Loading...
HomeMy WebLinkAbout25E - AGMT PEST OPTIONS PARKS AND ZOOREQUEST FOR COUNCIL ACTION CITY COUNCIL MEETING DATE: JANUARY 21, 2020 TITLE APPROVE AN AGREEMENT WITH PEST OPTIONS, INC. TO PROVIDE INTEGRATED PEST MANAGEMENT AND PEST CONTROL SERVICES AT CITY PARKS AND FACILITIES, SANTA ANA ZOO AND CIVIC CENTER FOR AN ANNUAL AMOUNT OF $787,593.66 (TOTAL NOT TO EXCEED $3,150,374.64) FOR THE PERIOD FEBRUARY 1, 2020 TO JANUARY 31, 2024 TO BE FUNDED BY THE GENERAL FUND AND CIVIC CENTER FUND {STRATEGIC PLAN NO. 6, 1B} CLERK OF COUNCIL USE ONLY: APPROVED ❑ As Recommended ❑ As Amended ❑ Ordinance on 111 Reading ❑ Ordinance on 2ntl Reading ❑ Implementing Resolution ❑ Set Public Hearing For CONTINUED TO /s/Kristine Ridge FILE NUMBER CITY MANAGER RECOMMENDED ACTION Authorize the City Manager to execute an agreement with Pest Options, Inc. to provide integrated pest management and pest control services at city parks and facilities, Santa Ana Zoo and Civic Center for an annual amount not to exceed $787,593.66, which includes a 10 percent contingency, for the period from February 1, 2020 to January 31, 2024 for a total agreement amount of $3,150,374.64 to be funded by the General Fund and Civic Center Fund, subject to non -substantive changes approved by the City Manager and City Attorney. DISCUSSION On October 7, 2019, the Parks, Recreation, and Community Services Agency (PRCSA) issued a Request for Proposal (RFP) for integrated pest management and pest control services of the four - landscape maintenance districts, Santa Ana Zoo at Prentice Park and the Civic Center. The City notified 28 companies (one Santa Ana company), 21 companies downloaded the documents (zero Santa Ana companies), and one company submitted a proposal (zero Santa Ana companies) for service at all locations. Even though there was only one proposal, an evaluation committee consisting of three representatives from PRCSA Park Facilities Division reviewed and rated the proposal to confirm the company is qualified to do the work. The proposal was evaluated according to the criteria listed in the RFP, which includes firm/team experience, reference/relevant project experience, listing of resources, manner for performing services/schedule and fee. The evaluation committee made the determination that the company is capable of performing the requested services. 25E-1 Agreement with Pest Options, Inc. to provide integrated pest management and pest control services at city parks and facilities, Santa Ana Zoo and Civic Center January 21, 2020 Page 2 The City proposes to enter into a four-year agreement with Pest Options, Inc. for the service of Districts 1, 2, 3, and 4, Santa Ana Zoo and the Civic Center (Exhibit 1). The PRCSA attempts to have one company per district, but due to the number of proposals received and the capacity of the company, PRCSA recommends that having the Pest Options, Inc. perform the work would be in the best interest of the City. STRATEGIC PLAN ALIGNMENT Approval of this item allows the City to meet Goal #6 - Community Facilities & Infrastructure, Objective #1 (Establish and maintain a Community Investment Plan for all City assets), Strategy B (equitably maintain existing streets and associated assets in a state of good repair so they are clean, safe and aesthetically pleasing for all users). FISCAL IMPACT The Fiscal Year (FY) 2019-20 budget contains new allocations in alignment with Measure X funding including increased funding in the PRCSA for improving the scope of contract services for landscaping, trees, lakes, ball diamonds, and custodial. Originally, the PRCSA had funding to provide pest control services, but eventually eliminated the service due to budgetary reductions. During the process of implementing integrated pest management and pest control services again, use of excess funds from the landscape maintenance budget was anticipated to cover the cost. However, the cost in landscape maintenance and in -field ball diamond maintenance came in higher than anticipated and there is little funding available for this service. The PRCSA and the Civic Center have enough funding for FY 2019-20 to cover the increased cost for the remainder the fiscal year. Additional funding for the PRCSA ($664,000) and Civic Center ($61,500) is required to continue the service agreement in FY 20-21 and beyond. Funds are available in the following accounts for the specified fiscal year of the initial term: Fiscal Accounting Fund Accounting Unit, Account Amount Year Unit -Account # Description Description FY 19-20 01113250- General Fund PRCSA-Park Facilities, $286,682.57 62320 Maint. & Repair / Bldng. & Ground FY 19-20 01113220- General Fund PRCSA-Zoo, $15,788.67 62300 Contract Services -Professional FY 19-20 07413250- Civic Center PRCSA-Civic Center Reg. $25,692.79 62320 Fund Maint., Maint. & Repair / Bldng. & Ground Total FY 19-20 $328,164.03 25E-2 Agreement with Pest Options, Inc. to provide integrated pest management and pest control services at city parks and facilities, Santa Ana Zoo and Civic Center January 21, 2020 Page 3 Funds will be budgeted and made available in the following accounts for the specified fiscal years of the remainina term: Fiscal Accounting Fund Accounting Unit, Account Annual Year Unit -Account # Description Description Amount FY 20-21 01113250- General Fund PRCSA-Park Facilities, $688,038.16 to 22-23 62320 Maint. & Repair / Bldng. & Ground FY 20-21 01113220- General Fund PRCSA-Zoo, $37,892.80 to 22-23 62300 Contract Services -Professional FY 20-21 07413250- Civic Center PRCSA-Civic Center Reg. $61,662.70 to 22-23 62320 Fund Maint., Maint. & Repair / Bldng. & Ground Annual Total $787,593.66 Fiscal Accounting Fund Accounting Unit, Account Amount Year Unit -Account # Description Description FY 23-24 01113250- General Fund PRCSA-Park Facilities, $401,355.60 62320 Maint. & Repair / Bldng. & Ground FY 23-24 01113220- General Fund PRCSA-Zoo, $22,104.13 62300 Contract Services -Professional FY 23-24 07413250- Civic Center PRCSA-Civic Center Reg. $35,969.90 62320 Fund Maint., Maint. & Repair / Bldng. & Ground Total FY 23-24 $459,429.63 The total agreement amount of the four-year term is $3,150,374.64. Lisa Rudloff Kathryn Downs, CPA Executive Director Executive Director Parks, Recreation, and Community Finance and Management Services Agency Services Agency 25E-3 Agreement with Pest Options, Inc. to provide integrated pest management and pest control services at city parks and facilities, Santa Ana Zoo and Civic Center January 21, 2020 Page 4 Exhibit: 1. Agreement 25E-4 Exhibit 7 AGREEMENT FOR PEST CONTROL AND WEED ABATEMENT SERVICES THIS AGREEMENT is made and entered into this 21st day of January, 2020 by and between Pest Options, Inc, a California Corporation ("Contractor"), and the City of Santa Ana, a charter city and municipal corporation organized and existing under the Constitution and laws of the State of California ("City"). RECITALS A. On October 7, 2019, the City issued a Request for Proposal ("RFP") for pest control and weed abatement services for City Districts 1-4, the Santa Ana Zoo, and District A (Civic Center). On October 25, 2019, City issued Addendum No. 1 regarding the RFP. (The RFP and Addendum No. 1 are incorporated by reference as though completely set forth in its entirety herein.) B. Contractor submitted a proposal dated November 4, 2019. Contractor's proposal was ultimately selected for the award of the contract. (Contractor's proposal is incorporated by reference as though completely set forth in its entirety herein.) C. In undertaking the performance of this Agreement, Contractor represents that it is knowledgeable in its field and that any services performed by Contractor under this Agreement will be performed in compliance with such standards as may reasonably be expected from a professional firm in the field. NOW THEREFORE, in consideration of the mutual and respective promises, and subject to the terms and conditions hereinafter set forth, the parties agree as follows: SCOPE OF SERVICES Contractor shall perform pest control services and weed abatement services for City Districts 1-4, the Santa Ana Zoo, and District A (Civic Center) as set forth in the City's RFP and Exhibit A attached hereto. Services are provided pursuant to the schedule attached hereto as Exhibit B. Said schedule is subject to modification during the term of this Agreement as mutually agreed upon in writing by the parties. 2. COMPENSATION a. City agrees to pay, and Contractor agrees to accept as total payment for its services the rates and charges identified in Exhibit C. The total sum to be expended under this Agreement shall not exceed $787,593.66 annually during the term of this Agreement. This annual amount is comprised of (1) the base agreement amount of $715,994.24 and (2) a 10% contingency of up to $71,599.42 for services as may be performed by Contractor at the sole discretion of City. The total Agreement amount for the entire term of this Agreement shall not exceed $3,150,374.64. Page 1 of 8 #197000 25E-5 Exhibit 7 Payment by City shall be made within forty-five of days (45) days following receipt of proper invoice evidencing work performed, subject to City accounting procedures. Payment need not be made for work that fails to meet the standards of performance set forth in the Recitals, which may reasonably be expected by City. 3. TERM This Agreement shall commence on February 1, 2020 and terminate on January 31, 2024, unless terminated earlier in accordance with Section 15, below. 4. PREVAILING WAGES Contractor is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., ("Prevailing Wage Laws"), which require the payment of prevailing wage rates and the performance of other requirements on "public works" and "maintenance" projects. Since the services being performed are part of an applicable "public works" or "maintenance" project, as defined by the Prevailing Wage Laws, and since the total compensation is $1,000 or more, Contractor agrees to fully comply with such Prevailing Wage Laws. Contractor shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. 5. INDEPENDENT CONTRACTOR Contractor shall, during the entire term of this Agreement, be construed to be an independent contractor and not an employee of the City. This Agreement is not intended nor shall it be construed to create an employer -employee relationship, a joint venture relationship, or to allow the City to exercise discretion or control over the professional manner in which Contractor performs the services which are the subject matter of this Agreement; however, the services to be provided by Contractor shall be provided in a manner consistent with all applicable standards and regulations governing such services. Contractor shall pay all salaries and wages, employer's social security taxes, unemployment insurance and similar taxes relating to employees and shall be responsible for all applicable withholding taxes. 