforce Agreement
• Appendices
In case of conflict between the Contract Documents, the precedence of documents shall be as
established in the Standard Specifications for Public Works Construction.
3. CITY agrees to pay and CONTRACTOR agrees to accept in full payment to complete the WORK
OF IMPROVEMENT the sum total amount not to exceed Three Million Seven Hundred Seventy-six
Thousand Eight Hundred Eighty Dollars and Fifty Cents ($3,776,880.50), as set forth and identified
in the BID PROPOSAL, which is attached hereto and incorporated herein as Exhibit "A."
The BID PROPOSAL contains a schedule of unit price(s) or lump sum(s) based on approximate
quantities only, and the City does not expressly or by implication agree that the actual amount of
work will correspond therewith, but reserves the right to increase or decrease the amount of any
class or portion of the work or to omit portions of the work as may be deemed necessary or
advisable.
rev. 09/01/2017 `OC—A 1 Page 1 of 3
4. CONTRACTOR agrees to complete the WORK OF IMPROVEMENT within the time specified in
the Time for Completion of Improvements section of the BID PROPOSAL (Exhibit "A") including
commencing construction within the timeframe therein specified after issuance of a Notice to
Proceed.
5. The CONTRACTOR will pay, and will require all subcontractors to pay, all employees on the
WORK OF IMPROVEMENT a salary or wage at least equal to the prevailing salary or wage
established for such work as set forth in the wage determinations for this work in accordance with
applicable State and Federal law.
6. If applicable, the CONTRACTOR shall adhere to the CITY'S Community Workforce Agreement
(CWA), a pre -hire collective bargaining agreement, which establishes the labor relations policies and
procedures for CONTRACTOR to follow in the crafts persons employed to complete the WORK OF
IMPROVEMENT as more fully described in the CWA. The CWA may be found on the City's
website at:
http://www.santa-ana.org/pwa/documents/CWA.pdf
7. CONTRACTOR shall, after award of this Contract, furnish two bonds to be approved by the CITY,
one in the amount of One Hundred Percent (100%) of the Contract price, to guarantee the faithful
performance of the work (Performance Bond), and one in the amount of One Hundred Percent
(100%) of the Contract price to guarantee payment of all claims for labor and materials furnished
(Payment Bond). This Contract shall not become effective until such bonds are supplied to and
approved by the CITY.
8. CONTRACTOR shall, prior to the release of the performance and payment bonds or the retention
payment, furnish a warranty performance and payment bond (Warranty Bond). Said Warranty Bond
shall also be required as a condition of project acceptance. For projects up to Five Hundred
Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of Ten Thousand
Dollars ($10,000) or Twenty Percent (20%) of the final contract price. For projects above Five
Hundred Thousand Dollars ($500,000), the Warranty Bond amount shall be the greater of One
Hundred Thousand Dollars ($100,000) or Ten Percent (10%) of the final contract price.
9. CONTRACTOR shall, after award of this Contract, furnish Certificates of Liability Insurance and
Worker's Compensation Insurance as outlined in the General Provisions, to be approved by the
CITY.
//
20 E-42 Page 2 of 3
IN WITNESS WHEREOF, the parties hereto have executed this Construction Contract on the day and
year first above written.
ATTEST:
DAISY GOMEZ
Clerk of the Council
APPROVED AS TO FORM:
SONIA R. CARVALHO
City Attorney
By: '�" -f�L
J N FUNK
Assistant City Attorney
RECOMMENDED FOR APPROVAL:
FUAD SWEISS, PE, PLS
Executive Director
Public Works Agency
CITY OF SANTA ANA
KRISTINE RIDGE
City Manager
CONTRACTOR:
Vido Samarzich, Inc.
V'4 !/
NAME: Vido L. Samarzich
TITLE: Vice President
20E-43
Page 3 of 3
EXHIBIT 4
COST ANALYSIS
CONSTRUCTION OF PROJECT NO. 17-6880: Santa Ana Boulevard and 5th
Street Protected Bike Lane [ATPL-5063 (170)]
Construction Contract
$
3,776,881
Contract Administration
$
150,543
Inspection and Testing
$
178,888
Contingencies
$
377,688
TOTAL ESTIMATED CONSTRUCTION COSTS
$
4,484,000