6. OWNERSHIP OF MATERIALS This Agreement creates a non-exclusive and perpetual license for City to copy, use, modify, reuse, or sublicense any and all copyrights, designs, and other intellectual property embodied in plans, specifications, studies, drawings, estimates, and other documents or works of authorship fixed in any tangible medium of expression, including but not limited to, physical drawings or data magnetically or otherwise recorded on computer diskettes, which are prepared or caused to be prepared by Contractor under this Agreement ("Documents & Data'). Contractor shall require all subcontractors to agree in writing that City is granted a non-exclusive and perpetual license for any Documents & Data the subcontractor prepares under this Agreement. Contractor represents and warrants that Contractor has the legal right to license any and all Documents & Data. Page 2 of 8 #19700v3 2 5 E -6 Exhibit 7 Contractor makes no such representation and warranty in regard to Documents & Data, which were provided, to Contractor by the City. City shall not be limited in any way in its use of the Documents and Data at any time, provided that any such use not within the purposes intended by this Agreement shall be at City's sole risk. INSURANCE Prior to undertaking performance of work under this Agreement, Contractor shall maintain and shall require its subcontractors, if any, to obtain and maintain insurance as described below: a. Commercial General Liability Insurance. Contractor shall maintain commercial general liability insurance naming the City, its officers, employees, agents, volunteers and representatives as additional insured(s) and shall include, but not be limited to protection against claims arising from bodily and personal injury, including death resulting therefrom and damage to property, resulting from any act or occurrence arising out of Contractor's operations in the performance of this Agreement, including, without limitation, acts involving vehicles. The insurance policy shall contain an exclusion for sexual molestation. The amounts of insurance shall be not less than the following: single limit coverage applying to bodily and personal injury, including death resulting therefrom, and property damage, in the total amount of $1,000,000 per occurrence, with $2,000,000 in the aggregate. Such insurance shall (a) name the City, its officers, employees, agents, volunteers and representatives as additional insured(s); (b) be primary and not contributory with respect to insurance or self-insurance programs maintained by the City; and (c) contain standard separation of insureds provisions. b. Business automobile liability insurance, or equivalent form, with a combined single limit of not less than $1,000,000 per occurrence. Such insurance shall include coverage for owned, hired and non -owned automobiles. C. Worker's Compensation Insurance. In accordance with the California Labor Code, Contractor, if Contractor has any employees, is required to be insured against liability for worker's compensation or to undertake self-insurance. Prior to commencing the performance of the work under this Agreement, Contractor agrees to obtain and maintain any employer's liability insurance with limits not less than $1,000,000 per accident. d. If Contractor is or employs a licensed professional such as an architect or engineer: Professional liability (errors and omissions) insurance, with a combined single limit of not less than $1,000,000 per claim with $2,000,000 in the aggregate. e. The following requirements apply to the insurance to be provided by Contractor pursuant to this section: (i) Contractor shall maintain all insurance required above in full force and effect for the entire period covered by this Agreement. Page 3 of 8 #197000 2 5 E -7 Exhibit 7 (ii) Certificates of insurance shall be furnished to the City upon execution of this Agreement and shall be approved by the City. (iii) Certificates and policies shall state that the policies shall not be canceled or reduced in coverage or changed in any other material aspect without thirty (30) days prior written notice to the City. (iv) Contractor shall supply City with a fully executed additional insured endorsement. f. If Contractor fails or refuses to produce or maintain the insurance required by this section or fails or refuses to furnish the City with required proof that insurance has been procured and is in force and paid for, the City shall have the right, at the City's election, to terminate this Agreement. Such termination shall not affect Contractor's right to be paid for its time and materials expended prior to notification of termination. Contractor waives the right to receive compensation and agrees to indemnify the City for any work performed prior to approval of insurance by the City. 8. INDEMNIFICATION Contractor agrees to and shall indemnify and hold harmless the City, its officers, agents, employees, consultants; special counsel, and representatives from liability: (1) for personal injury, damages, just compensation, restitution, judicial or equitable relief arising out of claims for personal injury, including death, and claims for property damage, which may arise from the negligent operations of the Contractor or its, subcontractors, agents, employees, or other persons acting on their behalf which relates to the services described in section 1 of this Agreement; and (2) from any claim that personal injury, damages, just compensation, restitution, judicial or equitable relief is due by reason of the terms of or effects arising from this Agreement. This indemnity and hold harmless agreement applies to all claims for damages, just compensation, restitution, judicial or equitable relief suffered, or alleged to have been suffered, by reason of the events referred to in this Section or by reason of the terms of, or effects, arising from this Agreement. The Contractor further agrees to indemnify, hold harmless, and pay all costs for the defense of the City, including fees and costs for special counsel to be selected by the City, regarding any action by a third party challenging the validity of this Agreement, or asserting that personal injury, damages, just compensation, restitution, judicial or equitable relief due to personal or property rights arises by reason of the terms of, or effects arising from this Agreement. City may make all reasonable decisions with respect to its representation in any legal proceeding. Notwithstanding the foregoing, to the extent Contractor Services are subject to Civil Code Section 2782.8, the above indemnity shall be limited, to the extent required by Civil Code Section 2782.8, to claims that arise out of, pertain to, or relate to the negligence, recklessness, or willful misconduct of the Contractor. Page 4 of 8 #197000 25E-8 Exhibit 7 9. RECORDS Contractor shall keep records and invoices in connection with the work to be performed under this Agreement. Contractor shall maintain complete and accurate records with respect to the costs incurred under this Agreement and any services, expenditures, and disbursements charged to the City for a minimum period of three (3) years, or for any longer period required by law, from the date of final payment to Contractor under this Agreement. All such records and invoices shall be clearly identifiable. Contractor shall allow a representative of the City to examine, audit, and make transcripts or copies of such records and any other documents created pursuant to this Agreement during regular business hours. Contractor shall allow inspection of all work, data, documents, proceedings, and activities related to this Agreement for a period of three (3) years from the date of final payment to Contractor under this Agreement. 10. CONFIDENTIALITY If Contractor receives from the City information which due to the nature of such information is reasonably understood to be confidential and/or proprietary, Contractor agrees that it shall not use or disclose such information except in the performance of this Agreement, and further agrees to exercise the same degree of care it uses to protect its own information of like importance, but in no event less than reasonable care. "Confidential Information" shall include all nonpublic information. Confidential information includes not only written information, but also information transferred orally, visually, electronically, or by other means. Confidential information disclosed to either party by any subsidiary and/or agent of the other party is covered by this Agreement. The foregoing obligations of non-use and nondisclosure shall not apply to any information that (a) has been disclosed in publicly available sources; (b) is, through no fault of the Contractor disclosed in a publicly available source; (c) is in rightful possession of the Contractor an obligation of confidentiality; (d) is required to be disclosed by operation of law; or (e) is independently developed by the Contractor without reference to information disclosed by the City. 11. CONFLICT OF INTEREST CLAUSE Contractor covenants that it presently has no interests and shall not have interests, direct or indirect, which would conflict in any manner with performance of services specified under this Agreement. 12. BACKGROUND CHECK REQUIREMENTS Contractor shall not assign any employee, agent, subcontractor or volunteer to provide services pursuant to this Agreement, if that employee, agent, subcontractor or volunteer is required to register as a sex offender under California Penal Code Section 290 et seq, has a conviction for any crime of moral turpitude, has a conviction for a violent felony as defined in California Penal Code Section 667.5(c), or has a conviction for a serious felony as defined in California Penal Code Section I I92.7(c). Disqualifying convictions include but are not limited to, violations of California Penal Code Sections 37, 128, 136.1 with Section 186.22, 187, 190-190.4 and 192(a), 205, 206, 207-209.5, 211, 212, 212.5, 213, 214, 215, 218-219, 220, 236.1(b) or 236.1(c), 243.4, 261, 261.5, Page 5 of 8 # 19700v3 2 5 E -9 Exhibit 7 273.5, 262, 264.1, 266, 266c, 266h, 266i, 266y 267, 269, 272, 273a, 273ab, 273d, 285, 286, 288, 288a, 288.2, 288.3, 288.4, 288.5, 288.7, 289, 290, 311.1, 311.2, 311.3, 311.4, 311.10, 311.11, 314, 347(a), 368, 417(b), 451(a),518 with 186.22, 647.6, 653f(c), 664 and 187, 667.5(c), 18745, 18750, or 18755, 12022.53, 11418(b)(1) or (b)(2); Business and Professions Code Section 729. Failure to comply with this Section shall be grounds for immediate termination of this Agreement. 13. NOTICE Any notice, tender, demand, delivery, or other communication pursuant to this Agreement shall be in writing and shall be deemed to be properly given if delivered in person or mailed by first class or certified mail, postage prepaid, or sent by fax or other telegraphic communication in the manner provided in this Section, to the following persons: To City: Clerk of the City Council City of Santa Ana 20 Civic Center Plaza (M-30) P.O. Box 1988 Santa Ana, CA 92702-1988 Fax 714- 647-6956 With courtesy copies to: To Contractor: Executive Director Parks, Recreation, and Community Services Agency City of Santa Ana 20 Civic Center Plaza (M-23) P.O. Box 1988 Santa Ana, California 92702 Fax 714-571-4211 Pest Options, Inc. Attention: Tracy Thompson, President 135 North Manchester Avenue Anaheim, California 92802 Tracy@pestoptions.com Fax 888-511-3584 A party may change its address by giving notice in writing to the other party. Thereafter, any communication shall be addressed and transmitted to the new address. If sent by mail, communication shall be effective or deemed to have been given three (3) days after it has been deposited in the United States mail, duly registered or certified, with postage prepaid, and addressed as set forth above. If sent by fax, communication shall be effective or deemed to have been given twenty-four (24) hours after the time set forth on the transmission report issued by the transmitting facsimile machine, addressed as set forth above. For purposes of calculating these Page 6 of 8 #19700v3 25E-10 Exhibit 7 time frames, weekends, federal, state, County or City holidays shall be excluded. 14. EXCLUSIVITY AND AMENDMENT This Agreement represents the complete and exclusive statement between the City and Contractor regarding the subject matter therein, and supersedes any and all other agreements, oral or written, between the parties. In the event of a conflict between the terms of this Agreement and any attachments hereto, the terms of this Agreement shall prevail. This Agreement may not be modified except by written instrument signed by the City and by an authorized representative of Contractor. The parties agree that any terms or conditions of any purchase order or other instrument that are inconsistent with, or in addition to, the terms and conditions hereof, shall not bind or obligate Contractor or the City. Each party to this Agreement acknowledges that no representations, inducements, promises or agreements, orally or otherwise, have been made by any party, or anyone acting on behalf of any party, which are not embodied herein. 15. ASSIGNMENT Inasmuch as this Agreement is intended to secure the specialized services of Contractor, Contractor may not assign, transfer, delegate, or subcontract any interest herein without the prior written consent of the City and any such assignment, transfer, delegation or subcontract without the City's prior written consent shall be considered null and void. Nothing in this Agreement shall be construed to limit the City's ability to have any of the services which are the subject to this Agreement performed by City personnel or by other consultants retained by City. 16. TERMINATION Except as otherwise specified herein, this Agreement may be terminated by the City upon thirty (30) days written notice of termination. In such event, Contractor shall be entitled to receive and the City shall pay Consultant compensation for all services performed by Contractor prior to receipt of such notice of termination, except that, payment need not be made for work that fails to meet the standard of performance specified in the Recitals of this Agreement. 17. NONDISCRIMINATION Provider shall not discriminate because of race, color, creed, religion, sex, marital status, sexual orientation, gender identity, gender expression, gender, medical conditions, genetic information, or military and veteran status, age, national origin, ancestry, or disability, as defined and prohibited by applicable law, in the recruitment, selection, teaching, training, utilization, promotion, termination or other employment related activities or any services provided under this Agreement. Provider affirms that it is an equal opportunity employer and shall comply with all applicable federal, state and local laws and regulations. 18. JURISDICTION - VENUE This Agreement has been executed and delivered in the State of California and the validity, interpretation, performance, and enforcement of any of the clauses of this Agreement shall be Page 7 of 8 #197000 25E-11 Exhibit 7 determined and governed by the laws of the State of California. Both parties further agree that Orange County, California, shall be the venue for any action or proceeding that may be brought or arise out of, in connection with or by reason of this Agreement. 19. PROFESSIONAL LICENSES Contractor shall, throughout the term of this Agreement, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary for the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies including but not limited to having its employees working on this Agreement maintain a qualified applicator's license and qualified applicator's certificate as set forth in the RFP. Contractor shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement. 20. MISCELLANEOUS PROVISIONS a. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attorney's fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn. b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement. IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written. ATTEST: Daisy Gomez Clerk of the Council APPROVED AS TO FORM: SONIA R. CARVALHO City Attorney By: Awv a. A Laura A. Rossini Senior Assistant City Attorney CITY OF SANTA ANA Kristine Ridge City Manager CONTRACTOR: Tracy Thompson President Pest Options, Inc. Page 8 of 8 #197000 25E-12 Exhibit 7 19. PROFESSIONAL LICENSES Contractor shall, throughout the lens of this AgTecmcnt, maintain all necessary licenses, permits, approvals, waivers, and exemptions necessary For the provision of the services hereunder and required by the laws and regulations of the United States, the State of California, the City of Santa Ana and all other governmental agencies including but not limited to having its employees working on this Agreement maintain a qualified applicator's license and qualified applicator's certificate as set forth in the RFP. Contractor shall notify the City immediately and in writing of its inability to obtain or maintain such permits, licenses, approvals, waivers, and exemptions. Said inability shall be cause for termination of this Agreement. 20. MISCELLANEOUS PROVISIONS a. Each undersigned represents and warrants that its signature herein below has the power, authority and right to bind their respective parties to each of the terms of this Agreement, and shall indemnify City fully, including reasonable costs and attomey's fees, for any injuries or damages to City in the event that such authority or power is not, in fact, held by the signatory or is withdrawn- b. All Exhibits referenced herein and attached hereto shall be incorporated as if fully set forth in the body of this Agreement. IN WITNESS WHEREOF, the parties hereto have executed this Agreement the date and year first above written. ATTEST: Daisy Gomez Clerk of the Council APPROVED AS TO FORM; SONIA R. CARVALHO City Attorney By: Laura A. Rossini Senior Assistant City Attorney CITY OF SANTA ANA Kristine Ridge City Manager CONTRACTOR: A Tracy'fh pson President Pest Options, Inc. [Signatures continue on the next page] Page 8 of 8 0 1970" "' 25E-13 Exhibit 7 RECOMMENDED FOR APPROVAL: Lisa Rudloff Executive Director Parks, Recreation, and Conununity Services Agency Page 9of8 1119700v2 25E-14 Exhibit 7 RECOMMENDED FOR APPROVAL: Lisa Rudloff Executive Director Parks, Recreation, and Community Services Agency Page 9 of 8 #197000 25E-15 Exhibit 7 EXHIBIT A SCOPE OF SERVICES 25E-16 Exhibit 7 Appendix ATTACHMENT 1 SCOPE OF WORK CITY OF SANTA ANA REQUEST FOR PROPOSALS FOR INTEGRATED PEST MANAGEMENT (IPM) & PEST CONTROL SERVICES RFP NO.: 19-094 Description of Work ROUTINE MAINTENANCE The City of Santa Ana, Park Services Division embraces and promotes sustainable site design and management principles and best management practices where feasible. The use of Integrated Pest Management (IPM) and organic pesticides, in lieu of traditional synthetic pesticides, are encouraged and, in cases listed herein, required as a part of this agreement. The Contractor, as part of our site management subject expert, shall play an important role toward recommending, using and collecting data concerning the use of IPM and organic pesticide products as specified herein. The Contractor shall assign the appropriate number of staff at the appropriate skill level and rank in their organization, to continuously improve the quality of Santa Ana Parks and Facilities. The Contractor understands and agrees by entering into the agreement with the City of Santa Ana Park Services Director's Representative shall be the sole source of interpreting the specifications and the quality of work specified herein in writing and by the Santa Ana Park Services Quality Maintenance Standards PowerPoint herewith. Should the Contractor fail to provide the City with the level of service specified, the Director's Representative shall have the authority to direct the Contractor to add additional staff, equipment or both to achieve the maintenance standards specified herein. Each week the Contractor's Supervisor or their designated representative shall inspect each site and respond to IPM and pest control issues. The Contractor shall also take a time/date stamped photographs documenting site inspections and noting any issues relating to but not limited to safety, maintenance, malfunctions, vandalism, hazardous conditions or otherwise abnormal conditions that are inconsistent with the quality standards specified herein or threaten people and/or property by reporting the condition immediately to the Director's Representative. Failure to inspect each site before 9:00am will result in a $300 penalty per site. Routine maintenance shall include, but, not be limited to the following services performed at the Work Sites and per the City of Santa Ana Park Services Quality Maintenance Standards (reference PowerPoint). 1.0 Certification of Applicators 1.1 All IPM and agricultural pest control employee -applicators shall possess and maintain a state licensed/certified agricultural pest control Qualified Applicators License (QAL) or a Qualified Applicators Certificate (QAC). Any employee serving as an assistant(s) shall not be required to possess at QAL or QAC. At no time shall an unlicensed or uncertified City of S,ngt a I� ' 9-094 LLI�� T211 Exhibit 7 employee perform any application of pesticides including, but not limited to, applying IPM, organic and/or pest control products. 2.0 Integrated Pest Management (IPM) & Organic Pesticide Products BMP's 2.1 IPM best management practices and products shall be the fast option considered for all pest control needs. When confronted with a pest issue, the Contractor shall demonstrate to the Director Representative's satisfaction, that all IPM/Organic products and methods were considered before recommending synthetic pesticides/products for pest control. 3.0 Notification of Intent (NOI) to Apply Pesticides 3.1 The Contractor shall notify the Orange County Agricultural Commissioner's Inspector (whose area or responsibility is the City of Santa Ana) directly and copy the Director's Representative via email a minimum of 48 hours in advance of any proposed IPM/pesticide applications. The required information shall be the name of the proposed IPM, organic or pesticides to be applied listing the manufacturer/name of the pesticide, the rate(s) of application, the reentry period and the method of application (see Attachment 4.0 On -Site Public Notification 4.1 Prior to starting any IPM/pest control applications, the Contractor shall post on A -frame barricades plastic sealed 18"x24" signs at a maximum 300' intervals (where applicable) public notification posters listing the company performing the application, the proposed pesticides to be applied listing the manufacturer/name of the pesticide, the rate(s) of application, the reentry period and the method of application. 4.2 The Contractor shall have an Assistant assigned to watch -out for the general public and, if any person attempts to enter the area where IPM/pest control products are being applied, to protect them by stopping their entry into the application zone. Should a person(s) from the general public ignore the Assistants warnings, the Assistant shall cause the QAL/QAC Applicator to cease operations until the Director's Representative can be contacted for assistance. 4.3 Following completion of the QAL/QAC Applicators applications, the Contractor's Assistant shall continue to protect the general public by warning them not to enter the pest control application zone until the re-entry zone time frame has passed. 5.0 Integrated Pest Management (IPM) & Pest Control Services 5.1 Weed Abatement 5.1.1 All hardscape and landscape areas shall be kept free of weeds at all times. Weeds shall be removed by hand and/or approved mechanical, organic or herbicide methods. The Contractor shall apply post emergent herbicides a minimum of one (1) time per month to abate all weeds to areas including, but not limited to, curbs/gutters, all hardscape, groundcover/shrub areas, tree rings, roof gutters and turf area being careful to not damage or eradicate non -target plant material. The Contractor shall be responsible for the replacement of any non -target plant material of like quantities, size and species per the Director's Representatives direction. In City of S tag �e�♦ V 9-094 Exhibit 7 addition, the Director's Representative may dispatch City staff or other contractor's to remove/eradicate weeds that reach two (1) inch or greater or when weeds exist in turf areas and are not removed/eradicated immediately. In such instance, the cost will be deducted from the Contractor's monthly invoice. 5.1.2 The Contractor may elect to apply pre -emergent herbicides as a strategy to reduce the germination of weeds at park properties. Should the Contractor elect to apply pre -emergent herbicides to control the germination of weeds, he/she shall get written approval from the Director's Representative prior to applying specific products. Note, should pre -emergent herbicides harm plant material, the Contractor shall remove the damaged plant material and replace the affected area with like quantities, sizes and species of plant material to the satisfaction of the Director's Representative. 5.2 Sport/Priority Turf Management Support 5.2.1 Perennial Rye Grass Eradication - Beginning in April all sport/priority turf shall have post -emergent herbicide Revolver (16-17 oz./acre), non-ionic surfactant, a turf marker and ferrous oxide pre -mixed in a tank to eradicate perennial rye grass, poa annua and other turf species indicated on the product label. Following the initial application, the Contractor shall continuously apply post emergent herbicides to eradicate all turf and broadleaf weeds. 5.3 Disease and Pest Control 5.3.1 The Contractor shall inspect weekly all landscaped areas (turf, trees, shrubs, ground cover, and annual color) for presence of disease, insect, rodent infestation or any other pests. If any pests, such as but not limited to, disease, insect, algae, birds, animals, such as rabbits, rats, squirrels, or rodent infestation (rodents including rats, gophers, moles, voles, etc.) is discovered, it shall immediately be controlled by the Contractor using the safest and most expedient method. Note that rodents, such as rats, if found in the landscape, regardless of whether or not they inhabit adjacent buildings, are considered agricultural pests and shall be treated as a part of this agreement. 5.3.2 If any plant material (turf, groundcover, shrubs, trees) dies due to pest damages the Contractor will be required to replace the plant with like quantities, species and size at no extra cost to the City. hi the case where turf is lost due to pest damage, the Contractors shall replace the area of turf lost with thick cut West Coast Turf Bandera Bermuda (during spring/summer) and thick cut West Coast Turf Bandera Bermuda that has been cropped over with Perennial Rye grass (during fall/winter). 6.0 Soil Fertility & Fertilization Services 6.1 Biological Soil Testing & Analysis 6.1.1 Twice per year the Contractor shall hire a contractor specializing in soil/water/plant tissue testing to perform biological and traditional soil testing at each park groundcover/shrub/trees/turf soils to gather information regarding soil nutrient levels, compaction, composition, potential of hydrogen (PH), compost and all aspects of a soils biological health. The contractor shall also test water quality and soil assay to determine City of S4a�t�i�.�neV1V9-094 Exhibit 7 which soil beneficial biologicals are present and in need of being added to soils. Following soil testing the Contractor shall provide a report for each sample taken which makes specific recommendations to be considered for improving the overall health and vitality of the soil. 6.2 Landscape Areas — All landscape areas shall be fertilized using the following products and rates: 6.2.1 Groundcover/Shrubs: California Organics Phyta Grow Leafy Green 7-1-2 granular fertilizer at a rate of 500 pounds per acre one (2) time per year in March and August. 6.2.2 Casual Turf California Organics Phyta Grow Leafy Green 7-1-2 granular fertilizer at a rate of 500 pounds per acre one (2) time per year in March and August. 6.2.3 Sport/Priority Turf: California Organics Phyta Grow Leafy Green 7-1-2 granular fertilizer at a rate of 700 pounds per acre one (2) time per year in April and October. 6.2.3 All Palms and Cycads shall be fertilized two times per year using California Organic Phyta-Boost 7-1-2 at five pounds per cycad/pahn and California Organic Compel pelletized organic compost at 3 pounds per Palm/Cycad. 7.0 Integrated Pest Management (IPM) & Organic Pest Management & Data Collection Sites 7.1 Each landscape -grounds park district shall have one (1) designated test site for use of IPM/Organic Pest Management control measures only. The Contractor shall manage and collect data at the sites utilizing only IPM/Organic pesticides and/or manual/mechanical control measures only: 7.1.1 District 1 — 17a' Street Triangle Park 7.1.2 District 2 — Angels Community Park 7.1.3 District 3 — Heritage Park 7.1.4 District 4 — McFadden Triangle Park 7.2 Annual Cost -Benefit Analysis Report 7.2.1 Each year the Contractor shall prepare a Cost -Benefit Analysis report identifying specific comparative costs, benefits, and/or challenges, associated with the use of IPM/Organic pesticide and use of manual/mechanical labor to control pests in the four (4) designated IPM/Organic park sites versus the other park sites which may also use synthetic pest control products. 7.2.2 The report shall specifically report all pesticides (IPM/organic/synthetic), what type of pesticide category they belong too, their brand names, active ingredient and percent, EPA#, whether they are liquid, granular, wettable powder, etc., the total annual quantities applied and manual/mechanical labor in hours needed to control pests throughout the designated test sites in the four (4) districts versus the other park sites which may use synthetic pest control measures. 7.2.3 The report shall list the total annual cost of materials, labor and equipment used to control pests in the four (4) per park site and also be broken down by cost per acre. The report shall also have the total annual cost of materials, labor and equipment to control pests in the other parks which may use traditional synthetic control products. The report shall compare the cost, benefits, challenges, and have recommendations for future consideration. Note, the Director's Representative shall have the authority to add additional cost -benefit report criteria as deemed necessary. Should the Director's Representative require additional cost -benefit City of SISM 9-094 Exhibit 7 information, he/she shall submit to the Contractor the direction in writing. 7.2.4 The Contractor's annual cost -benefit analysis report shall include an Executive Summary, a narrative describing the general findings based upon the data collected and recommendations for the City's consideration (see Exhibit _ Cost -Benefit Analysis Template). 8.0 Specialized Maintenance 8.1 Santa Ana Zoo Chemical Use - All pesticides and fertilizers must be approved as safe for the animals by the Zoo Manager or Zoo Veterinarian prior to their application at the Zoo. The Zoo Manager or their representative shall be informed prior to any application of chemicals/fertilizers on zoo property. Contractor Responsibilities: 1.0 GENERAL CONDITIONS 1.1 Definitions- 1.1.1 "Director's Representative" shall mean the Executive Director of Parks, Recreation and Community Services designated representative(s). 1.1.2 "SAPRF" shall mean Santa Ana Park and Recreation Facilities. 1.1.3 "Weed" shall mean any undesirable or misplaced plant. 1.1.4 "Hardscape" shall mean any resilient surface other than turf or planting beds, such as but not limited to curbs, gutters, sidewalks, decomposed pathways, asphalt pavement, mow strips, bollards, signs, grandstands, benches, picnic tables, drinking fountains, BBQ's, fencing, railing, tire stops, etc. 1.1.5 "Integrated Pest Management" (IPM) shall mean any biological live pest control solution. 1.1.6 "Organic" shall mean any non -synthetic product pest control solution. 1.1.7 "Synthetic" shall mean any non-IPM or organic pest control solution. 1.2 Scheduling of Work -The Contractor shall provide IPM/organic/synthetic pest control maintenance between the hours of 6:00 a.m. and 6:00 p.m., Monday through Friday. The schedule may be modified only with the Director's Representative consent. Landscape/grounds maintenance that generates excess noise cannot begin before 8:00 a.m. The Contractor shall establish schedules of "routine work" to be followed in the performance of this contract. In addition to the Contractor submitting the Monthly Park Maintenance Inspector's Inspection Schedule and other required monthly reports, the Contractor shall submit weekly schedules listing the work tasks, crew performing the task, and the projected hours to complete the task. The schedules shall be emailed to Director's Representative by Thursday at 4:OOpm for the upcoming week. Any changes in scheduling shall be reported in writing 48 hours before the proposed change and must be approved by the Director's Representative. The schedule shall include days of the week and what person/crew will be performing specific work in accordance with the specification. 1.3 Local Office - The Contractor shall maintain a physical office within the 714 area code (local office). The local office shall be open Monday through Friday 8:00 a.m. to 5:00 p.m. with a company representative present at all times. Answering services or mobile telephones will not be considered a local office. City of S= 2419-094 Exhibit 7 1.4 Emergency Response — The Contractor shall have an emergency "Stand-by" staff person assigned to respond to urgent calls after hours. The Contractor shall have the capability to answer calls immediately and respond to after-hours service within one (1) hour from the time the call is made. 1.5 Extra Work or Outside the Scope of Work -Damage or malfunction to site amenities, plant material or irrigation system equipment by any of the following may be considered outside the scope of this Agreement unless otherwise specified herein: -Acts of God -Civil Disorder -Vehicle Collision (excluding Contractor and its employees and subs) -Excavation or Re -surfacing of the Street -Power Failures -Underground Wiring Damage -Extra Work Requested by the Director's Representative Contractor will not be considered responsible for replacement. Contractor must prove to the satisfaction of Director's Representative that one of the above occurred in order to be excused from performing under the Agreement. Extra Work or Outside the Scope of Work -Damage (a.k.a. Extra Work) shall be compensated: i Labor- 25% above prevailing wage ii Materials- 15% above retail contractors cost ii Equip Rent-15% above contractor's cost All Extra Work or Outside the Scope of Work -Damage work shall be performed by Contractor's staff other than the routine maintenance staff assigned to the contract. Any staff routine maintenance Contractor's staff discovered performing Scope of Work - Damage work shall not be charged as Extra Work. 2.0 UNIFORMS AND VEHICLES IDENTIFICATION 2.1 The Contractor shall provide to all field personnel a standard uniform including but not limited to uniform company hats, collared work shirts, pants, jackets, cold weather vests and ANSI approved safety shoes. All uniforms will be marked by patch, silk screen or embroidery with the company name and logo or other form of identification. 2.2 All equipment shall be clearly identified on both sides and rear of the vehicles as belonging to the Contractor, well maintained, in excellent working condition, be clean in appearance and without extensive visible damage, dirt graffiti etc. In addition, all vehicles shall have the company's name, contractor's license number and contact information clearly identified on both sides and the rear of the vehicle. 2.3 The Director's Representative reserves the right to direct the Contractor to remove an employee or piece of equipment for not meeting high maintenance and appearance standards. 3.0 SAFETY REQUIREMENTS City of S= 2t 9-094 Exhibit 7 3.1 All work performed under this contract shall be completed with maximum safety as the priority above all other requirements. The Contractor shall be incompliance with his/her companies City approved Illness and Injury Prevention Program and all Federal, State and Local OSHA requirements, laws and regulations. 3.2 All work performed under this contract shall be performed in strict compliance with all federal, state and local safety laws, regulations or other authoritative mandates that protect workers and the general public, including but not limited to, blood borne pathogens, hazardous waste identification and transport and pesticide use and reporting. 3.3 In the event unsafe work is observed by City staff or otherwise reported, the Director's Representative may, at his discretion, order the Contractor to stop performing and pay all costs and or damages resulting from the delay. 3.4 The Contractor shall perform all safety training required by OSHA, CalOSHA and any and all authoritative government entities having authority over required safety training. 3.5 In addition, the Contractor shall submit to the Director's Representative each year upon renewal of the agreement his/her updated Illness and Injury Prevention Plan which shall include the annual OSHA safety training schedule and update OSHA safety training records and employee safety training certificates. All OSHA Training shall be performed by a certified OSHA Trainer. 4.0 SAFETY NOTIFICATION 4.1 If Contractor identifies a potential safety issue, Contractor shall: 4.1.1 Notify the public that potentially unsafe conditions exist by installing yellow "Caution Tape" and "A" frame barricades or equal substitute around the condition. 4.1.2 Notify the Director's Representative of the condition first by phone and then in writing (e-mail is acceptable) including digital photographs of the potential safety concern. Once the Contractor has notified the City and the public of the condition, as specified above, Contractor shall have no further responsibility regarding the condition. 5.0 UNDERGROUND ALERT SYSTEMS 5.1 Underground Alert Systems (telephone number 1-800-422-4133) must be notified 48- hours in advance prior to any excavation work. 6.1 Any damage to private property caused by Contractor shall be immediately reported to the property owner. Contractors shall pay for any damage caused to private property in performing this agreement. 7.0 ACCESS TO PRIVATE PROPERTY 7.1 Prior to any work involving private property, the Contractor shall notify the City of the proposed work and obtain all necessary permits and/or consent required from City and/or property owner City of S to Flt19-094 Exhibit 7 8.0 PROTECTION AND RESTORATION OF EXISTING IMPROVEMENTS 8.1 The Contractor shall protect City and/or private property adjacent to work areas including sprinkler systems, drain pipes, lawns, brick work, plantings, masonry work, fences, walls, sidewalks, street paving, etc., located on either public or private property. Contractor shall, at its expense, replace any property that is removed or damaged, other than property pre - approved for removal. Contractor shall abide by the City's "Policy for Driving on Park Property" (See Attachment 4). 9.0 TRAFFIC CONTROL 9.1 The Contractor will not interrupt traffic flow on City streets without obtaining a no -fee permit from the City. Prior to performing maintenance activities where Contractor employees work immediately adjacent City vehicular lanes 35 miles per hour or greater, or any other situation covered under the California MUTCD, the Contractor shall implement no -fee permitted City approved traffic safety plans to protect the health and welfare of its employees and the general public prior to commencement of the agreement. 10.0 MONTHLY REPORTS 10.1 Prior to the first of each month the Contractor shall submit to the Director's Representative for approval: 10.1.1 The Excel Park Maintenance Inspector's Inspection Schedule including a detailed annual, monthly, weekly and daily work schedules consistent with task frequencies in Exhibit A; 10.1.2 A copy of certified payroll sent to the Department of Industrial Relations (DIR) on the DIR required format/forms of employees assigned to the contract areas; 10.1.3 An updated organizational chart, or equal, listing the names, titles, schedules and number of Full -Time Equivalent (FTE'e) assignments of all persons working in the contract areas; 10.1.4 Invoices and packing slips of name, type and quantities of commodities purchased; 10.1.5 Annual/monthly pesticide use report completed on the City's Excel form; The information contained in the above referenced documents shall be updated with any new information as changes occur. The Director's Representative shall be immediately notified of any changes to the above information. Failure to submit a report by the first of each month shall result in a fine of $100.00 per day for each report submitted late. 11.0 WATER CONSERVATION & PROGRAMMING OF CONTROLLERS 11.1 The City shall be responsible for programming irrigation controllers and conserving water. The Contractor shall be responsible for all repairs and performing the weekly visible checks and the providing a monthly written pesticide use report on the City provided Excel spreadsheet form. 12.0 SPECIFICATIONS INTERPRETATION City of S2W2PA19-094 Exhibit 7 12.1 The intent of these specifications is known by the City of Santa Ana and SAPRF. Any questions relating to the interpretation of these specifications must be addressed, in writing, prior to the start of work. The Contractor agrees that interpretations of this contract after the start of work are at the sole discretion of the Director's Representative, and the Contractor shall abide by all such interpretations 13.0 PROTECTION OF EXISTING FACILITIES AND STRUCTURES 13.1 The Contractor shall exercise due care in protecting from damage all existing facilities, structures, and utilities, both above surface and underground on the City's property. Any damage to City, Santa Ana Park and Recreation Facilities (SAPRF), or private property caused by the Contractor's neglect shall be corrected and paid for by the Contractor at no cost to the City of Santa Ana or SAPRF. The City of Santa Ana and/or Director's Representative shall make the determination of fault. The Director's Representative reserves the right to issue a Stop Work Notice if the Contractor does not promptly repair any damage, within twenty-four (24) hours of the damage incurred. 13.2 If the Directors Representative requests or directs the Contractor to perform work in a given area, it will be the Contractor's responsibility to verify and locate any underground systems (i.e. utility lines) and take responsibility for taking reasonable precaution when working in these areas. 13.3 Contractor shall call Underground Alert (800) 422-4133) at least two working days prior to digging for line locations. Any damage or problems shall be reported immediately to the Director's Representative and the City of Santa Ana. If the Contractor discovers something unexpected or a unique problem occurs, he should stop work and immediately contact an authorized Director's Representative for a timely resolution of the problem. 14.0 SUBSTITUTIONS 14.1 Whenever a specific type of material is specified, no substitutions shall be allowed without written consent of the SAPRF representative. 15.0 CERTIFICATION & APPLICATION OF MATERIALS 15.1 All materials shall be delivered on the site in original containers. Materials shall be subject to inspection by the Director's Representative. The Director's Representative will not approve materials not meeting the SAPRF standards, and Contractor shall return any such non -satisfactory items at his/her cost. 15.2 No materials shall be applied prior to the Director's Representative verifying the specified quantities of materials. Furthermore, should the Contractor apply materials before the Director's Representative verifies correct materials and quantities, the Contractor shall not receive credit for the applied materials. The Contractor shall then reorder and deliver the materials, thereby not receiving credit for the applied materials. 16.0 CONTRACTOR NEGLECT City of SAr t19-094 Exhibit 7 16.1 Any damage to the City of Santa Ana, SAPRF, or private property, which has been determined to be due to the Contractor's neglect, shall be corrected at no additional cost to the City of Santa Ana or the SAPRF. 17.0 CONSTRUCTION EQUIPMENT 17.1 The Contractor shall take all necessary precautions for safe operation of his equipment and the protection of the public from injury and damage from such equipment. 18.0 SOUND CONTROL REQUIREMENTS 18.1 The Contractor shall comply with all local sound control and noise level rules, regulations and ordinances that apply to any work performed pursuant to the Contract. Each internal combustion engine used for any purpose on the job or related to the job shall be equipped with a muffler of a type recommended by the manufacturer of such equipment. No internal combustion engine shall be operated on the project without said muffler. Full compensation for conforming to the requirements of this section shall be considered as included in the prices paid for the various contract items of work involved and no additional compensation will be allowed therefore. Sounds, such as loud music, that are not related to the project, shall be kept at levels so as to not disturb the general public. 19.0 INQUIRIES AND COMPLAINTS 19.1 The Contractor shall maintain an office at some fixed place and shall maintain a telephone thereat, listed in the telephone directory in his own name or in the firm name by which he is most commonly known. Furthermore, the Contractor shall, at all times, have some responsible person(s), employed by the Contractor, to take the necessary action regarding all inquiries and complaints that may be received from the City of Santa Ana, Director's Representative, and/or private citizens during normal working hours. Whenever immediate action is required to prevent impending injury, death or property damage to the facilities being maintained, the Director's Representative may, after reasonable attempt to notify the Contractor cause such action to be taken by the SAPRF work force. All costs of any such action shall be charged against the Contractor, or the Director's Representative may deduct such cost from any amount due to Contractor. All complaints shall be abated as soon as possible after notification, to the satisfaction of the City of Santa Ana and/or Director's Representative. If any complaint is not abated within a reasonable time, the Director's Representative shall be notified immediately of the reason for not abating the complaint followed by a written report to the Director's Representative within five (5) days. If the complaints are not abated within the time specified or to the satisfaction of the Director's Representative, the Director's Representative may correct the specific complaint and the total cost incurred by the SAPRF will be deducted and forfeit from the payments owing to the Contractor from the SAPRF. Such cost shall include all SAPRF staff time required to resolve the problem and appropriate overhead charges 20.0 NOTIFICATION OF LOCATIONS OF WORK City of SAlr f N19-094 Exhibit 7 20.1 The Contractor shall notify the Director's Representative when the contractor's crews will be working within the SAPRF. Said notifications will be made on a daily basis by telephone, cell phone, fax, or by weekly written schedules which specify the entire weeks work locations. 21.0 WORK FORCE 21.1 The Director's Representative may evaluate each of the Contractor's staff and if he/she finds that a Contractors employee or sub -contractor's employee is not performing to the satisfaction of the Director's Representative, the Director's Representative shall require the Contractor to remove the employee from work sites at his or her discretion within 24 hours of written notice. 22.0 MATERIALS 22.1 The Director's Representative shall approve or reject all materials delivered to the work site. In addition, the Contractor shall not apply any materials until the Director's Representative inspects the materials to confirm they are correct per specifications. Note that the Director's Representative may stay at the work site to confirm that all materials are applied correctly and in the quantities specified. Materials applied by the Contractor prior to the Director's Representative inspecting the materials shall be considered not applied. Therefore, the Contractor shall not be given credit towards the quantity of the specified material required to be applied by the specification. The Contractor shall then be required to deliver the specified quantity of material to the work site and, following the Director's Representatives approval, apply the materials in the presence of the Director's Representative: Prior to the application or use of any materials the Contractor shall submit to the Director's Representative a minimum 48 hours before delivery to the work site a list of all materials and/or chemicals that may be used pursuant to the terms of this Agreement. The list shall include the name of the product, the products specifications, and the quantity of materials, prescribed method of use/application, Material Safety Data Sheets and chemical analysis where applicable, recommended usage and any other manufacturer's data that may be pertinent. The list must be submitted before any materials/chemicals are used pursuant to this Agreement. 22.1.1 The materials and chemicals utilized in furtherance of this Agreement shall comply with the following standards: 22.1.2 All fertilizers shall be complete, furnishing the required percentage of nitrogen, phosphoric acid and potash to keep turf, trees, shrubs and other plants in a healthy and vigorous growing condition. 22.1.3 Pesticides including but not limited to: Insecticides, fungicides, herbicides, algaecides, aviacides, and rodenticides shall be of the best quality obtainable and available on the market, properly labeled with guaranteed analysis, and brought to the job site in the manufacturer's original container. 22.1.4 Materials shall as specified herein, matching those existing at the work site, or as specified by the Director's Representative. City of SAr&t19-094 Exhibit 7 22.1.5 All materials delivered to the site shall be accompanied by a packing slip or other form from the vendor indicating the specific commodity delivered and the quantity. 23.0 TRASH DISPOSAL AND RECYCLING (Does not Apply) All organic waste (including leaves, grass clippings, brush, branches, and tree parts) resulting from work performed under this contract shall be disposed of pursuant to the requirements of the Santa Ana Municipal Code (SAMC) Chapter 16. Organic waste cannot be taken to a landfill. Every month, the Contractor shall submit receipts from licensed composters/green waste recycling facilities, to the Director listing the tons of organic waste recycled and the names and addresses of the composting or processing companies. As an alternative, the City may allow Contractor to dispose of green waste and trash in bins provided by the City. The City will determine the amount of green waste and trash allowed to be dumped in these bins based on historical amounts. Any additional disposal fees must be paid by Contractor. At no time will the contractor be allowed to dispose of trash or green waste that was not collected as part of this contract. If the City finds that the contractor is disposing of trash from other contracts, the City will discontinue this service for the contractor and the contractor will be required to pay for their own trash service.\ City Responsibilities 1.0 CITY -DIRECTOR'S AUTHORITY The Director's Representative is the only person authorized to direct changes in any of the requirements under the Agreement and, not withstanding any provisions contained elsewhere in the Agreement, and said authority remains solely in the Director's Representative. In the event that the Contractor effects any such changes at the direction of any person other than the Director's Representative, the changes will be considered to have been made without authority and solely at the risk of the Contractor. In addition, the Director's Representative shall have the authority to accept/reject materials, workmanship and to make changes in work or schedule, when the City determines that no extra costs are involved. The Director's Representative shall also have the authority to suspend portions of the specifications and withhold the cost of the suspended portion of the agreement at his/her discretion. The intent of these specifications is known by the City of Santa Ana. Any questions relating to the interpretation of these specifications must be addressed, in writing, prior to the start of work. When the performance of the work or completion per schedule is determined to be sub -standard or not on schedule, the Director's Representative may recommend that all or a portion of payment be withheld. In addition, the Director's Representative shall have the option to hire another qualified contractor to perform any portion of the work specified and withhold payment in the amount of the cost to hire the qualified contractor. Payment to be withheld shall be deducted from the next or subsequent monthly payment due, or if the amount is insufficient to cover payment, the Contractor shall be liable for said deficiency and will be billed accordingly. The Director's Representative shall decide all questions, which may arise as to the interpretation of the quality of work, manner of performance, completion per schedule, acceptable fulfillment of the Agreement by the Contractor, interpretation of the specifications, and compensation, including completion of work by alternate sources. City of S20�ty019-094 Exhibit 7 ^� APPENDIX ATTACHMENT 34; AGREEMENT STATEMENT CITY OF SANTA ANA REQUEST FOR PROPOSALS FOR IPM & PEST CONTROL MANAGEMENT SERVICES RFP NO.: 19-094 Proposer understands that the PROPOSER will enter into an Agreement similar to that as shown in Attachment 2, in the Appendix of this REP. PROPOSER will be asked to sign a tentative agreement that will be subject the City final approval. If a PROPOSER is unwilling or unable to execute an Agreement within thirty (30) days after being notified of selection under this RFP, the CITY reserves the right to select the next most qualified PROPOSER or call for new Proposals, whichever the CITY deems most appropriate. PROPOSER concurs to the statements in the standard agreement, with the exception of the following: Peat optionm Inc. will not c,xaplate the zolidwing casks: Irrigation Repair is NoT included at all in this proposal IASpaCt ital- will not ba toetad by 3 A:tl, they will be completed during normalbusiness hours Algae treatment will be done using a separate proposal eid wil'. not he included in this proposal we PYApnsB tO Amen. Cna n idW1Ag Tab 9: Ground Cover & PalmalCycad Fertilization axe to be don, in ✓enUary-P'abruary & Jily-AngUat Compel in specified in this contract, it is not in production, it is omitted f.,om this proposal 'Rye removal is to be completed in April -way Full Time Equivalents Clarification: lie listed the number of FTE's as total at the bottom of each District, we did not offer a line item total. Firm peat ow Ions Inn. Signed and Printed Name: Title President Bate 11, 1 . 19 25E 29 Exhibit 7 EXHIBIT B SCHEDULE 25E-30 Exhibit 7 I0, Pest Options, Inc. Manner for Performing Service & Schedule: Manner for Performing Service: Weekly Events #1 Inspections: Will inspect for pest, weed, nutritional, and other issues such as disease. In addition, will provide efficacy data on any current treatment programs. Example: success of organic herbicide application or program. • Technician: Inspector #2 Postings: Any needed posting notices will executed • Technician: Inspector #3 Notice of Intents: Any NOI's will be executed • Completed by office staff 44 Reports: Any required summary reports, updates on special projects, etc. will be sent to contract administrator(s). • Completed by office staff Monthly Events #1 Weed and Pest Control: Any weed and or pest control service will be completed on a monthly basis. Posting & NOI's, please see above. • Technicians: 1 QAC or QAL, 1 assistant (minimum) for re-entry control • We will utilize a wide variety of spray vehicles/machines to ensure our applicators can access all areas of each site. For example, working on the PE trail can be done efficiently with our RTV vehicles whether it be for gopher or weed control, or for fertilization applications. Semi -Annual Events # 1 Fertilization Applications of Phyta Grow 7-1-2: We propose to expand the months of application due to the numerous variables involved with these applications. As a cost savings to the City we are proposing to apply in the Landscape and the PalmslCycads on the following schedule. Both of these proposed changes are listed on the Exceptions page. Additionally the material called for in the contract called Compel, is omitted from this proposal because it is no longer in production (per the manufacturer). This is also listed on the Exceptions page. No 100135S46 1 PC'A -?53W QAI. #Q8AW 9PCB PR94069 C270777703 PO Boz 5827, Om V CA 92W3&5927 714.224.7378 office 888.511.3584 fax Email: results@pestoptions.com 2!�E-31 Exhibit 7 �r Pest Options, Inc. substitute is recommended (at this time) and the cost of a possible replacement is not included in this proposal. • Application 1: January thru February • Application 2: July thru August • Equipment: Tractor with spreader • Technicians: I QAC or QAL and 1 assistant #2 Soils Testing: Gather and send samples to our chosen lab for bio-activity and basic NPK. The following schedule allows for testing to take place prior to the semi-annual fertilization applications. • Test 1: November • Test 2: May • Technician: Inspector Annual Events 41 Rye Removal: Application to remove ryegrass from priority turf fields • Application: April • Technicians: I QAC or QAL, I assistant (minimum) for re-entry control • Equipment: Toro 5700 Fairway Sprayer • Posting: completed by Inspector • Notice of Intent: office staff Note: We have had very good success with applications after dark. This doesn't necessarily mean spraying all night. All of our turf spraying equipment has lights for just this reason. We have worked on extremely high use fields in the past and this has been a very effective solution for meeting nature's timelines and limiting risk to both our company and our clients. The cost of night applications is not included in our fee structure and would be an additional cost. Schedule (see following page) t0015384(i I FICA 0753bg()AL 49VO4 SPCB PRY4089 C27 C77703 PO BM 5827, Orange. CA 9286XS827 714.224.7378 office 888.511.3584 fax Email: results@lpestoptions.com 25.-32 Exhibit 7 �' Pest Options, Inc. District I Schedule Week NW*RoutieEvents SemlAnn" FerhTzaton Sand Annual. Sods Testing Site Inspection NOI,Posting Weed& Pest Cooled Aepods Sdt Wftfiar Vededde �� ficallon AppCatnn Rspods NWficattin � Colledian Review Lab Report Reports CesarChevea . Campesno 72 hours Edna Pdar Corrgleted Send PCA ElSalvador Wediesdayy; 1 Week Pdorve* a rurs i dgafon a �ti per remmrere ded Weekly summaryd 1 Week Prior"Ity schedule Collect and PUA Recanmend a�witth atiadWlab knory Lam Riverview Monday 7 Thursday We"Wtedrle and matedati w�nled wb sendrotib revlewiab report to Roska wkhmAV adnns4ator nolover watered n with stated persarmel sites contrador admnshalor for analysis repods contrnd admnstrata 17d Santa Ana River TrWlibs older to avoid and eopment Fairview Triangle damp Nesdtope LIM Annual: RVegrass Removal of Priority Turf site NaOfi on km~ ve"aabon NO, Posting Application Reports Cesar Chavez 72 hours Prior. Completed per Campestno t Week Prior-, verify schedule ensure "ation is adequate and 48 Hours Prior sent to O.C. Ag 24 to 48 Hours Prior to recommenaded materials with Weekly summary of EI Saivador Riverview with contractor administrator sou is not over watered in order to avoid damage Commissioner Application stated personnel and equipment completed sites Rostra :00155846. WCge75169QAL-482W SPCB PR940BQ C27 #7777e3 PO Box 5827Orange, CA 92863.5827 714.224.7378 office 888.511.3584 fax Email: results@pestoptions.com ` 29E-33 Exhibit 7 Pest Options, Inc. District 2 Schedule WeeklyMoMhy Routine Events SentAnnual Ferdlbratlnn Sarni Annual. Sills Testing Ste Inspection 140l. Postlrg Rio tion Application Reports Nokafion Sample Review ab Reports Pet Co Vedgcatlon Vemiif sffon Collection Report Angels Community Monday Mondry Wednesday 8hc4 Cabrillo Cheppas Eldridge Fisher 72 haws 1 Week Prior ensure inigitim is Completed Po recamnena 1 Weak SeM PC4 Recommend French Prior veriy adequate ded y Callao end PCA w9 Mabury Weekly schedule with contrad admF)strator and sod is no aver watered in orderto avoid damage materials will) stated personnel and nt equipment swm)e or w �esled schedule cantredo With adm Mstrelar send al lab for aroy515 review lab repels eneMadie6 'Opal to comincl administrate Marpasa Morrison po,� View Samde'a pka Blke Trail Tuesday Tuesday Thursday Sarah Mae Dowr)le Herb Garden Santa Ana Sladlum Annual: Ryegrass Removal of Priority Turf Site Notification Irrigation Verification Not Posting Application Reports Angels Community 1 Week Prior verify 72 hours Prior: ensure irrigation is 48 Hours prior: sent to 24 to 48 Completed per recommene dad Weekly Birch Cabrilto Morrison schedule adequateand O C. Ag Hours Prior materials summary of Portola with soil is not oinordewatered Commission to h stated completed Santiago contractor in to er Application personnel personnel sites plus Bike adminstrator avoid damage damage and Trail equipment Santa Ana Stadium I00155846 IPC'A n75tek QAL e98209 SPC8 PR#4069 C27 #777703 PO Bar 5827. Orange. CA 92863-5827 714.224.7378 office $88.511.3584 fax Email: results@pestoptions.com ,I 25E-34 Exhibit 7 Pest Options, Inc. District 3 Schedule Weekljykto*4 Routine Events Semi Anmal. Fer8lzatim Semi Anlwal Solis Testing Site Inspedfm NO] Posting Weald Repa G Schedu a Irt gait on Application Repads Notification Sample :Review Lab Repotts Pes ControlVerification verkatbn I Colectien Repot Bomo Koral Wede�ayy t Week Priorvm* 72 hours Pda. ensure rogation is adequate i I Completed pef mo>me ded Y srf 1 Week � se Collect and PCAAil Send PCA Recommend atiaswlh attached lab oehi Lille Khg Madison Memorial Padk Ekckk Sandloart kxkldng Monday Mondry ��y Weddy sdledie and so' is matedak �gftd , with � send to lab mvkwlab report to aseao,5 p wlh conhad adnnstreor not over watered in order to 1 wdb slated personnel and sles conhadet iadmnstratm or aretyas raws comad admnisVato Segerstmin Flower hail avoid equipment FlowarWamer damage l to Sunflower PE Tral Chesnut M800 to Afton Bristol Annual: Ryegrass Removal of Priority Turf Site Notification Irrigation N01 Reports Verification Posting Application Boma Koral 1 Week 72 hours Prior: ensure Hours Completed per48 Delhi Prior verify irtigation is Prior: sent to 24 to 48 recontmened Weekly Lillie King 9 schedule adequate and is O C. Ag Hours Prior ad materials summary of Madison with contractor soil not Over watered Commission to Application with stated personnel completed sites Memorial adminstrator In er and avoid damage equipment 00155944 ImCA 97i36S VAf. a9a209 SPCA PRC4089 C27*777703 PO Box 5827: Orange CA 92883-5827 714.224.7378 office 888.511.3584 fax Email: results@pestoptions.com 21E-35 Exhibit 7 Pest Options, Inc. District 4 Schedule WeeklyNonthly Routine Events Send Annual Fertilization Semi Annual Sots Testing She Inspection NDI, Posting Weed Rods Schedule lifli;allon AApka� Reports Notification Samoa Reports Peal Control Ve.cadm Verikatlon I CollectionR RHeponab Moms Mende) Mondry Wednesday 72 hours prior C ew Centennial Heritage Jenne Santa Anita ThaMon Witdsa Bear Street SegersUom to I � Send FCA MaaYtlalr I Week I Prior verify ensure ktigation is adequate mcom urie ded Weekly 1 Week Prior verify WWI and PCA will Recommend tons withHal leb Greenville NO to We" schedule and sellis materials summary of schedub sand to lab m0ew lab efiarhad Segerstrom with contrau adminstrator not met watered in with staled personnel completed sties a� convectorcontract for enerysis repass report to edministrato Ralft Street Segerstromto order to andedminstretor Al avoid damage equipment McFadden. Triangle Tuesday Tuesday Thursday Sonia Ane Gar tot Sarah Mae Downie Herb Garden Annual Ryegrass Removal of Priority Turf Site Notification irrigation N01 Reports Verification Posting Application Adams 1 Week Prior verify schedule 72 hours Nor: Prl irrigation is a dequate and ggHours Prior, sent to O.0 Ag 24 to 48 Hours Prior Completed per recommene ded materials Weekly summary Centennial Heritage Jerome with contractor adminstrator soil is not Over wattered in order to Commission er Application with stated personnel completed sites Santa Anita Thornton avoid damage and equipment 4Vtndsor I 10015594L IM,g M751rn QAI."82(N) SPCB PR94089 C27 w777703 PO Box 5827: Orange, CA 92803.5827 714.224.7378 office 888.511.3584 fax Email: results@pestoptions.com 25 1-36 Exhibit 7 I' Pest Options, Inc. Civic Center Schedule Weekly/Monthly Routine Events Site Inspection NOI, Posting Weed & Pest Control Re orts p Civic Center I Monday Monday Wednesday I Weekly Semi Annual. Fertilization Saint Annual. Soils Testing Schedule Irtigation Application Reports Nallflcetlort Sample Review lab Reporb VeMcation VerlRwtion Collection Report 72 hours Prior Completed Send PCA ensure per i Wask Recommend t Weak Prior: verfy Irrigation Is adequate recommence ded Weekly Prior' verify - Called and PCA will olio". with achadula amf »ell iz matedals summary of schedule send lab review lab attached lab report to with contract not over with stated comItes d sties wih drndador Tor enatysis al reports contract adminstretor watered In peraonnel edmMslralor do aminlatrat order to and r avoid equipment damage Annual: Ryegrass Removal of Priority Tuff Notification Irrigation Verification NOI Posting Application Reports Completed 1 Week Prior. verify 72 hours Prior: ensure irrigation is 48 Hours 24 to 48 per recommene Weekly schedule adequate and Prior sent to O C. Ag Hours Prior ded materials summary of with contractor soil is not rn Commission to cation lierwatered App with stated completed sites admtnstrator in order to or personnel avoid damage and equipment :U0155846 PCA kr5158 QAI. #982n9 SPCA PR#4089 C27 #7TT703 PO Sm 5827. Orange, CA 92883.5827 714.224.7378 office 888.511.3584fax Email: results@pestoptions.com 25E-37 Exhibit 7 '' Pest Options, Inc. Zoo Schedule Weekly/Monthly Routine Events Site Inspection NOI. Posting Weed & Pest Control Reports Weekly Zoo Monday Monday Wednesday and Zoo Staff Semi Annual: FerQitizdan Semi Annual Soils Testing Schedule Irrigation Rt epors Notification oon Sample Review Lab Reports Verification Collection Report 72 hours Prior: Send PCA 1 Week ensure irrigation is Completed 1 Week Recommend Prior: verify adequate per Weekly Prior verify ations with schedule and soil is recommene summary of schedule attached lab with contract not over dad comp completed with Collect and PCA will report to adminstretor watered in materials sites contractor send to lab review lab contract order to with stated adminstrator for analysis reports administrato avoid personnel r damage and equipment and Zoo and Zoo and Zoo and Zoo and Zoo Staff Staff Staff Staff Staff No Priority Turf VM 1 i5846 I PCA a75168 QAI- auMpU9 SPC8 PRt4089 C27 0777703 PO Box 5827, Orange. CA 92683-5827 714.224.7378 office 888.511.3584fax Email resuits@pestoptions.com `r) 25E-38 Exhibit 7 EXHIBIT C IwD)DO.71404Z .YMIID1)I"mDI 25E-39 Exhibit 7 APPENDIX — ATTACHMENT 3-5: FEE SCHEDULE CITY OF SANTA ANA-REQUESTFOR-PROPOSALS-FOR` INTEGRATED PEST MANAGEMENT (IPM) & PEST CONTROL MANAGEMENT SERVICES (DISTRICTS 1) RFP NO.: 19-092 Pricing for each site and each task should be as accurate as possible. Based on funding availability, the City may amend and/or remove a site or a task from the scope of work without affecting pricing for other sites and/or tasks. District 1 IPM & Past Control Services Sol] Fertility & Fertllization Management & Data Collection (Total for District Only) Annual Total Ful4Tlma Equivalents Parka Acreage* Cesar Chavez/Campesino 7 $5,030-18 $5,672.20 $10,702.3e Eee batt=Llne Edna 2 $3,646-68 $1,750.60 $5,397.28 see Eottom Lvne El Salvador 9 $6,105.68 $5,319.26 $11,424.94 see bottom Line Memory Lane 0.60 $3,646.68 $1,218-00 $4,864.66 see tnzeem ame Riverview 8 $5,378.18 $3,711.40 $9,0e9.56 seem=...^-=.�e Rosita a $5,515.68 $5,721.22 $11,0236.90 see Other Acreage' 1711 St. & Santa Ana River Triangle 0.69 $3, 646.68 $1,218.00 $4, 864.68 see boccnm ntm Fairview Tri angle 0,73 $3, 646.68 $1,218.00 $4, 864.68 _ee boceem c.ne Centers/Facilities Acreage* Newhope Library 0.56 $3, 646. 58 $1, _'16. 00 $4, 864.68 ee t,occm,� 1O" Mgmt & Date Collection Total for District Only) $9, 500 Blank Annual Total $40,263.12 $27,046.68 $9,500 $67,309.80 Full -Time Equivalents meal mz Di.nx dsalstanc .25 c 3 Inspector .2 L a npp .zs see left *Acreage information is an estimate provided by the City. The Contractor is responsible for obtaining actual acreage information. Certification - I certify that I have read, understand and agree to the terms and conditions of this Request for Proposals. I have examined the Scope of Services and am familiar with the scope of work locations. I am familiar with all the existing conditions and limitation that may impact work requests. I understand and agree that I am responsible for reporting any errors, otnissions or discrepancies to the City for clarification prior to the submission of my proposal. Proposal Item Price - Provide costs for landscape maintenance. Fee must be inclusive of all costs, including but not limited to, direct and indirect costs for labor, overhead, incidental supplies, travel, mileage, and fuel, The proposer warrants that the prices, terms and conditioned quoted will be valid for a period of 120 days from the date the proposal is due, in order to allow time to award an agreement. Tracy Thompson Printed Name of Authorized Agent _ President Title _L 1.19 Signature of Autlloriz Agenr Dale 25t-40 Exhibit 7 APPENDIX ATTACHMENT 3-5: FEE SCHEDULE -CITY OF SANTA ANA REQUEST'FOR-PROPOSAL TOR INTEGRATED PEST MANAGEMENT (IPM) & PEST CONTROL MANAGEMENT SERVICES (DISTRICTS 2): RFP NO.: 19-092 Pricing for each site and each task should be as accurate as possible. Based on funding availability, the City may amend and/or remove a site or a task from the scope of work without affecting pricing for other sites and/or tasks. District 2 IPM & Pest Control Services Soil Fertility & Fertilization Management & Data Collection ITotalfor District Only) Annual Total Full -Time Equivalents Parks Acreage Anels Community 1.7 $4,004.16 __;--.-_ 15,683.50 Birch 2.4 $4,196.68 $2,432.80 $6, 629.49 see bottom L,,.e Cabrillo 7-3 1 $5, 134.58 $7,276.60 $12, 411.18 sae bottom maa Chep ass 0,4 1 $3,464.68 f $1,433.28 $5,079.96 sea b.ttt_mne Eldridge 1.2 1 $3,464.68 $1,863.84 $5,510.52 See bottom Lim Fisher 1.5 $3, 464.68 $2,494. $6, 140. 98 Sae bOC[ Llne French 0.2 3,464.61 $1,218.00 $4,864.68 sea beccam Lira Mabury 5.5 $3,820.68 $6, 061. BO $9,882.48 see bottom Lien Marl osa 0.5 $3,464.68 $1,218.00 $4,864.68 Bee boom Li. Morrison 5,9 $4, 784. Be $4,316.50 $9,102.38 see bottom L{. Portola 9.1 $5, 623.48 $8, 991.20 $14, 514.68 sea boccrn. tine Saddleback View 0.9 $3,646.68 $2, 02E.30 S5671.98 see b..t-cane Santiago (including bike trail) 2E 0 $16, 569. 00 $26, 605.60 $43, 174.60 sec torc_;�, cro, Centers/Fadlales Acreage Sarah Mae Downie Herb Garden 0.1 17,061.00 $1,218.00 $8,-79.00 see w«,m Li.. Santa Ana Stadium 6.9 $8, 822.20 $6, 73e.4o $16, 560.fi0 ee Loccum Llr,e Management & Data Collection Total for District Only) 59, 500 Blank Blank Annual Total $81,896.76 $75,472.94 $9,500 $157,369.70 Full -Time Equivalents 1�1.1 1az aeale[anc .o- .3 Leea 11 .7s Be. Left '""Round off Amounts to $10***** *Acreage and Linear Miles information is an estimate provided by the City. The Contractor is responsible for obtaining actual acreage information. Certification - I certify that I have read, understand and agree to the terms and conditions of this Request for Proposals. I have examined the Scope of Services and am familiar with the scope of work locations. I am familiar with all the existing conditions and limitation that may impact work requests. I understand and agree that 1 am responsible for reporting any errors, omissions or discrepancies to the City for clarification prior to the submission of my proposal. Proposal Item Price - Provide costs for landscape maintenance. Fee must be inclusive of all costs, including but not limited to, direct and indirect costs for labor, overhead, incidental supplies, travel, mileage, and fuel. The proposer warrants that the prices, terms and conditioned quoted will be valid for a period of 120 days from the date the proposal is due, in order to allow tune to award an agreement. Tracy ThoMpaon President Printed Name of Authorized Agent Title Signature of Authori#d Agent Dat1. e City of Santa Ana RFP 19 00 25E-41 Exhibit 7 APPENDIX ATTACHMENT 3-5: FEE SCHEDULE CITY OF SANTA A'NA`REQUESTFORTROPOSALS FOR " INTEGRATED PEST MANAGEMENT (IPM) & PEST CONTROL MANAGEMEN I SEitv1k:r.5 (DISTRICTS 3) RFP NO.: 19-092 Pricing for each site and each task should be as accurate as possible. Based on funding availability, the City may .. e___ .&.- ...,..-.. ..4•..,.,.t. ..,i46nn4 urrnnHno nrieino far nther sites and/or tasks. amens aUWU4 rcuavrc a auc m a .aan uv.0 w -- -- Management & IPM & Pest Sol] Fertility & Data Collection Annual Total Full -Time District 3 Control Services Fertilization (Total for Equivalents District Only) Parks Acreage• Bomo Klral 11.0 $6, 862.18 $10, 075.29 $16, 937.42 see bovmm woe Delhi 10.4 $6,983.39 $8,137-72 $15,121.10 sea bottom Lieu Lillie King 9.6 $6,264.98 $10,075.24 $16,340.22 sae mxmm bane Madison 6.0 $4,682.18 $5,662.00 $10,344.18 sae boeepr. pipe Memorial 15.5 $8,53B.18 $13,735.00 ._. $22,273.18 s«bottom :.ins Pacific Electric 1.4 $6,253.00 S1,593.20 $7,846.20 sae boecam cioe Sandpointe(Including paseos) 7.7 $10, 548.60 $6, 691.60 $17, 010.20 See twttom I.. 5egerstrorn 1.2 $3,286.68 $1, 894 .60 $5, 181.28 sea mccom Dina Linear Trails and Walkways Miles Flower Trail (Flower/Warner t0 1.5 $8, 726.08 $24, 695.09 Flower/Sunflower) $15, 969.00 PE Trail (Chestnut/Maple to 3.5 $36, 961.00 $17, 134.25 $54, 095.25 sea beccom acne Alton/Bristol Management& Date Collection S�, _.00 Blank Blank Total for District Only) - Annual Total $106,349.18 $83,494.93 $9,500 $189,844.11 Full -Time Equivalents r,r.,, Uie[ric[ 3 S pecWi .3 :.cad Rpo .75 Aaefa` .7 Sae Left ""'Round off Amounts to $10""' *Acreage information is an estimate provided by the City. The Contractor is responsible for obtaining actual acreage information. Certification - I certify that I have read, understand and agree to the terms and conditions of this Request for Proposals. I have examined the Scope of Services and am familiar with the scope of work locations. I am familiar with all the existing conditions and [imitation that may impact work requests. I understand and agree that I am responsible for reporting any errors, omissions or discrepancies to the City for clarification prior to the submission of my proposal. Proposal Item Price - Provide costs for landscape maintenance. Fee must be inclusive of all costs, including but not limited to, direct and indirect costs for labor, overhead, incidental supplies, travel, mileage. and fuel. The proposer warrants that the prices, terms and conditioned quoted will be valid for a period of 120 days from the date the proposal is due, in order to allow time to award an agreement. Tracy Thompson Presidenr Printed NeAc of Auth. Title 1.1.19 Signature ofAuthodlzed Agent Date - City of Santa Ana R 25E-42 Exhibit 7 APPENDIX ATTACHMENT 3-5! FEE SCHEDULE 7 CITY OF SANTA ANA REQUEST FOR PROPOSALS FOR INTEGRATED PEST MANAGEMENT (IPM) & PEST CONTROL MANAGEMENT SERVICES (DISTRICTS 4): RFP NO.: 19-092 Pricing for each site and each task should be as accurate as possible. Based on funding availability, the City may' amend and/nr remove a site or a task from the seome of work without affecting Dricine for other sites and/or tasks. District 0 IPM & Pest Control Services Soil Fertility & Fertilization Management & Data Collection (Totalfor District Only) Annual Total Full -Time Equivalents Parks Aaea e Adams 7 s4, e92.6e .1 .p:. $1e, 016.4e se.°b.,,coa uae Centennial 87 $21, 964.75 $37, 534.20 $59, 528. 95 s^^ boccie I— Herita e 8 $5,034.43 $5, 392�90 $10,427.33 s^^ bo[mn Liao Jerome 14 $9,9333.43 $13,508.9E $22,942.39 sue boadn Lane Santa Anita 5 $4.626.41 $5. 199.15 $9.827.50 see bo .. LLre Thornton 35 $ $44, 193.70 sac bdecon Lon Windsor 12 $7, 347. f8 $8,460.64 $15, 908.32 ,_,. L,_..a, Trills and Wilkwayll tlMar, Mlles' Bear Street (Segertrom Ave. to MacArthur Blvd. 0.49 $8, 861.00 $2, 294.40 $11, 155.4U s°e baccuc. Lnia Greenville Street (North of Hall Ave. to Segerstrom Ave.) 0.38 $8, 861. 00 $2. 294.40 $111155.406^^ b„ccam :wn^ aaitt Street(Segertronl Ave. to Alton Ave.) 0.25 $8,861.00 52, 294.40 $11, 155.40 .gym noao,,, lean Dear Acreage McFadden Triangle 0,94 $3, 646.69 $1,218.00 s4, 9e 4.69 sua berm^L:ac Contort FticllftNf Acrea o 043 .Fi-plrK-r&9' 6ae bo[:um Lf ne Management & Data Collection Total for District Only) $9, soo Blank Annual Total $112,9eo.22 $114,423.05 $9,500 , Full -Time Equivalents - ota: 1f0 96,5.6„3 Sae Lett ""`Round offAmounts to $10""0 *Acreage and Linear Miles infonuation is an estimate provided by the City. The Connector is responsible for obtaining actual acreage information. Certification - I certify that 1 Have read, understand and agree to the terns mad conditions of this Request for Proposals. I have examined the Scope ol'Services and am land liar with the scope of work locations. I am tamiliar with all the existing conditions and limitation that may impact work requests. I understand and agree that I am responsible for reporting any errors, omissions or discrepancies to the City for clarification prior to the submission of my proposal. Proposal Item Price - Provide costs for landscape maintenance. Fee must be inclusive of all costs, including but not linuted to, direct and indirect costs for labor, overhead, incidental supplies, travel, mileage, and fuel. I he proposer warrants that the prices, terms and conditioned quoted will be valid for a period of 120 days rrom the date the proposal is due, in order to allow time to award an agreement. IYBr:y '!'hompAmi Prs e. tcNYt Printed Natne of Authorized Agent I it le Signanne of AuthOrgcd Agent —.� __... Date Cit4 of F;nnlLi Ai o Pt P I!) aSl4 Irk 25E-43 Exhibit 7 APPENDIX ATTACHMENT 3-5: FEE SCHEDULE CITY OF SANTA AWA REQUES'FI"K YKVYI/SALJ r vx INTEGRATED PEST MANAGEMENT (IPM) & PEST CONTROL MANAGEMENT SERVICES (DISTRICTS A) RFP NO.: 19-092 Pricing for each site and each task should be as accurate as possible. Based on funding availability, the City may k f thewor without f k ithou t affecGa rici for other sites and/or tasks. amend and/or remove s site or a tas rom sco o IPM & Pest Soil Fertility & Management & Annual Total Full -Time District A Control Services Fertilization Data Collection Equivalents Centers/Facilities Acreage* Civic Center $40,323.00 $15,734.00 $9,500 555.057,00 See Helow Full -Time Equivalents oi.tricc A : -coa .is ,Aaa 1 .xs aneisra„r 21 See Left "Acreage information is an estimate provided by the City. The Contractor is responsible for obtaining actual acreage information. Certification -1 certify that I have read, understand and agree to the terms and conditions of this Request for Proposals. I have examined the Scope of Services and am familiar with the scope of work locations. I am familiar with all the existing conditions and limitation that may impact work requests. 1 understand and agree that I am responsible for reporting any errors, omissions or discrepancies to the City for clarification prior to the submission of my proposal. Proposal Item Price - Provide costs for landscape maintenance. Fee must be inclusive of all costs, including but not limited to, direct and indirect costs for labor, overhead, incidental supplies, travel, imileage, and fuel. The proposer warrants that the prices, terms and conditioned quoted will be valid for a period of 120 days from the date the proposal is due, in order to allow time to award an agreement. Tracy Thompson --resident Printed Name of Authorized Agent Signature ofAulh .gent City of Santa Ana RF P 19-094 25�4 Date Exhibit 7 APPENDIX ATTACHMENT 3-5: FEE SCHEDULE CITY OF SANTA ANA REQUEST FOR PROPOSALS FOR INTEGRATEI) PEST MANAGEMENT (IPM) & PEST CONTROL MANAGEMENT SERVICES (SANTA ANA ZOO) RFP NO.: 19-092 Pricing for each site and each task should be as accurate as possible. Based on funding availability, the City may A __-u__ - -I.- - ....e..L r -- the wuhnvt affpetino nricino fnr other sites and/or tasks. IPM & Pest Soil Fertlllty & Management & Annual Total Full -Time District A Control Services Fertilization Data Collection Equivalents Centers/Facilitles Acreage' Zoo $24, a.e.au Puit-Time Equivalents Total zoo inepe=tjI c.ad App .: A..i Itart .a "Acreage information is an estimate provided by the City. The Contractor is tcsponsible for obtalttmg actual acreage information. Certification - I certify that I have read, understand and agree to the terms and conditions of this Request for Proposals. I have examined the Scope of Services and am familiar with the scope of work locations. I am familiar with all die existing conditions and limitation that may impact work requests. I understand and agree that I am responsible for reporting any errors, omissions or discrepancies to the City for clarification prior to the submission of my proposal. Proposal Item Price - Provide costs for landscape maintenance. Fee mast be inclusive of all costs, including but not limited to, direct and indirect costs for labor, overhead, incidental supplies, travel, mileage, and fuel. The proposer warrants that the prices, terms and conditioned quoted will be valid for a period of 120 days from the date the proposal is due, in order to allow time to award an agreement. Tracy Thompson President. Printed Name of Authorized Agent Title 1.i.. 19 Signature of Authorized. i Date 2k'--45